Groupe de la Banque mondiale · Loan Agreement

Loan Agreement for Loan 7974-ID Conformed

Indonésie Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

CONFORMED COPY LOAN NUMBER 7974-ID Loan Agreement (Fourth Infrastructure Development Policy Loan) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated November 24, 2010 LOAN AGREEMENT AGREEMENT dated November 24, 2010 , entered into between REPUBLIC OF INDONESIA (“Borrower”) and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (“Bank”) for the purpose of providing financing in support of the Program (as defined in the Appendix to this Agreement). The Bank has decided to provide this financing on the basis, inter alia, of (a) the actions which the Borrower has already taken under the Program and which are described in Section I of Schedule 1 to this Agreement, and (b) the Borrower’s maintenance of an appropriate macroeconomic policy framework. The Borrower and the Bank therefore hereby agree as follows: ARTICLE I — GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to this Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in this Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement. ARTICLE II — LOAN 2.01. The Bank agrees to lend to the Borrower, on the terms and conditions set forth or referred to in this Agreement, the amount of two hundred million United States Dollars (US$200,000,000), as such amount may be converted from time to time through a Currency Conversion in accordance with the provisions of Section 2.07 of this Agreement (“Loan”). 2.02. The Borrower may withdraw the proceeds of the Loan in support of the Program in accordance with Section II of Schedule 1 to this Agreement. 2.03. The Front-end Fee payable by the Borrower shall be equal to one quarter of one percent (0.25%) of the Loan amount. The Borrower shall pay the Front-end Fee not later than sixty (60) days after the Effective Date. 2.04. The interest payable by the Borrower for each Interest Period shall be at a rate equal to the Reference Rate for the Loan Currency plus the Variable Spread; provided, that upon a Conversion of all or any portion of the principal amount of the Loan, the interest payable by the Borrower during the Conversion Period on such amount shall be determined in accordance with the relevant provisions of Article IV of the General Conditions. Notwithstanding the foregoing, if any amount of the Withdrawn Loan Balance remains unpaid when due and such non- payment continues for a period of thirty (30) days, then the interest payable by -2- the Borrower shall instead be calculated as provided in Section 3.02(e) of the General Conditions. 2.05. The Payment Dates are April 1 and October 1 in each year. 2.06. The principal amount of the Loan shall be repaid in accordance with the provisions of Schedule 2 to this Agreement. 2.07. (a) The Borrower may at any time request any of the following Conversions of the terms of the Loan in order to facilitate prudent debt management: (i) a change of the Loan Currency of all or any portion of the principal amount of the Loan, withdrawn or unwithdrawn, to an Approved Currency; (ii) a change of the interest rate basis applicable to all or any portion of the principal amount of the Loan withdrawn and outstanding from a Variable Rate to a Fixed Rate, or vice versa, or from a Variable Rate based on a Variable Spread to a Variable Rate based on a Fixed Rate; and (iii) the setting of limits on the Variable Rate applicable to all or any portion of the principal amount of the Loan withdrawn and outstanding by the establishment of an Interest Rate Cap or Interest Rate Collar on the Variable Rate. (b) Any conversion requested pursuant to paragraph (a) of this Section that is accepted by the Bank shall be considered a “Conversion”, as defined in the General Conditions, and shall be effected in accordance with the provisions of Article IV of the General Conditions and of the Conversion Guidelines. 2.08. Without limitation upon the provisions of Section 5.08 of the General Conditions (renumbered as such pursuant to paragraph 4 of Section II of the Appendix to this Agreement and relating to Cooperation and Consultation), the Borrower shall promptly furnish to the Bank such information relating to the provisions of this Article II as the Bank may, from time to time, reasonably request. ARTICLE III — PROGRAM 3.01. The Borrower declares its commitment to the Program and its implementation. To this end, and further to Section 5.08 of the General Conditions: (a) the Borrower and the Bank shall from time to time, at the request of either party, exchange views on the Borrower’s macroeconomic policy framework and the progress achieved in carrying out the Program; (b) prior to each such exchange of views, the Borrower shall furnish to the Bank for its review and comment a report on the progress achieved in -3- carrying out the Program, in such detail as the Bank shall reasonably request; and (c) without limitation upon the provisions of paragraphs (a) and (b) of this Section, the Borrower shall promptly inform the Bank of any situation that would have the effect of materially reversing the objectives of the Program or any action taken under the Program including any action specified in Section I of Schedule 1 to this Agreement. ARTICLE IV — REMEDIES OF THE BANK 4.01. The Additional Event of Suspension consists of the following: A situation has arisen which shall make it improbable that the Program, or a significant part of it, will be carried out. ARTICLE V — EFFECTIVENESS; TERMINATION 5.01. The Additional Condition of Effectiveness consist of the following: The Bank is satisfied with the progress achieved by the Borrower in carrying out the Program and with the adequacy of the Borrower’s macroeconomic policy framework. 5.02. The Effectiveness Deadline is the date sixty (60) days after the date of this Agreement. ARTICLE VI — REPRESENTATIVE; ADDRESSES 6.01. The Borrower’s Representative is the Minister of Finance. 6.02. The Borrower’s Address is: Ministry of Finance c/o Directorate General of Debt Management Jalan Lapangan Banteng Timur 2-4 P.O. Box 1139 Jakarta 10710 Indonesia Cable address: Telex: Facsimile: FINMINISTRY 45799 DJMLN-IA (21) 381 2859 Jakarta 44319 DEPKEU-IA -4- 6.03. The Bank’s Address is: International Bank for Reconstruction and Development 1818 H Street, N.W. Washington, D.C. 20433 United States of America Cable address: Telex: Facsimile: INTBAFRAD 248423(MCI) or 1-202-477-6391 Washington, D.C. 64145(MCI) AGREED at Jakarta, Republic of Indonesia, as of the day and year first above written. REPUBLIC OF INDONESIA By: /s/ Rahmat Waluyanto Authorized Representative INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By: /s/ Chris Hoban Authorized Representative -5- SCHEDULE 1 Program Actions; Availability of Loan Proceeds; Access to Information Section I. Actions Taken Under the Program The actions taken by the Borrower under the Program include the following: 1. The Borrower has maintained the proposed 2011 APBN allocation for national infrastructure at least thirty percent (30%) over the 2007 APBN level. 2. The Borrower has issued a Ministerial Regulation (Permen ESDM 7/2010) which adjusts electricity tariffs in order to reduce and better target PSO subsidies. 3. The Borrower has prepared the MPW medium-term plan and submitted the MPW budget based on medium-term budget estimates. 4. The Borrower has submitted for inter-ministerial consultation a draft Government Regulation and a draft Presidential Regulation establishing a Road Preservation Fund which covers national and sub-national roads and defines the source of funding. 5. The Borrower has enacted Perpres 29/2009 which provides for a government support regime to assist financially viable PDAMs to access long-term loans. 6. The Borrower has enacted Perpres 13/2010 which amends Perpres 67/2005 by extending application to projects of sub-national governments and state-owned enterprises. 7. The Borrower has established the Infrastructure Guarantee Fund including staffing of senior management and drafting of operating procedures. 8. The Indonesia Infrastructure Finance Company has been staffed and business license awarded. 9. The Borrower has drafted Government Regulations on waste handling and waste minimizing and circulated the drafts for intra-ministerial consultation. 10. The Borrower has used the Semi E-procurement system for at least 75% of all MPW national-level procurements above Rp.50 million, and issued a Circular Letter requiring the use of the Semi E-procurement system in at least twenty three Provinces. 11. The Borrower has launched Risk-Based Internal Audit (RBIA) programs in nine (9) Provinces with staff training programs in place. -6- Section II. Availability of Loan Proceeds A. General. The Borrower may withdraw the proceeds of the Loan in accordance with the provisions of this Section and such additional instructions as the Bank may specify by notice to the Borrower. B. Allocation of Loan Amounts. The Loan is allocated in a single withdrawal tranche, from which the Borrower may make withdrawals of the Loan proceeds. The allocation of the amounts of the Loan to this end is set out in the table below: Allocations Amount of the Loan Allocated (expressed in USD) Single Withdrawal Tranche 200,000,000 TOTAL AMOUNT 200,000,000 C. Payment of Front-end Fee. No withdrawal shall be made from the Loan Account until the Bank has received payment in full of the Front-end Fee. D. Withdrawal Tranche Release Conditions. No withdrawal shall be made of the Single Withdrawal Tranche unless the Bank is satisfied: (a) with the Program being carried out by the Borrower; and (b) with the appropriateness of the Borrower’s macroeconomic policy framework. E. Deposits of Loan Amounts. Except as the Bank may otherwise agree: 1. all withdrawals from the Loan Account shall be deposited by the Bank into an account designated by the Borrower and acceptable to the Bank; and 2. the Borrower shall ensure that upon each deposit of an amount of the Loan into this account, an equivalent amount is accounted for in the Borrower’s budget management system, in a manner acceptable to the Bank. F. Excluded Expenditures. The Borrower undertakes that the proceeds of the Loan shall not be used to finance Excluded Expenditures. If the Bank determines at any time that an amount of the Loan was used to make a payment for an Excluded Expenditure, the Borrower shall, promptly upon notice from the Bank, refund an amount equal to the amount of such payment to the Bank. Amounts refunded to the Bank upon such request shall be cancelled. G. Closing Date. The Closing Date is March 31, 2011. -7- SCHEDULE 2 Amortization Schedule 1. The following table sets forth the Principal Payment Dates of the Loan and the percentage of the total principal amount of the Loan payable on each Principal Payment Date (“Installment Share”). If the proceeds of the Loan have been fully withdrawn as of the first Principal Payment Date, the principal amount of the Loan repayable by the Borrower on each Principal Payment Date shall be determined by the Bank by multiplying: (a) Withdrawn Loan Balance as of the first Principal Payment Date; by (b) the Installment Share for each Principal Payment Date, such repayable amount to be adjusted, as necessary, to deduct any amounts referred to in paragraph 4 of this Schedule, to which a Currency Conversion applies. Principal Payment Date Installment Share (Expressed as a Percentage) April 01, 2020 2.17 October 01, 2020 2.22 April 01, 2021 2.28 October 01, 2021 2.34 April 01, 2022 2.40 October 01, 2022 2.46 April 01, 2023 2.52 October 01, 2023 2.58 April 01, 2024 2.64 October 01, 2024 2.71 April 01, 2025 2.78 October 01, 2025 2.85 April 01, 2026 2.92 October 01, 2026 2.99 April 01, 2027 3.07 October 01, 2027 3.14 April 01, 2028 3.22 October 01, 2028 3.30 April 01, 2029 3.38 October 01, 2029 3.47 April 01, 2030 3.56 October 01, 2030 3.65 April 01, 2031 3.74 October 01, 2031 3.83 April 01, 2032 3.93 October 01, 2032 4.02 April 01, 2033 4.12 -8- October 01, 2033 4.23 April 01, 2034 4.33 October 01, 2034 4.44 April 01, 2035 4.71 2. If the proceeds of the Loan have not been fully withdrawn as of the first Principal Payment Date, the principal amount of the Loan repayable by the Borrower on each Principal Payment Date shall be determined as follows: (a) To the extent that any proceeds of the Loan have been withdrawn as of the first Principal Payment Date, the Borrower shall repay the Withdrawn Loan Balance as of such date in accordance with paragraph 1 of this Schedule. (b) Any amount withdrawn after the first Principal Payment Date shall be repaid on each Principal Payment Date falling after the date of such withdrawal in amounts determined by the Bank by multiplying the amount of each such withdrawal by a fraction, the numerator of which is the original Installment Share specified in the table in paragraph 1 of this Schedule for said Principal Payment Date (“Original Installment Share”) and the denominator of which is the sum of all remaining Original Installment Shares for Principal Payment Dates falling on or after such date, such amounts repayable to be adjusted, as necessary, to deduct any amounts referred to in paragraph 4 of this Schedule, to which a Currency Conversion applies. 3. (a) Amounts of the Loan withdrawn within two (2) calendar months prior to any Principal Payment Date shall, for the purposes solely of calculating the principal amounts payable on any Principal Payment Date, be treated as withdrawn and outstanding on the second Principal Payment Date following the date of withdrawal and shall be repayable on each Principal Payment Date commencing with the second Principal Payment Date following the date of withdrawal. (b) Notwithstanding the provisions of sub-paragraph (a) of this paragraph, if at any time the Bank adopts a due date billing system under which invoices are issued on or after the respective Principal Payment Date, the provisions of such sub-paragraph shall no longer apply to any withdrawals made after the adoption of such billing system. 4. Notwithstanding the provisions of paragraphs 1 and 2 of this Schedule, upon a Currency Conversion of all or any portion of the Withdrawn Loan Balance to an Approved Currency, the amount so converted in the Approved Currency that is repayable on any Principal Payment Date occurring during the Conversion Period, shall be determined by the Bank by multiplying such amount in its -9- currency of denomination immediately prior to the Conversion by either: (i) the exchange rate that reflects the amounts of principal in the Approved Currency payable by the Bank under the Currency Hedge Transaction relating to the Conversion; or (ii) if the Bank so determines in accordance with the Conversion Guidelines, the exchange rate component of the Screen Rate. 5. If the Withdrawn Loan Balance is denominated in more than one Loan Currency, the provisions of this Schedule shall apply separately to the amount denominated in each Loan Currency, so as to produce a separate amortization schedule for each such amount. - 10 - APPENDIX Section I. Definitions 1. “APBN” means Anggaran Pendapatan dan Belanja Negara, the Borrower’s national government budget for a Fiscal Year. 2. “Circular Letter” means a Surat Edaran, a letter of instruction issued by a line ministry of the Borrower. 3. “Excluded Expenditure” means any expenditure: (a) for goods or services supplied under a contract which any national or international financing institution or agency other than the Bank or the Association has financed or agreed to finance, or which the Bank or the Association has financed or agreed to finance under another loan, credit, or grant; (b) for goods included in the following groups or sub-groups of the Standard International Trade Classification, Revision 3 (SITC, Rev.3), published by the United Nations in Statistical Papers, Series M, No. 34/Rev.3 (1986) (the SITC), or any successor groups or subgroups under future revisions to the SITC, as designated by the Bank by notice to the Borrower: Group Sub-group Description of Item 112 Alcoholic beverages 121 Tobacco, un- manufactured, tobacco refuse 122 Tobacco, manufactured (whether or not containing tobacco substitutes) 525 Radioactive and associated materials 667 Pearls, precious and semiprecious stones, unworked or worked 718 718.7 Nuclear reactors, and parts thereof; fuel elements (cartridges), non- irradiated, for nuclear reactors 728 728.43 Tobacco processing - 11 - machinery 897 897.3 Jewelry of gold, silver or platinum group metals (except watches and watch cases) and goldsmiths’ or silversmiths’ wares (including set gems) 971 Gold, non-monetary (excluding gold ores and concentrates) (c) for goods intended for a military or paramilitary purpose or for luxury consumption; (d) for environmentally hazardous goods, the manufacture, use or import of which is prohibited under the laws of the Borrower or international agreements to which the Borrower is a party; (e) on account of any payment prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations; and (f) with respect to which the Bank determines that corrupt, fraudulent, collusive or coercive practices were engaged in by representatives of the Borrower or other recipient of the Loan proceeds, without the Borrower (or other such recipient) having taken timely and appropriate action satisfactory to the Bank to address such practices when they occur. 4. “Fiscal Year” or “FY” means the Borrower’s fiscal year commencing January 1 and ending December 31. 5. “General Conditions” means the “International Bank for Reconstruction and Development General Conditions for Loans”, dated July 31, 2010 with the modifications set forth in Section II of this Appendix. 6. “Government Regulation” means Peraturan Pemerintah, a regulation issued by the government of the Borrower. 7. “Indonesia Infrastructure Finance Company” means P.T. Indonesia Infrastructure Finance, a non-bank financial institution established by the Borrower and development partners to provide the needed long term local currency debt for private infrastructure projects. - 12 - 8. “Infrastructure Guarantee Fund” means PT Penjaminan Infrastruktur Indonesia, the institution established by the Borrower to facilitate the provision of guarantees by the Borrower for public-private partnership projects. 9. “Ministerial Regulation” means a Peraturan Menteri, a regulation of a line ministry of the Borrower. 10. “MPW” means the Ministry of Public Works of the Borrower, and any successor thereto. 11. “PDAM” means a Perusahaan Daerah Air Minum, any one of the Borrower’s region-owned water companies; and “PDAMs” means more than one PDAM. 12. “Permen ESDM” means Ministerial Regulation of the Ministry of Energy and Mineral Resources of the Borrower, and any successor thereto. 13. “Permen ESDM 7/2010” means Ministerial Regulation No. 7 of 2010 issued by the Minister of Energy and Mineral Resources of the Borrower on electricity tariffs. 14. “Perpres” means a Peraturan Presiden, a regulation of the President of the Borrower. 15. “Perpres 13/2010” means Presidential Regulation No. 13 of 2010 issued by the President of the Borrower regulating public-private partnership in infrastructure provision. 16. “Perpres 29/2009” means Presidential Regulation No. 29 of 2009 issued by the President of the Borrower regulating the government’s guarantee and interest subsidy for the acceleration of drinking water provision. 17. “Perpres 67/2005” means Presidential Regulation No. 67 of 2005 issued by the President of the Borrower regulating public-private partnership in infrastructure provision. 18. “PLN” means Perusahaan Listrik Negara, the Borrower’s state-owned electricity company, and any successor thereto. 19. “President” means the head of state of the Borrower. 20. “Presidential Regulation” means a Perpres, a regulation of the President of the Borrower. - 13 - 21. “Province” means the administrative sub-division of the Borrower below the national level; and “Provinces” means more than one Province 22. “PSO” means a public service obligation subsidy being provided by the Borrower to PLN to make up PLN’s financial shortfall due to rising cost of supply and inadequate tariffs. 23. “Program” means the program of actions, objectives and policies designed to promote growth and achieve sustainable reductions in poverty and set forth or referred to in the letter dated October 12, 2010 from the Borrower to the Bank declaring the Borrower’s commitment to the execution of the Program, and requesting assistance from the Bank in support of the Program during its execution. 24. “Risk-Based Internal Audit” or “RBIA” means an approach to audit that is driven by a systematic analysis of risk and focuses on higher risk areas. 25. “Road Preservation Fund” means a financing mechanism to be established by the Borrower for the preservation of all roads including sub-national, local and rural roads. 26. “Rp.” means Rupiah, the currency of the Borrower. 27. “Semi E-procurement” means the MPW’s electronic procurement system which at a minimum publishes advertisements, provides bidding documents, answers queries and notifies contract awards electronically. 28. “Single Withdrawal Tranche” means the amount of the Loan allocated to the category entitled “Single Withdrawal Tranche” in the table set forth in Part B of Section II of Schedule 1 to this Agreement. Section II. Modifications to the General Conditions The modifications to the General Conditions are as follows: 1. The last sentence of paragraph (a) of Section 2.03 (relating to Applications for Withdrawal) is deleted in its entirety. 2. Sections 2.04 (Designated Accounts) and 2.05 (Eligible Expenditures) are deleted in their entirety, and the remaining Sections in Article II are renumbered accordingly. 3. Sections 5.01 (Project Execution Generally), and 5.09 (Financial Management; Financial Statements; Audits) are deleted in their entirety, and the remaining Sections in Article V are renumbered accordingly. - 14 - 4. Paragraph (a) of Section 5.05 (renumbered as such pursuant to paragraph 4 above and relating to Use of Goods, Works and Services) is deleted in its entirety. 5. Paragraph (c) of Section 5.06 (renumbered as such pursuant to paragraph 4 above) is modified to read as follows: “Section 5.06. Plans; Documents; Records … (c) The Borrower shall retain all records (contracts, orders, invoices, bills, receipts and other documents) evidencing expenditures under the Loan until two years after the Closing Date. The Borrower shall enable the Bank’s representatives to examine such records.” 6. Paragraph (c) of Section 5.07 (renumbered as such pursuant to paragraph 4 above) is modified to read as follows: Section 5.07. Program Monitoring and Evaluation … (c) The Borrower shall prepare, or cause to be prepared, and furnish to the Bank not later than six months after the Closing Date, a report of such scope and in such detail as the Bank shall reasonably request, on the execution of the Program, the performance by the Loan Parties and the Bank of their respective obligations under the Legal Agreements and the accomplishment of the purposes of the Loan. 7. The following terms and definitions set forth in the Appendix are modified or deleted as follows, and the following new terms and definitions are added in alphabetical order to the Appendix as follows, with the terms being renumbered accordingly: (a) The definition of the term “Eligible Expenditure” is modified to read as follows: “‘Eligible Expenditure’ means any use to which the Loan is put in support of the Program, other than to finance expenditures excluded pursuant to the Loan Agreement.” (b) The term “Financial Statements” and its definition are deleted in their entirety. (c) The term “Project” is modified to read “Program” and its definition is modified to read as follows (and all references to “Project” throughout these General Conditions are deemed to be references to “Program”): - 15 - “‘Program’ means the program referred to in the Loan Agreement in support of which the Loan is made.”

Informations clés
Type de document Loan Agreement
Date d'adoption
Pays Indonésie
Source Banque mondiale