PROCUREMENT PLAN Second Eastern Indonesia Region Transport Project (EIRTP-2) as of AWP 1 23-Mar-2009 CIVIL WORKS / GOODS BIDDING PROCESS Allocated Amount Cost Program or Province/ Inter- Design Bidding Document, Incl. Eng. Design Bid Evaluation Report Procurement EE Prior / Post Invitation for Bid Opening Contract Contract Amount Nat./Prov./ Supplier/ Contractor CP / DP Completion No. Urban Urban / Package No. Name of Link Contract No. Method (USD 1=Rp.8,500) Bids Date Date Signature Date USD / IDR Kab./Kota Name (days) Kab Review Appr'd /NOL Date Submitted Date Appr'd /NOL Date Submitted Date NOL Date Request Date USD IDR(x1000) Date ICB Prior Review for C.Works PT. Waskita karya, 1 Sulbar/IU ICB 4,773,637 40,575,918 Prior EIB-101 Tapoyo-Karosa-Baras 6-Jan-05 24-Feb-05 6-Jan-05 24-Feb-05 25-Jul-05 6-Sep-05 22-Nov-05 22-Dec-05 15-Feb-06 Rp 45,254,724,777 Nat. Roads 01-053/EIB-101/RB/A/IBRD PT. Pasokorang, PT. 660 7-Dec-07 4744-IND/0206 Duta Graha, JO Baras-Pasangkayu- 2 Sulbar/IU ICB 5,232,977 44,480,304 Prior EIB-102 Surumana, Pasangkayu 28-Oct-05 11-Nov-05 28-Oct-05 11-Nov-05 15-Dec-05 26-Jan-06 18-Jul-06 28-Jul-06 29-Sep-06 Rp 44,480,304,000 Nat. Roads PT. Daya Mulya 02-53/EIB-102/RB/A/IBRD 776 13-Nov-08 Turangga 4744-IND/09/0 Bridges 3 Sultra/Prov ICB 3,231,384 27,466,761 Prior EIB-107 Tampo-Raha 15-Feb-05 15-Mar-05 15-Feb-05 15-Mar-05 14-Jun-05 28-Jul-05 30-Sep-05 3-Jan-06 31-May-06 Rp 27,466,761,468 Prov. Roads PT Jati Agung 02-56/EIB- 820 28-Aug-08 Arsitama 107/RB/B/4744/0506 Bau Bau-Bana Bungi / S, 4 Sultra/Prov ICB 3,348,813 28,464,911 Prior EIB-108 15-Feb-05 15-Mar-05 15-Feb-05 15-Mar-05 24-Jun-05 8-Aug-05 30-Sep-05 3-Jan-06 8-Jul-06 Rp 28,464,910,892 Prov. Roads PT Baita Sari-PT Jati 03-56/EIB- 733 10-Jul-08 Wasaga Agung Arsitama 108/RB/B/4744/0706 5 Maluku/Prov ICB 4,772,157 40,563,334 Prior EIB-109 Laha-Wakasihu 13-Oct-05 28-Oct-05 13-Oct-05 28-Oct-05 29-Nov-05 19-Jan-06 22-Feb-06 28-Feb-06 24-Aug-06 Rp 40,563,334,000 Prov. Roads 02-60/EIB- PT. Hutama Karya 835 6-Dec-08 109/RB/A/4744/0806 Sub-Total Cost 1 : 21,358,968 181,551,229 Rp 186,230,035,137 NCB Prior Review ( USD 1 million) 1 Maluku/IU NCB 1,532,553 13,026,703 Prior EIBR-100 Bridges ( 8Nos.) 31-Aug-04 3-Jan-05 31-Aug-04 3-Jan-05 28-Apr-05 30-May-05 17-Jun-05 13-Jul-05 17-Nov-05 Rp 13,026,703,404 Nat. Br. 01-60/EIBR-100/ PT Adhi Karya 734 21-Nov-07 BR/A/4744/1105 2 NTT/U NCB 1,635,218 13,899,357 Prior EIPB-101 Kupang 13-Aug-04 12-Nov-04 13-Aug-04 12-Nov-04 1-Mar-05 4-Apr-05 18-May-05 27-May-05 27-Jun-05 Rp 13,899,356,998 Kupang 01-44/EIPB-101/ PT Waskita Karya 240 22-Feb-06 RBPM/A/4744/0605 3 Sulteng/U NCB 1,193,284 10,142,915 Prior EIPB-103 Palu 10-Mar-05 24-Mar-05 28-Mar-05 11-Apr-05 18-Apr-05 23-May-05 14-Jul-05 9-Aug-05 24-Sep-05 Rp 8,452,429,404 Palu PT Triratna K - PT 01-52/EIPB-103/RB/ A/4744- 225 7-May-06 Fajar Raya IND/0905 4 Irjabar/Kab NCB 2,571,677 21,859,253 Prior EIPB-119 Nuni-Masni 6-Jan-05 14-Jul-05 6-Jun-05 14-Jul-05 29-Jul-05 30-Aug-05 4-Oct-05 25-Oct-05 2-May-06 Rp 21,859,253,000 Mnkwari PT Adhi Karya-PT 01-62/EIPB-119/RB/PM/ 465 10-Aug-07 Delapan E, JO C/4744/0506 Kasuara-Borong Rappoa, 5 Sulsel/Kab NCB 1,706,725 14,507,160 Prior EIPB-120 6-Jan-05 15-Mar-05 6-Jan-05 15-Mar-05 11-May-05 10-Jun-05 18-Aug-05 6-Sep-05 23-Nov-05 Rp 14,507,160,067 B.kumba PT Makassar Indah 01.73/EIPB-120/ 330 19-Oct-06 Sappiri-Gattareng Graha PMRB/C/4744/0805 6 Sulsel/Prov NCB 1,316,923 11,193,843 Prior EIP-103 Arasoe-Watampone 16-Feb-05 28-Feb-05 16-Feb-05 28-Feb-05 28-Apr-05 30-May-05 27-Jul-05 12-Aug-05 21-Nov-05 Rp 11,193,843,046 Prov. Rds PT Bawakaraeng-PT 01-54/EIP-103/ 410 5-Jan-07 Sabar Jaya PM/B/4744/1105 7 Papua/Kab NCB 1,585,164 13,473,890 Prior EIP-127 Usilimo-Bokondini 13-Apr-05 25-Apr-05 13-Apr-05 25-Apr-05 11-May-05 10-Jun-05 30-Jun-05 14-Jul-05 2-May-06 Rp 13,473,890,000 Jayawjya 01-93/EIP.127/ PT Vita Samudra 360 27-Apr-07 PM/C/4744/0506 8 Kalteng/U NCB 2,832,248 24,074,111 Prior EIB-103 Palangkaraya 13-Aug-04 12-Nov-04 13-Aug-04 12-Nov-04 1-Mar-05 4-Apr-05 9-May-05 26-May-05 1-Aug-05 Rp 24,074,110,891 Plgk.Raya PT Prestasi Karya 03-32/EIB-103/ 465 9-Nov-06 Mulia RB/A/4744/0805 Sub-Total Cost 2 : 14,373,792 122,177,233 Rp 120,486,746,810 NCB Prior Review 1st Packet 1 Sulsel/IU NCB 726,909 6,178,722 Prior EIB-100 Pinrang-Polewali 1-Sep-05 29-Sep-05 1-Sep-04 29-Sep-04 28-Apr-05 30-May-05 30-Jun-05 14-Jul-05 29-Nov-05 01-054/EIB-100/ Rp 6,178,722,299 Nat. Rds CV Kilat 240 27-Jul-06 RB/A/4744/1105 Soppeng-Pangkajene PT Bina Konstruksi 2 Sulsel/Prov NCB 1,293,255 10,992,670 Prior EIP-102 8-Sep-04 4-Jan-05 8-Sep-04 4-Jan-05 8-Mar-05 7-Apr-05 1-Jun-05 23-Jun-05 21-Nov-05 01-54/EIP-102/ Rp 10,992,669,964 Prov. Rds 300 17-Sep-06 Sidrap Utama - PT Karya Pare PM/B/4744/1105 Sejhtera,JO 3 Kalteng/Kab NCB 221,820 1,885,467 Prior EIPB-107 T Layang-Katambung 4-Jan-05 20-Jan-05 4-Jan-05 20-Jan-05 19-Apr-05 23-May-05 17-Jun-05 13-Jul-05 2-Aug-05 29.32/EIPB-107/ Rp 1,885,467,284 BaritoTim PT Hutama Karya 256 15-Apr-06 PM/C/4744/08.05 4 Kalsel/Kab NCB 288,571 2,452,853 Prior EIP-113 Tabalong Mati-Hapalah, 4-Jan-05 14-Oct-05 27-Sep-05 14-Oct-05 12-Dec-05 12-Jan-06 19-Jun-06 14-Aug-06 4-Sep-06 Rp 2,044,044,000 02-36-EIP- HuluSUt PT Hutama Karya 237 29-Apr-07 Panaitan- 113/PM/C/4744/09.06 5 Sulteng/Kab NCB 1,010,098 8,585,831 Prior EIPB-110 Labean-Manimbaya 11-Feb-05 15-Mar-05 11-Feb-05 15-Mar-05 14-Jun-05 14-Jul-05 29-Aug-05 19-Sep-05 15-Aug-06 PT Karya Baru 01-52/EIPB-110/ Rp 8,585,831,000 Donggala 365 15-Aug-07 Makmur PM/C/4744/0806 Suli-Malakosa, Mertajati- PT Putra J - PT 6 Sulteng/Kab NCB 529,850 4,503,724 Prior EIP-114 11-Feb-05 15-Mar-05 11-Feb-05 15-Mar-05 14-Jun-05 14-Jul-05 31-Aug-05 17-Oct-05 9-Oct-06 03-52/EIP-114/ Rp 4,503,724,000 PrgMout Bunga Cengkeh 240 6-Jun-07 Peore Abadi, JO PM/C/4744/1006 7 Sulsel/Kab NCB 579,615 4,926,729 Prior EIPB-112 Pa'Lingan-Layoa, Pa'Lingan- 7-Jul-05 18-Jul-05 7-Jul-05 18-Jul-05 29-Jul-05 30-Aug-05 18-Oct-05 10-Nov-05 8-Dec-05 PT Citratama T-PT 01-54/EIPB-112/ Rp 4,926,729,276 Bantaeng 240 5-Aug-06 Kaloling Nugraha T, JO PM/C/4744/1205 Damme/Mardekaya-Lantang- 8 Sulsel/Kab NCB 1,034,289 8,791,454 Prior EIPB-113 Cakura-Bantinoto,Bt Kassi- 10-Sep-04 12-Nov-04 10-Sep-04 12-Nov-04 8-Mar-05 7-Apr-05 27-May-05 10-Jun-05 21-Nov-05 PT Karya Mandala Rp 8,791,454,299 Takalar 01-54/EIPB-113/PM/C/ IBRD 377 3-Dec-06 Putra 4744-IND/1105 Bt Kanang Bontopedda-Karumasing, 9 Sulsel/Kab NCB 1,228,513 10,442,362 Prior EIPB-114 Pasir Putih-Batu Belerang, 10-Sep-04 12-Nov-04 10-Sep-04 12-Nov-04 8-Mar-05 7-Apr-05 27-May-05 10-Jun-05 17-Nov-05 PT Usaha Subur Rp 10,442,362,491 Sinjai 01-054/EIPB-114/ PM /C/IBRD- 300 13-Sep-06 Sejahtera 4744-IND/1105 Karumasing-Biji Nangka 01-73/EIB- 10 Sulsel/Kab NCB 579,901 4,929,154 Prior EIB-120 Pakalu-Soddange 1-Sep-04 29-Sep-04 1-Sep-04 29-Sep-04 8-Mar-05 7-Apr-05 3-Jun-05 23-Jun-05 17-Nov-05 Rp 4,929,154,375 Maros PT Bumi Karsa 120/RB/C/4744/NOPEMBE 449 9-Feb-07 R 2005 PT Aphasko Utama 11 Sulsel/Kab NCB 736,049 6,256,417 Prior EIB-122 Waempubbu-Pompanua 10-Sep-04 12-Nov-04 10-Sep-04 12-Nov-04 8-Mar-05 7-Apr-05 27-May-05 13-Jun-05 21-Nov-05 Rp 6,256,417,000 Bone Jaya-PT. Citra 07-54/EIB-122/RB/ C/IBRD- 180 20-May-06 Pribumi Teknik 4744-IND/1105 Perkasa.,JO 12 Sulsel/Kab NCB 464,253 3,946,154 Prior EIPB-116 Tikala-Rea 7-Jan-05 18-Apr-05 7-Jan-05 18-Apr-05 11-May-05 10-Jun-05 15-Sep-05 23-Sep-05 18-Nov-05 01-54/EIPB- Rp 3,946,154,000 Tator PT Usaha Subur 379 2-Dec-06 Sejahtera 116/PM/C/4744/1105 Simullu-Palarangan, Camba- 13 Sulbar/Kab NCB 751,520 6,387,922 Prior EIPB-118 Teppo-Palarangan-Kaida- 10-Sep-04 12-Nov-04 10-Sep-04 12-Nov-04 14-Jun-05 14-Jul-05 22-Nov-05 19-Dec-05 16-Jan-06 01-75/EIPB-118/PM- Rp 6,387,921,835 Majene PT Hutama Karya 330 12-Dec-06 Tinambung, Ambawe- RB/C/4744/0106 Rawang 14 Papua/Kab NCB 656,882 5,583,495 Prior EIP-129 Korem-Yenggarbun 26-Aug-04 11-Nov-04 26-Aug-04 11-Nov-04 8-Mar-05 7-Apr-05 17-Jun-05 13-Jul-05 10-May-06 PT Artamakmur 01-62/EIP-129/ Rp 5,583,495,000 Biak Nmfr 240 5-Jan-07 Permai PM/C/4744/0506 15 Papua/Kab NCB 398,615 3,388,230 Prior EIB-127 Muai-Musatfak 31-Aug-04 3-Jan-05 31-Aug-04 3-Jan-05 11-May-05 10-Jun-05 30-Jun-05 14-Jul-05 2-May-06 48,1/PRO-IBRD-EIB- Rp 3,388,230,000 Jayawijaya CV Ataka Serui 180 29-Oct-06 127/2006 Sub-Total Cost 3 : 10,500,139 89,251,186 Rp 88,842,376,822 AWP-1 Page 1 PROCUREMENT PLAN Second Eastern Indonesia Region Transport Project (EIRTP-2) as of AWP 1 23-Mar-2009 CIVIL WORKS / GOODS BIDDING PROCESS Allocated Amount Cost Program or Province/ Inter- Design Bidding Document, Incl. Eng. Design Bid Evaluation Report Procurement EE Prior / Post Invitation for Bid Opening Contract Contract Amount Nat./Prov./ Supplier/ Contractor CP / DP Completion No. Urban Urban / Package No. Name of Link Contract No. Method (USD 1=Rp.8,500) Bids Date Date Signature Date USD / IDR Kab./Kota Name (days) Kab Review Appr'd /NOL Date Submitted Date Appr'd /NOL Date Submitted Date NOL Date Request Date USD IDR(x1000) Date NCB Post Review 2nd Packet... etc 1 Kalteng/Kab NCB 118,988 1,011,399 Post EIP-110 Ampah-Awang 26-Aug-04 4-Jan-05 26-Aug-04 4-Jan-05 8-Mar-05 8-Apr-05 16-May-05 27-Jul-05 15-Aug-05 30-32/EIP-110/ Rp 1,011,398,545 BaritoTim PT.Hutama Karya 180 11-Feb-06 PM/C/4744/08.05 2 Sulteng/Kab NCB 247,346 2,102,444 Post EIP-116 Taopa-Sibatang 11-Feb-05 15-Mar-05 11-Feb-05 15-Mar-05 14-Jun-05 14-Jul-05 29-Jul-05 15-Aug-06 22-Aug-06 PT. Makmur 01-52/EIP- Rp 2,102,444,000 PrgMout 255 4-May-07 Sulteng Raya, JO 116/PM/C/4744/0806 Sp. Allu-Sinoa, Panaikang- PT. Ctratama Timurindo- 3 Sulsel/Kab NCB 561,387 4,771,791 Post EIP-118 6-Jan-05 15-Mar-05 6-Jan-05 15-Mar-05 29-Jul-05 30-Aug-05 9-Dec-05 10-Dec-05 19-Dec-05 02-54/EIP-118/ Rp 4,771,791,000 Bantaeng PT. Nugraha Tanamal, 240 16-Aug-06 Maroa JO RB/C/4744/1205 Kassi-Amma'Rang P- 4 Sulsel/Kab NCB 412,998 3,510,480 Post EIB-121 1-Sep-04 30-Sep-04 1-Sep-04 30-Sep-04 8-Mar-05 7-Apr-05 29-Jun-05 15-Nov-05 02-73/EIB- Rp 3,510,479,768 Maros PT. Putrajaya-PT 240 13-Jul-06 Sabantang Patriot J. Pratama, JO 121/RB/C/4744/1105 5 Sulsel/Kab NCB 546,121 4,642,027 Post EIB-123 Lapeccang-Pattiro Bajo 10-Sep-04 12-Nov-04 10-Sep-04 12-Nov-04 8-Mar-05 7-Apr-05 4-May-05 21-Nov-05 Rp 4,638,822,670 Bone PT.Sabar Jaya, CV.Karya 08-54/EIB-123/RB/C/IBRD 4744- 180 20-May-06 Subur Utama,JO IND/1105 6 Sulsel/Kab NCB 301,632 2,563,869 Post EIP-121 Rura-Tombang Kalua 6-Jan-05 15-Mar-05 6-Jan-05 15-Mar-05 11-May-05 10-Jun-05 2-Aug-05 30-Dec-05 PT. Sabar Jaya 02-54/EIP-121/ Rp 2,563,869,000 Tator 180 28-Jun-06 Pratama PM/C/4744/1205 7 Sulsel/Kab NCB 219,877 1,868,952 Post EIP-122 Makula-Batualu 6-Jan-05 15-Mar-05 6-Jan-05 15-Mar-05 11-May-05 10-Jun-05 2-Aug-05 30-Dec-05 PT. Sabar Jaya 02-54/EIP-122/ Rp 1,868,952,000 Tator 180 28-Jun-06 Pratama PM/C/4744/1205 Sub-Total Cost 4 : 2,408,348 20,470,962 Rp 20,467,756,983 ICB for Goods Packets 1 Jakarta ICB 3,411,111 28,994,447 Post EIG-1 4-Nov-04 9-Nov-04 22-Nov-04 5-Jan-05 17-Feb-05 3-Mar-05 4-May-05 Rp 28,994,446,800 PT Waagner Biro 01-20/EIG- Bridge Truss Indonesia 1/GD/A/4744/0505 Rp 2,823,236,031 Construction Kanto Bussan Kaisha, 2 Jakarta ICB 1,693,492 14,394,680 Post EIG-2 24-Feb-06 18-May-06 12-Jun-06 1-Aug-06 6-Nov-06 7-Nov-06 27-Nov-06 Material Lab. 03-20/EIG-2 GBP 396,106 Ltd, Panairsan Testing /GD/A/4744/1106 USD 202,588 Pratama, JO Equipment IT Equip. for 3 Jakarta ICB 591,000 5,023,500 Post EIG-3 16-May-06 27-Jul-06 3-Aug-06 15-Sep-06 19-Oct-06 12-Feb-07 26-Mar-07 Rp 4,726,293,000 PMU, BIPRAM, PT. Wira Eka 04-20/EIG-3 and BPJT Bhakti /GD/A/4744/0307 5,695,603 48,412,627 CP = Construction Period Total Cost : 54,336,851 461,863,235 DP = Delivery Period ICB Prior Review for C.Works 1 Sulbar/Prov. ICB 4,773,350 40,573,472 Prior EIB-106 Polewali-Tabone 22-Mar-07 04-Apr-07 22-Mar-07 04-Apr-07 23-Apr-07 06-Jun-07 24-Aug-07 11-Sep-07 09-Oct-07 Rp 40,573,472,153 Prov. Rds PT. Istaka Karya 04/34/EIB- 520 12-Mar-09 106/RB/B/4774/1007 Rp 73,763,395.000 (Rp PY Nindya Simp. Pelita Jaya- 04-60/EIB- 2 Maluku/Prov. ICB 6,890,588 58,570,000 Prior EIB-110 05-Sep-07 21-Sep-07 05-Sep-07 21-Sep-07 24-Oct-07 06-Dec-07 12-Feb-08 30-May-08 04-Jul-08 58,570,000,000 from Loan-APBD Prov. Rds Karya, PT 500 16-Nov-09 Taniwel & Rp 15,193,395,000 fr APBD- Brantas A, PT 110/RB/B/4744/0708 Prov. Budget FY 08) Anugrah K, JO Sub-Total Cost 1 : 11,663,938 99,143,472 Rp 40,573,472,153 NCB Prior Review ( USD 1 million) 1 NTT/Kab NCB 2,258,747 19,199,345 Prior EIB-115 Nualinu-Hangalande, 19-Oct-06 03-Nov-06 19-Oct-06 03-Nov-06 19-Dec-06 04-Jan-07 07-Mar-07 13-Mar-07 23-Apr-07 Rp 19,199,345,355 Ende PT. Nindya Karya 05-0824/EIB- 480 15-Aug-08 Nduaria-Warundari 115/RB/C/4744/0207 2 NTB/U NCB 1,970,589 16,750,007 Prior EIPB-100 Jl. Jend. Sudirman, Jl. Adi Sucipto, Jl. Selaparang22-Jan-07 30-Nov-06 30-Nov-06 22-Jan-07 01-Feb-07 06-Mar-07 14-May-17 23-May-07 11-Jun-07 Rp 27,320,322,866 Mataram PT. Waskita 01-23/EIPB- 535 27-Nov-08 karya 100/RB/A/4744/0607 3 Maluku/Prov. NCB 1,744,776 14,830,597 Prior EIP-104 Piru-Simp.Pelita Jaya 21-Sep-06 29-Sep-06 21-Sep-06 29-Sep-06 19-Oct-06 23-Nov-06 21-Dec-06 04-Jan-06 01-Feb-07 Rp 14,635,956,000 Prov. Rds PT Anugerah Karya 01.06/EIP-104/ 590 13-Sep-08 Agra Sentosa PM/B/4744/0207 4 Papua/U NCB 1,568,729 13,334,193 Prior EIP-100 Jayapura 05-Mar-08 01-Apr-08 05-Mar-08 01-Apr-08 12-May-08 11-Jun-08 23-Jul-08 30-Jul-08 09-Oct-08 Jayapura PENDING DELETETION 240 6-Jun-09 5 Papua/Kab NCB 1,637,674 13,920,225 Prior EIB-129 Kontiunai-Ambaidiru 08-May-08 19-May-08 08-May-08 19-May-08 20-Nov-08 03-Feb-09 06-Mar-09 18-Mar-09 17-Apr-09 Rp 18,080,644,000 Yapen Wrp PT. Sinar 240 13-Dec-09 Purnama Karya 6 NTT/Kab NCB 2,115,953 17,985,602 Prior EIB-108G Bitauni-Manufui 19-Oct-06 03-Nov-06 19-Oct-06 03-Nov-06 16-Nov-06 19-Dec-06 07-Mar-07 05-Apr-07 28-May-07 Rp 17,985,602,316 PT. Anugrah Karya 01-24-EIB- TimTgh Ut 420 21-Jul-08 Agra Sentosa 108G/RB/C/4744/0507 7 Sulbar/Kab NCB 2,352,941 20,000,000 Prior EIP-126G Kuo-Tommo 28-Dec-06 05-Jan-07 28-Dec-06 05-Jan-07 30-Jan-07 01-Mar-07 03-May-07 15-May-07 14-Jun-07 Rp 19,865,000,000 Mamuju PT. 02-54/EIP- 480 6-Oct-08 PASSOKORANG 126G/RB/C/4744/0407 8 NTB/Kab NCB 2,230,771 18,961,550 Prior EIP-107G Dena-Campa 11-Dec-06 19-Dec-06 11-Dec-06 19-Dec-06 01-Feb-07 06-Mar-07 14-May-07 25-May-07 15-Jun-07 Rp 18,865,089,684 Bima PT. LANCAR 04-23/EIP- 365 14-Jun-08 SEJATI, JO 107G/PM/C/4744/0607 PT. WASKITA 9 NTB/Kab NCB 2,414,700 20,524,950 Prior EIP-105G Mt Gamang-Janapiria, 11-Dec-06 19-Dec-06 11-Dec-06 19-Dec-06 01-Feb-07 06-Mar-07 14-May-07 25-May-07 30-Jun-07 Rp 22,043,978,000 Lmbk Tgh 02-23/EIP- KARYA 495 6-Nov-08 Mangkung-Selong Belanak 105G/PM/C/4744/0607 PERSERO 10 Irjabar/U NCB 2,117,191 17,996,126 Prior EIP-101 Sorong 18-Apr-08 24-Apr-08 18-Apr-08 24-Apr-08 26-May-08 01-Jul-08 12-Aug-08 19-Aug-08 29-Oct-08 Sorong PENDING DELETETION 240 26-Jun-09 Sub-Total Cost 2 : 20,412,070 173,502,596 Rp 157,995,938,221 AWP-1 Page 2 PROCUREMENT PLAN Second Eastern Indonesia Region Transport Project (EIRTP-2) as of AWP 1 23-Mar-2009 CIVIL WORKS / GOODS BIDDING PROCESS Allocated Amount Cost Program or Province/ Inter- Design Bidding Document, Incl. Eng. Design Bid Evaluation Report Procurement EE Prior / Post Invitation for Bid Opening Contract Contract Amount Nat./Prov./ Supplier/ Contractor CP / DP Completion No. Urban Urban / Package No. Name of Link Contract No. Method (USD 1=Rp.8,500) Bids Date Date Signature Date USD / IDR Kab./Kota Name (days) Kab Review Appr'd /NOL Date Submitted Date Appr'd /NOL Date Submitted Date NOL Date Request Date USD IDR(x1000) Date NCB Prior Review 1st Package 1 NTB/Kab NCB 1,611,108 13,694,415 Prior EIP-106G Adu-Rasabou, Sakalo- 11-Dec-06 19-Dec-06 11-Dec-06 19-Dec-06 01-Feb-07 06-Mar-07 23-May-07 30-May-07 15-Jun-07 Rp 14,757,945,990 Dompu PT. Rangga 03-23/EIP- 300 10-Apr-08 Saneo Ekapratama 106G/PM/C/4744/0607 2 NTT/Kab NCB 1,624,547 13,808,646 Prior EIPB-104 Bukapiting-Apui 28-Sep-07 10-Oct-07 28-Sep-07 10-Oct-07 25-Oct-07 28-Nov-07 04-Jan-08 18-Jan-08 06-Feb-08 Rp 13,652,199,000 Alor PT. Adhi Karya 01-0524/EIPB- 360 31-Jan-09 104/RBPM/C/4744/0208 3 Kalteng/Kab NCB 2,281,165 19,389,900 Prior EIPB-105G K Kapuas-Mandomai 09-Nov-07 21-Nov-07 09-Nov-07 21-Nov-07 17-Dec-07 17-Jan-08 16-Sep-08 23-Sep-08 20-Oct-08 Rp 20,928,727,251 Kapuas PT Mahir Jaya 01-14/EIPB-105G/RB- 365 20-Oct-09 C/4744/1008 4 Sulsel/Kab NCB 1,464,234 12,445,985 Prior EIP-115G Padang Loang-Dongi- 20-Apr-07 04-May-07 20-Apr-07 04-May-07 25-May-07 26-Jun-07 31-Aug-07 14-Sep-07 03-Oct-07 Rp 12,284,694,867 Sidrap PT. Karya Pare 01-1917/EIP-115G/PM- 240 30-May-08 Tannutedong Sejahtera C/4744/1007 5 Sultra/U NCB 727,116 6,180,485 Prior EIPB-102 Kendari 17-Dec-07 3-Jan-08 17-Dec-07 3-Jan-08 3-Mar-08 10-Apr-08 22-May-08 29-May-08 08-Aug-08 Kendari PENDING DELETION 150 5-Jan-09 6 Irjabar/Kab NCB 1,058,658 8,998,591 Prior EIP-128 Hurimber-Kinam 29-Sep-06 10-Oct-06 29-Sep-06 10-Oct-06 10-Nov-06 13-Dec-06 25-Jan-07 30-Jan-07 07-Feb-07 Rp 7,844,401,000 Fakfak PT. Torea Fak- 06-62/EIP-128/ 288 22-Nov-07 fak Indah PM/C/4744/0207 7 Sulteng/Kab NCB 1,097,533 9,329,032 Prior EIPB-111 Buatan-Bilo, Tambun-Bilo 21-Apr-08 05-May-08 21-Apr-08 05-May-08 13-May-08 11-Jun-08 23-Jul-08 30-Jul-08 09-Oct-08 Toli-Toli Sub-Total Cost 3 : 9,864,359 83,847,054 NCB Post Review 2nd Packet... etc 1 Sulteng/Kab NCB 183,622 1,560,786 Post EIP-117G Sp.Kasimbar- Dusun III 5-Oct-07 29-Oct-07 5-Oct-07 29-Oct-07 25-Feb-08 1-Apr-08 21-Apr-08 13-May-08 30-Jul-08 Prg. Moutong PROPOSE DELETE 180 26-Jan-09 2 Sulbar/Kab NCB 619,009 5,261,576 Post EIP-123G Tanete-Tande-Luttang, 23-Jan-08 31-Jan-08 23-Jan-08 31-Jan-08 29-Feb-08 1-Apr-08 2-Jul-08 25-Jul-08 04-Sep-08 Rp 8,479,889,817 Majene PT Lumpue Indah 19-34/EIP-123G/ 240 2-May-09 Tanete-Galung PM/C/4744/0908 3 Sulteng/Kab NCB 642,353 5,460,000 Post EIB-117 Gimpu-Peana 6-May-08 30-May-08 6-May-08 30-May-08 19-Aug-08 19-Sep-08 23-Oct-08 16-Jan-09 17-Jan-09 Rp 10,125,066,800 Donggala PT. Waskita 270 14-Oct-09 Karya 1,444,984 12,282,363 NCB for Goods Package 1 Jakarta NCB 195,000 1,657,500 Post EIG-4 N.A N.A N.A N.A 30-Jun-06 1-Aug-06 15-Sep-06 9-Oct-06 3-Nov-06 Rp 1,156,870,000 Lot A PT. Karya Agung 02-20/EIG- 15 18-Nov-06 (Lot A) contract Alexander Motor 4/GD/A/4744/1106 EIG-4 N.A N.A N.A N.A 21-Feb-07 22-Mar-07 21-May-07 Rp 798,996,000 Lot B PT. Karya Agung 06-20/EIG- 15 5-Jun-07 (Lot B) contract Alexander Motor 4/GD/A/4744/507 195,000 1,657,500 Rp 1,955,866,000 CP = Construction Period Total Cost : 43,580,351 370,432,984 All Works and Goods Packets apply Post Qualification and Unit Price Contract methods Rp 200,525,276,374 DP = Delivery Period Note Post Review < USD 1 million Prior Review > USD 1 million Date of process already complete Expected date to complete Date overdue For Prior Review Packages : 1. From bid opening to request for World Bank no objection max 6 weeks 2. From bid opening to award max 120 days For Post Review Packages : 1. From bid opening to request for Bina Program approval max 4 weeks 2. From bid opening to award max 120 days AWP-1 Page 3 PROCUREMENT PLAN Second Eastern Indonesia Region Transport Project (EIRTP-2) as of AWP 2 & 3 23-Mar-09 Name of PPU: M. Hatta Latief, PMU-EIRTP CIVIL WORKS BIDDING PROCESS Allocated Amount Cost Program or EE Design Bidding Document Incl. Eng. Bid Evaluation Report Province/ Inter- Contract Amount USD / IDR Procurement Prior / Post Design Invitation for Bid Opening Contract Nat./Prov./ Supplier/ Contractor CP/DP Completion No. Urban Urban / Package No. Name of Link Contract No. Method 1 USD = IDR 9,100 Review Submitted Appr'd /NOL Submitted Bids Date Date Appr'd /NOL Signature Date Kab./Kota Name (days) Kab NOL Date Request Date Original Date USD IDR(x1000) Date Date Date Date ICB Prior Review for C.Works PT Waskita Karya- 01-53/EIB- 1 Sulbar/IU ICB 9,832,844 89,478,882 Prior EIB-157 Kaluku-Topoyo, cs 5-Dec-07 8-Jan-08 5-Dec-07 8-Jan-08 29-Feb-08 16-May-08 14-Aug-08 22-Aug-08 20-Oct-08 Rp 107,259,572,362 Nat. Roads 390 14-Nov-09 PT Bumi Karsa, JO 157/RB/A/4744/1008 01-30/EIPB- 2 Kalbar/Prov ICB 5,015,418 45,640,300 Prior EIPB-139 A Singkawang-Sambas 20-Aug-07 3-Sep-07 20-Aug-07 3-Sep-07 14-Dec-07 5-Feb-08 15-May-08 23-May-08 19-Jun-08 Rp 40,223,003,000 Prov. Road PT Mahir Jaya 365 19-Jun-09 139A/RB/B/4744/0608 01-30/EIPB- 3 Kalbar/Prov ICB 4,279,198 38,940,700 Prior EIPB-139 B Tebas-Sambas 20-Aug-07 3-Sep-07 20-Aug-07 3-Sep-07 14-Dec-07 5-Feb-08 15-May-08 23-May-08 19-Jun-08 Rp 34,420,958,000 Prov. Road PT Bangun Cipta 365 19-Jun-09 139B/RB/B/4744/0608 Sub-Total Cost 1 : 19,127,460 174,059,882 NCB Prior Review ( USD 1 million) 1 Sulsel/IU NCB PT Sinar Agung Jaya 01-054/EIP- 954,815 8,688,820 Prior EIP-130 Maros-Bcd. Bone Barat 11-Oct-07 25-Oct-07 11-Oct-07 25-Oct-07 24-Apr-08 24-May-08 12-Aug-08 20-Aug-08 10-Oct-08 Rp 9,355,015,536 Nat. Roads 150 9-Mar-09 Lestari, JO 130/PM/A/4744/1008 Tarumpake-Bts.Luwu 2 Sulsel/IU NCB 1,570,054 14,287,490 Prior EIB-133 11-Oct-07 25-Oct-07 11-Oct-07 25-Oct-07 24-Apr-08 24-May-08 5-Jul-08 12-Jul-08 21-Sep-08 Nat. Roads PEINDING DELETETION 210 19-Apr-09 Selatan PT Modern Widya 02-60/EIB- 3 Maluku/IU NCB 2,679,863 24,386,755 Prior EIB-134 Mako-Namrole 4-Jan-08 23-Jan-08 4-Jan-08 23-Jan-08 8-Feb-08 13-Mar-08 6-Jun-08 16-Jun-08 3-Jul-08 Rp 30,340,188,000 Nat. Roads 360 28-Jun-09 Technical 134/RB/A/4744/0708 01-52/EIB- 4 Sulteng/Prov NCB 2,042,658 18,588,184 Prior EIB-137 Balingara-Bunta 29-Sep-06 3-Oct-06 29-Sep-06 3-Oct-06 30-Jan-07 6-Mar-07 16-Jul-07 25-Jul-07 15-Aug-07 Rp 13,799,708,901 Prov. Road PT Bumi Karsa 420 8-Oct-08 137/RB/B/4744/0807 Rp 22,200,570,000 (Rp 2,298,615,300 will be PT Yala Persada 05-60/EIP- 5 Maluku/Prov NCB 2,158,962 19,646,553 Prior EIP-132 Langgur-Danar 28-Sep-07 24-Oct-07 28-Sep-07 24-Oct-07 29-Jan-08 4-Mar-08 17-Jun-08 3-Jul-08 25-Jul-08 Prov. Road 365 25-Jul-09 financed fr APBD-Prov. Angkasa 132/PM/B/4744/0708 Budget) Rp 16,203,982,000 (Rp 1,263,672,000 will be 03-60/EIBR- 6 Maluku/Prov NCB 1,626,363 14,799,902 Prior EIBR-106 Morela-Liang & Bridges 28-Sep-07 24-Oct-07 28-Sep-07 24-Oct-07 29-Jan-08 4-Mar-08 22-May-08 30-May-08 20-Jun-08 Prov. Road PT Nindya Karya 300 16-Apr-09 financed fr APBD-Prov. 106/BR/B/4744/0608 Budget) Rp 21,925,073,000 (Rp 01-33/EIB- 7 Irjabar/Prov NCB 2,224,780 20,245,496 Prior EIB-141 Sorong-Seget 29-Sep-06 5-Oct-06 29-Sep-06 5-Oct-06 6-Aug-07 6-Sep-07 5-Nov-07 16-Nov-07 26-Nov-07 18,000,000,000 from Loan + Prov. Road PT Brantas Abipraya 413 20-Nov-08 APBD & Rp 3,925,073,000 fr 141/RB/B/4744/1107 APBD-Prov. Budget FY 08) 8 NTB/U NCB 1,773,264 16,136,702 Prior EIPB-123 Jl. Sutami, etc. 25-Oct-07 1-Nov-07 25-Oct-07 1-Nov-07 5-Dec-07 14-Jan-08 31-Mar-08 17-Apr-08 5-May-08 Rp 18,296,507,621 Bima PT Adhi Karya, JO 05-23/EIPB-123/RB/A/4744/0508 225 16-Dec-08 PT Tamako Raya 9 Kalteng/Kab NCB 1,246,857 11,346,400 Prior EIB-159 Ampah-Awang 9-Nov-07 21-Nov-07 9-Nov-07 21-Nov-07 29-Feb-08 1-Apr-08 9-Jun-08 16-Jun-08 30-Jul-08 Rp 10,102,100,000 Barito Timur WITHDRAWN 330 25-Jun-09 Perdana 10 NTB/Kab NCB 1,354,790 12,328,586 Prior EIPB-124 Sp.Latonda-SP.Kadindi 7-Nov-07 16-Nov-07 7-Nov-07 16-Nov-07 21-Jan-08 20-Feb-08 2-Apr-08 9-Apr-08 19-Jun-08 Dompu WITHDRAWN 270 16-Mar-09 11 Sulteng/Kab NCB 1,035,465 9,422,730 Prior EIPB-133 Babatona-Pem. Trans 11-Oct-07 25-Oct-07 11-Oct-07 25-Oct-07 19-Aug-08 19-Sep-08 14-Jan-09 21-Jan-09 17-Jan-09 Donggala 360 12-Jan-10 12 Sulteng/Kab NCB 1,388,684 12,637,027 Prior EIB-143 Air Terang-Modo 11-Oct-07 25-Oct-07 11-Oct-07 25-Oct-07 6-Apr-09 28-Apr-09 9-Jun-09 16-Jun-09 16-Jul-09 Buol PROPOSE REBID 360 11-Jul-10 PT Mahir Jaya 13 Sulteng/Kab NCB 1,560,518 14,200,718 Parigi Prior EIP-136 Suli-Puluksari 14-Nov-07 27-Nov-07 14-Nov-07 27-Nov-07 25-Feb-08 1-Apr-08 12-May-08 22-May-08 3-Jul-08 Rp 13,114,180,000 01-52/EIP-136/PM/C/4744/0708 360 28-Jun-09 Moutong Makahakam Jaya PT Sinar Agung Jaya 14 Sulsel/Kab NCB 1,038,893 9,453,923 Prior EIB-145 Pamanjengan-Btg.Gajah 7-Nov-07 16-Nov-07 7-Nov-07 16-Nov-07 10-Apr-08 14-May-08 31-Oct-08 12-Nov-08 12-Dec-08 Rp 8,948,402,235 Maros 03-73/EIB-145/RB/C/4744/1208 270 8-Sep-09 Lestari, JO 15 Papua/Kab NCB 1,241,889 11,301,193 Prior EIB-148 Sp.II Legari-Sp.IV Legari 18-Apr-08 24-Apr-08 18-Apr-08 24-Apr-08 2-May-08 12-Jun-08 24-Jul-08 31-Jul-08 10-Oct-08 Nabire 240 7-Jun-09 Rp 18,294,965,000 (Rp 3,828,985,000 will be PT Modern Widya 01-62/EIB- 16 Papua/Kab NCB 1,748,313 15,909,651 Prior EIB-155 Kenyapa-Waghete 5-Mar-08 1-Apr-08 5-Mar-08 1-Apr-08 16-May-08 17-Jun-08 25-Jul-08 12-Sep-08 26-Sep-08 Paniai 300 23-Jul-09 financed fr APBD-Kab. Technical 155/RB/C/4744/0908 Budget) 02-62/EIB- 17 Irjabar/Kab NCB 1,108,963 10,091,567 Prior EIB-152 Rangkedak-Tetar 8-May-08 19-May-08 8-May-08 19-May-08 23-May-08 24-Jun-08 6-Aug-08 12-Aug-08 19-Aug-08 Rp 9,540,389,000 Fakfak PT Nikita Raya 240 16-Apr-09 152/RB/C/4744/0808 Sub-Total Cost 2 : 26,755,131 243,471,696 NCB Prior Review 1st Packet PT. Gaya Bangun 01-28/EIP- 1 Mal Ut/U NCB 830,330 7,556,000 Prior EIP-131 Jl. Merdeka, etc. 31-Aug-07 14-Sep-07 31-Aug-07 14-Sep-07 12-Oct-07 28-Nov-07 23-Jan-08 12-Feb-08 6-Mar-08 Rp 7,545,844,405 Ternate 270 1-Dec-08 Prajatama, JO 131/PM/C/4744/0308 Sub-Total Cost 3 : 830,330 7,556,000 NCB Post Review 2nd Packet... etc 1 Sulteng/Prov NCB 513,464 4,672,525 Post EIBR-102 Korompodi 5-Oct-07 29-Oct-07 5-Oct-07 29-Oct-07 8-Jan-09 17-Mar-09 14-Apr-09 15-Jul-09 12-Aug-09 Prov. Br REBIDDING PROCESS 240 9-Apr-10 2 Sultra/Prov NCB 318,226 2,895,854 Post EIBR-105 S. Aepodu 12-Nov-07 28-Dec-07 12-Nov-07 28-Dec-07 16-Jun-08 18-Jul-08 15-Aug-08 29-Aug-08 15-Nov-08 Prov. Br. REBIDDING PROCESS 300 11-Sep-09 3 Sulsel/U NCB 659,375 6,000,311 Post EIB-135 Jl. Sudirman 1-Aug-07 29-Oct-07 1-Aug-07 29-Oct-07 24-Apr-08 24-May-08 21-Jun-08 5-Jul-08 21-Sep-08 Nat. Roads PENDING DELETETION 240 19-May-09 PT Karya Bumi 05-60/EIP- 4 Maluku/U NCB 305,275 2,778,000 Post EIP-139 Jl. Ahmad Yani, etc. 31-Aug-07 14-Sep-07 31-Aug-07 14-Sep-07 11-Oct-07 29-Nov-07 23-Jan-08 11-Mar-08 7-Apr-08 Rp 3,246,842,000 Nat. Roads 60 6-Jun-08 Nasional Perkasa 139/PM/A/4744/04.08 5 NTB/Kab NCB 155,481 1,414,877 Post EIP-140 Rato - Mangge 5-Oct-07 29-Oct-07 5-Oct-07 29-Oct-07 12-Apr-08 12-Jun-08 10-Jul-08 24-Jul-08 10-Oct-08 Bima PROPOSE REBIDDING 120 7-Feb-09 6 Sulteng/Kab NCB 837,830 7,624,250 Post EIB-142 Bilo-Lampasio 5-Oct-07 29-Oct-07 5-Oct-07 29-Oct-07 10-May-08 9-Jun-08 7-Jul-08 21-Jul-08 7-Oct-08 Toli-toli 300 3-Aug-09 7 Sulteng/Prov. NCB 858,573 7,813,012 Post EIBR-104 Lobu Bridge 5-Oct-07 29-Oct-07 5-Oct-07 29-Oct-07 8-Jan-09 17-Mar-09 14-Apr-09 15-Jul-09 12-Aug-09 Prov. Br. REBIDDING PROCESS 360 7-Aug-10 PT Purnama Karya- 8 Sulsel/Kab NCB 705,263 6,417,893 Post EIB-161 Palampang-Palangisang 1-Aug-07 29-Oct-07 1-Aug-07 29-Oct-07 24-Dec-07 31-Jan-08 2-May-08 27-May-08 20-Aug-08 Rp 6,293,093,912.72 Bulukumba 01.73/EIB.161/RB/C/4744/08. 250 27-Apr-09 PT Agung Perdana 08 9 Sulsel/Kab NCB 245,045 2,229,910 Post EIB-144 Morowa-Talakaya 9-Aug-07 30-Jan-08 9-Aug-07 30-Jan-08 15-Feb-08 28-Mar-08 25-Apr-08 9-May-08 26-Jul-08 Bantaeng PROPOSE REBIDDING 150 23-Dec-08 10 Sulsel/Kab NCB 624,080 5,679,131 Post EIP-138 Korong-Bua, etc. 5-Oct-07 29-Oct-07 5-Oct-07 29-Oct-07 23-Jan-08 26-Feb-08 3-Jul-08 25-Jul-08 28-Aug-08 Rp 5,629,904,705 Sinjai PT Tri Star Mandiri, JO02.54/EIP.138/PM/C/4744/ 150 25-Jan-09 0808 PT Karya Subur 06-54/EIB-146/RB/C/IBRD- 11 Sulsel/Kab NCB 861,910 7,843,383 Post EIB-146 Lapecang-Lonrong 9-Aug-07 29-Oct-07 9-Aug-07 29-Oct-07 23-Jan-08 26-Feb-08 30-May-08 17-Jun-08 28-Aug-08 Rp 9,411,600,258.97 Bone 270 25-May-09 Teknik, JO 4744-IND/0808 PT Bina Konstruksi 02-54/EIB- 12 Sulsel/Kab NCB 537,075 4,887,380 Post EIB-147 Cipotakari-Anabanae, etc. 5-Oct-07 29-Oct-07 5-Oct-07 29-Oct-07 23-Jan-08 26-Feb-08 12-May-08 30-May-08 3-Jul-08 Rp 6,081,349,986 Sidrap 210 29-Jan-09 Utama 147/RB/C/4744/0708 Barana-Pangli Pallawa, PT Usaha Subur 01-54/EIPB- 13 Sulsel/Kab NCB 581,654 5,293,053 Post EIPB-135 29-Oct-07 30-Jan-08 29-Oct-07 30-Jan-08 15-Feb-08 28-Mar-08 26-Jun-08 25-Jul-08 25-Aug-08 Rp 5,280,859,919 Tana Toraja 210 23-Mar-09 etc. Sejahtera 135/PM/C/4744/0808 PT Adhi Karya, JO 01-62/EIB- 14 Irjabar/Kab NCB 881,170 8,018,648 Post EIB-162 Nuni-Masni 7-Aug-07 11-Jun-08 7-Aug-07 11-Jun-08 7-Jul-08 6-Aug-08 17-Sep-08 26-Sep-08 31-Oct-08 Rp 9,671,153,000 Manokwari 240 28-Jun-09 162/B/C/4744/1008 Sub-Total Cost 4 : 8,084,421 73,568,227 CP = Construction Period Total Cost : 54,797,341 498,655,805 All Works and Goods Packets apply Post Qualification and Unit Price Contract methods DP = Delivery Period Page 1 DEIRTP2 AWP1-2-3 for ProcPlan 09 Mar 23 - actual modified PROCUREMENT PLAN Second Eastern Indonesia Region Transport Project (EIRTP-2) as of AWP 2 & 3 23-Mar-09 Name of PPU: M. Hatta Latief, PMU-EIRTP CIVIL WORKS BIDDING PROCESS Allocated Amount Cost Program or EE Design Bidding Document Incl. Eng. Bid Evaluation Report Province/ Inter- Contract Amount USD / IDR Procurement Prior / Post Design Invitation for Bid Opening Contract Nat./Prov./ Supplier/ Contractor CP/DP Completion No. Urban Urban / Package No. Name of Link Contract No. Method 1 USD = IDR 9,100 Review Submitted Appr'd /NOL Submitted Bids Date Date Appr'd /NOL Signature Date Kab./Kota Name (days) Kab NOL Date Request Date Original Date USD IDR(x1000) Date Date Date Date ICB Prior Review for C.Works PT Strada 14-30/EIB-164G/RB/A/4744- 1 Kalbar/IU ICB 3,400,055 30,940,500 Prior EIB-164 G Sei Duri-Singkawang 20-Aug-07 3-Sep-07 20-Aug-07 3-Sep-07 14-Dec-07 14-Feb-08 14-Aug-08 22-Aug-08 29-Aug-08 Rp 36,871,158,000 Nat. Road 365 29-Aug-09 Multiperkasa IND/0808 2 Kalteng/Prov NCB Sampit-Samuda, Samuda- 4,832,088 43,972,000 Prior EIB-172 G 9-Nov-07 21-Nov-07 9-Nov-07 21-Nov-07 25-Feb-08 22-May-08 3-Jul-08 10-Jul-08 19-Sep-08 Prov. Roads PROPOSED REBIDDING 365 19-Sep-09 Ujungpandaran 3 NTT/IU ICB 01-24/EIPB- 7,748,876 70,514,775 Prior EIPB-141 Niki Niki-Noelmuti, etc. 11-Oct-07 29-Oct-07 11-Oct-07 29-Oct-07 14-Nov-07 7-Jan-08 4-Mar-08 8-Apr-08 10-Jun-08 Rp 69,555,069,803.37 Nat. Road PT Waskita Karya 365 10-Jun-09 141/RPB/4744/0608 PT Duta Graha 03-53/EIB- 4 Sulbar/IU ICB 4,871,334 44,329,135 Prior EIB-165 Topoyo-Karosa, etc. 5-Dec-07 17-Dec-07 5-Dec-07 17-Dec-07 29-Feb-08 16-May-08 12-Aug-08 20-Oct-08 31-Oct-08 Rp 53,399,226,145 Nat. Road 390 25-Nov-09 Indah, JO 165/RB/A/4744/1008 PT Hutama Karya, 02-53/EIPB- 5 Sulbar/IU ICB 5,757,042 52,389,082 Prior EIPB-142 Baras-Pasangkayu, etc. 5-Dec-07 17-Dec-07 5-Dec-07 17-Dec-07 29-Feb-08 16-May-08 19-Aug-08 25-Aug-08 20-Oct-08 Rp 62,287,001,341 Nat. Road 390 14-Nov-09 PT Passokorang, JO 142/RB/A/4744/1008 PT. Bumi Karsa, PT. 02-054/EIB- Makassar Indah 6 Sulsel/IU ICB 8,189,365 74,523,225 Prior EIB-166 Wotu-Masamba 25-Oct-07 2-Nov-07 25-Oct-07 2-Nov-07 24-Apr-08 5-Jun-08 17-Oct-08 2-Dec-08 11-Dec-08 Rp 91,322,619,759 Nat. Road 420 4-Feb-10 GS,PT. Latanindo Graha Perkasa JO 166/RB/A/4744/1208 Makale-Bts. Cabdin Luwu 7 Sulsel/IU ICB 5,219,512 47,497,558 Prior EIB-167 14-Nov-07 16-Apr-08 14-Nov-07 16-Apr-08 24-Apr-08 26-May-08 7-Jul-08 14-Jul-08 23-Sep-08 Nat. Road PENDING DELETETION 390 18-Oct-09 Selatan PT Adhi Karya-PT 01-054/EIB- 8 Sulsel/IU ICB 4,617,593 42,020,092 Prior EIB-168 Bts.Cabdin Wajo-Pareman 25-Oct-07 2-Nov-07 25-Oct-07 2-Nov-07 24-Apr-08 5-Jun-08 26-Aug-08 20-Oct-08 4-Dec-08 Rp 50,003,511,877 Nat. Road 365 4-Dec-09 Karya Pare S, JO 168/RB/A/4744/1208 03-60/EIB- 9 Maluku/IU ICB 6,999,977 63,699,788 Prior EIB-169 Kobisonta-Banggoi, etc. 31-Jan-08 12-Feb-08 31-Jan-08 12-Feb-08 26-Feb-08 9-Apr-08 11-Jun-08 18-Jun-08 16-Jul-08 Rp 75,920,243,000 Nat. Road PT Waskita Karya 400 20-Aug-09 169/RB/A/4744/0708 04-60/EIB- 10 Maluku/IU ICB 7,438,196 67,687,583 Prior EIB-170 Banggoi-Bula 31-Jan-07 12-Feb-08 31-Jan-07 12-Feb-08 26-Feb-08 9-Apr-08 11-Jun-08 20-Jun-08 16-Jul-08 Rp 81,150,917,000 Nat. Road PT Adhi Karya, JO 365 16-Jul-09 170/RB/A/4744/0708 Sub-Total Cost 1 : 59,074,037 537,573,738 NCB Prior Review ( USD 1 million) PT. Sinar Sama 01-60/EIPB- 1 Maluku/IU NCB 2,787,363 25,365,000 Prior EIPB-143 Besi-Wahai 18-Sep-07 1-Oct-07 18-Sep-07 1-Oct-07 11-Oct-07 27-Nov-07 24-Jan-08 12-Feb-08 21-Feb-08 Rp 28,647,182,000 Nat. Roads 410 6-Apr-09 Sejati, JO 143/RB/A/4744/0208 Rp 24,455,467,000 (Rp 5,984,467,000 will be 01.043/EIB- 2 Kalteng/Prov NCB 2,029,780 18,471,000 Prior EIB-171 Ampah-Buntok 9-Nov-07 21-Nov-07 9-Nov-07 21-Nov-07 25-Feb-08 27-Mar-08 9-Jul-08 18-Jul-08 6-Sep-08 Prov. Roads PT, Adhi Karya 365 6-Sep-09 financed fr APBD-Prov. 171/RB/B/4744/0908 Budget) 3 Sulteng/Prov NCB 2,447,872 22,275,639 Prior EIB-173 Pape-Tomata 7-Nov-07 16-Nov-07 7-Nov-07 16-Nov-07 8-Jan-09 31-Mar-09 12-May-09 29-Jul-09 26-Aug-09 Prov. Roads REBIDDING PROCESS 360 21-Aug-10 PT Angkasapuri 02-52/EIP- 4 Sulteng/Prov NCB 2,218,580 20,189,075 Prior EIP-142 Palupi-Bangga 25-Oct-07 1-Nov-07 25-Oct-07 1-Nov-07 5-Dec-07 17-Jan-08 9-Jul-08 18-Jul-08 22-Aug-08 Rp 17,199,744,000 Prov. Roads 360 17-Aug-09 Konsursindo 142/PM/B/4744/0808 5 Sulsel/Prov NCB 1,003,793 9,134,514 Prior EIBR-108 S. Solo Bridge 11-Feb-08 21-Feb-08 11-Feb-08 21-Feb-08 24-Apr-08 11-Jun-08 23-Jul-08 30-Jul-08 9-Oct-08 Prov. Roads 300 5-Aug-09 Pasarwajo-Matanauwe, 6 Sultra/Prov NCB 2,170,104 19,747,945 Prior EIPB-144 14-Nov-07 28-Nov-07 14-Nov-07 28-Nov-07 16-Jun-08 18-Jul-08 27-Oct-08 3-Nov-08 3-Dec-08 Rp 25,702,707,000 Prov. Roads PT Istaka Karya 150 2-May-09 etc. 7 Papua/Prov NCB 2,394,092 21,786,234 Prior EIB-174 Kimibay-Napan 18-Apr-08 24-Apr-08 18-Apr-08 24-Apr-08 16-May-08 18-Jun-08 4-Nov-08 11-Nov-08 11-Dec-08 Prov. Roads 300 7-Oct-09 8 Papua/Prov NCB 1,922,900 17,498,393 Prior EIB-190 Waena-Arso V 5-Mar-08 1-Apr-08 5-Mar-08 1-Apr-08 12-May-08 11-Jun-08 23-Jul-08 30-Jul-08 9-Oct-08 Prov. Roads PROPOSED REBIDDING 300 5-Aug-09 Timor Tengah 01-24/EIPB-145/C/4744/1208 9 NTT/Kab NCB 1,439,903 13,103,120 Prior EIPB-145 Amol-Manamas, etc. 31-Mar-08 18-Apr-08 31-Mar-08 18-Apr-08 25-Jun-08 28-Jul-08 14-Nov-08 20-Nov-08 9-Dec-08 Rp 16,554,736,000 PT Hutama Karya 240 6-Aug-09 Utara PT. Harfia Graha P, Karampuang-Hila Hila, 10 Sulsel/Kab NCB 1,214,850 11,055,138 Prior EIB-183 14-Nov-07 27-Nov-07 14-Nov-07 27-Nov-07 24-Dec-07 31-Jan-08 24-Apr-08 4-Jun-08 20-Aug-08 Rp 11,015,442,778.70 Bulukumba PT Sabar Jaya 02.54/EIB.183/RB/C/4744/08.08 365 20-Aug-09 etc. Pratama JO Rp 13,648,219,000 (Rp 1,626,714,000 will be PT Artamakmur 01-62/EIB- 11 Papua/Kab NCB 1,321,025 12,021,330 Prior EIB-189 Korem-Yenggarbun 18-Apr-08 24-Apr-08 18-Apr-08 24-Apr-08 8-May-08 10-Jun-08 31-Jul-08 8-Aug-08 26-Aug-08 Biak Numfor 240 23-Apr-09 financed fr APBD-Kab. Permai 189/RB/C/4744/0808 Budget) 12 Papua/Kab NCB 2,801,900 25,497,287 Prior EIP-143 Kumbe-Salor III 5-Mar-08 1-Apr-08 5-Mar-08 1-Apr-08 15-Apr-08 16-May-08 27-Jun-08 4-Jul-08 13-Sep-08 Merauke 300 10-Jul-09 Sub-Total Cost 2 : 23,752,162 216,144,675 NCB Post Review 2nd Packet... etc Tamiyang Layang- PT Benawa Citra 17.32/EIB- 1 Kalteng/Kab NCB 468,099 4,259,700 Post EIB-176 27-Jul-07 14-Nov-07 27-Jul-07 14-Nov-07 29-Feb-08 1-Apr-08 22-May-08 30-May-08 1-Jul-08 Rp 4,125,371,946.22 Barito Timur 180 28-Dec-08 Katambung Putra Tabalong 176/PM/C/4744/0708 Rp 9,388,598,000 (Rp 753,372,000 will be 02-0524/EIB- 2 NTT/Kab NCB 889,230 8,091,996 Post EIB-179 Lelahomi-Mainang 13-Feb-08 19-Feb-08 13-Feb-08 19-Feb-08 5-Mar-08 8-Apr-08 16-May-08 11-Jun-08 4-Jul-08 Alor PT Adhi Karya 300 30-Apr-09 financed fr APBD-Kab. 179/RB/C/4744/0708 Budget) 3 NTT/Kab NCB 912,492 8,303,675 Post EIB-180 Roa-Saga, etc. 7-Aug-07 21-Apr-08 7-Aug-07 21-Apr-08 26-Jun-08 26-Jul-08 23-Aug-08 6-Sep-08 23-Nov-08 Ende PROPOSED REBIDDING 240 21-Jul-09 02-54/EIB- 4 Sulsel/Kab NCB 347,278 3,160,233 Post EIB-184 Cikoang/Laikang-Puntodo 9-Aug-07 29-Oct-07 9-Aug-07 29-Oct-07 16-Jan-08 21-Feb-08 26-Jun-08 9-Jul-08 20-Aug-08 Rp 3,134,933,000 Takalar PT Cisco Sinar Jaya 180 16-Feb-09 184/PM/C/IBRD/4744/0820 PT Citratama T-PT 03-54/EIB- 5 Sulsel/Kab NCB 623,406 5,672,995 Post EIB-185 Batebala-Tarutu Campaga 9-Aug-07 29-Oct-07 9-Aug-07 29-Oct-07 23-Jan-08 26-Feb-08 14-May-08 26-May-08 19-Jun-08 Rp 5,627,367,000 Bantaeng 150 16-Nov-08 Nugraha T, JO 185/RB/C/4744/0608 PT. Usaha Subur 04-73/EIB- 6 Sulsel/Kab NCB 355,328 3,233,486 Post EIB-186 Kaluku-Malaka 5-Oct-07 29-Oct-07 5-Oct-07 29-Oct-07 10-Apr-08 14-May-08 31-Oct-08 28-Nov-08 30-Dec-08 Rp 3,045,318,521 Maros 180 28-Jun-09 Sejahtera 186/RB/C/4744/1208 PT Sabar Jaya 12-54/EIB-187/RB/C/IBRD- 7 Sulsel/Kab NCB 241,564 2,198,235 Post EIB-187 Tacipi-Tokaseng 1-Aug-07 29-Oct-07 1-Aug-07 29-Oct-07 23-Jan-08 26-Feb-08 17-Sep-08 17-Oct-08 16-Nov-08 Rp 2,924,947,606 Bone 270 13-Aug-09 Pratama 4744-IND/1108 Sub-Total Cost 3 : 3,837,398 34,920,321 CP = Construction Period Total Cost : 86,663,597 788,638,733 All Works and Goods Packets apply Post Qualification and Unit Price Contract methods DP = Delivery Period Note Post Review < USD 1 million Prior Review > USD 1 million Date of process already complete Expected date to complete Date overdue For Prior Review Packages : 1. From bid opening to request for World Bank no objection max 6 weeks 2. From bid opening to award max 120 days For Post Review Packages : 1. From bid opening to request for Bina Program approval max 4 weeks 2. From bid opening to award max 120 days Page 2 DEIRTP2 AWP1-2-3 for ProcPlan 09 Mar 23 - actual modified
Groupe de la Banque mondiale · Procurement Plan
Indonesia - Second Eastern Indonesia Region Transport Project (EIRTP-2) : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Indonésie
Source
Banque mondiale