Procurement Plan for Nanning-Guangzhou Railway Project 国铁VI南广铁路项目世行贷款采购计划 Componen Procu Component Reviewed t Unit Contract remen Packa Estimate by Contrac Description of Goods or Price Estimate t Issue of Retroacti Items ge Unit Q'ty Cost Bank(Prio t No. Services (10000$) Cost(10000$) Metho BD ve Loan 招标内容 招标 单位 数量 (10000$) r/Post ) 合同号 设备名称 单价 估算合同总额 d 发标日期 追溯贷款 包 概算 世行审批( (万美元 (万美元) 采购 (万美元) 前审/后审) ) 方式 Leakage coaxial cable 900MHz Prior TE01 Km 公里 140.5 2.147 301.654 301.654 ICB Feb/2011 900MHz 漏泄同轴电缆 前审 I.Telecom 8-core Single-mode Optic Cable Km 公里 414.0 0.073 30.222 30.222 Equipment TE 单模光缆8芯 通信设备 Prior TE02 20-core Single-mode Fiber ICB Feb/2011 前审 Optic Cable (flame retardant Km 公里 946.0 0.091 86.086 86.086 type) 单模光缆20芯(阻燃型) Laying of Digital Signal Cables (all cores) Hm 百米 25,244.0 0.049 1,226.137 1,226.137 敷设数字信号电缆(各芯) Prior SE01 ICB Feb/2011 Laying of Cables Specially 前审 for Balise Hm 百米 1,786.0 0.040 71.440 71.440 敷设点式应答器电缆 Non-insulation transmitter Set 台 2,363.0 0.257 607.629 607.629 无绝缘发送器 Non-insulation receiver Set 台 1,173.0 0.200 234.600 234.600 Prior SE02 无绝缘接受器 ICB Feb/2011 前审 Automatic Blocking Cabinets Set 柜 139.0 0.766 106.432 106.432 自动闭塞机柜 intelligent power supply equipment for station Set 台 14.0 9.286 130.000 130.000 车站智能电源电源屏 Prior SE03 intelligent power supply ICB Feb/2011 前审 equipment for intermediate ATP Set 台 17.0 6.429 109.286 109.286 center 中继站智能电源屏 II. Signalling SE Equipment 信号设备 Procurement Plan for Nanning-Guangzhou Railway Project 国铁VI南广铁路项目世行贷款采购计划 Componen Procu Component Reviewed t Unit Contract remen Packa Estimate by Contrac Description of Goods or Price Estimate t Issue of Retroacti Items ge Unit Q'ty Cost Bank(Prio t No. Services (10000$) Cost(10000$) Metho BD ve Loan 招标内容 招标 单位 数量 (10000$) r/Post ) 合同号 设备名称 单价 估算合同总额 d 发标日期 追溯贷款 包 概算 世行审批( (万美元 (万美元) 采购 (万美元) 前审/后审) ) 方式 Computer Interlocking Equipment for block post Set 套 2.0 21.429 42.857 42.857 线路所计算机联锁设备 computer interlocking II. equipment (under 20 sets of Set 套 5.0 30.000 150.000 150.000 Signalling switch) SE 20组以下计算机联锁设备 Equipment Prior SE04 computer interlocking ICB Feb/2011 信号设备 前审 equipment (20-40 sets of Set 套 6.0 37.143 222.857 222.857 switch) 20-40组计算机联锁设备 computer interlocking equipment (80 sets of switch) Set 套 1.0 51.429 51.429 51.429 80组计算机联锁设备 Balise Set 台 1,344.0 0.171 230.400 230.400 点式应答器 station ATP center Set 套 14.0 25.714 360.000 360.000 车站列控中心 Prior SE05 ICB Feb/2011 intermediate ATP center 前审 Set 套 17.0 22.857 388.569 388.569 中继站列控中心 lineside electronic unit Set 台 113.0 1.357 153.357 153.357 LEU 大站微机监测 signal monitoring Set 套 2.0 8.571 17.143 17.143 system for large station signal monitoring system for medium station or small Prior SE06 Set 套 12.0 5.714 68.571 68.571 ICB Feb/2011 station 前审 中小车站微机监测 signal monitoring system for intermediate station Set 套 17.0 2.857 48.571 48.571 中继站微机监测 Procurement Plan for Nanning-Guangzhou Railway Project 国铁VI南广铁路项目世行贷款采购计划 Componen Procu Component Reviewed t Unit Contract remen Packa Estimate by Contrac Description of Goods or Price Estimate t Issue of Retroacti Items ge Unit Q'ty Cost Bank(Prio t No. Services (10000$) Cost(10000$) Metho BD ve Loan 招标内容 招标 单位 数量 (10000$) r/Post ) 合同号 设备名称 单价 估算合同总额 d 发标日期 追溯贷款 包 概算 世行审批( (万美元 (万美元) 采购 (万美元) 前审/后审) ) 方式 concrete mast Prior CE01 Lot 根 6,652.0 0.067 445.684 445.684 ICB Feb/2011 接触悬挂混凝土柱 前审 H section pole GHT240 Prior CE02 Lot 根 3,580.0 0.139 497.620 497.620 ICB Feb/2011 接触悬挂H型钢柱GHT240 前审 H section pole GH260 CE03 Lot 根 2,118.0 0.134 283.812 283.812 接触悬挂H型钢柱GH260 Contact Wire ( Guangxi Prior CE04 Section) Ton 吨 488.8 0.966 472.181 472.181 ICB Feb/2011 前审 接触线(广西段) Contact Wire (Guangdong Prior CE05 Section) Ton 吨 1,061.8 0.966 1,025.699 1,025.699 ICB Feb/2011 前审 接触线(广东段) Messenger Wire (Guangxi Prior CE06 Section) Ton 吨 383.6 0.872 334.499 334.499 ICB Feb/2011 前审 承力索 (广西段) Messenger Wire (Guangdong Prior CE07 Section) Ton 吨 878.3 0.872 765.878 765.878 ICB Feb/2011 前审 承力索(广东段) Cantilever Solid/core Rod Insulator used outside Prior CE08 Lot 根 33,186.0 0.006 199.116 199.116 ICB Feb/2011 tunnels 前审 隧道外腕臂用棒式绝缘子 Cantilever Silicone Rubber Insulators Lot 根 11,595.0 0.010 115.950 115.950 腕臂用硅橡胶绝缘子 Prior CE09 Silicone Rubber Insulators ICB Feb/2011 前审 used by Additive wire inside Lot 根 9,590.0 0.010 95.900 95.900 the tunnels 隧道内附加导线用硅橡胶绝缘子 Procurement Plan for Nanning-Guangzhou Railway Project 国铁VI南广铁路项目世行贷款采购计划 Componen Procu Component Reviewed t Unit Contract remen Packa Estimate by Contrac Description of Goods or Price Estimate t Issue of Retroacti Items ge Unit Q'ty Cost Bank(Prio t No. Services (10000$) Cost(10000$) Metho BD ve Loan 招标内容 招标 单位 数量 (10000$) r/Post ) 合同号 设备名称 单价 估算合同总额 d 发标日期 追溯贷款 包 概算 世行审批( (万美元 (万美元) 采购 (万美元) 前审/后审) ) 方式 Limited Steady Arm,Main Line Prior CE10 Set 套 20,726.0 0.008 165.808 165.808 ICB Feb/2011 正线限位定位器 前审 Positive Feeder Ton 吨 791.8 0.286 226.229 226.229 正馈线 Protection wire Prior CE11 Ton 吨 712.8 0.170 121.176 121.176 ICB Feb/2011 保护线 前审 Feeder cables Ton 吨 55.6 0.291 16.180 16.180 供电线 The single suspension mast assembly of OCS(except for the cantilever insulator, 接触网 steady arm with offset hook set套 15,381.0 0.031 476.811 476.811 设备 end clamp) conte 接触网中间柱装配(扣除腕臂绝缘 CE 子、限位定位器) nary equip The uninsulated transition ment mast assembly of OCS(except for the cantilever insulator, steady arm with offset hook set套 3,167.0 0.089 281.863 281.863 end clamp) 接触网非绝缘转换柱装配(扣除腕 臂绝缘子、限位定位器) Prior CE12 ICB Feb/2011 The insulated transition mast 前审 assembly of OCS(except for the cantilever insulator, steady arm with offset hook set套 294.0 0.101 29.694 29.694 end clamp) 接触网绝缘转换柱装配(扣除腕臂 绝缘子、限位定位器) III.E lectr ifica equip ment Procurement Plan for Nanning-Guangzhou Railway Project 国铁VI南广铁路项目世行贷款采购计划 Prior CE12 ICB Feb/2011 Componen 前审 Procu Component Reviewed t Unit Contract remen Packa Estimate by Contrac Description of Goods or Price Estimate t Issue of Retroacti Items ge Unit Q'ty Cost Bank(Prio t No. Services (10000$) Cost(10000$) Metho BD ve Loan 招标内容 招标 单位 数量 (10000$) r/Post ) 合同号 设备名称 单价 估算合同总额 d 发标日期 追溯贷款 包 概算 世行审批( (万美元 (万美元) 采购 (万美元) 前审/后审) ) 方式 The turnout mast assembly of OCS(except for the cantilever insulator, steady arm with set套 246.0 0.082 20.172 20.172 offset hook end clamp) 接触网道岔柱装配(扣除腕臂绝缘 III.E 子、限位定位器) lectr ifica the spring compensating device tion of OCS set套 67.0 0.534 35.778 35.778 Syste 接触网弹簧补偿器装置 ratchet wheel moor device of m OCS set套 879.0 0.091 79.989 79.989 Prior CE13 ICB Feb/2011 接触网棘轮下锚装置 前审 电气 化设 the whole compensation pulley 备 block device 2×1:3 2×1:3 set套 1,102.0 0.080 88.160 88.160 全补偿下锚滑轮组装置 zinc oxide arrester Prior CE14 set台 704.0 0.043 30.171 30.171 ICB Feb/2011 氧化锌避雷器 前审 load switch 2-pole Isolator set台 75.0 1.579 118.393 118.393 负荷开关(双极) load switch 1-pole Isolator set台 38.0 0.200 7.600 7.600 负荷开关(单极) Prior CE15 Manual 2-pole Isolator ICB Feb/2011 set台 84.0 0.143 12.012 12.012 前审 手动隔离开关双极 Manual Single-pole Isolator set台 5.0 0.057 0.285 0.285 手动隔离开关单极 Electric Power Cable(95) Prior elect EE01 Km 公里 473.0 2.993 1,415.689 1,415.689 ICB 电力电缆(95) 前审 Dec/2010 ric Electric Power Cable (70) Prior EE02 Km 公里 473.0 2.346 1,109.658 1,109.658 ICB equip 电力电缆(70) 前审 EE ment High Voltage Switch Cabinet Set 面 124.0 1.143 141.714 141.714 电力设 高压开关柜(断路器柜) Prior EE03 ICB Apr/2011 备 High Voltage Switch Cabinet 前审 Set 面 55.0 0.571 31.429 31.429 高压开关柜(非断路器柜) Procurement Plan for Nanning-Guangzhou Railway Project 国铁VI南广铁路项目世行贷款采购计划 Componen Procu Component Reviewed t Unit Contract remen Packa Estimate by Contrac Description of Goods or Price Estimate t Issue of Retroacti Items ge Unit Q'ty Cost Bank(Prio t No. Services (10000$) Cost(10000$) Metho BD ve Loan 招标内容 招标 单位 数量 (10000$) r/Post ) 合同号 设备名称 单价 估算合同总额 d 发标日期 追溯贷款 包 概算 世行审批( (万美元 (万美元) 采购 (万美元) 前审/后审) ) 方式 Traction Transformer Prior TRE01 Set 台 16.0 80.393 1,286.288 1,286.288 ICB Apr/2011 牵引变压器 前审 Auto-transformer Prior TRE02 Set 台 68.0 14.076 957.168 957.168 ICB Apr/2011 自耦变压器 前审 220kV SF6 Circuit Breakers Prior TRE03 Group 组 16.0 6.429 102.864 102.864 ICB Apr/2011 220kV SF6断路器 前审 220kV Current Transformer Set 台 48.0 0.857 41.143 41.143 220kV电流互感器 Prior TRE04 ICB Apr/2011 220kV voltage transformer 前审 Set 台 48.0 0.857 41.143 41.143 220kV电压互感器 220kV Disconnector Prior TRE05 Set 台 16.0 1.714 27.429 27.429 ICB Apr/2011 220kV电动隔离开关 前审 55/27.5kV double-pole electrical driven isolating Prior TRE06 Set 台 148.0 0.670 99.160 99.160 ICB Apr/2011 switch 前审 55/27.5kV双极电动隔离开关 tract 27.5kV monopole electrical Prior TRE07 driven isolating switch Set 台 6.0 0.543 3.258 3.258 ICB Apr/2011 ion 前审 equip 27.5kV单极电动隔离开关 TRE Vacume Curcuit Breaker, two ment Prior TRE08 poles Set 台 166.0 4.864 807.424 807.424 ICB Apr/2011 牵引变 前审 双极真空断路器 电设备 AC/DC Device(transformer substation) set套 8.0 3.143 25.143 25.143 交直流系统(变电所) Prior TRE09 ICB Apr/2011 AC/DC Device(Section 前审 post/Autotransformer post) set套 25.0 2.571 64.286 64.286 交直流系统(分区所/AT所) Integrated Automation Device(transformer set套 8.0 16.607 132.856 132.856 substation) 综合自动化系统(变电所) Integrated Automation Prior TRE10 Device(Section post) set套 9.0 5.714 51.426 51.426 ICB Apr/2011 前审 综合自动化系统(分区所) TRE ment 牵引变 电设备 Procurement Plan for Nanning-Guangzhou Railway Project 国铁VI南广铁路项目世行贷款采购计划 Componen Procu Component Reviewed t Unit Contract remen Packa Estimate by Contrac Description of Goods or Price Estimate t Issue of Retroacti Items ge Unit Q'ty Cost Bank(Prio t No. Services (10000$) Cost(10000$) Metho BD ve Loan 招标内容 招标 单位 数量 (10000$) r/Post ) 合同号 设备名称 单价 估算合同总额 d 发标日期 追溯贷款 包 概算 世行审批( Prior TRE10 (万美元 (万美元) 采购 ICB Apr/2011 (万美元) 前审/后审) 前审 ) 方式 Integrated Automation Device(Autotransformer post) set套 16.0 3.571 57.136 57.136 综合自动化系统(AT所) Power Suppl Catenary installation working y Prior PSE PSE01 vehicle set套 10.0 20.914 209.140 209.140 ICB Feb/2011 Equip 前审 接触网作业车 ment 供电段 IIIC Prestressed concrete sleeper (DK0+000~ DK202+810) Prior R01 Lot 根 328,500.0 0.0038 1,248.300 1,248.300 ICB May/2010 IIIC型预应力混凝土轨枕(DK0+000~ 前审 DK202+810段) IIIC Prestressed concrete sleeper (DK0+000~ DK202+810) Prior R02 Lot 根 328,501.0 0.0038 1,248.304 1,248.304 ICB May/2010 IIIC型预应力混凝土轨枕(DK0+000~ 前审 DK202+810段) IIIC Prestressed concrete sleeper Prior R03 (IDK202+810~D1K406+100) Lot 根 282,480.0 0.0038 1,073.424 1,073.424 ICB May/2010 前审 IIIC型预应力混凝土轨枕(IDK202+8 10~D1K406+100段) IIIC Prestressed concrete sleeper Prior IV.Rail R04 (IDK202+810~D1K406+100) Lot 根 282,481.0 0.0038 1,073.428 1,073.428 ICB May/2010 Yes 前审 轨道 IIIC型预应力混凝土轨枕(IDK202+8 是 10~D1K406+100段) Procurement Plan for Nanning-Guangzhou Railway Project 国铁VI南广铁路项目世行贷款采购计划 Componen Procu Component Reviewed t Unit Contract remen Packa Estimate by Contrac Description of Goods or Price Estimate t Issue of Retroacti Items ge Unit Q'ty Cost Bank(Prio t No. Services (10000$) Cost(10000$) Metho BD ve Loan 招标内容 招标 单位 数量 (10000$) r/Post ) IV.Rail 合同号 设备名称 单价 估算合同总额 d 发标日期 追溯贷款 Yes 包 概算 世行审批( 轨道 (万美元 (万美元) 采购 是 (万美元) 前审/后审) ) 方式 No.18 Track switching fitting - simple turnout with concrete Prior R05 sleeper(RC Sleeper) Group组 123.0 18.143 2,231.589 2,231.589 ICB May/2010 前审 轨道转辙装置 - 单开道岔 60kg 18号 (混凝土枕) Procurement Plan for Nanning-Guangzhou Railway Project IV.Rail 国铁VI南广铁路项目世行贷款采购计划 Yes 轨道 Componen Procu 是 Component Reviewed t Unit Contract remen Packa Estimate by Contrac Description of Goods or Price Estimate t Issue of Retroacti Items ge Unit Q'ty Cost Bank(Prio t No. Services (10000$) Cost(10000$) Metho BD ve Loan 招标内容 招标 单位 数量 (10000$) r/Post ) 合同号 设备名称 单价 估算合同总额 d 发标日期 追溯贷款 包 概算 世行审批( (万美元 (万美元) 采购 (万美元) 前审/后审) ) 方式 Type V tension clamp used for Prior R06 type 60 rail(Guangxi Province) Group组 657,001.0 0.0025 1,642.503 1,642.503 ICB May/2010 前审 60kg钢轨弹条V型扣配件(广西段) Type V tension clamp used for type 60 rail(Guangdong Prior R07 Group组 564,961.0 0.0025 1,412.403 1,412.403 ICB May/2010 Province) 前审 60kg钢轨弹条V型扣配件(广东段) V.mechanic Rail car Prior ME ME01 Unit 辆 10.0 17.143 171.429 171.429 ICB Feb/2012 equipment 轨道车 前审 VII. Technical Assistance 技援项目 30 30 ⅥII. Front-end-fee 先征费 75 75 VIIII.Contingency 备用金 2605 2,605 合计 total 30000 30,000 Notes: Item IV.Rail Lot R01~04 and R06~07 (marked with blue color): the unit price for these lots are set based upon the previous procurement plan which the 附件: 新建南广铁路世行贷款采购清单(合计) 单价 总价 包号 序号 设备名称 单位 数量 (万RMB (万RMB ) ) Ⅰ、通信设备 3718.55 TE01 1 900MHz 漏泄同轴电缆 公里 152.4 17.800 2712.72 2 单模光缆8芯 公里 564.0 0.5187 292.56 TE02 3 单模光缆20芯(阻燃型) 公里 947.0 0.7532 713.27 Ⅱ、信号设备 31273.10 1 敷设数字信号电缆 百米 26168.0 0.3400 8897.12 SE01 2 敷设点式应答器电缆 百米 1869.0 0.2800 523.32 3 信号贯通地线(35mm2) 百米 8416.0 0.3200 2693.12 4 无绝缘发送器 台 2380.0 1.8000 4284.00 SE02 5 无绝缘接受器 台 1175.0 1.4000 1645.00 6 自动闭塞机柜 柜 139.0 5.3600 745.04 7 车站智能电源电源屏 台 15.0 65.0000 975.00 SE03 8 中继站智能电源屏 台 16.0 45.0000 720.00 9 线路所计算机联锁设备 套 2.0 150.0000 300.00 10 20组以下计算机联锁设备 套 6.0 210.0000 1260.00 SE04 11 20-40组计算机联锁设备 套 6.0 260.0000 1560.00 12 80组计算机联锁设备 套 1.0 360.0000 360.00 13 点式应答器 台 15.0 1.2000 18.00 14 车站列控中心 套 15.0 180.0000 2700.00 SE05 15 中继站列控中心 套 16.0 160.0000 2560.00 16 LEU 台 115.0 9.5000 1092.50 17 大站微机监测 套 1.0 60.0000 60.00 SE06 18 中小车站微机监测 套 14.0 40.0000 560.00 19 中继站微机监测 套 16.0 20.0000 320.00 Ⅲ、电气化设备 84930.90 (一)接触网设备 ######### CE01 1 接触悬挂混凝土柱 根 7252.0 0.499 3618.75 CE02 2 接触悬挂H型钢柱 根 4935.0 0.844 4165.14 CE03 3 接触线(广西段) 吨 1531.0 4.500 6889.41 CE04 接触线(广东段) CE05 4 承力索(广西段) 吨 1248.3 4.500 5617.35 CE06 承力索(广东段) CE07 5 隧道外腕臂用棒式绝缘子 根 31772.0 0.038 1207.34 6 隧道内腕臂用硅橡胶绝缘子 根 11093.0 0.070 776.51 CE08 7 隧道内附加导线用硅橡胶绝缘子 根 9732.0 0.070 681.24 CE09 8 正线限位定位器 套 19942.0 0.054 1076.87 9 正馈线 条公里 800.5 2.000 1600.94 CE10 10 保护线 条公里 800.5 1.002 802.07 11 接触网弹簧补偿器装置 套 67.0 3.738 250.446 CE11 12 接触网棘轮下锚装置 套 773.0 0.700 541.100 13 2×1:3全补偿下锚滑轮组装置 套 2069.0 0.464 960.016 CE12 15 氧化锌避雷器 台 704.0 0.300 211.200 14 负荷开关(双极) 台 126.0 11.050 ###### 16 电动隔离开关单极 台 12.0 3.800 45.600 17 手动隔离开关双极 台 56.0 1.500 84.000 CE13 18 手动隔离开关单极 台 5.0 0.400 2.000 19 电动隔离开关双极 台 27.0 6.500 175.500 20 自动过分相装置 套 20.0 6.000 120.000 (二)电力设备 ######### EE01 1 电力电缆 km 944.5 22.350 21109.13 EE02 2 电力电缆 km 3 高压开关柜(断路器柜) 面 130.0 8.000 1040.00 EE03 4 高压开关柜(非断路器柜) 面 78.0 4.000 312.00 (三)牵引变电 ######### TRE01 1 牵引变压器 台 16.0 640.000 ######### TRE02 2 自耦变压器 台 66.0 135.000 8910.000 TRE03 3 220kVSF6断路器 组 16.0 48.000 768.000 4 220kV电流互感器 台 48.0 6.000 288.000 TRE04 5 220kV电压互感器 台 48.0 6.000 288.000 TRE05 6 220kV电动隔离开关 台 16.0 12.000 192.000 TRE06 7 双极真空断路器 台 164.0 45.000 7380.000 8 交直流系统(变电所) 套 8.0 22.000 176.000 TRE07 9 交直流系统(分区所/AT所) 套 25.0 18.000 450.000 10 综合自动化系统(变电所) 套 8.0 110.000 880.000 TRE08 11 综合自动化系统(分区所) 套 9.0 60.000 540.000 12 综合自动化系统(AT所) 套 16.0 40.000 640.000 (四)供电段 PSE01 1 接触网作业车 套 10.0 150.000 1500.000 Ⅳ、轨道 ######### 1 钢轨(广西段) 吨 48581.7 0.570 ######### R01 钢轨(广东段) R03 2 轨枕(广西段) 根 1370826 0.0157 21521.97 R04 轨枕(广东段) R05 3 单开道岔 60kg 18号 (混凝土枕) 组 91.0 127.0000 11557.00 R06 4 60kg钢轨弹条Ⅱ型扣配件(广西段) 组 1313362.0 0.0083 10900.90 R07 61kg钢轨弹条Ⅱ型扣配件(广东段) Ⅴ、机械设备 2550.000 1 轨道车 辆 10.0 120.0000 1200.00 ME01 ME01 2 确认车 辆 5.0 270.0000 1350.00 Ⅵ、车辆设备 1121.000 1 红外线轴温探测设备 套 28.0 38.0000 1064.00 VE01 2 红外线轴温探测监控中心主机 套 2.0 28.5000 57.00 Ⅶ、技援项目 210.00 Ⅷ、先征费 525.00 Ⅸ、备用金 14000.00 合计 210000.00 备注 531.22 387.53 41.79 101.90 4467.59 1271.02 74.76 384.73 612.00 235.00 106.43 139.29 102.86 42.86 180.00 222.86 51.43 2.57 385.71 365.71 156.07 8.57 80.00 45.71 12132.99 4316.83 516.96 595.02 984.20 按省界分包 136.0 286 47.55% 728.0 0.00 150.0 52.45% 803.0 802.48 按省界分包 593.6 0.00 654.7 172.48 110.93 97.32 153.84 228.71 114.58 35.78 77.30 137.15 30.17 198.90 增加的内容 6.51 12.00 0.29 25.07 17.14 3208.73 3015.59 按省界分包 449.1 0.00 495.4 148.57 44.57 4393.14 1462.86 1272.86 109.71 41.14 41.14 27.43 1054.29 修改的内容 25.14 64.29 125.71 77.14 增加的内容 91.43 0.00 214.29 10238.78 3955.94 按省界分包 23101.8 0.00 25479.9 3074.57 按省界分包 651861.3 0.00 718964.7 1651.00 1557.27 按省界分包 624535.8 0.00 688826.2 364.29 171.43 192.86 160.14 152.00 8.14 30.00 75.00 2000.00 30000.00 南广项目外资采购清单 单价 总价 设备名 中铁二 中铁咨 数量合 (万US (万US 序号 称 单位 院数量 询数量 计 D) D) Ⅰ、通信设备 900MHz 139.2 漏泄同 301.591 1 轴电缆 公里 1.3 140.5 2.147 单模光 344 2 缆8芯 公里 70 414 0.073 30.152 单模光 缆20芯 675 (阻燃 3 型) 公里 271 946 0.091 86.354 Ⅱ、信号设备 敷设数 字信号 1226.39 1 电缆 百米 8855 16389 25244 0.049 0 敷设点 式应答 2 器电缆 百米 833 953 1786 0.040 71.440 无绝缘 607.598 3 发送器 台 708 1655 2363 0.257 无绝缘 234.600 4 接受器 台 340 833 1173 0.200 自动闭 106.434 5 塞机柜 柜 44 95 139 0.766 车站智 能电源 130.000 6 电源屏 台 7 7 14 9.286 中继站 智能电 109.286 7 源屏 台 4 13 17 6.429 线路所 计算机 联锁设 8 备 套 2 0 2 21.429 42.857 20组以 下计算 机联锁 150.000 9 设备 套 1 4 5 30.000 20-40 组计算 机联锁 222.857 10 设备 套 3 3 6 37.143 80组计 算机联 11 锁设备 套 1 0 1 51.429 51.429 点式应 230.385 12 答器 台 508 836 1344 0.171 车站列 360.000 13 控中心 套 7 7 14 25.714 中继站 列控中 388.571 14 心 套 4 13 17 22.857 153.355 15 LEU 台 52 61 113 1.357 大站微 16 机监测 套 2 0 2 8.571 17.143 中小车 站微机 17 监测 套 5 7 12 5.714 68.572 中继站 微机监 18 测 套 4 13 17 2.857 48.571 Ⅲ、电气化设备 (一)接触网设 接触悬 挂混凝 4092 447.861 1 土柱 根 2560 6652 0.067 接触悬 挂H型钢 2995 柱GHT2 497.793 2 40 根 585 3580 0.139 接触悬 挂H型钢 318 柱GH26 283.875 3 0 根 1800 2118 0.134 1497.45 1061.8 4 接触线 吨 488.8 1551 0.966 6 1099.91 878.3 5 承力索 吨 383.6 1262 0.872 1 隧道外 腕臂用 18842 棒式绝 188.349 6 缘子 根 14344 33186 0.006 腕臂用 硅橡胶 10877 119.058 7 绝缘子 根 718 11595 0.010 隧道内 附加导 线用硅 9516 橡胶绝 8 缘子 根 74 9590 0.010 95.900 正线限 位定位 14112 161.776 9 器 根 6614 20726 0.008 226.276 577.1 10 正馈线 吨 214.7 791.8 0.286 121.413 577.1 11 保护线 吨 135.7 712.8 0.170 12 供电线 吨 36.8 18.8 55.6 0.291 16.164 接触网 中间柱 装配( 扣除腕 臂绝缘 9955 子、限 位定位 470.917 13 器) 套 5426 15381 0.031 接触网 非绝缘 转换柱 装配( 扣除腕 2410 臂绝缘 子、限 位定位 282.456 14 器) 套 757 3167 0.089 接触网 绝缘转 换柱装 配(扣 除腕臂 134 绝缘子 、限位 定位器 15 ) 套 160 294 0.101 29.767 接触网 道岔柱 装配( 扣除腕 臂绝缘 129 子、限 位定位 16 器) 套 117 246 0.082 20.243 接触网 弹簧补 0 偿器装 17 置 套 67 67 0.534 35.778 接触网 棘轮下 583 18 锚装置 套 296 879 0.091 80.071 2×1:3 全补偿 下锚滑 862 轮组装 19 置 套 240 1102 0.080 88.051 负荷开 关(双 34 118.410 20 极) 台 41 75 1.579 氧化锌 431 21 避雷器 台 273 704 0.043 30.229 负荷开 关(单 24 22 极) 台 14 38 0.200 7.602 手动隔 离开关 68 23 双极 台 16 84 0.143 11.995 手动隔 离开关 0 24 单极 台 5 5 0.057 0.285 (二)电力设备 电力电 1415.89 333 1 缆(95) 公里 140 473 2.993 7 电力电 1109.44 333 2 缆(70) 公里 140 473 2.346 4 高压开 关柜( 90 断路器 141.714 3 柜) 面 34 124 1.143 高压开 关柜( 41 非断路 4 器柜) 面 14 55 0.571 31.429 (三)牵引变电 牵引变 1286.28 10 1 压器 台 6 16 80.393 6 自耦变 957.143 48 2 压器 台 20 68 14.076 220kVSF 10 102.857 3 6断路器 组 6 16 6.429 220kV电 流互感 30 4 器 台 18 48 0.857 41.143 220kV电 压互感 30 5 器 台 18 48 0.857 41.143 220kV电 动隔离 10 6 开关 台 6 16 1.714 27.429 55/27.5 kV双极 114 电动隔 7 离开关 台 34 148 0.670 99.143 27.5kV 单极电 动隔离 8 开关 台 6 6 0.543 3.257 双极真 空断路 112 807.429 9 器 台 54 166 4.864 交直流 系统( 5 变电所 10 ) 套 3 8 3.143 25.143 交直流 系统( 18 分区所/ 11 AT所) 套 7 25 2.571 64.286 综合自 动化系 5 统(变 132.857 12 电所) 套 3 8 16.607 综合自 动化系 6 统(分 13 区所) 套 3 9 5.714 51.429 综合自 动化系 12 统(AT 14 所) 套 4 16 3.571 57.143 (四)供电段 0 接触网 209.143 8 1 作业车 套 2 10 20.914 Ⅳ、轨道 60kg钢 轨弹条V 840207 型扣配 1222059 1 件 组 381852 待定 待定 IIIC型预 应力混 840207 凝土轨 1222059 2 枕 根 381852 待定 待定 单开道 岔 60kg 75 18号 (混 2213.43 3 凝土枕) 组 47 122 18.143 9 Ⅴ、机械设备 171.429 8 1 轨道车 辆 2 10 17.143
Groupe de la Banque mondiale · Procurement Plan
China - Nanning-Guangzhou Railway Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Chine
Source
Banque mondiale