Page 1 Country/Organisation:NIGERIA IMO STATE 2008 GOODS PROCUREMENT PLAN Project/Programme: LOCAL EMPOWERMENT & ENVIRONMENTAL MANAGEMENT PROJECT (LEEMP) Draft Bid Documents, including specs and quantities, draft SPN CREDIT NO:3818 UNI BASIC DATA Description: Package Number Lot Numbe r Estimated Amount in US $ Procurement Method Pre-or Post Qualification Prior or Post Review Plan vs. Actual Prep & Submission by Ex Agency Norm Duration of Proc Steps 000 If Prequalification Plan 4 - 7 wks add 7-13 wks Actual List of Contracts Bookshelves IM/LEEMP/NS/08/001 A 3.5 NS NA Post Review Plan NA Actual GIS Equipment:(i) Arc info & (ii) GPS IM/LEEMP/NS/08/002 A 2.498 NS NA Post Review Plan NA Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Total Cost 5.998 Plan 0 Actual Page 2 If Post-Review, No-objection Dates are not needed Spec Proc Notice Advert Bidding Period Bid Evaluation Contract Finalization Contract Implementation No-objection Date On-line UNDB Gateway Nat Press Bid Invitation Date Bid Closing/Opening Submissio n Bid Eval Rpt No- objection Date Plan vs. Actual Contract Amount in US$'000 Date of Contract Award Date Contract Advert Date Contract Signature Opening of Letter of Credit Arrival of Goods 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks Plan 1 wk 1.5-3 wks Actual NA NA 8/6/2007 6/7/2007 NA NA Plan 3.5 07/26/2007 NA 6/8/2007 NA 01/29/2008 11/14/07 11/30/2007 Actual 3.46 12/17/2008 NA 12/18/2007 NA NA 02/13/2008 03/14/2008 NA NA Plan 2.498 3/4/2008 NA 04/14/2008 NA 05/15/2008 Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan 0 Actual 0 Page 3 Contract Implementation Inspection Final Acceptance 8/2/2008 05/28/2008 Page 4 Country/Organisation:NIGERIA For Contracts under projects approved before the May 2002 Guidelines Project/Programme: IMO STATE LEEMP If Post-Review, No-objection Dates are not needed Request for EOI (where required) CREDIT NO:3181 UNI Contract Type Preparation Request for Proposals Description: Selection Method Lumpsum or Time- Based Estimated Amount in US$ '000 Prior/Post Review Plan vs. Actual Prep & Submission by Ex Ag No- objection Date On-line UNDB Gateway Nat Press Norm Duration of Proc Steps Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks Actual List of Contracts External Auditor Least Cost Lumpsum 9 Plan RECRUITED Actual Consultant OOs - 16No Individual Consultancy Lumpsum 44 Plan RECRUITED Actual Baseline Study of Least Cost Lumpsum 44 Post Plan NA NA 5/6/2006 2nd 70 Communities Actual 9/6/2006 GIS Poverty Mapping Least Cost Lumpsum 25.2 Post Plan NA NA 04/30/2007 Actual 11/5/2007 Documentation of Project Activities/ CQ Lumpsum 12.903 Post Plan NA NA NA Impact Assessment Actual Page 5 Plan Actual Plan Actual Total Cost 135.903 Plan Actual Page 6 IMO STATE 2008 CONSULTANCY PROCUREMENT PLAN Short List Consultant Proposals Proposal Evaluation and Negotiation for Projects after May 2002 Technical (T) & Financial (F) and Negotions (N) Lead-time before shortlist Submission Date No-objection Date Plan vs. Actual Invitation Date Submission/ Opening Date Preparation of Evaluation Report (T) 2 wks 1 - 2 wks Plan 4 to 12 wks 2 - 3 wks Actual Plan RECRUITED Actual Plan RECRUITED Actual NA NA NA Plan 5/6/2006 07/17/2006 08/15/2006 Actual 9/6/2006 07/17/2006 4/8/2006 NA NA NA Plan 04/30/2007 12/6/2007 2/7/2007 Actual 11/5/2007 06/22/2007 07/23/2007 NA NA NA Plan 02/26/2008 03/26/2008 NA Actual Page 7 Plan Actual Page 8 Draft Contract Contract Finalization No-objection Evaluation Report (T) Opening Financial Proposals Preparation Eval Report (T) (F) Negotiations Plan vs. Actual Submission Date No-objection Date Contract Amount in US$ '000 Contract Award 0.5 - 2 wks 2 wks 1 - 2 wks 2 wks Plan 1 - 2 wks 1 - 2 wks 1 wk Actual Plan RECRUITED Actual Plan RECRUITED Actual NA 08/18/2006 NA 08/29/2006 Plan NA NA 44 7/9/2006 9/8/2006 NA 08/15/2006 Actual 43.36 08/22/2006 NA 5/7/2007 NA 07/18/2007 Plan NA NA 25.2 07/27/2007 07/25/2007 NA 07/27/207 Actual 24.67 1/8/2007 NA NA 04/15/2008 04/24/2008 Plan NA NA 12.903 6/5/2008 Actual Page 9 Plan 0 Actual 0 Page 10 Contract Implementation Date Contract Advert Contract Signature Plan vs Actual Mobilization Advance Payment Draft Report Final Report Final Cost 1 - 3 wks Plan Actual Plan 12/4/2008 05/14/2008 Actual Plan 04/24/2008 06/16/2008 Actual NA 09/20/2006 Plan 3/10/2006 02/26/2008 04/15/2008 4/9/2006 Actual 09/15/2006 NA 08/16/2007 Plan 02/25/2008 7/4/2008 05/19/2008 08/13/2007 Actual NA 05/15/2008 Plan 05/26/2008 06/13/2008 06/24/2008 Actual Page 11 Plan 0 Actual 0
Groupe de la Banque mondiale · Procurement Plan
Nigeria - Local Empowerment and Environmental Management Project : Procurement plan - IMO state 2008 goods
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Nigeria
Source
Banque mondiale