63660 China : Liaoning Medium Cities Infrastructure Project „ Procurement Plan (October 2010 – December 2012) I. General 1. Project information: Country: China Borrower: People’s Republic of China Project Name: Liaoning Medium Cities Infrastructure Project Project ID: P 099992 Project Implementing Agency (PIA): Liaoning Urban Construction and Renewal Project Office (LUCRPO) will coordinate and supervise all procurement activities. The PIAs for each project component are described as follows: No. Project Sub-component PIA 1 Liaoyang Sub-component PMO under the Urban Construction Bureau 2. Jinzhou Sub-component PMO under the Municipal Construction Committee 3 Benxi Sub-component PMO under the Municipal Construction Committee 4 Panjin Sub-component PMO under the Urban Construction Bureau 5 Fushun Sub-component PMO under the Municipal Construction Committee 2. Bank’s approval Date of the procurement Plan: XXXXXXXXX 3. Date of General Procurement Notice: April 6, 2006 4. Period covered by this procurement plan: October 2010-December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior Review Thresholds Proposed (USD) Goods 0.5 million Works 5 million 2. Prequalification: Not applied. 3. Any Other Special Procurement Arrangements: Not applied in 2010-2012. 4. Procurement Packages with Methods and Time Schedule Domestic Estimated Contract Procurement Review Expected Preference Construction Estimated Cost Prequalification by Bid- Period Ref. No. (Description) Method Category (yes/no) (yes/no) Bank Opening (months) (Million (Million (Prior / Date RMB) USD) Post) Benxi Goods BPT21 Bus stop signs & Bus Shelters 10.81 1.58 ICB NO NO Prior March ,2011 12 (G) Xihu Road Houhu Section, BRI14 Jiefang 2 Road, Xincheng road 35.13 5.14 NCB CW NO NO Prior May ,2011 12 North Section Fushun FTM23 Traffic Signal Control System 7.08 1.06 ICB G NO NO Prior April,2011 6 Qianjin Road,Shiyidao Street,Shisidao Street,Fumin FRM14 Road,Zhonghe Road,Jiudao 41.84 6.24 NCB CW NO NO Prior Feb, 2011 12 Street,Erdao Street,Sidao Street,Qidao Street,Badao Street Yongshou Road,Fengxiang Road,Wangqing Street,Huncun FRM15 33.1 4.93 NCB CW NO NO Post Feb, 2011 12 Street,Meihe Road,Jiangjunsan Street,Xinhuasan Street Heishan Street,Huanren FRM16 Road,West Section of Leifeng 34.33 5.12 NCB CW NO NO Prior March,2011 12 Road,Zhangwu Road Nanhuayuan Street,Suiyang Road,Rengonghe FRM17 37.14 5.54 NCB CW NO NO Prior March,2011 12 Zroad,Hudongyi Street Ningan Road,Meidu Road FRM18 Pannan Road 33.6 5.01 NCB CW NO NO Prior April,2011 12 Domestic Estimated Contract Procurement Review Expected Preference Construction Estimated Cost Prequalification by Bid- Period Ref. No. (Description) Method Category (yes/no) (yes/no) Bank Opening (months) (Million (Million (Prior / Date RMB) USD) Post) Liaoyang milling machine(0.5m), cold recycling machine(2M), LRM22 9.60 1.43 ICB G NO NO Prior April, 2011 6 Mud-sucking truck, 14M Cherry Picker Truck CCTV and cables, Command LTM21 Centre Upgrading, GD system, 15 2.2 ICB G NO NO Prior Feb, 2011 12 ATC and signals Qingnian Street, Jiefang LRM14 31.81 4.74 NCB CW NO NO Post Feb, 2011 12 Road,Laodong Street Shuguang Road, Erdao Street, LRM15 Sandao Street, Bus Stops and 26.71 3.98 NCB CW NO NO Post March,2011 12 passenger waiting sheds LRM16 Greening for Nanhuan Road 27.65 4.12 NCB CW NO NO Post Feb, 2011 6 October, LPT12 Liaohua Bus parking lots 3 0.44 NCB CW NO NO Post 12 2010 Zhongxin road, Beixin street, LRI17 10.45 1.53 NCB CW NO NO Post May, 2011 12 Dongxing road Domestic Estimated Contract Procurement Review Expected Preference Construction Estimated Cost Ref. Prequalificati by Period (Description) Method Category (yes/no) Bid-Opening No. on (yes/no) Bank (months) (Million (Million (Prior / Date RMB) USD) Post) Jinzhou Traffic signals maintenance car, CCTV and cables, RLR JTM21 system, GD System, 26.44 3.87 ICB G NO NO Prior March, 2011 12 Information Screen ATC and signals Shengli Bus Terminal, Xinzhi JPT12 Street Bus Interchange, 2.7 0.4 NCB CW NO NO Post March, 2011 10 Nanshan Bus Interchange Zhongyang Street, JRI18 Zhongyang North Street, 63.63 9.32 NCB CW NO NO Prior March, 2011 12 Jinxing Road JRM18 Shifu Road, Shifu West Road 6.01 0.88 NCB CW NO NO Post March, 2011 10 JRM19 Mingde Street 6.19 0.91 NCB CW NO NO Post March, 2011 10 Beian Road, Beizhen Road, Anda Street, Taifeng Road, Hubei Road, Jingdong Street, Weidong Street, Fukang JRM15 Road, Jinyuan Road, Hechun 51.05 7.47 NCB CW NO NO Prior March, 2011 12 Road, Zhaodong Street, Kuanggong Street, Jinxi Street, Jiangxi Street, Zhonghuan south Road Domestic Estimated Contract Procurement Review Expected Preference Construction Estimated Cost Ref. Prequalification Bid- Period (Description) Method Category (yes/no) by Bank No. (yes/no) Opening (months) (Million (Million (Prior / Date RMB) USD) Post) Panjin ATC and signals, RLR system, March, PTM21 45.81 6.71 ICB G NO NO Prior 12 CCTV 2011 Command Centre Integrated Platform, Command Centre and Computer Room, Wireless Intercom Command System, March, PTM22 Command Centre Upgrading, 35.22 5.16 ICB G NO NO Prior 12 2011 GD System, Urban entrance- exit management system, 122 police system, Traffic flow monitoring system March, PTM24 Guardrail 5 0.73 ICB G NO NO Prior 6 2011 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Prior Review Thresholds Proposed (USD) Consulting Service 0.2 million for firm, 0.05 million for individuals, all SSS 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 300,000 or equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: No. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 7 Ref. No. Description of Estimated Selection Review Expected Comment Assignment Cost (USD) Method by Bank Proposals s (Prior / Submission Post) Date LUCRPO IDTS1 Enforcement of 300,000 QCBS Prior May 1, 2011 traffic and parking strategies Management, training & study tour IDRI2 Transport 250,000 QCBS Prior May 1, 2011 Planning IDRM1 Preventative 120,000 CQS Post May 1, 2011 road Maintenance planning training & study tour IDPT1 Bus Priority 140,000 CQS Post May 1,2011 training & study tour

Informations clés
Type de document Procurement Plan
Date d'adoption
Pays Chine