Page 1 SL No- PACKAGE NO. AMOUNT REMARK 1 PACKAGE - 1 -MEASURING TOOLS 58000 2 PACKAGE - 2- HAND TOOLS 130100 3 PACKAGE - 3 - CUTTING TOOLS 440700 4 PACKAGE - 4 - EQUIPMENTS (MECH) 81900 5 PACKAGE - 5 EQUIPMENTS(Elect. Meters) 102800 6 PACKAGE - 6 - EQUIPMENTS(Electrical) 169,600 7 PACKAGE - 7- EQUIPMENTS(Electrical) 201000 8 PACKAGE - 8 - EQUIPMENTS(Computer) 648600 9 PACKAGE - 9 - MACHINERY (Lath) 875000 10 PACKAGE - 10 - MACHINERY (Drilling ) 150000 11 PACKAGE - 11 - FURNITURE 3000000 TOTAL Rs 5857700 PACKAGE NO. - 1 PACKAGENAME:- Measuring Tools S.NO. DESCRIPTION OF ITEM QTY. RATE 1 MICROMETER OUTSIDE 0 TO 25MM READING .01MM 4 2500 2 MICROMETER OUTSIDE 25 TO 50MM READING .01MM 2 2000 3 MICROMETER INSIDE UPTO 25 MM READING .01MM 2 3000 4 MICROMETER INSIDE UPTO 25 MM READING .01MM 2 4000 5 SOLID PARALLELS IN PAIRS (DIFFERINT SIZES) IN METRIC 10 3000 Total PACKAGE NO. - 2 PACKAGENAME:- Hand Tools S.NO. DESCRIPTION OF ITEM QTY. RATE OFFICE OF THE PRINCIPAL INDUSTRIAL TRAINING INSTITUTE RAMPURA Schedule of Requirement OFFICE
Groupe de la Banque mondiale · Procurement Plan
India - Vocational Training Improvement Project : procurement plan (Vol. 3 of 29) : Procurement plan for Industrial Training Institute (ITI), Rampur (M.P.)
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Inde
Source
Banque mondiale