Page 1 P071170- Alborz Integrated Lamd and Water Resources Management Project Tech. Spec. Compl Interval /d Bidding Doc./ PQ Compl Interval /d WB - NO Interval /d SPN Issue BD/PQ I nterval /d Bid/PQ Submission Interval /d Eval. Report to Bank Interval /d WB - NO Interval /d Award I nterval /d Signature Interval /d Completion period (M) Start C ompletion A. Upper Watershed and Forestry Management A.1 Technical Assistance and Capacity Building A.2 Soil and Water Protection A.3 Rangeland and Forest Conservation & Management P UWFM/W1 A3 MOJA Shopping Post N.A. N.A. 23-Jul-07 08-Aug-07 15-Aug-07 N.A. 22-Aug-07 22-Aug-07 12 R UWFM/W1 (Lot1) MOJA Shopping Post 20-May-09 7 27-May-09 _ N.A. 7 N.A. 03-Jun-09 14 17-Jun-09 _ N.A. _ N.A. 3 20-Jun-09 7 27-Jun-09 7 27 04-Jul-09 22-Sep-11 A 14-Jun-09 15-Jun-09 N.A. N.A. 17-Jun-09 04-Jul-09 N.A. N.A. 17-Aug-09 27-Oct-09 31-Oct-09 P UWFM/W1 (Lot2) A3 MOJA Shopping Post 01-Mar-10 7 08-Mar-10 _ N.A. 7 N.A. 15-Mar-10 14 29-Mar-10 _ N.A. _ N.A. 3 01-Apr-10 7 8-Apr-10 7 27 15-Apr-10 03-Jul-12 R A 15-Nov-09 12-Jan-10 N.A. N.A. 13-Jan-10 26-Jan-10 N.A. N.A. 15-Mar-10 15-May-10 20-May-10 P UWFM/W2 A2 MOJA Shopping Post N.A. N.A. 01-Dec-07 15-Dec-07 23-Dec-07 N.A. 01-Jan-08 1-Jan-08 2 R UWFM/W2 (Lot1) MOJA Shopping Post 01-Aug-07 7 08-Aug-07 _ N.A. 7 N.A. 15-Aug-07 14 29-Aug-07 _ N.A. _ N.A. 3 01-Sep-07 7 8-Sep-07 7 7 15-Sep-07 14-Sep-08 A Shopping Post 12-Aug-07 19-Aug-07 N.A. N.A. 03-Sep-07 17-Sep-07 _ N.A. _ N.A. 20-Sep-07 9-Oct-07 11 09-Oct-07 P UWFM/W2 (Lot2) A2 MOJA Shopping Post 01-Sep-09 7 08-Sep-09 _ N.A. 7 N.A. 15-Sep-09 14 29-Sep-09 _ N.A. _ N.A. 3 02-Oct-09 7 9-Oct-09 7 3 16-Oct-09 14-Jan-10 R 20-May-09 7 27-May-09 _ N.A. 7 N.A. 03-Jun-09 14 17-Jun-09 _ N.A. _ N.A. 3 20-Jun-09 7 27-Jun-09 7 3 04-Jul-09 02-Oct-09 A 14-Jun-09 15-Jun-09 N.A. N.A. 17-Jun-09 04-Jul-09 N.A. N.A. 17-Aug-09 27-Oct-09 31-Oct-09 P UWFM/W4 A3 MOJA Shopping Post 15-Jun-07 01-Jul-07 23-Jul-07 01-Aug-07 6 R MOJA NCB Post 01-Jun-10 15 16-Jun-10 _ N.A. 10 26-Jun-10 26-Jun-10 30 26-Jul-10 15 10-Aug-10 _ N.A. 5 15-Aug-10 20 4-Sep-10 30 8 04-Oct-10 01-Jun-11 A P UWFM/W5 A3 MOJA Shopping Post N.A. N.A. 01-Apr-07 15-Apr-07 23-Apr-07 N.A. 01-May-07 1-May-07 6 R UWFM/W5 MOJA Shopping Prior A UWFM/W5 (Lot1) MOJA Shopping Prior N.A. N.A. 26-May-07 27-May-07 _ N.A. _ N.A. 06-Jun-07 6-Jun-07 15 6-Jun-07 17-Jan-09 P UWFM/W5 (Lot2) A3 MOJA NCB Post 01-May-09 15 16-May-09 _ N.A. 10 26-May-09 26-May-09 30 25-Jun-09 15 10-Jul-09 _ N.A. 5 15-Jul-09 20 4-Aug-09 30 8 03-Sep-09 01-May-10 R 10-Jun-09 15 25-Jun-09 _ N.A. 10 05-Jul-09 05-Jul-09 30 04-Aug-09 15 19-Aug-09 _ N.A. 5 24-Aug-09 20 13-Sep-09 30 8 13-Oct-09 10-Jun-10 A 15-Dec-09 22-Feb-10 N.A. 02-Mar-10 02-Mar-10 06-Apr-10 04-May-10 N.A. 16-May-10 08-Jun-10 12-Jun-10 P UWFM/W5 (Lot3) A3 MOJA Shopping Post 01-May-09 7 08-May-09 _ N.A. 7 N.A. 15-May-09 14 29-May-09 _ N.A. _ N.A. 3 01-Jun-09 7 8-Jun-09 7 7 15-Jun-09 11-Jan-10 R NCB Post 30-May-09 15 14-Jun-09 _ N.A. 10 24-Jun-09 24-Jun-09 30 24-Jul-09 15 08-Aug-09 _ N.A. 5 13-Aug-09 20 2-Sep-09 30 8 02-Oct-09 30-May-10 A 06-Jun-09 15-Jun-09 N.A. 25-Jun-09 25-Jun-09 21-Jul-09 N.A. N.A. 16-Aug-09 19-Oct-09 25-Oct-09 P UWFM/W6 A3 MOJA Shopping Post N.A. N.A. 01-Oct-07 15-Oct-07 23-Oct-07 N.A. 01-Nov-07 6 R UWFM/W6 MOJA NCB Post 30-Dec-10 15 14-Jan-11 _ N.A. 10 24-Jan-11 24-Jan-11 30 23-Feb-11 15 10-Mar-11 _ N.A. 5 15-Mar-11 20 4-Apr-11 30 8 04-May-11 30-Dec-11 A P UWFM/W7 A3 MOJA Shopping Post 01-Oct-07 15-Oct-07 23-Oct-07 01-Nov-07 2 R UWFM/W7 MOJA Shopping Post 01-Aug-07 7 23-Oct-07 _ N.A. 7 N.A. 30-Oct-07 14 13-Nov-07 _ N.A. _ N.A. 3 16-Nov-07 7 23-Nov-07 7 5 30-Nov-07 28-Apr-08 A 16-Oct-07 05-Nov-07 19-Nov-07 _ N.A. _ N.A. 22-Nov-07 2-Dec-07 7 5 2-Dec-07 4-May-09 Forest Roads Gates (Addendum No. 1)-Revised Contract Price Ad UWFM/W7-AD1 4-May-09 4-May-09 4-May-09 P UWFM/W8 A3 MOJA Shopping Post 01-Aug-07 15-Aug-07 23-Aug-07 01-Sep-07 6 R UWFM/W8 MOJA NCB Post 01-Dec-10 15 16-Dec-10 _ N.A. 10 26-Dec-10 26-Dec-10 30 25-Jan-11 15 09-Feb-11 _ N.A. 5 14-Feb-11 20 6-Mar-11 30 8 05-Apr-11 01-Dec-11 A P UWFM/W9 (Lot 1) A2 MOJA Shopping Post 6 R UWFM/W9 (Lot 1) MOJA Shopping Prior A UWFM/W9 (Lot 1) MOJA Shopping Prior 16-May-07 19-May-07 21-May-07 03-Jun-07 3-Jun-07 8 03-Jun-07 29-Jan-08 Esklimroud First addendum- Revised Contract Price Ad UWFM/W9 (Lot 1)- AD1 MOJA 25-Jan-08 2 29-Jan-08 29-Mar-08 P UWFM/W9 (Lot 2) A2 MOJA Shopping Post R UWFM/W9 (Lot 2) MOJA NCB Post 30-May-09 15 14-Jun-09 _ N.A. 10 24-Jun-09 24-Jun-09 30 24-Jul-09 15 08-Aug-09 _ N.A. 5 13-Aug-09 20 2-Sep-09 30 6 02-Oct-09 31-Mar-10 A 06-Jun-09 15-Jun-09 N.A. 25-Jun-09 25-Jun-09 21-Jul-09 N.A. N.A. 16-Aug-09 31-Oct-09 01-Nov-09 P UWFM/W16(Lot 1) A3 MOJA Shopping Post 01-Aug-07 15-Aug-07 23-Aug-07 01-Sep-07 6 R UWFM/W10 MOJA NCB Post 20-Dec-10 15 04-Jan-11 _ N.A. 10 14-Jan-11 14-Jan-11 30 13-Feb-11 15 28-Feb-11 _ N.A. 5 05-Mar-11 20 25-Mar-11 30 6 24-Apr-11 21-Oct-11 90 100 Sabz Moeude Ghaemshahr Co. 100 Prior/ Post Reviews 100 C o n t r a c t o r ' s N a m e Preparation Evaluation Azar Ab Tabarestan Co. Abbas Abade Savad Kouh Co. Implementation 65 100 Cheshmeh Omide Shalizarhaye Shomal Co. 100 Contract Bidding Maintenance of Forest Roads (4 km Babolrud) Grass Planting, Fencing and Seedling of Rangeland Grass Planting, Fencing and Seedling of Rangeland Agency Maintenance of Water Sources and Structures Proc. Method Sub Component Maintenance of Forest Roads (20 km Karsangrud) Maintenance of Water Sources and Structures Maintenance of Forest Roads (10 km Karsangrud) Thinning of old Plantation Procurement Plan Works Package No. Plan/Revised/Actual Contract Description Forest Roads Gates (3 Gates) Buildings for Integrated Natural Resources Management (for MNRD, Cooperatives and MDOE ) Structural Soil Conservation Measures (Esklim rood) Land Slide stabilizing and construction of retaining wall in Lafourak-Darzanoun forest road and rehabilitation of the second Canceled Nursery construction and supply with equipment 40 Rah Gostar Khazar Ab Remarks Structural Soil Conservation Measures (Babolak) P h y s i c a l P r o g r e s s ( % ) 30 Lapour Dam Savad Kouh 50 Rouyan Kesht Savad Kouh Rah Sanj Khazar Co. Lapour Dam Savad Kouh Sarouj Sazeh Gostar October 20, 2010 Page 2 P071170- Alborz Integrated Lamd and Water Resources Management Project Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Procurement Plan Works Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) October 20, 2010 Tech. Spec. Compl Interval /d Bidding Doc./ PQ Compl Interval /d WB - NO Interval /d SPN Issue BD/PQ I nterval /d Bid/PQ Submission Interval /d Eval. Report to Bank Interval /d WB - NO Interval /d Award I nterval /d Signature Interval /d Completion period (M) Start C ompletion Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) A P UWFM/W1 A2 MOJA NCB Prior 15-Sep-07 15 30-Sep-07 15 15-Oct-07 10 25-Oct-07 25-Oct-07 30 24-Nov-07 15 09-Dec-07 15 24-Dec-07 5 29-Dec-07 20 18-Jan-08 30 10 17-Feb-08 13-Dec-08 R UWFM/W11 Shopping Post 01-Dec-10 7 08-Dec-10 _ N.A. 7 N.A. 15-Dec-10 14 29-Dec-10 _ N.A. _ N.A. 3 01-Jan-11 7 8-Jan-11 7 10 15-Jan-11 11-Nov-11 A P UWFM/W2 A2 MOJA NCB Post 15-Sep-08 15 30-Sep-08 _ N.A. 10 10-Oct-08 10-Oct-08 30 09-Nov-08 15 N.A. _ N.A. 5 29-Nov-08 20 19-Dec-08 30 10 18-Jan-09 14-Nov-09 R UWFM/W12 20-Dec-10 15 04-Jan-11 _ N.A. 10 14-Jan-11 14-Jan-11 30 13-Feb-11 15 28-Feb-11 _ N.A. 5 05-Mar-11 20 25-Mar-11 30 10 24-Apr-11 18-Feb-12 A P UWFM/W3 A2 MOJA NCB Post 15-Sep-09 15 30-Sep-09 _ N.A. 10 10-Oct-09 10-Oct-09 30 09-Nov-09 15 N.A. _ N.A. 5 29-Nov-09 20 19-Dec-09 30 10 18-Jan-10 14-Nov-10 R UWFM/W13 20-Feb-11 15 07-Mar-11 _ N.A. 10 17-Mar-11 17-Mar-11 30 16-Apr-11 15 01-May-11 _ N.A. 5 06-May-11 20 26-May-11 30 10 25-Jun-11 20-Apr-12 A P UWFM/W4 A2 MOJA NCB Post 15-Sep-10 15 30-Sep-10 _ N.A. 10 10-Oct-10 10-Oct-10 30 09-Nov-10 15 N.A. _ N.A. 5 29-Nov-10 20 19-Dec-10 30 10 18-Jan-11 14-Nov-11 R UWFM/W14 20-Feb-11 15 07-Mar-11 _ NA 10 17-Mar-11 17-Mar-11 30 16-Apr-11 15 01-May-11 _ NA 5 06-May-11 20 26-May-11 30 10 25-Jun-11 20-Apr-12 A P UWFM/W5 A2 MOJA NCB Post 15-Sep-07 15 30-Sep-07 _ N.A. 10 10-Oct-07 10-Oct-07 30 09-Nov-07 15 N.A. _ N.A. 5 29-Nov-07 20 19-Dec-07 30 10 18-Jan-08 13-Nov-08 R UWFM/W15 20-Feb-11 15 07-Mar-11 _ NA 10 17-Mar-11 17-Mar-11 30 16-Apr-11 15 01-May-11 _ NA 5 06-May-11 20 26-May-11 30 10 25-Jun-11 20-Apr-12 A P UWFM/W6 A2 MOJA NCB Post 15-Sep-08 15 30-Sep-08 _ N.A. 10 10-Oct-08 10-Oct-08 30 09-Nov-08 15 N.A. _ N.A. 5 29-Nov-08 20 19-Dec-08 30 10 18-Jan-09 14-Nov-09 R UWFM/W16 20-Feb-11 15 07-Mar-11 _ NA 10 17-Mar-11 17-Mar-11 30 16-Apr-11 15 01-May-11 _ NA 5 06-May-11 20 26-May-11 30 10 25-Jun-11 20-Apr-12 A P UWFM/W7 A2 MOJA NCB Post 15-Sep-09 15 30-Sep-09 _ N.A. 10 10-Oct-09 10-Oct-09 30 09-Nov-09 15 N.A. _ N.A. 5 29-Nov-09 20 19-Dec-09 30 10 18-Jan-10 14-Nov-10 R UWFM/W17 20-Feb-11 15 07-Mar-11 _ NA 10 17-Mar-11 17-Mar-11 30 16-Apr-11 15 01-May-11 _ NA 5 06-May-11 20 26-May-11 30 10 25-Jun-11 20-Apr-12 A P UWFM/W22 A3 MOJA NCB Post 01-May-08 15 16-May-08 _ N.A. 10 26-May-08 26-May-08 30 25-Jun-08 15 N.A. _ N.A. 5 15-Jul-08 20 4-Aug-08 30 10 03-Sep-08 30-Jun-09 R UWFM/W29 A3 Shopping Post 23-Sep-08 7 30-Sep-08 _ N.A. 7 N.A. 07-Oct-08 14 21-Oct-08 _ N.A. _ N.A. 3 24-Oct-08 7 31-Oct-08 7 6 07-Nov-08 06-May-09 A UWFM/W29 A3 MOJA Shopping Post 10-Nov-08 10-Jan-09 _ N.A. N.A. 14-Jan-09 14 28-Jan-09 _ N.A. _ N.A. 03-Mar-09 7 03-Mar-09 7 27 03-Mar-09 P UWFM/W23 A3 MOJA NCB Post 01-May-09 15 16-May-09 _ N.A. 10 26-May-09 26-May-09 30 25-Jun-09 15 N.A. _ N.A. 5 15-Jul-09 20 4-Aug-09 30 10 03-Sep-09 30-Jun-10 R UWFM/W30 MOJA Shopping Post 20-Feb-11 7 27-Feb-11 _ N.A. 7 N.A. 06-Mar-11 14 20-Mar-11 _ N.A. _ N.A. 3 23-Mar-11 7 30-Mar-11 7 6 06-Apr-11 03-Oct-11 A 29-Jan-10 07-Feb-10 N.A. N.A. 08-Feb-10 21-Feb-10 N.A. N.A. 28-Mar-10 15-May-10 20-May-10 P UWFM/W31 A3 MOJA NCB Post 20-Feb-10 15 07-Mar-10 _ N.A. 10 17-Mar-10 17-Mar-10 30 16-Apr-10 15 N.A. _ N.A. 5 06-May-10 20 26-May-10 30 10 25-Jun-10 21-Apr-11 R NCB Post 20-Dec-10 15 04-Jan-11 _ N.A. 10 14-Jan-11 14-Jan-11 30 13-Feb-11 15 28-Feb-11 _ N.A. 5 05-Mar-11 20 25-Mar-11 30 10 24-Apr-11 18-Feb-12 A P UWFM/W32 A3 MOJA NCB Post 20-Feb-10 15 07-Mar-10 _ N.A. 10 17-Mar-10 17-Mar-10 30 16-Apr-10 15 N.A. _ N.A. 5 06-May-10 20 26-May-10 30 10 25-Jun-10 21-Apr-11 R NCB Post 20-Dec-10 15 04-Jan-11 _ N.A. 10 14-Jan-11 14-Jan-11 30 13-Feb-11 15 28-Feb-11 _ N.A. 5 05-Mar-11 20 25-Mar-11 30 10 24-Apr-11 18-Feb-12 A P UWFM/W38 A3 MOJA NCB Post 01-Oct-08 15 18-Dec-08 _ N.A. 10 28-Dec-08 28-Dec-08 30 27-Jan-09 15 N.A. _ N.A. 5 16-Feb-09 20 8-Mar-09 30 10 07-Apr-09 01-Feb-10 R A NCB Post 03-Dec-08 25-Jan-09 NA 04-Feb-09 04-Feb-09 01-Mar-09 NA NA 04-Mar-09 28-Apr-09 28-Apr-09 P UWFM/W39 A3 MOJA NCB Post 01-May-09 15 16-May-09 _ N.A. 10 26-May-09 26-May-09 30 25-Jun-09 15 N.A. _ N.A. 5 15-Jul-09 20 4-Aug-09 30 10 03-Sep-09 30-Jun-10 R NCB Post 20-Dec-10 15 04-Jan-11 _ N.A. 10 14-Jan-11 14-Jan-11 30 13-Feb-11 15 N.A. _ N.A. 5 05-Mar-11 20 25-Mar-11 30 10 24-Apr-11 18-Feb-12 A P UWFM/W40 A3 MOJA NCB Post 01-May-09 15 16-May-09 _ N.A. 10 26-May-09 26-May-09 30 25-Jun-09 15 N.A. _ N.A. 5 15-Jul-09 20 4-Aug-09 30 9 03-Sep-09 31-May-10 R 30-May-09 15 16-May-09 _ N.A. 10 26-May-09 26-May-09 30 25-Jun-09 15 N.A. _ N.A. 5 01-Nov-09 20 21-Nov-09 30 9 21-Dec-09 17-Sep-10 A 09-Jun-09 09-Sep-09 N.A. 24-Sep-09 24-Sep-09 27-Oct-09 N.A. N.A. 03-Mar-10 13-Apr-10 26-Apr-10 P UWFM/W41 A3 MOJA NCB Post 01-May-09 15 17-Jun-09 _ N.A. 10 27-Jun-09 27-Jun-09 30 27-Jul-09 15 N.A. _ N.A. 5 16-Aug-09 20 5-Sep-09 30 9 05-Oct-09 02-Jul-10 R 20-May-09 15 16-May-10 _ N.A. 10 26-May-10 26-May-10 30 25-Jun-10 15 N.A. _ N.A. 5 15-Jul-10 20 4-Aug-10 30 9 03-Sep-10 31-May-11 A 02-Jun-09 10-Jun-09 N.A. 09-Aug-09 09-Aug-09 08-Sep-09 N.A. N.A. 02-Nov-09 22-Dec-09 28-Dec-09 P UWFM/W42 A3 MOJA NCB Post 01-May-10 15 15-Jan-00 _ N.A. 10 25-Jan-00 25-Jan-00 30 24-Feb-00 15 N.A. _ N.A. 5 15-Mar-00 20 4-Apr-00 30 10 04-May-00 28-Feb-01 R MOJA NCB Prior 07-Sep-10 15 22-Sep-10 15 07-Oct-10 10 17-Oct-10 17-Oct-10 30 16-Nov-10 15 01-Dec-10 15 16-Dec-10 5 21-Dec-10 20 10-Jan-11 30 12 09-Feb-11 04-Feb-12 A Construction of 2.7 km of access road Tavana Sazeh Savad Kouh Co. Zarjou Boland Tabarestan Co. Chakal Sazeh Mazeroun Co. 30 100 Twig Check dams/ vegetative measures Structural soil conservation measures (Babolakroud) Twig Check dams/ vegetative measures Twig Check dams/ vegetative measurea Structural soil conservation measures Structural soil conservation measures and rehabilitation of the second 10 Km Canceled Canceled Canceled Canceled Canceled Canceled Rehabilitation of degraded forests in Karsang Roud Zone Maintenance and Competition of Ghozak Roudbar Access on Forest Road Construction of 6.9 km of Forest access road and Bridges (Karsangrud) Reforestation of forest cleaning (300Ha) Improvment of Eco Tourisem Places (Gazou Waterfall) Rehabilitation of degraded forests Structural soil conservation measures 50 90 Karsang Roud Cooperative Karsang Roud Cooperative Construction of 3 km of access road (Babolrud) 70 Construction of Forest access road Page 3 P071170- Alborz Integrated Lamd and Water Resources Management Project Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Procurement Plan Works Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) October 20, 2010 Tech. Spec. Compl Interval /d Bidding Doc./ PQ Compl Interval /d WB - NO Interval /d SPN Issue BD/PQ I nterval /d Bid/PQ Submission Interval /d Eval. Report to Bank Interval /d WB - NO Interval /d Award I nterval /d Signature Interval /d Completion period (M) Start C ompletion Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) P UWFM/W43 A3 MOJA NCB Post 01-May-10 15 16-May-10 _ N.A. 10 26-May-10 26-May-10 30 25-Jun-10 15 N.A. _ N.A. 5 15-Jul-10 20 4-Aug-10 30 10 03-Sep-10 30-Jun-11 R MOJA NCB Post 20-Feb-11 15 07-Mar-11 _ N.A. 10 17-Mar-11 17-Mar-11 30 16-Apr-11 15 N.A. _ N.A. 5 06-May-11 20 26-May-11 30 10 25-Jun-11 20-Apr-12 A P UWFM/W44 A3 MOJA NCB Prior 07-Sep-10 15 22-Sep-10 _ N.A. 10 02-Oct-10 02-Oct-10 30 01-Nov-10 15 N.A. _ N.A. 5 21-Nov-10 20 11-Dec-10 30 10 10-Jan-11 06-Nov-11 R A P UWFM/W45 A2 MOJA NCB Post 20-Oct-10 15 04-Nov-10 _ N.A. 10 14-Nov-10 14-Nov-10 30 14-Dec-10 15 N.A. _ N.A. 5 03-Jan-11 20 23-Jan-11 30 10 22-Feb-11 19-Dec-11 R A P UWFM/W46 A3 MOJA NCB Post 20-Oct-10 15 04-Nov-10 _ N.A. 10 14-Nov-10 14-Nov-10 30 14-Dec-10 15 N.A. _ N.A. 5 03-Jan-11 20 23-Jan-11 30 10 22-Feb-11 19-Dec-11 R A Subtotal MOJA Subtotal MRWC Total Both PIUs B. Irrigation and Drainage Management B.1 Rehabilitation and Development of Irrigation and Drinage Systems B.3 Agricultural Extension and Research Activities P IDM/W101 B1 MRWC ICB Prior 01-Apr-09 01-Jun-09 01-Jul-09 01-Aug-09 30 R IDM/W101 MRWC ICB Prior 06-Apr-10 20 26-Apr-10 15 04-Aug-10 10 14-Aug-10 14-Aug-10 60 13-Oct-10 30 28-Oct-10 15 12-Nov-10 5 17-Nov-10 20 7-Dec-10 30 18 06-Jan-11 29-Jun-12 A 06-Jul-10 20-Jul-10 23-Jul-10 19-Aug-10 19-Aug-10 28-Sep-10 P IDM/W102 B1 MRWC ICB Prior 01-Jan-09 01-Mar-09 01-Apr-09 01-May-09 33 R IDM/W102 MRWC ICB Prior 06-Apr-10 20 26-Apr-10 15 04-Aug-10 10 14-Aug-10 14-Aug-10 60 13-Oct-10 30 28-Oct-10 15 12-Nov-10 5 17-Nov-10 20 7-Dec-10 30 18 06-Jan-11 29-Jun-12 A 06-Jul-10 20-Jul-10 23-Jul-10 19-Aug-10 19-Aug-10 28-Sep-10 P IDM/W103 B1 MRWC ICB Prior 01-Oct-08 01-Dec-08 01-Jan-09 01-Feb-09 24 R IDM/W103 MRWC ICB Prior 06-Apr-10 20 26-Apr-10 15 31-Jul-10 10 10-Aug-10 10-Aug-10 60 09-Oct-10 30 28-Oct-10 15 12-Nov-10 5 17-Nov-10 20 7-Dec-10 30 18 06-Jan-11 29-Jun-12 A 06-Jul-10 16-Jul-10 23-Jul-10 19-Aug-10 19-Aug-10 28-Sep-10 P IDM/W201 B1 MRWC ICB Prior 01-Sep-05 15-Oct-05 31-Dec-05 01-May-06 30 R IDM/W201 MRWC ICB Prior A IDM/W201 MRWC ICB Prior 18-Jul-05 18-Jul-05 19-Sep-05 21-Dec-05 31-Dec-05 02-Feb-06 30 02-Feb-06 P IDM/W202 B1 MRWC ICB Prior 02-Aug-06 24-Sep-06 02-Dec-06 01-Apr-07 30 R IDM/W202 MRWC ICB Prior A IDM/W202 MRWC ICB Prior 12-Jun-06 02-Jul-06 17-Jul-06 26-Jul-06 02-Aug-06 24-Sep-06 01-Dec-06 07-Dec-06 01-Jan-07 11-Jan-07 30 11-Jan-07 P IDM/W203 B1 MRWC ICB Prior 31-Mar-07 15-May-07 15-Jun-07 15-Jul-07 18 R ICB Prior 07-Jul-08 15 22-Jul-08 15 28-Aug-08 10 30-Nov-08 30-Nov-08 30 30-Dec-08 15 23-Mar-09 15 11-Jun-09 5 09-Jun-09 20 29-Jun-09 30 18 29-Jul-09 20-Jan-11 A 19-Jul-08 13-Aug-08 20-Nov-08 19-Jan-09 19-Jan-09 08-Mar-09 27-May-09 04-Jun-09 16-Jun-09 19-Jul-09 22-Jul-09 P IDM/W204 MRWC ICB Prior 28-Feb-07 20 20-Mar-07 15 04-Apr-07 10 14-Apr-07 14-Apr-07 60 13-Jun-07 30 13-Jul-07 15 28-Jul-07 5 02-Aug-07 20 22-Aug-07 30 30 21-Sep-07 09-Mar-10 R ICB 01-Feb-09 20 21-Feb-09 15 23-Apr-09 10 NA 03-May-09 60 02-Jul-09 15 11-Nov-09 15 26-Nov-09 5 01-Dec-09 20 27-Feb-10 30 24 29-Mar-10 18-Mar-12 A 01-Feb-09 08-Apr-09 22-Aug-09 24-Aug-09 24-Aug-09 27-Oct-09 17-Jan-10 30-Jan-10 07-Feb-10 17-Mar-10 17-Mar-10 P IDM/W205 MRWC ICB Prior 01-Oct-08 20 21-Oct-08 15 05-Nov-08 10 15-Nov-08 15-Nov-08 60 14-Jan-09 30 13-Feb-09 15 28-Feb-09 5 05-Mar-09 20 25-Mar-09 30 36 24-Apr-09 08-Apr-12 R ICB 15-Feb-09 20 07-Mar-09 10 06-Jun-09 10 NA 16-Jun-09 45 31-Jul-09 20 12-Oct-09 15 27-Oct-09 5 01-Nov-09 10 11-Nov-09 30 30 11-Dec-09 29-May-12 A 07-May-09 27-May-09 09-Jul-09 22-Jul-09 22-Jul-09 22-Sep-09 16-Nov-09 17-Dec-09 23-Dec-09 17-Mar-10 17-Mar-10 P IDM/W206 B1 MRWC PQ Prior 31-Aug-07 20 20-Sep-07 15 05-Oct-07 10 15-Oct-07 15-Oct-07 60 14-Dec-07 30 13-Jan-08 15 28-Jan-08 5 _ 20 _ - _ _ R NA 20 01-Nov-08 15 15-Mar-10 10 25-Mar-10 25-Mar-10 45 09-May-10 10 19-May-10 10 29-May-10 5 _ 20 _ - _ _ A 18-Aug-08 18-Aug-08 P IDM/W206 MRWC ICB Prior 01-Oct-08 20 18-Jan-08 15 02-Feb-08 10 12-Feb-08 12-Feb-08 60 12-Apr-08 30 12-May-08 15 27-May-08 5 01-Jun-08 20 21-Jun-08 30 36 21-Jul-08 06-Jul-11 R ICB 19-May-10 20 08-Jun-10 15 23-Jun-10 10 NA 03-Jul-10 60 01-Sep-10 30 01-Oct-10 15 16-Oct-10 5 21-Oct-10 20 10-Nov-10 30 20 10-Dec-10 01-Aug-12 A New New Rehabilitation of forest road New Rangeland protection measures B.2 Institutional Support for WUA Establishment Choulab Co. Construction of nursery Fencing in forests (Protection and Natural Resources Management) Pars Garma Co. 75 5 100 55 8 Financed by GOI Canceled Babol Right Bank Traditional I&D System (B1) Talar Right Bank Traditional I&D System (B3) Halidasht Pumping Station Systems Siah left Bank New I&D Prim. & Sec. Systems Bastian & No Gostaran JV Gohar Roude Gilan Co. Main New Canals and Drain System (C24,C25 & MD2) Talar Right Bank New I&D Prim. & Sec. Systems Main Conveyance Canal III Raeiskola System Weir, Canals and Drains (including two non- project river check structures) Ab-o Khak Keshvar Co. Talar Left Bank Traditional I&D System (B2) Page 4 P071170- Alborz Integrated Lamd and Water Resources Management Project Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Procurement Plan Works Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) October 20, 2010 Tech. Spec. Compl Interval /d Bidding Doc./ PQ Compl Interval /d WB - NO Interval /d SPN Issue BD/PQ I nterval /d Bid/PQ Submission Interval /d Eval. Report to Bank Interval /d WB - NO Interval /d Award I nterval /d Signature Interval /d Completion period (M) Start C ompletion Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) P IDM/W301 a B1 MOJA ICB Prior 15-Feb-08 20 06-Mar-08 15 21-Mar-08 10 31-Mar-08 31-Mar-08 60 30-May-08 30 29-Jun-08 15 14-Jul-08 5 19-Jul-08 20 8-Aug-08 30 30 07-Sep-08 24-Feb-11 R IDM/W301 ICB Prior 03-May-09 20 13-Jun-09 15 28-Jun-09 10 08-Jul-09 08-Jul-09 60 06-Sep-09 30 31-Dec-09 15 15-Jan-10 5 20-Jan-10 20 9-Feb-10 30 24 11-Mar-10 29-Feb-12 A 24-May-09 02-Sep-09 14-Sep-09 14-Sep-09 06-Oct-09 01-Dec-09 12-Jan-10 11-Feb-10 16-Feb-10 15-Mar-10 14-Apr-10 P IDM/W302 a MOJA ICB Prior 28-Feb-09 20 20-Mar-09 15 04-Apr-09 10 14-Apr-09 14-Apr-09 60 13-Jun-09 30 13-Jul-09 15 28-Jul-09 5 02-Aug-09 20 22-Aug-09 30 30 21-Sep-09 09-Mar-12 R IDM/W302 27-Nov-09 20 17-Dec-09 15 01-Jan-10 10 11-Jan-10 11-Jan-10 60 12-Mar-10 30 11-Apr-10 15 26-Apr-10 5 01-May-10 20 21-May-10 30 24 20-Jun-10 09-Jun-12 A 20-Jan-10 20-Jan-10 26-Feb-10 04-Mar-10 04-Mar-10 04-May-10 P IDM/W303a B1 MOJA ICB Prior 14-Feb-09 20 06-Mar-09 15 21-Mar-09 10 31-Mar-09 31-Mar-09 60 30-May-09 30 29-Jun-09 15 14-Jul-09 5 19-Jul-09 20 8-Aug-09 30 30 07-Sep-09 24-Feb-12 R ICB 07-Sep-10 20 27-Sep-10 15 12-Oct-10 10 22-Oct-10 22-Oct-10 60 21-Dec-10 30 20-Jan-11 15 04-Feb-11 5 09-Feb-11 20 1-Mar-11 30 20 31-Mar-11 20-Nov-12 A P IDM/W303b B1 MOJA ICB Prior 14-Feb-09 20 06-Mar-09 15 21-Mar-09 10 31-Mar-09 31-Mar-09 60 30-May-09 30 29-Jun-09 15 14-Jul-09 5 19-Jul-09 20 8-Aug-09 30 30 07-Sep-09 24-Feb-12 R ICB 07-Apr-10 20 27-Apr-10 15 12-May-10 10 22-May-10 22-May-10 60 21-Jul-10 30 20-Aug-10 15 04-Sep-10 5 09-Sep-10 20 29-Sep-10 30 20 29-Oct-10 20-Jun-12 A P IDM/W304a B1 MOJA ICB Prior 14-Feb-09 20 06-Mar-09 15 21-Mar-09 10 31-Mar-09 31-Mar-09 60 30-May-09 30 29-Jun-09 15 14-Jul-09 5 19-Jul-09 20 8-Aug-09 30 30 07-Sep-09 24-Feb-12 R ICB 07-Apr-10 20 27-Apr-10 15 12-May-10 10 22-May-10 22-May-10 60 21-Jul-10 30 20-Aug-10 15 04-Sep-10 5 09-Sep-10 20 29-Sep-10 30 20 29-Oct-10 20-Jun-12 A P IDM/W304b B1 MOJA ICB Prior 02-Feb-09 20 22-Feb-09 15 09-Mar-09 10 19-Mar-09 19-Mar-09 60 18-May-09 30 17-Jun-09 15 02-Jul-09 5 07-Jul-09 20 27-Jul-09 30 30 26-Aug-09 12-Feb-12 R ICB 07-Apr-10 20 27-Apr-10 15 12-May-10 10 22-May-10 22-May-10 60 21-Jul-10 30 20-Aug-10 15 04-Sep-10 5 09-Sep-10 20 29-Sep-10 30 20 29-Oct-10 20-Jun-12 A P IDM/W401 B1 MOJA NCB Prior 24-Sep-07 15 09-Oct-07 _ N.A. 10 19-Oct-07 19-Oct-07 30 18-Nov-07 15 N.A. _ N.A. 5 08-Dec-07 20 28-Dec-07 30 6 27-Jan-08 25-Jul-08 R NCB 05-May-09 15 20-May-09 15 19-Feb-10 7 26-Feb-10 26-Feb-10 30 28-Mar-10 15 12-Apr-10 15 27-Apr-10 5 02-May-10 20 22-May-10 30 12 21-Jun-10 16-Jun-11 A 14-Jun-09 15-Jun-09 P IDM/W402a B1 MOJA ICB Prior 24-Sep-07 20 14-Oct-07 15 29-Oct-07 10 08-Nov-07 08-Nov-07 60 07-Jan-08 30 06-Feb-08 15 21-Feb-08 5 26-Feb-08 20 17-Mar-08 30 12 16-Apr-08 11-Apr-09 R IDM/W402a (Lot 1) NCB 01-Apr-10 20 21-Apr-10 15 06-May-10 10 16-May-10 16-May-10 60 15-Jul-10 30 14-Aug-10 15 29-Aug-10 5 03-Sep-10 20 23-Sep-10 30 12 23-Oct-10 18-Oct-11 A P IDM/W402a (Lot 2) B1 MOJA NCB Prior 01-Apr-10 20 21-Apr-10 15 06-May-10 10 16-May-10 16-May-10 60 15-Jul-10 30 14-Aug-10 15 29-Aug-10 5 03-Sep-10 20 23-Sep-10 30 12 23-Oct-10 18-Oct-11 R A P IDM/W402b (Lot 1) B1 MOJA ICB Prior 17-Dec-09 20 06-Jan-10 15 21-Jan-10 10 31-Jan-10 31-Jan-10 60 01-Apr-10 30 01-May-10 15 16-May-10 5 21-May-10 20 10-Jun-10 30 24 10-Jul-10 29-Jun-12 R ICB 06-May-10 20 26-May-10 15 10-Jun-10 10 20-Jun-10 20-Jun-10 60 19-Aug-10 30 18-Sep-10 15 03-Oct-10 5 08-Oct-10 20 28-Oct-10 30 24 27-Nov-10 16-Nov-12 A P IDM/W402b (Lot 2) B1 MOJA NCB Prior 01-Dec-07 15 16-Dec-07 15 31-Dec-07 10 10-Jan-08 10-Jan-08 30 09-Feb-08 15 24-Feb-08 15 10-Mar-08 5 15-Mar-08 20 4-Apr-08 30 13 04-May-08 29-May-09 R NCB 16-Jun-08 15 01-Jul-08 15 16-Jul-08 7 23-Jul-08 23-Jul-08 30 22-Aug-08 15 06-Sep-08 15 21-Sep-08 5 26-Sep-08 20 16-Oct-08 30 12 15-Nov-08 10-Nov-09 A NCB 23-Jun-08 01-Jul-08 27-Oct-08 30-Oct-08 30-Oct-08 24-Nov-08 29-Nov-08 10-Dec-08 14-Dec-08 04-Jan-09 04-Jan-09 Land Consolidation in Qaemshahr First addendum- Revised Contract Price Ad IDM/W402b (Lot 2)- AD1 MOJA 07-Jul-09 P IDM/W402b (Lot 3) B1 MOJA NCB Prior 01-Dec-07 15 16-Dec-07 15 31-Dec-07 10 10-Jan-08 10-Jan-08 30 09-Feb-08 15 24-Feb-08 15 10-Mar-08 5 15-Mar-08 20 4-Apr-08 30 13 04-May-08 29-May-09 R NCB 16-Jun-08 15 01-Jul-08 15 16-Jul-08 7 23-Jul-08 23-Jul-08 30 22-Aug-08 15 06-Sep-08 15 21-Sep-08 5 26-Sep-08 20 16-Oct-08 30 12 15-Nov-08 10-Nov-09 A NCB 23-Jun-08 01-Jul-08 10-Sep-08 23-Sep-08 23-Sep-08 11-Oct-08 15-Oct-08 16-Oct-08 19-Oct-08 26-Nov-08 26-Nov-08 Land Consolidation in Babol First addendum-Revised Contract Price Ad IDM/W402b (Lot 3)- AD1 MOJA 20-Jul-09 P IDM/W402b (Lot 4) B1 MOJA NCB Prior 01-Dec-07 15 16-Dec-07 15 31-Dec-07 10 10-Jan-08 10-Jan-08 30 09-Feb-08 15 24-Feb-08 15 10-Mar-08 5 15-Mar-08 20 4-Apr-08 30 13 04-May-08 29-May-09 R NCB 16-Jun-08 15 01-Jul-08 15 16-Jul-08 7 23-Jul-08 23-Jul-08 30 22-Aug-08 15 06-Sep-08 15 21-Sep-08 5 26-Sep-08 20 16-Oct-08 30 12 15-Nov-08 10-Nov-09 A NCB 23-Jun-08 01-Jul-08 10-Sep-08 23-Sep-08 23-Sep-08 11-Oct-08 15-Oct-08 05-Nov-08 09-Nov-08 06-Dec-08 06-Dec-08 P IDM/W402b (Lot 6) B1 MOJA Shopping Post 01-Dec-07 7 08-Dec-07 _ N.A. 7 N.A. 15-Dec-07 14 29-Dec-07 _ N.A. _ N.A. 3 01-Jan-08 7 8-Jan-08 7 6 15-Jan-08 13-Jul-08 R A Shopping Post 02-Dec-08 09-Dec-08 10-Dec-07 03-Jan-08 30-Jan-08 13-May-08 8 13-May-08 Dredging of Abbandans First addendum-Revised Contract Price Ad IDM/W402b (Lot 6)- AD1 MOJA 6-Sep-08 17 6-Sep-08 P IDM/W402b (Lot 7) B1 MOJA Shopping Post 01-Dec-07 7 08-Dec-07 _ N.A. 7 N.A. 15-Dec-07 14 29-Dec-07 _ N.A. _ N.A. 3 01-Jan-08 7 8-Jan-08 7 6 15-Jan-08 13-Jul-08 R A Shopping Post 02-Dec-08 09-Dec-08 10-Dec-07 03-Jan-08 30-Jan-08 12-May-08 4-Jul-09 Dredging of Abbandans First addendum Ad IDM/W402b (Lot 7)- AD1 MOJA 6-Sep-08 4-Jul-09 Dredging of Abbandans Second addendum-Revised Contract Ad IDM/W402b (Lot 7)- AD2 MOJA 4-Jul-09 4-Jul-09 P IDM/W402b (Lot 8) B1 MOJA Shopping Post 01-Dec-07 7 08-Dec-07 _ N.A. 7 N.A. 15-Dec-07 14 29-Dec-07 _ N.A. _ N.A. 3 01-Jan-08 7 8-Jan-08 7 6 15-Jan-08 13-Jul-08 R Siah left Bank New I&D Teritiary Systems (Upper and Lower) Dredging of Abbandans including: Ziarkola and Douk 70 100 Pol Shibe 100 60 Paya Khak Gostar Co. 60 Land Consolidation in Qaemshahr Land Consolidation in Babol Bahnamir Co. Siah Lower Left Bank New Quat. & On-Farm Systems Small Pilot Works for Design Option Assessments (Sub- Surface Drainage, 500 ha) Pilot New Area Farm-Level Systems (500 ha) Dredging of Abbandans including: Tanbala and Astarabad Mirabe Shomal Co. Land Consolidation in Babolsar Paland Sazan Co. Dredging of Abbandans including: Siahkola Mahaleh and Kapourchal Pilot Traditional Area Farm- Level Systems (2x 1,000 ha) Financed by GOI Financed by GOI Financed by GOI Financed by GOI Financed by GOI 3.00 Financed by GOI Financed by GOI Financed by GOI Siah Upper Left Bank New Quat. & On-Farm Systems Talar Upper Right Bank New Quat. & On-Farm Systems Talar Right Bank I&D Tertiary Systems (Upper and Lower) Ab-o Khak Keshvar Co. Pilot New Area Farm-Level Systems (500 ha) Tir Sotone Khazar Co. Talar lower Right Bank New Quat. & On-Farm Systems Page 5 P071170- Alborz Integrated Lamd and Water Resources Management Project Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Procurement Plan Works Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) October 20, 2010 Tech. Spec. Compl Interval /d Bidding Doc./ PQ Compl Interval /d WB - NO Interval /d SPN Issue BD/PQ I nterval /d Bid/PQ Submission Interval /d Eval. Report to Bank Interval /d WB - NO Interval /d Award I nterval /d Signature Interval /d Completion period (M) Start C ompletion Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) A Shopping Post 02-Dec-08 09-Dec-08 10-Dec-07 03-Jan-08 30-Jan-08 13-May-08 8 13-May-08 Dredging of Abbandans First addendum-Revised Contract Price Ad IDM/W402b (Lot 8)- AD1 MOJA 6-Sep-08 17 6-Sep-08 P IDM/W402b (Lot 9) B1 MOJA Shopping Post 01-Dec-07 7 08-Dec-07 _ N.A. 7 N.A. 15-Dec-07 14 29-Dec-07 _ N.A. _ N.A. 3 01-Jan-08 7 8-Jan-08 7 6 15-Jan-08 13-Jul-08 R A Shopping Post 02-Dec-08 09-Dec-08 10-Dec-07 03-Jan-08 20-Jan-08 12-May-08 4-Jul-09 Dredging of Abbandans First addendum Ad IDM/W402b (Lot 9)- AD1 MOJA 6-Sep-08 4-Jul-09 Dredging of Abbandans Second addendum-Revised Contract Price Ad IDM/W402b (Lot 9)- AD2 MOJA 4-Jul-09 4-Jul-09 P IDM/W402b (Lot 10) B1 MOJA Shopping Post 01-Dec-07 7 08-Dec-07 _ N.A. 7 N.A. 15-Dec-07 14 29-Dec-07 _ N.A. _ N.A. 3 01-Jan-08 7 8-Jan-08 7 6 15-Jan-08 13-Jul-08 R A Shopping Post 27-Jan-08 02-Feb-08 03-Feb-08 18-Feb-08 05-Mar-08 13-May-08 8 Dredging of Abbandans First addendum Ad IDM/W402b (Lot 10)- AD1 MOJA 6-Sep-08 17 Dredging of Abbandans Second addendum-Revised Contract Price Ad IDM/W402b (Lot 10)- AD2 MOJA 28-Jun-09 30-Jun-09 P IDM/W402b (Lot 11) B1 MOJA Shopping Post 01-Nov-09 7 08-Nov-09 _ N.A. 7 N.A. 15-Nov-09 14 29-Nov-09 _ N.A. _ N.A. 3 02-Dec-09 7 9-Dec-09 7 6 16-Dec-09 14-Jun-10 R A 13-Nov-09 13-Dec-09 N.A. N.A. 13-Dec-09 30-Dec-09 N.A. N.A. 17-Jan-10 23-Feb-10 27-Feb-10 P IDM/W403 B1 MOJA NCB Prior 08-Jan-09 15 23-Jan-09 15 07-Feb-09 10 17-Feb-09 17-Feb-09 30 19-Mar-09 15 03-Apr-09 15 18-Apr-09 5 23-Apr-09 20 13-May-09 30 24 12-Jun-09 02-Jun-11 R IDM/W403 (Lot1) NCB Prior 25-Jun-10 15 10-Jul-10 15 25-Jul-10 10 04-Aug-10 04-Aug-10 30 03-Sep-10 15 18-Sep-10 15 03-Oct-10 5 08-Oct-10 20 28-Oct-10 30 24 27-Nov-10 16-Nov-12 A P IDM/W403 B1 MOJA NCB Prior 08-Jan-09 15 23-Jan-09 15 07-Feb-09 10 17-Feb-09 17-Feb-09 30 19-Mar-09 15 03-Apr-09 15 18-Apr-09 5 23-Apr-09 20 13-May-09 30 24 12-Jun-09 02-Jun-11 R IDM/W403 (Lot 2) NCB Prior 25-Jun-10 15 10-Jul-10 15 25-Jul-10 10 04-Aug-10 04-Aug-10 30 03-Sep-10 15 18-Sep-10 15 03-Oct-10 5 08-Oct-10 20 28-Oct-10 30 24 27-Nov-10 16-Nov-12 A P Ir&Dr/CW2 B2 MOJA NCB Post 03-May-09 20 23-May-09 _ N.A. 10 02-Jun-09 02-Jun-09 30 02-Jul-09 15 N.A. _ N.A. 5 22-Jul-09 20 11-Aug-09 30 24 10-Sep-09 31-Aug-11 R IDM/W404 NCB Post 01-Jun-09 15 16-Jun-09 _ N.A. 10 26-Jun-09 26-Jun-09 30 26-Jul-09 15 N.A. _ N.A. 5 15-Nov-09 20 5-Dec-09 30 12 04-Jan-10 30-Dec-10 A 19-Sep-09 04-Oct-09 N.A. 10-Oct-09 10-Oct-09 10-Nov-09 N.A. N.A. 11-Jan-10 18-Feb-10 21-Feb-10 P Ir&Dr/CW2 B1 MOJA NCB Post 03-May-09 20 23-May-09 _ N.A. 10 02-Jun-09 02-Jun-09 30 02-Jul-09 15 N.A. _ N.A. 5 22-Jul-09 20 11-Aug-09 30 24 10-Sep-09 31-Aug-11 R IDM/W405 NCB Post 01-Dec-10 15 16-Dec-10 _ N.A. 10 26-Dec-10 26-Dec-10 30 25-Jan-11 15 N.A. _ N.A. 5 14-Feb-11 20 6-Mar-11 30 12 05-Apr-11 30-Mar-12 A P IDM/W406 B1 MOJA NCB Post 23-May-09 15 07-Jun-09 _ N.A. 10 17-Jun-09 17-Jun-09 30 17-Jul-09 15 N.A. _ N.A. 5 06-Aug-09 20 26-Aug-09 30 12 25-Sep-09 20-Sep-10 R IDM/W406 (Lot 1) Shopping Post 10-Aug-09 7 17-Aug-09 _ N.A. 7 N.A. 24-Aug-09 14 07-Sep-09 _ N.A. _ N.A. 3 27-Oct-09 7 3-Nov-09 7 4 10-Nov-09 10-Mar-10 A 10-Aug-09 10-Aug-09 N.A. N.A. 01-Oct-09 24-Oct-09 N.A. N.A. 20-Nov-09 21-Dec-09 28-Dec-09 P IDM/W406 B1 MOJA NCB Post 23-May-09 15 07-Jun-09 _ N.A. 10 17-Jun-09 17-Jun-09 30 17-Jul-09 15 N.A. _ N.A. 5 06-Aug-09 20 26-Aug-09 30 12 25-Sep-09 20-Sep-10 R IDM/W406 (Lot 2) Shopping Post 10-Aug-09 7 17-Aug-09 _ N.A. 7 N.A. 24-Aug-09 14 07-Sep-09 _ N.A. _ N.A. 3 27-Oct-09 7 3-Nov-09 7 4 10-Nov-09 10-Mar-10 A 10-Aug-09 10-Aug-09 N.A. N.A. 01-Oct-09 24-Oct-09 N.A. N.A. 11-Nov-09 21-Dec-09 28-Dec-09 P IDM/W406 B1 MOJA NCB Post 23-May-09 15 07-Jun-09 _ N.A. 10 17-Jun-09 17-Jun-09 30 17-Jul-09 15 N.A. _ N.A. 5 06-Aug-09 20 26-Aug-09 30 12 25-Sep-09 20-Sep-10 R IDM/W406 (Lot 3) Shopping Post 10-Aug-09 7 17-Aug-09 _ N.A. 7 N.A. 24-Aug-09 14 07-Sep-09 _ N.A. _ N.A. 3 27-Oct-09 7 3-Nov-09 7 4 10-Nov-09 10-Mar-10 A 10-Aug-09 10-Aug-09 N.A. N.A. 01-Oct-09 24-Oct-09 N.A. N.A. 11-Nov-09 17-Dec-09 21-Dec-09 P IDM/W406 B1 MOJA NCB Post 23-May-09 15 07-Jun-09 _ N.A. 10 17-Jun-09 17-Jun-09 30 17-Jul-09 15 N.A. _ N.A. 5 06-Aug-09 20 26-Aug-09 30 12 25-Sep-09 20-Sep-10 R IDM/W406 (Lot 4) Shopping Post 10-Aug-09 7 17-Aug-09 _ N.A. 7 N.A. 24-Aug-09 14 07-Sep-09 _ N.A. _ N.A. 3 27-Oct-09 7 3-Nov-09 7 4 10-Nov-09 10-Mar-10 A 10-Aug-09 10-Aug-09 N.A. N.A. 10-Oct-09 24-Oct-09 N.A. N.A. 11-Nov-09 28-Dec-09 30-Dec-09 P IDM/W501a B2 MOJA Shopping Post 01-Sep-07 15-Sep-07 01-Oct-07 15-Oct-07 6-8 R IDM/W501(Lot 1) NCB Post 01-Dec-10 15 16-Dec-10 _ N.A. 10 26-Dec-10 26-Dec-10 30 25-Jan-11 15 N.A. _ N.A. 5 14-Feb-11 20 6-Mar-11 30 12 05-Apr-11 30-Mar-12 A P IDM/W501b B2 MOJA Shopping Post 15-Jan-08 01-Feb-08 15-Feb-08 01-Mar-08 6-8 R IDM/W501(Lot2) NCB 01-Feb-11 7 08-Feb-11 _ N.A. 7 N.A. 15-Feb-11 14 01-Mar-11 _ N.A. _ N.A. 3 04-Mar-11 7 11-Mar-11 7 12 18-Mar-11 12-Mar-12 A P Ir&Dr/CW1 B2 MOJA Shopping Post 05-Jun-05 7 12-Jun-05 _ N.A. 7 N.A. 19-Jun-05 14 03-Jul-05 _ N.A. _ N.A. 3 06-Jul-05 7 13-Jul-05 7 7 20-Jul-05 15-Feb-06 R IDM/W501(Lot3) NCB 01-May-11 7 08-May-11 _ N.A. 7 N.A. 15-May-11 14 29-May-11 _ N.A. _ N.A. 3 01-Jun-11 7 8-Jun-11 7 12 15-Jun-11 09-Jun-12 A P IDM/W502 B2 MOJA ICB Prior 06-Oct-10 20 26-Oct-10 15 10-Nov-10 10 20-Nov-10 20-Nov-10 60 19-Jan-11 30 18-Feb-11 15 05-Mar-11 5 10-Mar-11 20 30-Mar-11 30 18 29-Apr-11 20-Oct-12 Mirab Tabarestan Co. 40 Tir Sotoun Ashianeh Co. 40 100 100 Sarmad Saraye Sari Co. 100 Pol Shibe Mazandaran Co. Omidane Shomal Co. Mahaleh Dredging of Abbandans including: Aznova and Khordsar Small pilot Works Rehabilitation and Improvement of Water Recourses (Kalleh Bast Rehabilitation of Canals) Land Consolidation in Savadkouh (Dehkalan) Pilot New Area Farm-Level I & D Systems (500 ha) Office & Store Buildings for 6 WUA Centers (Lot 1) Rehabilitation and Improvement of Water Recourses (Bagher Tange Dredging of Ab Bandan) Office & Store Buildings for 6WUA Centers (Lot3) Office & Store Buildings for 11 WUA Centers (Lot2) Pilot New Area Farm-Level I & D Systems (500 ha) Rehabilitation and Improvement of Water Recourses (Darikande Pumping Station) Abgostaran Tabarestan Co. Takvin Bana Shomal Co. 50 80 60 Saghf Bana Babol Co. 60 Mirab Tabarestan Co. Financed by GOI Financed by GOI Dredging of Kaleh Bon Abbandan Construction of Central WUAs Office Rehabilitation and Improvement of Water Recourses (Mouzi Galleh Dredging of Ab Bandan) Rehabilitation of traditional Page 6 P071170- Alborz Integrated Lamd and Water Resources Management Project Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Procurement Plan Works Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) October 20, 2010 Tech. Spec. Compl Interval /d Bidding Doc./ PQ Compl Interval /d WB - NO Interval /d SPN Issue BD/PQ I nterval /d Bid/PQ Submission Interval /d Eval. Report to Bank Interval /d WB - NO Interval /d Award I nterval /d Signature Interval /d Completion period (M) Start C ompletion Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) R A New canals and rivers and on-farm systems Page 7 P071170- Alborz Integrated Lamd and Water Resources Management Project Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Procurement Plan Works Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) October 20, 2010 Tech. Spec. Compl Interval /d Bidding Doc./ PQ Compl Interval /d WB - NO Interval /d SPN Issue BD/PQ I nterval /d Bid/PQ Submission Interval /d Eval. Report to Bank Interval /d WB - NO Interval /d Award I nterval /d Signature Interval /d Completion period (M) Start C ompletion Prior/ Post Reviews C o n t r a c t o r ' s N a m e Preparation Evaluation Implementation Contract Bidding Agency Proc. Method Sub Component Package No. Plan/Revised/Actual Contract Description Remarks P h y s i c a l P r o g r e s s ( % ) P IDM/G6 B3 MOJA Shopping Post 01-Jan-09 15 16-Jan-09 _ N.A. 10 26-Jan-09 26-Jan-09 30 25-Feb-09 15 N.A. _ N.A. 5 17-Mar-09 20 6-Apr-09 30 24 06-May-09 26-Apr-11 R IDM/W601 Shopping 15-May-09 7 22-May-09 _ N.A. 7 N.A. 29-May-09 14 12-Jun-09 _ N.A. _ N.A. 3 27-Oct-09 7 3-Nov-09 7 4 10-Nov-09 10-Mar-10 A 21-Nov-09 07-Dec-09 N.A. N.A. 10-Dec-09 29-Dec-09 N.A. N.A. 23-Jan-10 18-Feb-10 21-Feb-10 Subtotal MOJA Subtotal MRWC Total Both PIUs C. Integrated Water Resources Management C.1 BWC and BWF C.2 Systems Development and Technical Assistance P IWRM/W1 C2 MOJA CPP Prior R A P IWRM/W2 C2 MOJA CPP Prior R A P IWRM/W3 C2 MOJA CPP Prior R A P IWRM/W4 C3 MRWC CPP Prior R A P IWRM/W5 C3 MRWC CPP Prior R A Subtotal MOJA Subtotal MRWC Total Both PIUs 4.899 MUS$ D. Environmental Management P EM/W2 D2 MOJA NCB Post 05-Jul-07 20 25-Jul-07 _ N.A. 10 04-Aug-07 04-Aug-07 30 03-Sep-07 15 N.A. _ N.A. 5 23-Sep-07 20 13-Oct-07 30 12 12-Nov-07 06-Nov-08 R D2 MRWC NCB Post 01-Jun-10 20 21-Jun-10 _ N.A. 10 01-Jul-10 01-Jul-10 30 31-Jul-10 15 N.A. _ N.A. 5 20-Aug-10 20 9-Sep-10 30 12 09-Oct-10 04-Oct-11 A Subtotal MOJA Subtotal MRWC Total Both PIUs E. Project Implementation and Coordination Support P PICS/W6 E1 MOJA Shopping Post 6 R Prior A 19-Mar-08 16-Jan-09 Rehabilitation of PIU-MJAO Building First addendum-Revised Contract Amount Ad PICS/W6-AD1 30-Dec-07 Subtotal MOJA Subtotal MRWC Total Both PIUs Awarded contracts Not Awarded contracts Canceled Range Management and Development ___ ___ ___ 90 ___ ___ ___ ___ ___ ___ ___ Environmental Rehabilitation Activities from Babolsar to Babol Greenhouse including heating/cooling equipment for plant disease assessment Rehabilitaiton of MOJA PIU office Not applicable as meant for BSGF ( First year portion of a total of OS$ 0.70 million for use in CDD (minor works and activities for income generation and water shed management, distributed over 7 years of the project) Not applicable as meant for BSGF (First year portion of a total of OS$ 0.25 million for use in CDD (minor works and activities for income generation and range activities, distributed over 7 years of the project) Not applicable as meant for BSGF ( First year portion of a total of OS$ 0.250 million for use in CDD (minor works and activities for income generation and forestry activities, distributed over 7 years of the project) Forestry Protection and Rehabilitation Irrigation and Drainage On-farm Activities Not applicable as meant for BSGF (First year portion of a total of OS$ 0.50 million for use in CDD (minor works and activities for income generation and environment conservation activities, distributed over 7 years of the project) Canceled Fajr Gostare Ghaem Mazand Aramesh Co. 100 Watershed Management Activities Environment Conservation Activities Total Available Budget (PAD) Not applicable as meant for BSGF ( First year portion of a total of OS$ 1.30 million for use in CDD (minor works and activities for income generation and on-farm I&D activities, distributed over 7 years of the project) Page 8 P071170- Alborz Integrated Lamd and Water Resources Management Project Tech. Spec. Compl Interval /d Bidding Doc./ PQ Compl Interval /d WB - NO Interval /d SPN Issue BD/PQ Interval /d Bid/PQ Submission Interval /d Eval. Report to Bank Interval /d WB - NO Interval /d Award Interval /d Signature Interval /d C ompletion period ( M) Start Completion A. Upper Watershed and Forestry Management A.1 Technical Assistance and Capacity Building A.2 Soil and Water Protection A.3 Rangeland and Forest Conservation & Management P UWFM/G1 A1 MOJA Shopping Post 1-Apr-05 15-Apr-05 22-Apr-05 1-May-05 1 R A 9-Aug-05 20-Aug-05 22-Aug-05 28-Aug-05 3-Sep-05 12-Sep-05 P UWFM/G2 A1 MOJA Shopping Post 1-Nov-05 15-Nov-05 22-Nov-05 1-Dec-05 1 R A 22-Oct-05 2-Nov-05 17-Dec-05 18-Dec-05 19-Dec-05 10-Apr-06 P UWFM/G3 A1 MOJA Shopping Post 1-Oct-05 15-Oct-05 22-Oct-05 1-Nov-05 1 R A 10-Dec-05 20-Dec-05 26-Dec-05 26-Dec-05 27-Dec-05 23-Jan-06 P UWFM/G4 A1 MOJA Shopping Post 31-Oct-05 15-Nov-05 22-Nov-05 1-Dec-05 1 R A 8-Aug-05 17-Aug-05 13-Nov-05 13-Nov-05 13-Nov-05 25-Feb-06 P UWFM/G5 (Lot 1) A1 MOJA Shopping Post 31-May-06 15-Jun-06 22-Jun-06 1-Jul-06 3 R A 12-Apr-06 23-Apr-06 7-May-06 7-Jun-06 19-Jun-06 2-Jul-06 P UWFM/G5 (Lot 2) A1 MOJA Shopping Post 1-Mar-06 15-Mar-06 22-Mar-06 1-Apr-06 2 R A 12-Apr-06 23-Apr-06 7-May-06 7-Jun-06 19-Jun-06 2-Jul-06 P UWFM/G6 A1 MOJA Shopping Post 31-Oct-05 30-Nov-05 15-Dec-05 1-Apr-06 1 R A 28-Sep-05 8-Oct-05 22-Nov-05 29-Nov-05 3-Dec-05 17-Mar-06 P UWFM/G7 (Lot 1) A1 MOJA Shopping Post 15-Jun-07 1-Jul-07 15-Jul-07 1-Aug-07 4 R 1-Aug-07 7 8-Aug-07 _ N.A. 7 N.A. 15-Aug-07 14 29-Aug-07 7 5-Sep-07 _ N.A. 3 8-Sep-07 7 15-Sep-07 7 7.00 22-Sep-07 19-Apr-08 A 29-Sep-07 1-Oct-07 20-Oct-07 20-Oct-07 23-Oct-07 23-Oct-07 7 30-Oct-07 9-Dec-07 P UWFM/G7 (Lot 2) A1 MOJA Shopping Post 15-Jun-07 1-Jul-07 15-Jul-07 1-Aug-07 4 R 1-Aug-07 7 8-Aug-07 _ N.A. 7 N.A. 15-Aug-07 14 29-Aug-07 7 5-Sep-07 _ N.A. 3 8-Sep-07 7 15-Sep-07 7 5 22-Sep-07 19-Feb-08 A 1-Sep-07 1-Sep-07 3-Sep-07 24-Sep-07 25-Sep-07 23-Oct-07 23-Oct-07 7 3.3 30-Oct-07 6-Feb-08 P UWFM/G7 (Lot 3) A1 MOJA Shopping Post 15-Jun-07 1-Jul-07 15-Jul-07 1-Aug-07 4 R 15-Jul-08 7 22-Jul-08 _ N.A. 7 N.A. 29-Jul-08 14 12-Aug-08 7 19-Aug-08 _ N.A. 3 22-Aug-08 7 29-Aug-08 7 4 5-Sep-08 3-Jan-09 A 21-Jul-08 21-Jul-08 19-Aug-08 2-Sep-08 16-Sep-08 17-Sep-08 - 25-Sep-08 25-Sep-08 30-Sep-08 P UWFM/G9 (Lot 1) A3 MOJA Shopping Post 1-Feb-08 7 8-Feb-08 _ N.A. 7 N.A. 15-Feb-08 14 29-Feb-08 7 7-Mar-08 _ N.A. 3 10-Mar-08 7 17-Mar-08 7 3 24-Mar-08 22-Jun-08 R 15-Jun-10 7 22-Jun-10 _ N.A. 7 N.A. 29-Jun-10 14 13-Jul-10 7 20-Jul-10 _ N.A. 3 23-Jul-10 7 30-Jul-10 7 4 6-Aug-10 4-Dec-10 A P UWFM/G9 (Lot 2) A3 MOJA Shopping Post 1-Aug-08 7 8-Aug-08 _ N.A. 7 N.A. 15-Aug-08 14 29-Aug-08 7 5-Sep-08 _ N.A. 3 8-Sep-08 7 15-Sep-08 7 3 22-Sep-08 21-Dec-08 R 15-Sep-10 7 22-Sep-10 _ N.A. 7 N.A. 29-Sep-10 14 13-Oct-10 7 20-Oct-10 _ N.A. 3 23-Oct-10 7 30-Oct-10 7 4 6-Nov-10 6-Mar-11 A P UWFM/G9 (Lot 3) A3 MOJA Shopping Post 1-Aug-09 7 8-Aug-09 _ N.A. 7 N.A. 15-Aug-09 14 29-Aug-09 7 5-Sep-09 _ N.A. 3 8-Sep-09 7 15-Sep-09 7 3 22-Sep-09 21-Dec-09 R 15-Dec-10 7 22-Dec-10 _ N.A. 7 N.A. 29-Dec-10 14 12-Jan-11 7 19-Jan-11 _ N.A. 3 22-Jan-11 7 29-Jan-11 7 4 5-Feb-11 5-Jun-11 A Subtotal MOJA Subtotal MRWC Total Both PIUs B. Irrigation and Drainage Management B.1 Rehabilitation and Development of Irrigation and Drinage Systems B.2 Institutional Support for WUA Establishment B.3 Agricultural Extension and Research Activities P IDM/G1 ( Lot 1-1) B2 MOJA NCB Prior 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 R NCB Prior 30-Jun-10 15 15-Jul-10 15 30-Jul-10 10 9-Aug-10 9-Aug-10 30 8-Sep-10 15 23-Sep-10 15 8-Oct-10 5 13-Oct-10 20 2-Nov-10 30 3 2-Dec-10 2-Mar-11 A Watching and wireless telecommunication towers (2) Seed and fodder Procurement Plan Goods Agri Keshtzar Inst. Hamkar Motor Co. Garos Tajhiz Pouya Co. Iran Khodro Canceled Canceled 100 Canceled Canceled 100 100 100 100 100 100 Remarks 100 P h y s i c a l P r o g r e s s ( % ) Sub Component Package No. Computers, Software, Printers (4) Computers (6), 2 B&W and 1 color Printer) Seed and fodder Seed and fodder 4WD (5) Water tanks (2) Fire Control Equipment Calipers, Compass, Altimeters Contract Description Plan/Revised/Actual Prior/ Post Reviews Proc. Method/ PQ Chain Saws (12) Loader/Backhoe (1) Agency Sedans cars (4) 4WD pickup (3) Backpack sprayer (15) 100 Preparation Bidding Abi Asa Co. Evaluation Contract Persia Trading Co. S u p p l i e r ' s n a m e Implementation Garos Tajhiz Pouya Co. Ebrahimi Co. Sahand Ertebatat Sahel Pars Khodro October 20, 2010 20 Page 9 Procurement Plan Goods Remarks P h y s i c a l P r o g r e s s ( % ) Sub Component Package No. Contract Description Plan/Revised/Actual Prior/ Post Reviews Proc. Method/ PQ Agency Preparation Bidding Evaluation Contract S u p p l i e r ' s n a m e Implementation October 20, 2010 Tech. Spec. Compl Interval /d Bidding Doc./ PQ Compl Interval /d WB - NO Interval /d SPN Issue BD/PQ Interval /d Bid/PQ Submission Interval /d Eval. Report to Bank Interval /d WB - NO Interval /d Award Interval /d Signature Interval /d C ompletion period ( M) Start Completion Remarks P h y s i c a l P r o g r e s s ( % ) Sub Component Package No. Contract Description Plan/Revised/Actual Prior/ Post Reviews Proc. Method/ PQ Agency Preparation Bidding Evaluation Contract S u p p l i e r ' s n a m e Implementation P IDM/G1 ( Lot 1-2) B2 MOJA NCB Prior 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 R NCB Prior 5-Sep-10 15 20-Sep-10 15 05-Oct-10 10 15-Oct-10 15-Oct-10 30 14-Nov-10 15 29-Nov-10 15 14-Dec-10 5 19-Dec-10 20 8-Jan-11 30 3 7-Feb-11 8-May-11 A P IDM/G1 ( Lot 1-3) B2 MOJA NCB Prior 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 R NCB Prior 5-Dec-10 15 20-Dec-10 15 04-Jan-11 10 14-Jan-11 14-Jan-11 30 13-Feb-11 15 28-Feb-11 15 15-Mar-11 5 20-Mar-11 20 9-Apr-11 30 3 9-May-11 7-Aug-11 A P IDM/G1 ( Lot 2-1) B2 MOJA Shopping Post 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 R Shopping Post 30-Jul-08 7 6-Aug-08 _ N.A. 7 N.A. 2-Jun-10 14 16-Jun-10 7 23-Jun-10 _ N.A. 3 26-Jun-10 7 3-Jul-10 7 3 10-Jul-10 8-Oct-10 A 29-Dec-08 11-Jan-09 P IDM/G1 ( Lot 2-2) B2 MOJA NCB Prior 1-Dec-07 15-Jan-08 15-Feb-08 15-Mar-08 6 R NCB Prior 5-Dec-10 20 25-Dec-10 15 09-Jan-11 10 19-Jan-11 19-Jan-11 30 18-Feb-11 15 5-Mar-11 15 20-Mar-11 5 25-Mar-11 20 14-Apr-11 30 3 14-May-11 12-Aug-11 A P IDM/G1 ( Lot 3-1) B2 MOJA Shopping Post 1-Dec-07 15-Jan-08 15-Feb-08 15-Mar-08 6 R Shopping Post 30-Jul-08 7 6-Aug-08 _ N.A. 7 N.A. 2-Jun-10 14 16-Jun-10 7 23-Jun-10 _ N.A. 3 26-Jun-10 7 3-Jul-10 7 3 10-Jul-10 8-Oct-10 A 29-Dec-08 11-Jan-09 P IDM/G1 ( Lot 3-2) B2 MOJA Shopping Post 1-Dec-07 15-Jan-08 15-Feb-08 15-Mar-08 6 R Shopping Post 5-Dec-10 7 12-Dec-10 _ N.A. 7 N.A. 19-Dec-10 14 2-Jan-11 7 9-Jan-11 _ N.A. 3 12-Jan-11 7 19-Jan-11 7 3 26-Jan-11 26-Apr-11 A P IDM/G1 ( Lot 4-1) B2 MOJA NCB Prior 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 R NCB Prior 30-Dec-10 15 14-Jan-11 15 29-Jan-11 10 8-Feb-11 8-Feb-11 30 10-Mar-11 30 9-Apr-11 15 24-Apr-11 5 29-Apr-11 20 19-May-11 30 3 18-Jun-11 16-Sep-11 A P IDM/G1 ( Lot 4-2) B2 MOJA NCB Prior 1-Jul-07 15-Aug-07 15-Sep-07 15-Oct-07 6 R NCB Prior 5-Dec-10 15 20-Dec-10 15 04-Jan-11 10 14-Jan-11 14-Jan-11 30 13-Feb-11 30 15-Mar-11 15 30-Mar-11 5 4-Apr-11 20 24-Apr-11 30 3 24-May-11 22-Aug-11 A P IDM/G3 B2 MOJA Shopping Post 31 Apr 2007 31-May-07 15-Jun-07 1-Jul-07 6 R Shopping Post 29-Aug-10 7 5-Sep-10 _ N.A. 7 N.A. 12-Sep-10 14 26-Sep-10 7 3-Oct-10 _ N.A. 3 6-Oct-10 7 13-Oct-10 7 2 20-Oct-10 19-Dec-10 A P IDM/G4 (Lot 1) B2 MOJA Shopping Post 31 Apr 2007 31-May-07 15-Jun-07 1-Jul-07 6 R Shopping Post 29-Oct-10 7 5-Nov-10 _ N.A. 7 N.A. 12-Nov-10 14 26-Nov-10 7 3-Dec-10 _ N.A. 3 6-Dec-10 7 13-Dec-10 7 2 20-Dec-10 18-Feb-11 A P IDM/G4 (Lot 2) B2 MOJA Shopping Post 31 Apr 2007 31-May-07 15-Jun-07 1-Jul-07 6 R Shopping Post 5-Jul-10 7 12-Jul-10 _ N.A. 7 N.A. 19-Jul-10 14 2-Aug-10 7 9-Aug-10 _ N.A. 3 12-Aug-10 7 19-Aug-10 7 2 26-Aug-10 25-Oct-10 A P IDM/G4 (Lot 3) B2 MOJA Shopping Post 4-Jan-10 7 11-Jan-10 _ N.A. 7 N.A. 18-Jan-10 14 1-Feb-10 7 8-Feb-10 _ N.A. 3 11-Feb-10 7 18-Feb-10 7 2 25-Feb-10 26-Apr-10 Shopping Post 5-Oct-10 7 12-Oct-10 _ N.A. 7 N.A. 19-Oct-10 14 2-Nov-10 7 9-Nov-10 _ N.A. 3 12-Nov-10 7 19-Nov-10 7 2 26-Nov-10 25-Jan-11 P IDM/G5 B3 MOJA Shopping Post 15-May-06 31-May-06 7-Jun-06 21-Jun-06 3 R A 7-Jun-06 20-Jun-06 25-Jun-06 26-Jun-06 20-Mar-07 20-Mar-07 P IDM/G6 B3 MOJA Shopping Post 1-Jan-09 15 16-Jan-09 _ N.A. 10 26-Jan-09 26-Jan-09 30 25-Feb-09 15 N.A. _ N.A. 5 17-Mar-09 20 6-Apr-09 30 24 6-May-09 26-Apr-11 R IDM/G6 Shopping 15-May-09 15 30-May-09 _ N.A. 10 9-Jun-09 9-Jun-09 30 9-Jul-09 15 N.A. _ N.A. 5 29-Jul-09 20 18-Aug-09 30 18 17-Sep-09 11-Mar-11 A P IDM/G7 B3 MOJA Shopping Post 15-May-06 31-May-06 7-Jun-06 21-Jun-06 3 R A 28-Feb-06 10-Mar-06 9-Apr-06 18-Apr-06 11-Feb-07 11-Feb-07 P Ir&Dr/G10 B3 MOJA NCB Prior 1-Oct-07 15 16-Oct-07 15 31-Oct-07 10 10-Nov-07 10-Nov-07 30 10-Dec-07 15 25-Dec-07 15 25-Dec-07 5 30-Dec-07 20 19-Jan-08 30 3 18-Feb-08 18-May-08 R IDM/G8 Shopping Post 1-Apr-10 7 8-Apr-10 _ N.A. 7 N.A. 15-Apr-10 14 29-Apr-10 7 6-May-10 _ N.A. 3 9-May-10 7 16-May-10 7 3 23-May-10 21-Aug-10 A 20-Jan-10 1-Mar-10 N.A. N.A. 25-Mar-10 5-Apr-10 5-Apr-10 N.A. 18-Apr-10 18-Apr-10 19-May-10 19-May-10 P Ir&Dr/G11 B3 MOJA Shopping Post 15-Dec-07 7 22-Dec-07 _ N.A. 7 N.A. 29-Dec-07 14 12-Jan-08 7 19-Jan-08 _ N.A. 3 22-Jan-08 7 29-Jan-08 7 3 5-Feb-08 5-May-08 R IDM/G9 Shopping Post 1-Aug-10 7 8-Aug-10 _ N.A. 7 N.A. 15-Aug-10 14 29-Aug-10 7 5-Sep-10 _ N.A. 3 8-Sep-10 7 15-Sep-10 7 3 22-Sep-10 21-Dec-10 A Canceled Canceled Canceled Canceled Moved to works under IDM/W601 4WD (5) Olom Pishrafteh Co. Darpang Afzarmand Canceled Canceled Canceled Tractor (15) Trucks (5) Loader Tractor/Backhoe (5) Loader Tractor/Backhoe (15) Office Furniture and Equipment for 5 Water Users Association centers Greenhouse including heating/cooling equipment for plant disease assessment Van for agronomy and research (2) Office Furniture and Equipment for 10 Water Users Association centers Equipment for research Training Centres (in 4 Packages)
Groupe de la Banque mondiale · Procurement Plan
Iran - Alborz Integrated Land and Water Management Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Source
Banque mondiale