Groupe de la Banque mondiale · Procurement Plan

Laos - Greater Mekong Subregion (GMS) Power Trade Project : procurement plan

Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

 73674 LAO PDR - GMS Power Trade Project (Revised June 19, 2009) Goods & Works 1 2 3 4 5 6 7 8 9 Ref. Contract Procur P- Domestic Review Expected Comment Status as of October 23, 2008 No. (Descriptio ement Q Preferenc by IDA Bid- s Revised as of June 19, 2009 n) Metho e (Prior / Opening d (yes/no) Post) Date IFB-1 115kV ICB No No Prior February Supply & On going. transmissio 2008 Installatio n system n from Ban Hat to the Cambodia border IFB-2 115kV ICB No No Prior August Supply & Contract Signature Date: July 4, 2008 transmissio 2007 Installatio Awarded Bidder(s) n system n Name: BEIJING POWER ENGINEERING COMPANY from Xeset 1 to Saravan IFB-3 National ICB No No Prior To be Supply & Bank NOL on draft REP 4/20/09 and determine Installatio regional d n load Possible dispatch two-stage centers bidding IFB-4 Field Work ICB No No Prior To be Supply NOL on BER 3/18/09 Vehicles determine only d 5 Computers Shoppi No No Post To be Supply Contract signed 4/29/08 & office ng determine only equipment d 1 Consultants 1 2 3 4 5 6 7 Review by Expected Ref. Description of Assignment Selection IDA Proposals Status as of October 23, 2008 No. Comments Method (Prior / Submission Revised as of June 19, 2009 Post) Date 1. Consultant services for QCBS Prior August 2007 EdL - Contract signed with Maunsell transmission lines and Power Grid on 2/17/09 substations - Submitted signed contract on (Consultant for Supervision 2/23/09 of Construction IFB 1 & 2) 2. Consultant services for load QCBS Prior August 2007 EdL NOL draft REP on 4/20/09 dispatch centers (design and project management) 3. Tariff study QCBS Prior August 2007 EdL Bank NOL Evaluation Report: 07/21/2008 Signed contract: 10/01/2008 4. Feasibility study of Houay QCBS Prior August 2007 DOE Bank NOL TER: 03/12/2008 Lamphang Gnai Hydro Combined TER: 03/21/2008 Bank NOL draft contract: 04/28/2008 Signed contract: 05/08/2008 5. Environmental and social QCBS Prior August 2007 DOE Bank NOL the Technical Evaluation Reports assessment of Houay EIA & SIA for Houay Lamphan Hydropower Lamphang Gnai Hydro Project :05/12/2008 Combined TER: 05/26/2008 Signed Contract: 06/23/2008 6. Technical assistance for QCBS Prior To be DOE Procurement has not yet started. collector substation system determined 2

Informations clés
Type de document Procurement Plan
Date d'adoption
Source Banque mondiale