Project Name : China - Shihutang Navigation & Hydro-power Complex Project 项目名称 中国石虎塘航电枢纽工程 Loan number : 贷款编号 TTL: Wenlai Zhang(张文来) Subject: Procurment Implementation Plan for Goods, and Works and Services 科目 工程、货物及服务采购实施计划 PMO: JANA 项目办 Date: 22-Apr-10 日期 2010年4月22日 江西省赣江石虎塘航电枢纽工程采购计划 Procurement Plan (Version 4/22/2010) 1 2 3 4 5 6 Exchange Rate: 7 US$1 = RMB 8 7.0 Ref. Procurement Review by Bank Invitation for Contract Contract No. Contract Description Estimate Cost No. Method (Prior / Post) Bid Award 编号 合同编号 合同描述 估算费用 采购方式 前 /后 审 招标 授标 (million RMB) (million US$) 百万元 百万美元 Shihutang Main Complex Works (1) (石虎塘枢纽主要土建工程) 1 W1 Preparation of Site(四通一平) 13.58 1.94 NBF/Works N/A 02/01/2009 Buildings Works of Complex 2 W2 13.54 1.93 NBF/Works N/A 06/01/2009 (枢纽房屋建筑工程) Buildings Works in the Jian City 3 W3 7.03 1.00 NBF/Works N/A 08/01/2011 (吉安市房屋建筑) Construction of Powerhouse and Right Part Sluices 4 W4 (电厂及右侧闸坝土建工程--- 517.93 73.99 ICB/Works Prior 01/16/2009 04/29/2009 包括相应金结及电气安装) Construction of Ship-lock and Rest 5 W5 Sluices(船闸及左侧闸坝土建工程------- 240.24 34.32 ICB/Works Prior 01/16/2009 04/29/2009 包括相应金结及电气安装) Subtotal 5contracts(5个合同包) (小计) (2) Flood Protection Works (防洪工程) River Bank Protection Works in Wanhe & 6 W6 122.48 17.50 NBF/Works N/A 01/15/2009 Zhangtang(万合、樟塘防护区工程) River Bank Protection Works in Yanxi 7 W7 63.65 9.09 NBF/Works N/A 01/15/2009 (沿溪防护区工程) River Bank Protection Works in Taihe 8 W8 68.34 9.76 NBF/Works N/A 01/29/2010 (泰和防护区工程) River Bank Protection Works in Jingtan 9 W9 134.91 19.27 NBF/Works N/A 01/26/2010 (金滩防护区工程) Subtotal 4 contract(4个合同包) (小计) Complex M&E Equipment Supply (3) (枢纽机电设备供应) Turbine Sets and its automation element 10 G1 329.15 47.02 ICB/Goods Prior 04/23/2009 08/20/2009 (机组及自动化元件设备) Hydraulic Hoists for Flood Gates and Ship 11 G2 41.84 5.98 ICB/Goods Prior 03/24/2010 06/10/2010 lock(泄水闸、船闸液压启闭设备) Metal structure of hydropower 12 G3 28.78 4.11 NBF/Goods N/A 04/04/2010 house(电站厂房金属结构制造) Metal structure of flood 13 G4 62.97 9.00 NBF/Goods N/A 05/30/2009 gate(泄水闸金属结构制造) Metal structure of 14 G5 17.56 2.51 ICB/Goods Prior 03/28/2010 shiplock(船闸工程金属结构制造) Speed Goveror and oil pressure unit 15 G6 3.60 0.51 NBF/Goods N/A 05/30/2010 (调速器及油压装置) Automatic excitation regulator 16 G7 4.80 0.69 NBF/Goods N/A 05/30/2010 (自动励磁调节装置) Gantry Crane 、 Crest Lifting Machinery of Powerhouse & trash Rack 17 G8 18.85 2.69 NBF/Goods N/A 05/30/2010 Equipment(厂房门机、桥式起重机及清污设备 等) Main Transformers and other dry 18 G9 13.75 1.96 NBF/Goods N/A 07/10/2010 transformers(主变压器及干式变压器) 19 G10 Switchyard Equipment(开关站设备) 10.47 1.50 NBF/Goods N/A 07/10/2010 20 G11 Isolated-phase bus (离相全封闭母线) 10.22 1.46 NBF/Goods N/A 07/10/2010 High/Low voltage switchgear and switch power 21 G12 16.23 2.32 NBF/Goods N/A 07/10/2010 panel(高/低压开关柜及动力箱) Cable for power and electric 22 G13 16.23 2.32 NBF/Goods N/A 07/10/2010 wire(电力及动力电缆) 23 G14 Relay protection systems (继电保护系统) 10.32 1.47 NBF/Goods N/A 12/20/2010 Control & Monitoring System of 24 G15 Complex(枢纽监控监视系统) 10.52 1.50 NBF/Goods N/A 12/20/2010 25 G16 Communication System(通讯系统) 2.30 0.33 NBF/Goods N/A 12/20/2010 Automatic Forecast of Water Situation 26 G17 3.65 0.52 NBF/Goods N/A 12/20/2010 System (水情自动测报) Installation of generating units and other M&E 27 G18 equipment in Hydro- 23.90 3.41 NBF/Goods N/A 11/06/2009 plant(电站机电设备安装工程) Dam Safety monitoring 28 G19 6.20 0.89 NBF/Goods N/A 11/06/2009 system(大坝安全监测系统) Powerhouse Auxiliary 29 G20 4.74 0.68 NBF/Goods N/A 07/10/2010 Systems(电站辅助设备系统) 30 G21 fire-extinguishing system (消防系统) 0.49 0.07 NBF/Goods N/A 08/20/2010 Electrical Equipment for Ship Lock & Flood 31 G24 2.84 0.41 NBF/Goods N/A 06/01/2010 Gates(船闸及闸坝电气设备) Electrical Equipment of Protection 32 G25 6.50 0.93 NBF/Goods N/A 03/01/2009 Areas(防护区电排站电气设备) Crest Lifting Machinery of Protection 33 G26 4.20 0.60 NBF/Goods N/A Works (防护区启闭设备) 34 G27 Pump-set of protection areas(防护区泵组) 10.90 1.56 NBF/Goods N/A 05/30/2009 Subtotal 25contracts(25个合同包) (小 计 ) (4) Consultant Service(咨询服务) Study on Reservoir Optimizing 35 C1 2.72 0.39 NBF/Services N/A 06/30/2009 Control(水库优化调度研究) Research on Downstream Water Level Connection 36 C2 2.49 0.36 NBF/Services N/A 12/20/2007 (下游水位衔接研究) 37 C3 Survey and Design(勘测设计) 59.60 8.51 NBF/Services N/A 06/05/2007 Supervision Services for Construction of W4 &Supervision for major Equipments 38 C4 14.91 2.13 NBF/Services N/A 01/15/2009 Manufacturing(W4土建工程施工监理及重要设 备监造) Construction Supervision Services for 39 C5 W5 & Flood Protection Works 5.30 0.76 NBF/Services N/A 01/15/2009 (W5土建库区工程施工监理) 40 C6 Bidding Agent(招标代理) 5.10 0.73 NBF/Services N/A 12/12/2007 Overseas Training/Technical 41 C7 3.56 0.51 CQS/Services Prior 11/01/2010 Assistance (国外培训) Subtotal 7contracts(7个合同包) Total of All 276 Total of ICB/Works 108 Total of NCB/Works 0 Total of NBF/Works 61 Total of ICB/Goods 56 Total of NCB/Goods 0 Total of NBF/Goods 39 Total of CQS Services 1 Total of QBS Services 0 Total of SOE/CQ 0 Total of NBF Services 13 Total of above 277 Total of Prior Review 164 Total of Post Review 0
Groupe de la Banque mondiale · Procurement Plan
China - Jiangxi Shihutang Navigation and Hydropower Complex Project : procurement plan : China - Jiangxi Shihutang Navigation and Hydropower Complex Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Chine
Source
Banque mondiale