Page 1 ecaroncaronffflfl3523fl3fldotaccentfiHPHQWflSODQflfflflfiflfi\1a\11fihungarumlaut\11[OV 1 2 3 4 5 6 7 8 9 10 11 No. Contrac t No. Contract Description ( )Ba se Cost(Y m) Base Cost (US$ m) / Pr ocurement Method/Sel ection Method / Revie wed by Bank(Prio r/post) Expec ted Biding Date Commence Date Exp ected Duration in Months Pro posed Retroactiv e Financing( US$ m) Imple mentation Agency WSEC1.2 Enhance condition to deliver training(1.2) 15.43 2.27 - - - - - Chongqing Wushan County Vocational Education Center 20 WSEC1.2-1 Equipment for home electric appliances maintenance 1.29 0.19 NCB Prior 2010.08 2010.09 6 0.11 21 WSEC1.2-2 Equipment for automobile maintenance 1.15 0.17 NCB post 2010.06 2010.07 6 0.1 22 WSEC1.2-3 1 machinery equipment package 1 1.42 0.21 NCB post 2010.08 2010.09 7 0.13 23 WSEC1.2-4 2 machinery equipment package 2 0.74 0.11 shopping post 2011.04 2011.05 5 24 WSEC1.2-5 Equipment for electron and electrician 0.86 0.13 shopping post 2010.06 2010.07 5 0.08 25 WSEC1.2-6 Equipment in relation to tailoring sewing 0.92 0.14 shopping post 2010.07 2010.08 5 0.08 26 WSEC1.2-7 Equipment in relation to architecture 0.70 0.10 shopping post 2010.10 2011.01 5 27 WSEC1.2-8 1 Computer equipment package 1 4.31 0.63 NCB Prior 2010.07 2010.08 10 0.38 28 WSEC1.2-9 2 Computer equipment package 2 2.33 0.35 NCB Prior 2011.02 2011.03 10 29 WSEC1.2-10 3 Computer equipment package 3 1.71 0.25 NCB post 2012.01 2012.02 8 WSECS1.1 1.3 1.4 1.5 1.6 Soft Activities, include: monitor and evaluate the project activities; develop curricula; training the trainer and management level, develop specific training etc. 1.70 0.25 - - - - - Chongqing Wushan County Vocational Education Center 30 WSECS1 1.1 1.4 1.6 Multiple Training courses 1.1 1.4 1.6 1.05 0.15 training/SO E Prior - 2010.10 20 0.08 1. -- Wushan sub-component Updated Procurement Plan for Component B: Employment Capacity Upgrade of Migrant Workers of Chongqing Urban Rural Integrated Project B. Employment Capacity Upgrade of Migrant Workers arumlaut 569.0 768.7 12.0 6.0 90 : fi Page 2 ecaroncaronffflfl3523fl3fldotaccentfiHPHQWflSODQflfflflfiflfi\1a\11fihungarumlaut\11[OV 1 2 3 4 5 6 7 8 9 10 11 No. Contrac t No. Contract Description ( )Ba se Cost(Y m) Base Cost (US$ m) / Pr ocurement Method/Sel ection Method / Revie wed by Bank(Prio r/post) Expec ted Biding Date Commence Date Exp ected Duration in Months Pro posed Retroactiv e Financing( US$ m) Imple mentation Agency 31 WSECS2 1.1 1.6 Multiple Workshops 1.1 1.6 0.10 0.01 workshop/S OE post - 2010.08 12 0.01 WSECS3 1.1 1.3 1.4 1.5 1.6 Multiple Consultants 0.55 0.08 - - 32 WSEC3.1 1.1 Prepare School-enterprise Cooperation Guideline for Wushan Vocational Education Center 0.10 0.01 IC post - 2010.08 8 0.01 33 WSEC3.2 1.3 Devel op curricula textbooks and document 0.15 0.02 IC post - 2011.01 30 34 WSEC3.4 1.4 Expert panel for training the trainer 0.15 0.02 IC post - 2010.09 10 0.01 35 WSEC3.5 1.5 Develop a three-level training plan, and capacity-oriented training method 0.05 0.01 IC post - 2010.09 6 0.01 36 WSEC3.6 1.6 Design, develop and implement monitoring indicator system 0.10 0.01 IC post - 2011.01 10 Subtotal 17.13 2.52 design, supervision, project management etc. 1.77 0.26 Total Investment 18.90 2.78 1.00 YBEC1.2 Enhance condition to deliver training(1.2) 12.04 1.77 - - - - - Chongqing Yubei County 37 YBEC1.2-1 machinery equipment package 5.29 0.78 NCB Prior 2010.06 2010.11 3 0.47 38 YBEC1.2-2 Computer equipment package 1 2.16 0.32 NCB Prior 2010.06 2010.11 3 0.19 39 YBEC1.2-3 Equipment procurement and installation for tourism major 0.41 0.06 Shopping Post 2010.06 2010.11 3 0.04 40 YBEC1.2-4 equipment for electron and electrician 0.98 0.14 NCB Post 2011.03 2011.08 3 2. -- Yubei Subcomponent arumlaut 569.0 768.7 12.0 6.0 90 : ffl Page 3 ecaroncaronffflfl3523fl3fldotaccentfiHPHQWflSODQflfflflfiflfi\1a\11fihungarumlaut\11[OV 1 2 3 4 5 6 7 8 9 10 11 No. Contrac t No. Contract Description ( )Ba se Cost(Y m) Base Cost (US$ m) / Pr ocurement Method/Sel ection Method / Revie wed by Bank(Prio r/post) Expec ted Biding Date Commence Date Exp ected Duration in Months Pro posed Retroactiv e Financing( US$ m) Imple mentation Agency 41 YBEC1.2-5 equipment for automobile maintenance 0.87 0.13 NCB Prior 2011.03 2011.08 3 42 YBEC1.2-6 Equipment in relation to tailoring sewing 0.91 0.13 NCB Post 2011.03 2011.08 3 43 YBEC1.2-7 Equipment in relation to architecture 0.58 0.09 Shopping Post 2012.03 2012.08 12 44 YBEC1.2-8 Equipment for special operation major 0.54 0.08 NCB Post 2012.03 2012.08 60 45 YBEC1.2-9 Soft ware and books 0.30 0.04 Shopping Post 2010.06 2012.08 60 0.01 YBECS1.1 1.3 1.4 1.5 1.6 Soft Activities, include: monitor and evaluate the project activities; develop curricula; training the trainer and management level, develop specific training etc. 1.93 0.28 - - - - - Chongqing Yubei County Vocational Education Center 46 YBECS1 1.4 1.6 Multiple training 0.56 0.08 training/SO E post - 2010.10 5 0.04 47 YBECS2 1.4 1.6 Multiple training 0.46 0.07 NBF n/a n/a 2010.10 5 48 YBECS3 Multiple workshops 0.39 0.06 NBF n/a n/a 2010.10 5 YBECS4 Multiple Consultancy 0.52 0.08 - n/a n/a 2010.10 5 49 YBECS4.1 1fi\03 Invite experts from the enterprise to give professional guidelines 0.10 0.01 NBF n/a n/a 2010.10 5 50 YBECS4.2 1.3 Develop training on special work such as welding , safety technology training, and training for migrant workers 0.30 0.04 NBF n/a n/a 2010.10 5 51 YBECS4.3 1.4 Provide training to enhance teaching capacity once a year 0.08 0.01 NBF n/a n/a 2010.04 5 arumlaut 569.0 768.7 12.0 6.0 90 : ffi Page 4 ecaroncaronffflfl3523fl3fldotaccentfiHPHQWflSODQflfflflfiflfi\1a\11fihungarumlaut\11[OV 1 2 3 4 5 6 7 8 9 10 11 No. Contrac t No. Contract Description ( )Ba se Cost(Y m) Base Cost (US$ m) / Pr ocurement Method/Sel ection Method / Revie wed by Bank(Prio r/post) Expec ted Biding Date Commence Date Exp ected Duration in Months Pro posed Retroactiv e Financing( US$ m) Imple mentation Agency 52 YBECS4.4 1.6 Design, develop and implement monitoring indicator system 0.04 0.01 IC post - 2010.04 5 0.01 Subtotal 13.97 2.05 design, supervision, project management etc. 2.74 0.40 NBF n/a n/a n/a n/a Total Investment 16.71 2.46 0.76 CTBUEC1.2 Enhance condition to deliver training(1.2) 20.97 3.08 - Chong qing Technology and Business University 53 CTBUEC1.2-1 Road reconstruction, network 2.40 0.35 NCB Prior 2010.04 2010.07 5 0.13 0.35 ap plying for retroactive 54 CTBUEC1.2-2 Renovation and expansion of practice and training buildings 2.63 0.39 NCB post 2010.06 2010.08 5 0.14 55 CTBUEC1.2-3 Decoration of students' dormitory 4.20 0.62 NBF n/a n/a n/a n/a 56 CTBUEC1.2-4-1 Computers, servers,switches,networking switch cabinets, network materials and earphones procurement and installation 1.74 0.26 NCB Prior 2010.07 2010.10 3 0.19 CTBUEC1.2-4-2 multimedia teaching equipment 0.43 0.06 NCB Prior 2010.07 2010.10 3 57 CTBUEC1.2-5-1 air-conditioners 0.18 0.03 Shopping post n/a CTBUEC1.2-5-2 Procurement and installation of computer desks and chairs for two people, teachers' desks and chairs, ditches, classroom desks. 0.22 0.03 Shopping post n/a n/a n/a 58 CTBUEC1.2-6 Teaching practice software procurement (first batch) 0.40 0.06 Shopping post n/a 3. -- Chongqing Technology and Business University Subcomponent arumlaut 569.0 768.7 12.0 6.0 90 : ff Page 5 ecaroncaronffflfl3523fl3fldotaccentfiHPHQWflSODQflfflflfiflfi\1a\11fihungarumlaut\11[OV 1 2 3 4 5 6 7 8 9 10 11 No. Contrac t No. Contract Description ( )Ba se Cost(Y m) Base Cost (US$ m) / Pr ocurement Method/Sel ection Method / Revie wed by Bank(Prio r/post) Expec ted Biding Date Commence Date Exp ected Duration in Months Pro posed Retroactiv e Financing( US$ m) Imple mentation Agency 59 CTBUEC1.2-7 Procurement and installation of NC processing simulating system, lathe, NC lathe 2.75 0.40 NCB Prior 2010.09 2010.12 3 60 CTBUEC1.2-8 Procurement and installation of computer-aided design and manufacturing software, and equipment for fitters' labs 1.03 0.15 NBF n/a n/a n/a n/a 61 CTBUEC1.2-9 Procurement and installation of data-centralization storage system 0.90 0.13 Shopping post n/a 62 CTBUEC1.2-10-1 Computers, servers,switches,networking 1.12 0.16 NCB post 2011.04 2011.07 3 CTBUEC1.2-10-2 multimedia teaching equipment procurement and installation (second batch) 0.29 0.04 NCB post 2011.04 2011.07 3 63 CTBUEC1.2-11-1 air-conditioners 0.11 0.02 Shopping post n/a n/a n/a CTBUEC1.2-11-2 Procurement and installation of computer desks and chairs for two people, teachers' desks and chairs, ditches, classroom 0.15 0.02 Shopping post n/a n/a n/a 64 CTBUEC1.2-12 Teaching practice software procurement (second batch) 0.11 0.02 Shopping post n/a n/a n/a 65 CTBUEC1.2-13 Procurement and installation of automobile assembly equipment 0.31 0.05 Shopping post n/a n/a n/a 66 CTBUEC1.2-14 Professional books (five batches) 2.00 0.29 NBF n/a n/a n/a n/a CTBUECS1.1 1. 3 1.4 1.5 1.6 Soft Activities, include: monitor and evaluate the project activities; develop curricula; training the trainer and management level, develop specific training etc. 5.44 0.80 - Chong qing Technology and Business University CTBUECS1 training 3.15 0.46 arumlaut e Page 6 ecaroncaronffflfl3523fl3fldotaccentfiHPHQWflSODQflfflflfiflfi\1a\11fihungarumlaut\11[OV 1 2 3 4 5 6 7 8 9 10 11 No. Contrac t No. Contract Description ( )Ba se Cost(Y m) Base Cost (US$ m) / Pr ocurement Method/Sel ection Method / Revie wed by Bank(Prio r/post) Expec ted Biding Date Commence Date Exp ected Duration in Months Pro posed Retroactiv e Financing( US$ m) Imple mentation Agency 67 CTBUECS1-1 1.3 1.4 1.6 Domestic multiple training 1.65 0.24 training/SO E Prior n/a 2010.7 60 0.05 68 CTBUECS1-2 1.4 1.6 Overseas Study tour 1.50 0.22 NBF n/a n/a 69 CTBUECS2 1.1 Multiple workshops 0.25 0.04 training/SO E Post n/a 2010.7 60 0.01 CTBUECS3 1.1 1.3 1.4 Multiple consultancy 2.04 0.30 - n/a n/a 2010.7 60 70 CTBUECS3.1 1.1 Establish a school- enterprise guiding committee participated by high level management of enterprises and industries, build a platform to release information, promote exchange and infor 0.10 0.01 IC post - 2010.7 60 0.01 71 CTBUECS3.2 1.1 Launch enterprise survey, organize workshop on the dynamic development of the sector 0.10 0.01 IC post - 2010.7 60 0.01 72 CTBUECS3.3 strengthen practical training by building practical training base 0.15 0.02 IC post - 2010.7 60 0.01 73 CTBUECS3.4 1.1 Prepare guidelines and agreement for school-enterprise, and school-local cooperation 0.18 0.03 IC post - 2010.7 36 0.01 74 CTBUECS3.5 1.3 Establish a committee to compile text books, develop syllabus, design training programs, building training base, and launch a pilot program of credit system 0.85 0.13 IC post - 2010.7 60 0.04 75 CTBUECS3.6 1.5 De velop a capacity-based evaluation method 0.10 0.01 IC post - 2010.7 24 0.01 arumlaut n Page 7 ecaroncaronffflfl3523fl3fldotaccentfiHPHQWflSODQflfflflfiflfi\1a\11fihungarumlaut\11[OV 1 2 3 4 5 6 7 8 9 10 11 No. Contrac t No. Contract Description ( )Ba se Cost(Y m) Base Cost (US$ m) / Pr ocurement Method/Sel ection Method / Revie wed by Bank(Prio r/post) Expec ted Biding Date Commence Date Exp ected Duration in Months Pro posed Retroactiv e Financing( US$ m) Imple mentation Agency 76 CTBUECS3.7 1.6 Design, develop and implement monitoring indicator system 0.56 0.08 IC post - 2010.7 60 0.04 Subtotal 26.41 3.88 design, supervision, project management etc. 5.96 0.88 NBF n/a n/a n/a n/a Total Investment 32.37 4.76 0.65 SZEC1.2 Enhance condition to deliver training(1.2) 17.48 2.57 Shizhu County Vocational Education Center 77 SZEC1.2-1 1 Equipment procurement and installation for NC machinery major package 1 3.15 0.46 NCB Prior 2010.05 2010.07 18 0.08 78 SZEC1.2-2 2 Equipment procurement and installation for NC machinery major package 2 1.09 0.16 NCB Post 2012.01 2012.02 9 79 SZEC1.2-3 Equipment procurement and installation for computer major 3.03 0.45 NCB Prior 2010.07 2010.09 18 0.08 80 SZEC1.2-4 1 Equipment procurement and installation for automobile maintenance package 1 2.92 0.43 NCB Prior 2010.06 2010.08 12 0.13 81 SZEC1.2-5 2 Equipment procumrent and installation for automobile maintenace package 2 1.63 0.24 NCB Post 2011.10 2012.01 8 82 SZEC1.2-6 Equipment in relation to tailoring sewing 1.33 0.20 NCB Post 2010.07 2010.09 18 0.04 4. -- Shizhu sub-component arumlaut 569.0 768.7 12.0 6.0 90 : \1a Page 8 ecaroncaronffflfl3523fl3fldotaccentfiHPHQWflSODQflfflflfiflfi\1a\11fihungarumlaut\11[OV 1 2 3 4 5 6 7 8 9 10 11 No. Contrac t No. Contract Description ( )Ba se Cost(Y m) Base Cost (US$ m) / Pr ocurement Method/Sel ection Method / Revie wed by Bank(Prio r/post) Expec ted Biding Date Commence Date Exp ected Duration in Months Pro posed Retroactiv e Financing( US$ m) Imple mentation Agency 83 SZEC1.2-7 1 Equipment procurement and installation for electron and electrician package 1 3.12 0.46 NCB Prior 2010.05 2010.07 18 0.08 84 SZEC1.2-8 2 Equipment procurement and installation for electron and electrician package 2 1.21 0.18 NCB Post 2012.01 2012.02 9 SZECS1.1 1.3 1.4 1.5 1.6 Soft Activities, include: monitor and evaluate the project activities;develop curricula; training the trainer and management level, develop specific training etc. 2.84 0.42 60 Shizhu County Vocational Education Center 85 SZECS1 1.1 1.4 1.6 Multiple Training 0.78 0.11 training/SO E post - 2010.6 15 0.06 86 SZECS2 Multiple workshops 1.1 1.3 1.6 0.26 0.04 Workshop/S OE post - 2010.8 10 0.04 SZECS3 Multiple consultancy 1.1 1.3 1.6 1.80 0.26 - - 87 SZECS3.1 1.1 Prepare School-enterprise Cooperation Guideline for Shizhu Vocational Education Center 0.10 0.01 IC post - 2010.5 8 0.01 88 SZECS3.2 1.3 8 Develop text books for short-term programs of delivering training to 8 key towns and villages featuring large population and huge exports of migrant workers 1.50 0.22 IC Post - 2010.9 30 0.07 89 SZECS3.3 1.6 1- 2 Design, develop and implement monitoring indicator system 0.20 0.03 IC post - 2010.8 10 0.01 Subtotal 20.32 2.99 design, supervision, project management etc. 2.13 0.31 NBF n/a n/a n/a n/a arumlaut ccent Page 9 ecaroncaronffflfl3523fl3fldotaccentfiHPHQWflSODQflfflflfiflfi\1a\11fihungarumlaut\11[OV 1 2 3 4 5 6 7 8 9 10 11 No. Contrac t No. Contract Description ( )Ba se Cost(Y m) Base Cost (US$ m) / Pr ocurement Method/Sel ection Method / Revie wed by Bank(Prio r/post) Expec ted Biding Date Commence Date Exp ected Duration in Months Pro posed Retroactiv e Financing( US$ m) Imple mentation Agency Total Investment 22.45 3.30 0.60 90.42 13.30 Total Investment on Migrant Worker Training Component arumlaut arumlaut
Groupe de la Banque mondiale · Procurement Plan
China - Chongqing Urban Rural Integration Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Chine
Source
Banque mondiale