Page 1 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 10/11/2010 Report No.: AC4425 1. Basic Project Data Country: Indonesia Project ID: P106384 Project Name: Strengthening Statistics Task Team Leader: Vivi Alatas Estimated Appraisal Date: November 1, 2010 Estimated Board Date: December 21, 2010 Managing Unit: EASPI Lending Instrument: Specific Investment Loan Sector: Central government administration (100%) Theme: Economic statistics, modeling and forecasting (29%);Macroeconomic management (29%);Other economic management (14%);Decentralization (14%);Managing for development results (14%) IBRD Amount (US$m.): 65.00 IDA Amount (US$m.): 0.00 GEF Amount (US$m.): 0.00 PCF Amount (US$m.): 0.00 Other financing amounts by source: Borrower 18.00 18.00 Environmental Category: C - Not Required Simplified Processing Simple [X] Repeater [] Is this project processed under OP 8.50 (Emergency Recovery) or OP 8.00 (Rapid Response to Crises and Emergencies) Yes [ ] No [X] 2. Project Objectives The development objectives of the Project to Strengthen the National Statistical System of Indonesia (STATCAP-CERDAS project) are to increase the effectiveness and efficiency of the Indonesian National Statistics Office (BPS-Statistics Indonesia) to produce and disseminate reliable and timely statistics in accordance with international standards and best practices, and to be responsive to user needs. The STATCAP-CERDAS project will support the implementation of BPS# five-year reform program articulated in its 2010-2014 Strategic Plan for Change and Reform for the Development of Statistics (CERDAS). This will be achieved by: streamlining and integrating processes and systems for major product lines; implementing quality assurance system; improving dissemination and user communication; adopting international standards; improving information management systems; strengthening human resources management and development; and aligning organizational structures to business needs. Page 2 3. Project Description This Project is proposed as a 5-year Specific Investment Loan, under the umbrella of the multi-country STATCAP Adaptable Program Loan. The project will have five components: Component A: Improved Statistical Quality. This component will ensure the ongoing relevance and responsiveness of BPS (Statistics Indonesia) programs to emerging user needs. In light of escalating demands and limited resources, the project will assist with improving priority setting processes around statistical collections and exploring trade-offs between competing needs to ensure the BPS work program is #doable# with existing resources. This includes improvements of key statistics, as well as strengthening of cross- cutting areas, such as analysis, survey management and methodology, quality assurance, dissemination and user engagement. Component B: Improved ICT. This component will support the upgrade of information management system and ICT infrastructure to improve standardization, accuracy and timeliness of BPS products. An integrated data warehouse will be designed to facilitate internal data collection, processing and analysis, as well as dissemination and user accessibility. The project will strengthen management of ICT focusing on common tools, shared systems, and IT staffing and skills. Component C: Improved HR Management and Development. The component will implement reforms to HR policies and practices dealing with HR management issues such as performance management, manpower planning, and career development. The Project will also support training and development, through improved corporate training plan, including upgrading of the BPS Education and Training Center and development of HR information system. Component D: Improved Organizational Alignment. This component will ensure that the organizational structure and arrangements are strategically aligned with the changes induced by business process reengineering, introduction of new technologies and systems, and changes in HR requirements. Any changes to legal and regulatory framework (Statistics Law and related government regulations) that may be necessary as a result of changes to institutional arrangements and organizational structure will also be addressed. Component E: Project Management. Project Management Unit (PMU) will be established in BPS and will be supported by specialist consultants to assist with procurement and contract management, as well as a firm to provide Owner's Agent services. 4. Project Location and salient physical characteristics relevant to the safeguard analysis Nation-wide in Indonesia (BPS offices at national, provincial and district level) for technical assistance and capacity development/ training activities. Systems development activities will be based in BPS Headquarters. The Project will not be financing any Page 3 constructions/civil works, but it will provide server and network equipment to enable organizational connectivity, and shared application systems and database access. #Software# will be the major focus of the Project, but limited quantity of #hardware# will also be provided to accommodate and support this development. The equipment financed through the Project will be investing in new systems to augment, rather than replace, existing ICT infrastructure and equipment in BPS. 5. Environmental and Social Safeguards Specialists 6. Safeguard Policies Triggered Yes No Environmental Assessment (OP/BP 4.01) X Natural Habitats (OP/BP 4.04) X Forests (OP/BP 4.36) X Pest Management (OP 4.09) X Physical Cultural Resources (OP/BP 4.11) X Indigenous Peoples (OP/BP 4.10) X Involuntary Resettlement (OP/BP 4.12) X Safety of Dams (OP/BP 4.37) X Projects on International Waterways (OP/BP 7.50) X Projects in Disputed Areas (OP/BP 7.60) X II. Key Safeguard Policy Issues and Their Management A. Summary of Key Safeguard Issues 1. Describe any safeguard issues and impacts associated with the proposed project. Identify and describe any potential large scale, significant and/or irreversible impacts: N/A 2. Describe any potential indirect and/or long term impacts due to anticipated future activities in the project area: N/A 3. Describe any project alternatives (if relevant) considered to help avoid or minimize adverse impacts. N/A 4. Describe measures taken by the borrower to address safeguard policy issues. Provide an assessment of borrower capacity to plan and implement the measures described. N/A 5. Identify the key stakeholders and describe the mechanisms for consultation and disclosure on safeguard policies, with an emphasis on potentially affected people. N/A Page 4 B. Disclosure Requirements Date Environmental Assessment/Audit/Management Plan/Other: Was the document disclosed prior to appraisal? N/A Date of receipt by the Bank Date of "in-country" disclosure Date of submission to InfoShop For category A projects, date of distributing the Executive Summary of the EA to the Executive Directors Resettlement Action Plan/Framework/Policy Process: Was the document disclosed prior to appraisal? Date of receipt by the Bank Date of "in-country" disclosure Date of submission to InfoShop Indigenous Peoples Plan/Planning Framework: Was the document disclosed prior to appraisal? Date of receipt by the Bank Date of "in-country" disclosure Date of submission to InfoShop Pest Management Plan: Was the document disclosed prior to appraisal? Date of receipt by the Bank Date of "in-country" disclosure Date of submission to InfoShop * If the project triggers the Pest Management and/or Physical Cultural Resources, the respective issues are to be addressed and disclosed as part of the Environmental Assessment/Audit/or EMP. If in-country disclosure of any of the above documents is not expected, please explain why: N/A C. Compliance Monitoring Indicators at the Corporate Level (to be filled in when the ISDS is finalized by the project decision meeting) The World Bank Policy on Disclosure of Information Have relevant safeguard policies documents been sent to the World Bank's Infoshop? N/A Have relevant documents been disclosed in-country in a public place in a form and language that are understandable and accessible to project-affected groups and local NGOs? N/A All Safeguard Policies Have satisfactory calendar, budget and clear institutional responsibilities been prepared for the implementation of measures related to safeguard policies? N/A Have costs related to safeguard policy measures been included in the project N/A Page 5 cost? Does the Monitoring and Evaluation system of the project include the monitoring of safeguard impacts and measures related to safeguard policies? N/A Have satisfactory implementation arrangements been agreed with the borrower and the same been adequately reflected in the project legal documents? N/A D. Approvals Signed and submitted by: Name Date Task Team Leader: Ms Vivi Alatas 10/08/2010 Environmental Specialist: Social Development Specialist Additional Environmental and/or Social Development Specialist(s): Approved by: Sector Manager: Mr Shubham Chaudhuri 10/11/2010 Comments:
Groupe de la Banque mondiale · Integrated Safeguards Data Sheet
Indonesia - Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) Project
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Integrated Safeguards Data Sheet
Pays
Indonésie
Source
Banque mondiale