Groupe de la Banque mondiale · Procurement Plan

India - Andhra Pradesh Community Based Tank Management Project : procurement plan for 2009-2010

Inde Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

48249 Annexure-2 Procurement Plan for services for APCBTMP for 2009-10 RFP Final No Objection Evaluation to be No Objec-tion by the No of Unit Cost Estimated Proposals to be Advertising Shortlist to Draft to be from Bank for Finalised (Technical/ Bank (Technical/ SL Packag Methods of RFP Issued Received by the Phase Description of Services Cost (in for Short be Finalised forwarded to TOR/ Shortlist/ Combined/ Draft #Combined/ Draft No e No. Contrac (in Lakhs Selection @ (Date) Project ts Rs.) Lakh Rs.) listing (Date) (Date) the Bank Final RFP Contract/ Final Contract/ Final Authorities (Date) (Date)** (Date)** Contract) (Date) Contract) (Date)** A B C D E F G H I J K L M N O P Component II: Tank system improvement Phase III District level engineering support 1 consultancy/ a Ls 100.00 Individual As and when required Component III: Livelihood Support Services Promotion of New business opportunities Phase III 1 At district level 19 2.5 45.00 CQ 1-Mar-09 I+15 Days J+15 days M+30 days N+30 days 2 crop demonstrations by KVKs 8 2.03 16.24 SS Component IV: Project Management Phase III 1 Special studies and action research Ls 50.00 QCBS As and when identified - 2 MIS design 1 Ls 35.00 QCBS 1-Apr-09 I+15 Days J+15 days K+15 days L+10 days M+15 days N+30 days 3 Production of films 3 5 15.00 Individual 1-Apr-09 I+15 Days J+30 days 4 Website refinement and management 1 Ls 10.00 CQ 1-Apr-09 I+15 Days J+15 days K+15 days L+10 days M+15 days N+30 days Total Cost 211.24 /a: Two engineering consultants per DPU for a period of two years with a annual cost of Rs. 4.8 lakhs

Informations clés
Type de document Procurement Plan
Date d'adoption
Pays Inde
Source Banque mondiale