Groupe de la Banque mondiale · Procurement Plan

Europe and Central Asia - Neretva and Trebisnjica River Basin Management Project (BiH/Croatia) : procurement plan

Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

Page 1 Type GEF in US$ BiH Estimated cost in US$ Procurement method Packages Post / Prior Issue Bids received Evaluation Ctr. Signed Ctr Completed 1.1.b Support for operation of ISWC and TWG 1. Meetings organization TR Other Post 2. Study tours TR Other Post 1.1.c Training on preparation of river basin management plans and implementation of the EU WFD 1. Series of workshops related to the implementation of EU WFD TR Other Post 2. Workshops series related to the Water Conflicts and Negotiations Techniques TR Other Post 1.1.d Design of a set of appropriate regional coordination procedures for transboundary water resource management CS IC Post Sep-09 Oct-09 Nov-09 Dec-09 Apr-10 1.1.e Identification of necessary additional policy and institutional reforms to facilitate enhanced transboundary management tools CS IC Post Sep-09 Oct-09 Nov-09 Dec-09 Apr-10 1.2.a Equipment and expansion of the existing network of water measurement and monitoring stations CS IC Post Sep-09 Oct-09 Nov-09 Dec-09 Apr-10 1.2.c Develop and implement mathematical models for hydrological predictions, HPP operations, forecasting and decision making CS QCBS Prior Feb-10 May-10 Jul-10 Aug-10 Dec-11 1.3.a Preparation of background studies for development of the NTRB RBMP * CS QCBS Prior Mar-09 Jul-09 Aug-09 Sep-09 Jun-11 1.3.c Conduct an economic analysis of water use in the NTRB CS QCBS Prior Oct-09 Feb-10 Mar-10 Apr-10 Dec-11 1.3.d Develop the river basin management plan CS QCBS Prior Jul-09 Nov-09 Dec-09 Jan-10 Dec-12 2.1.a Improved wetlands management in Hutovo Blato Nature Park CS QCBS Prior Sep-09 Sep-09 Sep-09 Sep-09 Nov-09 2.1.c 1. Completion and Display of the Flora and Fauna exhibit within the Museum of Herzegovina-Trebinje CS CQ Post Sep-09 Sep-09 Sep-09 Sep-09 Sep-09 2.1. Improved management and use of water-dependent ecosystems Improved management and use of wetlands ecosystems COMPONENT 2: * Estimation of the component 1.3.a) (in accordance of BH proposal) is 399,430 USD. Deficiency in the amount of 162,500 USD should be ensured from the B&H contribution, anticipated for the component 1.2a). Prior Development of ecological management objectives for the NTRB Subtotal COMPONENT 1 1.3.b CS Post CS CQ Sep-09 Oct-09 Nov-09 Dec-09 Dec-10 PROCUREMENT PLAN for Bosnia and Herzegovina Neretva and Trebisnjica Management Project 07/13/2010 CONSULTANTS COMPONENT 1 Improved Transboundary Water Resource Management 1.1. Institution and Capacity Building 1.2. Measurement, monitoring and information management 1.2.b Develop basin-wide water information system including GIS system, equipment and training 1.3. River basin management planning Dec-11 Apr-11 May-11 Jun-11 Jul-11 CQ Page 2 Sep-09 2.3.a Conduct a study to determine the minimum environmental flow CS QCBS Prior Sep-09 Sep-09 Oct-09 Oct-09 Nov-09 2.2. Water management infrastructure 2.3. Improved operation of reservoirs, HPPs and dams Post 2.1.c 3.Increased understanding of values of wetlands and their resources-

Informations clés
Type de document Procurement Plan
Date d'adoption
Source Banque mondiale