52870 Agreed by the Recipient, dated 15 December, 2009 KYRGYZ REPUBLIC: Small Towns Infrastructure and Capacity Buiding Project (CREDIT NUMBER 4016-KG/GRANT NUMBER H139-KG) ORIGINAL ACTIVITIES UNDER THE PROJECT DATA UPDATED PROCUREMENT PLAN - GOODS AND WORKS for 2008-2009 Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Signature Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Completion Review No: bidding docs Awd. Tash-Kumyr I W NCB 550,000 6/1/2007 N/A 7/6/2007 8/20/2007 9/24/2007 N/A 10/11/2007 10/21/2008 Post Review 1 Rehabilitation of road 4 km long in Tash- Kumyr Tash-Kumyr II W NCB 140,000 03.09.2007 N/A 9/7/2007 10/18/2007 11/30/2007 N/A 1/11/2008 1/21/2009 Post Review Rehabilitation of sewerage pumping 2 station of second up gradient in Tash- Kumyr Kyzyl Kiya 3 Post Review Emergency rehabilitation works W NCB 410,256 12/10/2006 N/A 12/18/2006 1/15/2007 2/1/2007 N/A 2/19/2007 5/19/2008 4 Tokmok Rehabilitation W NCB 510,000 1/13/2006 12/1/2007 12/26/2007 2/4/2008 3/14/2008 3/17/2008 4/17/2008 10/28/2008 of water supply system in Tokmok Post Review Cholpon Ata I 5 Water slow gravel filter W NCB 789,006 11/23/2007 N/A 11/23/2007 1/25/2008 3/7/2008 N/A 4/4/2008 4/14/2009 Post Review Cholpon Ata II 6 Water slow sand filter W NCB 877,791 11/23/2007 N/A 11/23/2007 1/25/2008 3/7/2008 N/A 4/1/2008 4/11/2009 Post Review Jalalabat Submersible pumps 7 Water tower construction W NCB 600,000 12/4/2006 N/A 12/4/2006 1/19/2007 3/20/2007 N/A 4/14/2007 4/24/2008 Post Review Production water meters; Balykchy Submersible pumps 8 2-nd and 3-nd stage pump stations Water distribution system W NCB 496,763 11/6/2006 N/A 11/6/2006 12/22/2006 1/22/2007 N/A 2/19/2007 2/29/2008 Post Review Production water meters Desinfection facilities Kant Submersible pumps Rehabilitation of well 9 2-nd and 3-nd stage pump stations Water distribution system W NCB 576,520 11/6/2006 N/A 11/6/2006 12/22/2006 1/22/2007 N/A 2/15/2007 2/25/2008 Post Review Production water meters Desinfection facilities Kara-Suu 2-nd and 3-nd stage pump stations Submersible pumps Rehabilitation of well 10 Water tower construction W NCB 412,333 12/4/2006 N/A 12/4/2006 1/19/2007 3/20/2007 N/A 4/16/2007 4/26/2008 Post Review Desinfection facilities Production water meters; Water distribution system Mailuu-Suu 2-nd and 3-nd stage pump stations Water treatment plant; 11 Production water meters; W NCB 714,150 11/5/2007 N/A 11/5/2007 12/20/2007 1/25/2008 N/A 2/27/2008 3/8/2009 Post Review Sewer pumps Rehabilitation of sewerage system Uzgen 12 W NCB 500,000 12/18/2006 N/A 12/18/2006 2/1/2007 3/20/2007 2/26/2007 4/18/2007 6/30/2008 Post Review Reservoir construction Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Signature Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Completion Review No: bidding docs Awd. Kyzyl Kiya Civil works for transfer of water pipe line's 13 emergency districts within the W NCB 410,256 12/18/2006 N/A 12/18/2006 1/15/2007 2/1/2007 N/A 2/19/2007 4/24/2008 Post Review rehabilitation of water supply system in Kyzyl-Kya Sulyukta 14 Rehabilitation of water supply system W NCB 843,457 2/20/2008 N/A 2/22/2008 4/7/2008 6/2/2008 N/A 6/20/2008 6/30/2009 Post Review Nookat 15 Rehabilitation of water supply system W NCB 491,335.82 1/31/2009 N/A 2/13/2009 3/27/2009 6/25/2009 N/A 7/28/2009 8/8/2010 Post Review Shopokov 16 Rehabilitation of water supply system W NCB 262,009 2/20/2008 N/A 2/22/2008 4/7/2008 6/4/2008 N/A 6/30/2008 7/10/2009 Post Review Batken 17 Rehabilitation of sewerage system and clearing of public water supply utilities W NCB N/A N/A Post Review 846,132.00 1/30/2009 2/13/2009 3/27/2009 5/20/2009 6/30/2009 7/10/2010 Kok-Jangak 18 Rehabilitation of water supply system W NCB N/a N/A Post Review 477,981.00 1/30/2009 2/27/2009 4/13/2009 6/6/2009 7/1/2009 7/11/2010 Kara-Balta 19 Rehabilitation of water supply system W NCB N/A N/A Post Review 685,853.00 1/30/2009 2/27/2009 4/13/2009 6/8/2009 6/30/2009 7/10/2010 Equipment for municipal services in Kyzyl- 14 G Shopping 43,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 7/15/2007 8/9/2007 Post Review Kya Equipment for municipal services in 15 G Shopping 44,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/26/2007 8/1/2007 Post Review Nookat Equipment for municipal services in 16 G Shopping 83,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/29/2007 2/22/2008 Post Review Batken Equipment for municipal services in Kok- 17 G Shopping 83,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/29/2007 2/20/2008 Post Review Jangak 18 Equipment for municipal services in Talas G Shopping 90,000 1/29/2007 N/A 1/29/2007 2/12/2007 4/5/2007 N/A 4/9/2007 2/14/2008 Post Review Equipment for municipal services in 19 G Shopping 83,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/29/2007 1/16/2008 Post Review Sulukta Equipment for municipal services in 20 G Shopping 73,000 1/29/2007 N/A 1/29/2007 2/12/2007 4/5/2007 N/A 4/9/2007 2/14/2008 Post Review Naryn Equipment for municipal services in Kara- 21 G Shopping 23,000 1/29/2007 N/A 1/29/2007 2/12/2007 4/5/2007 N/A 4/9/2007 8/27/2007 Post Review Balta Equipment for municipal services in 22 G Shopping 23,000 1/20/2007 N/A 1/29/2007 2/12/2007 4/5/2007 N/A 4/9/2007 8/10/2007 Post Review Shopokov Equipment for municipal services in 23 G Shopping 36,000 1/20/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/29/2007 8/1/2007 Post Review Kochkor-Ata Equipment for municipal services in Kara- 34 G Shopping 97,000 1/20/2007 N/A 1/29/2007 2/12/2007 4/5/2007 N/A 4/9/2007 1/16/2007 Post Review Kol Equipment for municipal services in 35 G Shopping 44,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/29/2007 8/27/2007 Post Review Kerben Equipment for municipal services in Kara- 36 G Shopping 47,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 8/27/2007 Post Review Suu Equipment for municipal services in 37 G Shopping 44,000 29/01/07 N/A 29/01/07 12/02/07 20/03/07 N/A 29/03/07 7/8/2007 Post Review Isfana Equipment for municipal services in 38 G Shopping 93,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 2/20/2008 Post Review Tokmok Equipment for municipal services in 39 G Shopping 27,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 8/1/2007 Post Review Uzgen ARIS Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Signature Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Completion Review No: bidding docs Awd. Computer, Office Equipment and 40 G Shopping 37,500 5/30/2007 N/A 5/30/2007 6/13/2007 6/27/2007 N/A 5/7/2007 6/7/2007 Furniture 41 ARIS Building W Shopping 4,500 12/4/2007 N/A 12/4/2007 12/18/2007 1/29/2008 N/A 1/31/2008 3/20/2008 Post Review PIAP Support (computer equipment 42 for billing system in Uzgen and G Shopping 8,500 4/26/2007 N/A 4/26/2007 5/11/2007 5/22/2007 N/A 5/23/2007 6/23/2007 Post Review Tokmok) 43 PIAP Support G Shopping 15,000 6/1/2007 N/A 6/1/2007 6/15/2007 6/22/2007 N/A 6/27/2007 7/27/2007 Post Review 320,500 Supply of office furniture 1083.32 11/10/2008 11/10/2008 11/21/2008 11/24/2008 11/27/2008 12/26/2008 44 G Shopping N/A N/A Post Review Supply of office furniture 509.39 11/10/2008 11/10/2008 11/21/2008 11/24/2008 11/28/2008 12/28/2008 45 G Shopping N/A N/A Post Review Supply of office furniture 340.67 6/8/2009 6/8/2009 6/22/2009 6/25/2009 n/a 6/26/2009 7/3/2009 46 G Shopping N/A Post Review Supply of computer equipment 4036 6/26/2009 6/26/2009 7/15/2009 8/5/2009 n/a 8/7/2009 9/7/2009 for small towns (billing system) 47 G Shopping N/A Post Review PIAP support Supply of computer equipment 2,067.67 6/26/2009 6/26/2009 7/15/2009 8/5/2009 n/a 8/17/2009 9/17/2009 for municipal utilities 48 G Shopping N/A Post Review Manufacturing of the book 6,821.46 6/26/2009 6/26/2009 7/15/2009 7/29/2009 n/a 9/17/2009 12/4/2009 "Investments to life" 49 G Shopping N/A Post Review Supply of spechial technic: 76,499.00 7/13/2009 7/13/2009 7/27/2009 8/26/2009 n/a 8/27/2009 12/25/2009 loader-digger and excavator 50 G Shopping N/A Post Review within competition Supply of computer equipment 30,000.00 12/11/2009 12/11/2009 12/25/2009 1/15/2010 n/a 1/18/2010 2/17/2010 51 for Project units. G Shopping N/A Post Review Supply of computer equipment 5,000.00 12/11/2009 12/11/2009 12/25/2009 1/15/2010 n/a 1/18/2010 2/17/2010 52 for municipal water utilities G Shopping N/A Post Review "Vodokanals" in Small Towns TOTAL GOODS AND WORKS Agreed by the Recipient, dated 15 June, 2009 KYRGYZ REPUBLIC: Small Towns Infrastructure and Capacity Buiding Project (CREDIT NUMBER 4016-KG/GRANT NUMBER H139-KG) ORIGINAL ACTIVITIES UNDER THE PROJECT DATA UPDATED PROCUREMENT PLAN - GOODS AND WORKS for 2008-2009 Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Signature Completion Review No: bidding docs Awd. Tash-Kumyr I W NCB 550,000 06/01/2007 N/A 07/06/2007 08/20/2007 09/24/2007 N/A 10/11/2007 10/21/2008 Post Review 1 Rehabilitation of road 4 km long in Tash- Kumyr Tash-Kumyr II W NCB 140,000 03.09.2007 N/A 09/07/2007 10/18/2007 11/30/2007 N/A 01/11/2008 01/21/2009 Post Review Rehabilitation of sewerage pumping 2 station of second up gradient in Tash- Kumyr Kyzyl Kiya 3 Post Review Emergency rehabilitation works W NCB 410,256 12/10/2006 N/A 12/18/2006 01/15/2007 02/01/2007 N/A 02/19/2007 05/19/2008 Tokmok Rehabilitation 4 W NCB 510,000 01/13/2006 12/01/2007 12/26/2007 02/04/2008 03/14/2008 03/17/2008 04/17/2008 10/28/2008 of water supply system in Tokmok Post Review Cholpon Ata I 5 Water slow gravel filter W NCB 789,006 11/23/2007 N/A 11/23/2007 01/25/2008 03/07/2008 N/A 04/04/2008 04/14/2009 Post Review Cholpon Ata II 6 Water slow sand filter W NCB 877,791 11/23/2007 N/A 11/23/2007 01/25/2008 03/07/2008 N/A 04/01/2008 04/11/2009 Post Review Jalalabat Submersible pumps 7 Water tower construction W NCB 600,000 12/04/2006 N/A 12/04/2006 01/19/2007 03/20/2007 N/A 04/14/2007 04/24/2008 Post Review Production water meters; Balykchy Submersible pumps 8 2-nd and 3-nd stage pump stations Water distribution system W NCB 496,763 11/06/2006 N/A 11/06/2006 12/22/2006 01/22/2007 N/A 02/19/2007 02/29/2008 Post Review Production water meters Desinfection facilities Kant Submersible pumps Rehabilitation of wel 9 2-nd and 3-nd stage pump stations Water distribution system W NCB 576,520 11/06/2006 N/A 11/06/2006 12/22/2006 01/22/2007 N/A 02/15/2007 02/25/2008 Post Review Production water meters Desinfection facilities Kara-Suu 2-nd and 3-nd stage pump stations Submersible pumps Rehabilitation of well 10 Water tower construction W NCB 412,333 12/04/2006 N/A 12/04/2006 01/19/2007 03/20/2007 N/A 04/16/2007 04/26/2008 Post Review Desinfection facilities Production water meters; Water distribution system Mailuu-Suu 2-nd and 3-nd stage pump stations Water treatment plant; 11 Production water meters; W NCB 714,150 11/05/2007 N/A 11/05/2007 12/20/2007 01/25/2008 N/A 02/27/2008 03/08/2009 Post Review Sewer pumps Rehabilitation of sewerage system Uzgen 12 W NCB 500,000 12/18/2006 N/A 12/18/2006 02/01/2007 03/20/2007 02/26/2007 04/18/2007 06/30/2008 Post Review Reservoir construction Kyzyl Kiya Civil works for transfer of water pipe 13 line's emergency districts within the W NCB 410,256 12/18/2006 N/A 12/18/2006 01/15/2007 02/01/2007 N/A 02/19/2007 04/24/2008 Post Review rehabilitation of water supply system in Kyzyl-Kya Sulyukta 14 Rehabilitation of water supply system W NCB 843,457 02/20/2008 N/A 02/22/2008 04/07/2008 06/02/2008 N/A 06/20/2008 06/30/2009 Post Review Nookat 15 Rehabilitation of water supply system W NCB 433,299 02/13/2009 N/A 02/13/2009 03/27/2009 05/04/2009 N/A 05/25/2009 06/05/2010 Post Review Shopokov 16 Rehabilitation of water supply system W NCB 262,009 02/20/2008 N/A 02/22/2008 04/07/2008 06/04/2008 N/A 06/30/2008 07/10/2009 Post Review Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Signature Completion Review No: bidding docs Awd. Batken 17 Rehabilitation of sewerage system and clearing of public water supply W NCB 705,861 02/13/2009 N/A 02/13/2009 03/27/2009 05/02/2009 N/A 05/23/2009 06/03/2010 Post Review utilities Kok-Jangak 18 Rehabilitation of water supply system W NCB 476,033 02/20/2009 N/a 02/20/2009 04/03/2009 05/06/2009 N/A 05/27/2009 06/08/2010 Post Review Kara-Balta 19 Rehabilitation of water supply system W NCB 680,617 02/20/2009 N/A 02/20/2009 04/03/2009 05/08/2009 N/A 05/29/2009 06/08/2010 Post Review Equipment for municipal services in Kyzy 14 G Shopping 43,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 07/15/2007 08/09/2007 Post Review Kya Equipment for municipal services in 15 G Shopping 44,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/26/2007 08/01/2007 Post Review Nookat Equipment for municipal services in 16 G Shopping 83,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/29/2007 02/22/2008 Post Review Batken Equipment for municipal services in Kok 17 G Shopping 83,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/29/2007 02/20/2008 Post Review Jangak 18 Equipment for municipal services in Talas G Shopping 90,000 01/29/2007 N/A 01/29/2007 02/12/2007 04/05/2007 N/A 04/09/2007 02/14/2008 Post Review Equipment for municipal services in 19 G Shopping 83,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/29/2007 01/16/2008 Post Review Sulukta Equipment for municipal services in 20 G Shopping 73,000 01/29/2007 N/A 01/29/2007 02/12/2007 04/05/2007 N/A 04/09/2007 02/14/2008 Post Review Naryn Equipment for municipal services in Kara 21 G Shopping 23,000 01/29/2007 N/A 01/29/2007 02/12/2007 04/05/2007 N/A 04/09/2007 08/27/2007 Post Review Balta Equipment for municipal services in 22 G Shopping 23,000 01/20/2007 N/A 01/29/2007 02/12/2007 04/05/2007 N/A 04/09/2007 08/10/2007 Post Review Shopokov Equipment for municipal services in 23 G Shopping 36,000 01/20/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/29/2007 08/01/2007 Post Review Kochkor-Ata Equipment for municipal services in Kara 34 G Shopping 97,000 01/20/2007 N/A 01/29/2007 02/12/2007 04/05/2007 N/A 04/09/2007 01/16/2007 Post Review Kol Equipment for municipal services in 35 G Shopping 44,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/29/2007 08/27/2007 Post Review Kerben Equipment for municipal services in Kara 36 G Shopping 47,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 08/27/2007 Post Review Suu Equipment for municipal services in 37 G Shopping 44,000 29/01/07 N/A 29/01/07 12/02/07 20/03/07 N/A 29/03/07 07/08/2007 Post Review Isfana Equipment for municipal services in 38 G Shopping 93,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 02/20/2008 Post Review Tokmok Equipment for municipal services in 39 G Shopping 27,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 08/01/2007 Post Review Uzgen ARIS Computer, Office Equipment and 40 G Shopping 37,500 05/30/2007 N/A 05/30/2007 06/13/2007 06/27/2007 N/A 05/07/2007 06/07/2007 Furniture 41 ARIS Building W Shopping 4,500 12/04/2007 N/A 12/04/2007 12/18/2007 01/29/2008 N/A 01/31/2008 03/20/2008 Post Review PIAP Support (computer equipment 42 for billing system in Uzgen and G Shopping 8,500 04/26/2007 N/A 04/26/2007 05/11/2007 05/22/2007 N/A 05/23/2007 06/23/2007 Post Review Tokmok) 43 PIAP Support G Shopping 15,000 06/01/2007 N/A 06/01/2007 06/15/2007 06/22/2007 N/A 06/27/2007 07/27/2007 Post Review PIAP Support (computer equipment for billing system in Kara- 44 G Shopping 4,000 07/03/2009 N/A 07/03/2009 07/17/2009 07/31/2009 N/A 07/31/2009 09/15/2009 Post Review Kol,Balykchy, Tash-Kumyr, Cholpon- Ata) PIAP Support (typographical 45 illustrated book about project G Shopping 10,000 07/10/2009 N/A 07/10/2009 07/24/2009 08/17/2009 N/A 08/19/2009 09/19/2009 Post Review activities within 4 years) Equipment for municipal services (2 46 excavators and 4 computers) component G Shopping 110,000 09/02/2009 N/A 09/02/2009 09/16/2009 09/21/2009 N/A 09/25/2009 12/25/2009 Post Review A1 TOTAL GOODS AND WORKS 124,000
Groupe de la Banque mondiale · Procurement Plan
Kyrgyz Republic - Small Towns Infrastructure and Capacity Building Project : procurement plan for goods and works for 2008-2009
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Source
Banque mondiale