57086 PROCUREMENT PLAN FOR COMPONENT D AND E Time Duration WB's No. Code Package Costs Type Mode Time activities procurement (month) approval COMPONENT D I Consultancy costs for preparing database: 1 D1 Local Consultant 150.000 Cons QCBS 9/2010-11/2010 12/2010-8/2011 9 Prior II Consultancy costs for establishment database - Database software 1 D2 49.000 Cons CQS 12/2010-2/2010 3/2010-8/2011 5 Post management, training III Equipment - Computers and 1 D3 35.000 Equip Shopping 4/2011-5/2011 5/2011 1 Post Hosting... IV Consultancy costs for Foreign Consultant - Consultant support in 1 D4 appliance database for 190.000 Cons QCBS 11/2010-2/2010 3/2011-8/2011 5 Prior the Government V Study tours in abroad (non-procurement) - Conduct study tours in Study 1 D5 local and abroad (MoC, 116.000 SOE 2/2011 tour MPI, MoF and WSCs) COMPONENT E I Independent Project Monitoring Consultant 1 E-MP - Monitoring Project 37.200 Cons IC 9/2010-10/2010 11/2011-12/2011 13 Post II Independent Quality Assurance Consultant 1 E-QA1 - Quality Assurance 1 24.500 Cons IC 9/2010-10/2010 11/2011-12/2011 7.5 Post 2 E-QA2 - Quality Assurance 2 16.800 Cons IC 9/2010-10/2010 11/2011-12/2011 5 Post
Groupe de la Banque mondiale · Procurement Plan
Vietnam - Urban Water Supply Development Project : procurement plan for component D and E
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Source
Banque mondiale