55171 NAHICO PROCUREMENT PLAN: JANUARY 2010 - JANUARY 2011 (Date of Approval: ____________ ) LAO AVIAN AND HUMAN INFLUENZA PROJECT (WB FINANCED) Prepared: February 8, 2010 Technical Planned Source BD Shortlist Issuance Final Procure- Prior / IDA's non- Submis- Ev-n Rep-t IDA's non- IDA's non- Contract Budget of / RFP / IDA's non- SPN / approved of Bidding Evaluation Contract Name of Supplier / No ID Measure Number and Description Activity / Description Category ment Post Status objection sion approved objection objection Comple- Versus Financ- TOR Doc- objection REOI by NAHICO Doc-s / Report Signed Contractor / Consultant Method Review (CS only) Deadline by NAHICO (CS only) tion Actual ing s ready (CS only) RFP ready (CS only) (USD) 1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 24 25 26 27 1. GOODS AND WORKS: S1 Measure 2: Reduce risk of AI Issue and enforce the regulation on movement restriction of duck plan 01/06/08 n/a 06/06/08 n/a n/a 06/06/08 06/07/08 n/a n/a 21/07/08 n/a 31/07/08 14/09/08 10,000 Saiyadeth Aporn Factory 1 introduction in commercial poultry Goods SH post flocks: 2) PA materials - T-shirts, Jackets and Caps. actual 01/07/08 n/a 08/07/08 n/a n/a 08/07/08 18/07/08 n/a n/a 26/09/08 n/a 29/09/08 21/01/09 9,319 Ltd. production AHIF & S1M2A3.2 IDA plan 01/06/08 n/a 06/06/08 n/a n/a 06/06/08 06/07/08 n/a n/a 21/07/08 n/a 31/07/08 14/09/08 10,000 Issue and enforce the regulation on movement restriction of duck Noum Lao Printing House 2 Goods SH post flocks: 2) PA printing materials on biosecurity actual 25/08/08 n/a 30/08/08 n/a n/a 30/08/08 17/09/08 n/a n/a 26/09/08 n/a 29/09/08 20/03/09 5,763 Ltd. S1 Measure 4 Enhance capacity for plan 01/06/08 n/a 06/06/08 n/a n/a 06/06/08 16/06/08 n/a n/a 26/06/08 n/a 06/07/08 06/08/08 10,000 Strengthen capacity for disease recognition, reporting and Sunlabob Renewable Energy 3 S1M4A2.1 erarly detection and early warning of AI AHIF (2) Goods SH post outbreak investigation: 10) cold chain (fridges and freezers, etc.). actual 25/05/08 n/a 02/06/08 n/a n/a 02/06/08 13/06/08 n/a n/a 20/06/08 15/07/08 18/07/08 12/08/08 17,927 Ltd. outbreaks at field levels New activity: Purchase of Syringes and vet material kits (through plan 01/03/10 n/a 06/03/10 n/a n/a 06/03/10 05/04/10 n/a n/a 20/04/10 n/a 30/04/10 14/06/10 4 S1M4A2.1.4.1 AHIF (2) Goods NCB prior reallocation from S1M4A2.1.4) actual New activity: Printing of DLF Regulations, Laws and other related plan 01/04/10 n/a 06/04/10 n/a n/a 06/04/10 16/04/10 n/a n/a 26/04/10 n/a 06/05/10 05/06/10 5 S1M4A2.1.4.2 AHIF (2) Goods NCB post materials (through reallocation from S1M4A2.1.4) actual New activity: procurement of rapid test kits for NAHC Lab plan 15/03/10 n/a 20/03/10 n/a n/a 20/03/10 19/04/10 n/a n/a 04/05/10 n/a 14/05/10 28/06/10 6 S1M4A2.1.4.3 AHIF (2) Goods NCB prior (through reallocation from S1M4A2.1.4) actual Strengthen capacity for disease recognition, reporting and AHIF & DC plan 20/05/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 30/05/07 06/06/07 26/07/07 100,000 7 S1M4A2.2 Goods prior UN IAPSO outbreak investigation: 4) Transport (4 stand by mobile unit). IDA IAPSO actual 23/05/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 25/05/07 20/06/07 30/11/07 102,787 S1 Measure 5 Strengthen capacity for Complete the construction of the building for National Animal plan 01/01/08 31/01/08 05/02/08 n/a n/a 05/02/08 21/03/08 n/a n/a 20/05/08 19/06/08 09/07/08 02/10/09 laboratory diagnosis Health Center with safe facility for virus isolation: Financial AHIF & 8 S1M5A1.1 support needed to complete NAHC Lab construction. Budget Works ICB prior revised 10/11/08 06/09/09 11/09/09 n/a n/a 11/09/09 26/10/09 n/a n/a 25/12/09 08/02/10 28/02/10 24/05/11 IDA increased from 1.0 to 1.6 mln: (i) $100,000 from S1M4A2.1.6; (ii) $300,000 from S1M4A2.2.2; (iii) $100,000 from S1M8A5.1. actual 28/11/08 n/a n/a n/a n/a 0 Improve IM system: 2) Procur-t of comm-n eq-t and supplies for plan 15/03/07 25/03/07 30/03/07 n/a n/a 30/03/07 30/04/07 n/a n/a 28/05/07 10/06/07 12/06/07 12/07/07 63,535 L1: Micro Info AHIF & 9 S1M7A3 poultry mortality reporting at central and provincial livestock Goods NCB prior L2: Top Com IDA actual 01/03/07 27/03/07 30/03/07 n/a n/a 30/03/07 30/04/07 n/a n/a 05/06/07 28/08/07 21/09/07 12/10/07 63,535 offices - package 1 DLF L3: Micro Info S1 Measure 5 Strengthen capacity for Improve information management system: Procurement of IT laboratory diagnosis ($146461); equipment - package 2 DLF and 17 provinces; Provide plan 10/06/08 30/06/08 05/07/08 n/a n/a 05/07/08 04/08/08 n/a n/a 19/08/08 08/09/08 18/09/08 02/11/08 221,461 L1: NSV Computer S1M7A3 + S2 Measure 2 Inclusion of ILI/ARI and communication tools for district offices and health centres by L2: Cyberia AHIF & 10 S2M2A6.1 + strengthening of routine (weekly) expansion of existing systems: Mobile phones / Radio; Establish Goods ICB prior L3: NSV Computer IDA S3M1A35.1 surveillance system ($50000); information systems in 14 hospitals (excludes 10 EWORS hosp.- L4: NSV Computer S3 Measure 1 Strengthen Curative 4 central and 6 regional): Computers + other equipment. (three actual 10/06/08 19/07/08 24/07/08 n/a n/a 24/07/08 12/09/08 n/a n/a 24/10/08 06/01/09 19/01/09 168,489 L5: Micro Info Resources ($25000). packages merged together) Strengthen capacity for laboratory New activity: Procurement of training sets of IT equipment for plan 28/02/10 n/a 05/03/10 n/a n/a 05/03/10 15/03/10 n/a n/a 25/03/10 n/a 04/04/10 04/05/10 AHIF & 11 S1M7A3 diagnosis DLF provincial offices (balance remained from above ICB Goods NCB post IDA actual n/a n/a n/a n/a process). Provide communication tools for district plan 01/04/10 n/a 06/04/10 n/a n/a 06/04/10 16/04/10 n/a n/a 26/04/10 n/a 06/05/10 05/06/10 New activity: Procurement of comunication equipment (balance AHIF & 12 S2M2A6.1 offices and health centres by expansion Goods NCB post remained from above ICB process). IDA n/a n/a n/a n/a of existing systems actual S1 Measure 8 Enhance capacity for Establish Emergency store of PPE, equipment and supplies plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 89,815 13 rapid and effective response to HPAI consummable: 1) procurement of equipment. (part was purchased DC prior Srisiam Commercial Ltd outbreak under SS during outbreak) actual 21/03/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 07/04/07 20/04/07 29/11/07 89,815 Establish Emergency store of PPE, equipment and supplies plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 14 consummable: 1) procurement of equipment ($100,000 were ICB prior reallocated to S1M5A1.1 for NAHC Lab). actual n/a n/a n/a n/a 0 New activity: procurement of 40 spray machines and disinfectant AHIF & plan 01/06/08 n/a 06/06/08 n/a n/a 06/06/08 16/06/08 n/a n/a 26/06/08 n/a 06/07/08 05/08/08 13,864 15 S1M8A5.1 (was not included with the first set of PPE) Goods SH post Srisiam Commercial Ltd IDA 27/05/08 n/a 28/05/08 n/a n/a 28/05/08 06/06/08 n/a n/a 13/06/08 n/a 18/06/08 14/07/08 13,864 actual New activity: procurement of Virkon Disinfectant for DLF and plan 15/06/08 01/07/08 n/a n/a n/a n/a 15/07/08 n/a n/a n/a n/a 25/07/08 24/08/08 23,100 16 provincial offices. DC prior Srisiam Commercial Ltd actual 10/06/08 02/07/08 n/a n/a n/a n/a 08/07/08 n/a n/a n/a n/a 11/08/08 10/09/08 23,100 New activity: procurement of sanitizer gel - hand disinfection - for plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 9,909 17 health facilities during H1N1 pandemic (through reallocation from SH post Pharmaceutical Factory #2 PPEequipment). actual 20/10/09 n/a 24/10/09 n/a n/a 24/10/09 30/10/09 n/a n/a 31/10/09 n/a 28/11/09 09/12/09 9,909 S2 Measure 5 Strengthening the Provide transportation for RRT (Vehicles): Procurement of 3 AHIF & DC plan 15/10/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 01/11/07 15/11/07 30/03/08 60,000 18 S2M5A10 capacity to investigate and respond to Goods prior UNOPS Vehicles IDA IAPSO actual 05/11/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 15/11/07 27/11/07 14/08/08 63,435 EID (incl. AI) at central level S3 Measure 1 Strengthen Curative Provide secure transportation for case transfer by special AHIF & DC plan 30/03/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 15/04/07 01/05/07 01/08/07 45,620 19 Resources ambulance to the nearest isolation room: 5 ambulances (1 Goods prior UN IAPSO IDA IAPSO actual 19/03/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 07/04/07 18/05/07 26/12/07 45,619 Vientiane, 4 Regional hosp.) - 1 piece Provide secure transportation for case transfer by special AHIF & DC plan 15/11/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 15/12/07 05/01/08 05/06/08 124,380 20 S3M1A14.1 ambulance to the nearest isolation room: 5 ambulances (1 Goods prior UNOPS IDA IAPSO actual 15/12/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 10/01/08 28/01/08 14/08/08 129,123 Vientiane, 4 Regional hosp.) - 4 pieces New activity: procurement of 4 emergency kits for the supplied 4 AHIF & plan 05/06/08 20/06/08 n/a n/a n/a n/a 01/07/08 n/a n/a n/a n/a 10/07/08 10/08/08 4,000 21 Goods DC prior W. Sohngen GMBH ambulances IDA actual 01/05/08 24/06/08 n/a n/a n/a n/a 24/06/08 n/a n/a n/a n/a 24/06/08 07/08/08 6,337 Investment in waste management equipment and supplies: Waste plan 01/11/08 n/a 06/11/08 n/a n/a 06/11/08 06/12/08 n/a n/a 21/12/08 n/a 31/12/08 14/02/09 AHIF & 22 S3M1A21.2.1 transport van (to be merged with S3M1A21.2.2 and procured Goods NCB post IDA 06/11/08 n/a n/a n/a n/a 0 under ICB). actual plan 01/03/08 31/03/08 05/04/08 n/a n/a 05/04/08 20/05/08 n/a n/a 04/07/08 03/08/08 23/08/08 20/01/09 Investment in waste management equipment and supplies: Waste AHIF & 23 S3M1A21.2.2 Goods ICB prior revised 01/11/08 01/10/09 06/10/09 n/a n/a 06/10/09 20/11/09 n/a n/a 20/12/09 19/01/10 08/02/10 07/08/10 management equipment. IDA actual 06/11/08 n/a n/a n/a n/a 0 Investment in waste management equipment and supplies: Other AHIF & plan 15/01/09 n/a 20/01/09 n/a n/a 20/01/09 30/01/09 n/a n/a 09/02/09 n/a 19/02/09 21/03/09 24 S3M1A21.2.3 Goods SH post supplies. IDA actual n/a n/a n/a n/a 0 Fax machines and mobile phones for 18 plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 7,800 S3M1A29 + US$200 per fax machine for 24 places = US$4,800 AHIF & L1: BP Computer 25 border check points and DCM as Focal Goods SH post S3M1A37.1 US$200 per mobile phone for 15 places = US$3,000 IDA actual 15/6/2009 n/a n/a n/a n/a 17/06/09 23/06/09 n/a n/a 30/06/09 n/a 14/07/09 29/07/09 7,552 L2: Micro Info Point Provide means of transportation by way plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 23,750 AHIF & Santiphab Suzuki Lao 26 S3M1A29.2 of a motorbike for each border check 19 borders x US$1,250 - Excluding the 4 Airports Goods SH post IDA actual 15/6/2009 n/a n/a n/a n/a 17/06/09 22/06/09 n/a n/a 14/07/09 n/a 22/08/09 07/10/09 23,465 Factory (Laos) points The purchase of medical kit BOX and plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 23,000 AHIF & 27 S3M1A29.4 other necessary furniture for the 23 23 check points x US$1,000 (Med Kit) Goods SH post Atlantic Pharmed Ltd IDA actual 17/6/2009 n/a n/a n/a n/a 19/06/09 25/06/09 n/a n/a 14/08/09 n/a 14/08/09 15/09/09 7,225 border check points Technical Planned Source BD Shortlist Issuance Final Procure- Prior / IDA's non- Submis- Ev-n Rep-t IDA's non- IDA's non- Contract Budget of / RFP / IDA's non- SPN / approved of Bidding Evaluation Contract Name of Supplier / No ID Measure Number and Description Activity / Description Category ment Post Status objection sion approved objection objection Comple- Versus Financ- TOR Doc- objection REOI by NAHICO Doc-s / Report Signed Contractor / Consultant Method Review (CS only) Deadline by NAHICO (CS only) tion Actual ing s ready (CS only) RFP ready (CS only) (USD) 1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 24 25 26 27 1. GOODS AND WORKS:of a motor vehicle (Minibus) for Purchase of a minibus for Curative Unit for M&E and rapid Purchase AHIF & plan 10/03/10 n/a 15/03/10 n/a n/a 15/03/10 14/04/10 n/a n/a 29/04/10 n/a 09/05/10 23/06/10 28 S3M1A29.5 Curative Unit for M&E and rapid Goods NCB prior transport purposes IDA actual 15/02/10 transport purposes Provision of 3 Thermo Scanners for the Approximate cost per scanner (including installation and training) - AHIF & plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 135,000 Thermoscan Co. Ltd 29 S3M1A29.7 Goods DC prior remaining 3 international Airports $45,000 per unit IDA actual 01/05/09 n/a n/a n/a n/a n/a n/a n/a n/a 28/05/09 17/06/09 16/07/09 24/07/09 135,450 (Thailand) plan 01/09/08 01/10/08 06/10/08 n/a n/a 06/10/08 20/11/08 n/a n/a 04/01/09 03/02/09 23/02/09 20/12/09 S3 Measure 2 Strengthening Laboratory Upgrading laboratory facility NCLE - Civil Works (depends on the AHIF & 30 S3M2A2.1 Works ICB prior revised 15/01/10 14/02/10 19/02/10 n/a n/a 19/02/10 05/04/10 n/a n/a 20/05/10 19/06/10 09/07/10 05/05/11 Resources Designer hired by WHO) IDA actual n/a n/a n/a n/a 0 New activity: temporary transfer of the NCLE office to another AHIF & revised 28/02/10 n/a 05/03/10 n/a n/a 05/03/10 15/03/10 n/a n/a 25/03/10 n/a 04/04/10 04/05/10 31 S3M2A2.3 Strengthening Laboratory Resources Works SH post building (through reallocation from S3M2A2.1 - lab construction) IDA actual 15/02/10 n/a n/a n/a n/a S5 Measure 1 Strengthening the function AHIF & plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 32 S5M1A3.2 Review and disseminate ToR of CDC (not required anymore) Goods SH post of the National CDC Committee IDA actual n/a n/a n/a n/a 0 S5 Measure 2 Develop national stockpile Stockpile of PPE kits at central and provincial level, multiple kits AHIF & plan 01/12/08 21/12/08 26/12/08 n/a n/a 26/12/08 09/02/09 n/a n/a 11/03/09 10/04/09 30/04/09 29/06/09 33 S5M2A2 for frontline workers: procurement of PPE (depends on the new Goods ICB prior of essential supplies IDA actual n/a n/a n/a n/a 0 outbreaks) S5 Measure 4 NAHICO Program plan 15/03/07 25/03/07 02/04/07 n/a n/a 02/04/07 24/04/07 n/a n/a 05/06/07 16/05/07 01/06/07 01/07/07 13,980 34 Management 6 office equipment sets for NAHICO SH prior NSV Computer actual 06/03/07 28/03/07 02/04/07 n/a n/a 02/04/07 24/04/07 n/a n/a 05/06/07 12/06/07 26/06/07 25/07/07 13,980 AHIF & plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 16,052 L1: Micro Info 35 S5M4A3.2 NAHICO equipment for office extension 1 Goods SH post IDA actual 15/10/07 n/a 19/10/07 n/a n/a 12/11/07 22/11/07 n/a n/a 29/11/07 n/a 06/12/07 23/01/08 18,599 L3: BP Computer plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 17,575 L1&2: Micro Info 36 NAHICO equipment for office extension 2 SH post actual 20/03/08 n/a n/a n/a n/a 31/03/08 10/04/08 n/a n/a 25/04/08 n/a 25/04/08 17/09/08 17,575 L3: Panuvat Furniture AHIF & plan 10/10/07 n/a 15/10/07 n/a n/a 20/10/07 20/11/07 n/a n/a 05/12/07 n/a 15/12/07 15/07/08 15,000 37 S5M4A10 FM Software for NAHICO Goods SH post APIS Resourses IDA actual 15/10/07 n/a 01/11/07 n/a n/a 01/11/07 11/11/07 n/a n/a 28/11/07 n/a 06/12/07 06/09/09 14,902 AHIF & DC plan 20/05/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 30/05/07 25/06/07 23/10/07 20,511 38 Vehicles for NAHICO - 1 minibus Goods prior UN IAPSO IDA IAPSO actual 29/05/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 31/05/07 16/07/07 26/12/07 20,511 S5M4A11 AHIF & DC plan 15/10/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 01/11/07 15/11/07 30/03/08 39,489 39 Vehicles for NAHICO - 1 Station wagon Goods prior UNOPS IDA IAPSO actual 05/11/07 n/a n/a n/a n/a n/a n/a n/a n/a n/a 20/11/07 27/11/07 14/08/08 38,283 AHIF & plan 15/07/08 n/a 20/07/08 n/a n/a 20/07/08 30/07/08 n/a n/a 09/08/08 n/a 19/08/08 18/09/08 4,000 40 S5M4A25 M&E computer Goods SH post NSV Computer Ltd IDA actual 01/06/08 n/a n/a n/a n/a 04/06/08 12/06/08 n/a n/a 20/06/08 n/a 23/06/08 15/07/08 1,023 AHIF & plan 15/07/08 n/a 20/07/08 n/a n/a 20/07/08 30/07/08 n/a n/a 09/08/08 n/a 19/08/08 18/09/08 41 S5M4A26 M&E software Goods SH post IDA actual n/a n/a n/a n/a 0 Technical Planned Source BD Shortlist Issuance Final Procure- Prior / IDA's non- Submis- Ev-n Rep-t IDA's non- IDA's non- Contract Budget of / RFP / IDA's non- SPN / approved of Bidding Evaluation Contract Name of Supplier / No ID Measure Number and Description Activity / Description Category ment Post Status objection sion approved objection objection Comple- Versus Financ- TOR Doc- objection REOI by NAHICO Doc-s / Report Signed Contractor / Consultant Method Review (CS only) Deadline by NAHICO (CS only) tion Actual ing s ready (CS only) RFP ready (CS only) (USD) 1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 24 25 26 27 1. GOODS AND WORKS: 42 S5M4A28 New activity: Renovation/Expansion of NAHICO office to AHIF & plan 15/04/07 15/05/07 20/05/07 n/a n/a 20/05/07 20/06/07 n/a n/a 20/07/07 10/08/07 01/09/07 01/12/07 22,000 Works NCB prior Tehno Construction accommodate fiduciary staff IDA actual 24/04/07 27/06/07 01/08/07 n/a n/a 02/08/07 05/09/07 n/a n/a 25/09/07 30/10/07 07/11/07 15/02/08 23,137 Remaining funds from AHIF &IDA (from 1 Nissan Pick-up and 2 Toyota Minibuses for the Ministry of AHIF & plan 15/05/08 15/06/08 n/a n/a n/a n/a n/a n/a n/a n/a n/a 01/07/08 01/11/08 80,000 43 tbd Goods NCB prior UNOPS 100,000 unallocated) Health for provincial level rapid containment activities IDA actual 05/06/08 15/08/08 n/a n/a n/a n/a n/a n/a n/a n/a 17/11/08 13/03/09 30/09/09 76,471 Total commited (1) 973,503 SUBTOTAL 1 (GOODS & WORKS) ESTIMATED: Total savings (1) 40,788 2. CONSULTANTS: S1 Measure 4 Enhance capacity for Formulate the guidelines, procedures and legal framework for plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 1 S1M4A4 erarly detection and early warning of AI PHRD Cons-s IC prior checkpoints (realocated to S1M5A1.2 lab supervision) 0 outbreaks at field levels actual S1 Measure 5 Strengthen capacity for Supervision of NAHC (and NCLE) Lab construction - local plan 01/03/09 16/03/09 21/03/09 15/04/09 n/a 20/04/09 30/04/09 n/a n/a 10/05/09 n/a 20/05/09 n/a 2 S1M5A1.2 PHRD Cons-s CQ prior laboratory diagnosis supervisor actual 25/02/09 0 S1 Measure 5 Strengthen capacity for NAHC Lab design and supervision of BSL3 component during AHIF & plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 50,000 3 S1M5A1.3 construction (reallocated from: (i) $20,000 from S1M2A1 Cons-s SS prior FioTech Thailand Co.Ltd laboratory diagnosis IDA actual 24/04/09 11/05/09 n/a n/a n/a 14/05/09 28/05/09 n/a n/a 04/06/09 11/06/09 22/06/09 28/02/10 130,744 (ii) $20,000 from S1M2A3.1.1; (iii) $10,000 from S1M2A4.1.1 ) S1 Measure 8 Enhance capacity for plan 15/01/08 30/01/08 05/02/08 20/02/08 01/03/08 05/03/08 15/03/08 n/a n/a 30/03/08 10/04/08 20/04/08 20/06/08 30,000 TA on evaluation of compensation scheme for effective outbreak 4 S1M8A7 rapid and effective response to HPAI PHRD Cons-s SS prior Mr. Antoon van Engelen containment. actual 01/01/08 27/02/08 18/07/08 17/10/08 28/10/08 n/a n/a n/a n/a 10/11/08 17/11/08 19/12/08 ctd 36,100 outbreak S3 Measure 1 Strengthen Curative TA on (i) determination of waste quantity; (ii) evaluation of waste AHIF & plan 01/11/07 15/11/07 20/11/07 20/12/07 05/01/08 10/01/08 30/01/08 20/02/08 05/03/08 15/03/08 25/03/08 10/04/08 10/07/08 90,000 5 S3M1A21.1 management technologies; (iii) Develop hospital waste Cons-s CQ prior Grontmij Carl Bro Resources IDA actual 15/10/07 27/12/07 08/01/08 27/03/08 29/05/08 30/05/08 10/06/08 n/a n/a 24/06/08 19/07/08 21/07/08 ctd 128,000 management plan Rapid participatory community survey on basic KAP about AI and plan 01/02/10 16/02/10 21/02/10 18/03/10 02/04/10 07/04/10 17/04/10 n/a n/a 27/04/10 07/05/10 17/05/10 16/07/10 30,000 S4 Measure 1 Formulation of National AHIF & 6 S4M1A4.2 Emerging Infectious Disease: The end of project KAP (Y5) - Cons-s IC prior Mr. Valery Gilbos Campaign on avian and human influenza IDA actual 14/11/08 08/12/08 16/12/08 23/01/09 02/11/09 n/a n/a n/a n/a 23/01/09 14/04/09 20/04/09 ctd 30,114 decided to hire in Y3 S5 Measure 1 Strengthening the function Desktop pandemic simulation exercises - TA - Design and train PHRD & plan 01/06/09 16/06/09 21/06/09 16/07/09 n/a 21/07/09 31/07/09 n/a n/a 10/08/09 n/a 20/08/09 19/09/09 7 S5M1A4.5.2 of the National CDC Committee national team (decided to postpone until JIR 2009 for decision on AHIF (2) Cons-s IC post further necessity for this TA) actual 0 Technical assistance/consultancy for pandemic planning review plan 01/06/09 16/06/09 21/06/09 16/07/09 31/07/09 05/08/09 15/08/09 n/a n/a 25/08/09 04/09/09 14/09/09 13/11/09 8 S5M1A4.8 annually (decided to postpone until JIR 2009 for decision on PHRD Cons-s IC prior further necessity for this TA) actual 0 Development Radio and TV Risk communication materials to be plan 01/12/08 16/12/08 21/12/08 15/01/09 30/01/09 04/02/09 14/02/09 n/a n/a 24/02/09 06/03/09 16/03/09 15/04/09 9 S5M1A2.7 part of pandemic preparedness (this is in connection with the PHRD Cons-s IC post activities on IEC-depends on plan presented by S4) actual 0 Update emergency contacts list (developed by NAHICO)- with plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 10 S5M1A2.5 regular updating of names, phone numbers, emails, etc. (not PHRD Cons-s IC post necessary anymore - to be reallocated) actual 0 Review existing decrees, regulations, laws related to pandemic/disease prevention and control against current IHR plan 01/06/09 16/06/09 21/06/09 16/07/09 n/a 21/07/09 31/07/09 n/a n/a 10/08/09 n/a 20/08/09 S5 Measure 3 Development of financial 11 S5M3 A3.2 requirements: 1 foreign and 2 local con-s (postpone until JIR PHRD Cons-s IC / CQ prior and legal frameworks 2009 for decision on further necessity for this TA; possible actual 0 overlap with ADB/CDC project) New activity: Hiring civil works supervisor for NAHICO extension plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 1,500 Mr. Bounlith Natharasy (3 12 S5M4A7 Capacity buidling of staff PHRD Cons-s IC post (unforeseen) actual 10/10/07 26/10/07 n/a n/a n/a 26/10/07 26/10/07 n/a n/a 06/11/07 13/11/07 13/11/07 15/02/08 1,500 months) S5 Measure 4 NAHICO Program plan 01/10/06 n/a 01/11/06 n/a n/a n/a 20/11/06 n/a n/a 10/12/06 20/12/06 01/01/07 01/01/08 226,000 Mr. Noel Joseph Roch (24 13 S5M4A8.1 FM Specialist for NAHICO PHRD Cons-s IC prior Management actual 01/10/06 n/a 09/11/06 n/a n/a 11/06/07 30/06/07 n/a n/a 27/08/07 15/11/07 19/11/07 19/11/09 234,000 months) plan 01/10/06 n/a 01/11/06 n/a n/a n/a 20/11/06 n/a n/a 10/12/06 20/12/06 01/01/07 01/01/08 226,000 Mr. Marian Nenita (27 14 S5M4A8.2 Procurement Specialist for NAHICO PHRD Cons-s IC prior actual 01/10/06 n/a 09/11/06 n/a n/a 09/11/06 21/11/06 n/a n/a 24/04/07 31/08/07 05/10/07 04/01/10 226,000 months) plan 01/10/06 n/a 01/11/06 n/a n/a n/a 20/11/06 n/a n/a 10/12/06 20/12/06 01/01/07 01/01/08 30,000 Mr. Chanthasack 15 Accountant 1 for NAHICO PHRD Cons-s IC prior actual 01/10/06 n/a 09/11/06 n/a n/a 06/11/06 21/11/06 n/a n/a 24/04/07 26/04/07 01/06/07 01/06/09 17,632 Souvannasy (24 months) S5M4A8.3 plan 01/10/06 n/a 01/11/06 n/a n/a n/a 20/11/06 n/a n/a 10/12/06 20/12/06 01/01/07 01/01/08 30,000 Ms. Thipkesone Sanasakda 16 Accountant 2 for NAHICO PHRD Cons-s IC prior actual 01/10/06 n/a 09/11/06 n/a n/a 11/06/07 30/06/07 n/a n/a 30/08/07 n/a 18/10/07 18/10/08 17,200 (24 months) plan 01/06/07 n/a 06/06/07 n/a n/a 06/06/07 26/06/07 n/a n/a 06/07/07 15/07/07 28/07/07 28/07/08 30,000 Mr. Viravanh Sourinphoumy 17 S5M4A8.4 Procurement assistant for NAHICO PHRD Cons-s IC prior actual 01/06/07 n/a 16/11/07 n/a n/a 16/11/07 28/11/07 n/a n/a 10/12/07 21/12/07 01/01/08 31/12/08 25,000 (24 months) Part-time Procurement Specialist 1 for NAHICO (local, before the plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 1,000 Mr. Bounsathien 18 S5M4A8.4.1 PHRD Cons-s SS prior staff is hired, HSIP staff) actual 15/11/06 n/a n/a n/a n/a n/a n/a n/a n/a n/a 01/12/06 06/12/06 06/09/07 975 Phimmasenh (9 momths) Part-time Procurement Specialist 2 for NAHICO (local, before the plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 1,000 Mr. Kiettisack Senephansiri 19 S5M4A8.4.2 PHRD Cons-s SS prior staff is hired, HSIP staff) actual 15/11/06 n/a n/a n/a n/a n/a n/a n/a n/a n/a 01/12/06 06/12/06 06/09/07 975 (9 momths) Part-time Financial Specialist for NAHICO (local, before the staff plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 1,000 Mrs. Khayta Southivong (9 20 S5M4A8.3.1 PHRD Cons-s SS prior is hired, HSIP staff) actual 15/11/06 n/a n/a n/a n/a n/a n/a n/a n/a n/a 01/12/06 06/12/06 06/09/07 975 momths) plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 15,000 Ms. Viengdaly Yathothu (6 21 S5M4A8.5 New position: Communication Officer for NAHICO PHRD Cons-s IC prior actual 20/0908 10/09/08 10/10/08 n/a n/a n/a n/a n/a n/a n/a 16/11/08 17/11/08 16/05/09 4,400 momths) plan 01/09/07 15/09/07 20/09/07 10/10/07 20/10/07 25/10/07 25/11/07 15/12/07 01/01/08 15/01/08 25/01/08 05/02/08 01/03/09 30,000 22 S5M4A9 Annual external audit of financial statements for NAHICO PHRD Cons-s LCS prior KPMG Lao (Y1+Y2) actual 01/10/07 01/11/07 02/11/07 28/11/07 10/01/08 15/01/08 12/02/08 29/02/08 05/03/08 12/03/08 17/03/08 17/03/08 28/03/08 22,803 M&E: local TA for annual review meeting (local M&E already plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 23 S5M4A23 PHRD Cons-s IC post selected - refer next activity) actual 0 plan 01/06/07 n/a 06/06/07 n/a n/a 06/06/07 26/06/07 n/a n/a 06/07/07 15/07/07 28/07/07 28/07/08 16,050 24 S5M4A27 M&E: International TA (national specialist was selected) PHRD Cons-s IC prior Mr. Khamphet Oudom actual 01/06/07 n/a 11/06/07 n/a n/a 11/06/07 30/06/07 n/a n/a 30/10/07 05/03/08 10/03/08 31/12/08 20,050 plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 25 S5M4A27 Reselection: M&E: International TA for 1.5 years, part-time PHRD Cons-s IC prior actual 05/01/10 25/01/10 0 plan 01/06/08 16/06/08 21/06/08 16/07/08 31/07/08 05/08/08 15/08/08 n/a n/a 25/08/08 04/09/08 14/09/08 14/09/09 11,200 26 S5M4A27.1 New activity: M&E: Administrative Assistant for 2 years PHRD Cons-s IC post Mrs. Sengdgara Vongsouvan actual 25/05/08 20/06/08 25/06/08 10/07/08 n/a n/a n/a n/a n/a n/a n/a 01/08/08 30/09/09 11,200 plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 27 S5M4A27.1 Reselection: M&E: Administrative Assistant for 1.5 years PHRD Cons-s IC post actual 05/01/10 25/01/10 0 New activity: Transfer of the Hotline Manager under WB plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 10,300 28 S5M4A8.6 PHRD Cons-s SS prior Mr. Chanthanome Sydavanh financing actual 01/09/09 n/a n/a n/a n/a n/a n/a n/a n/a n/a 24/09/09 24/09/09 24/09/10 10,300 New activity: Transfer of the 2 Hotline Call Operators under WB plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 11,360 Mr. Putthaxay Sirisack 29 S5M4A8.7 PHRD Cons-s SS prior financing actual 01/09/09 n/a n/a n/a n/a n/a n/a n/a n/a n/a 24/09/09 24/09/09 24/09/10 11,360 Mr. Khamp Keophichith New activity: Transfer of the Senior Project Assistant under WB plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 25,000 30 S5M4A8.8 PHRD Cons-s SS prior Ms. Nalinthone Vilaysane financing actual 01/12/09 n/a n/a n/a n/a n/a n/a n/a n/a n/a 21/01/10 01/02/10 01/02/11 12,484 New activity: Transfer of the Project Secretary under WB plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 20,000 Mrs. Souphavanh 31 S5M4A8.9 PHRD Cons-s SS prior financing actual 01/12/09 n/a n/a n/a n/a n/a n/a n/a n/a n/a 21/01/10 01/02/10 01/02/11 8,872 Phonsavanh Planning for hot line(s) during pre- New ctivity: Development of NAHICO Website; initially planned to AHIF & plan n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 15,000 32 S5M1A2.5.2 Cons-s IC post Mr. Anousa Souannavong pandemic and pandemic phases be covered by UN IDA actual 15/08/08 15/01/09 16/01/09 11/02/08 n/a n/a n/a n/a n/a 12/02/09 n/a 16/02/09 ctd 11,100 Total commited (2) 915,368 SUBTOTAL 2 (CONSULTANTS) ESTIMATED: Total savings (2) -85,018 3. TRAINING / WORKSHOPS: Technical Planned Source BD Shortlist Issuance Final Procure- Prior / IDA's non- Submis- Ev-n Rep-t IDA's non- IDA's non- Contract Budget of / RFP / IDA's non- SPN / approved of Bidding Evaluation Contract Name of Supplier / No ID Measure Number and Description Activity / Description Category ment Post Status objection sion approved objection objection Comple- Versus Financ- TOR Doc- objection REOI by NAHICO Doc-s / Report Signed Contractor / Consultant Method Review (CS only) Deadline by NAHICO (CS only) tion Actual ing s ready (CS only) RFP ready (CS only) (USD) 1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 24 25 26 27 1. GOODS AND WORKS: Total commited (3) 0 SUBTOTAL 3 (TRAINING / WORKSHOPS) ESTIMATED: Total savings (3) 0 4. OPERATING COSTS / OTHER: Total commited (4) 0 SUBTOTAL 4 (OPERATING COSTS / OTHER) ESTIMATED: Total savings (4) 0 Grand Total commited 1,888,871 TOTAL ESTIMATED: Grand Total savings -44,230
Groupe de la Banque mondiale · Procurement Plan
Lao PDR - Avian and Human Influenza Control and Preparedness Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Source
Banque mondiale