Groupe de la Banque mondiale · Procurement Plan

India - Fourth Power System Development Project : procurement plan

Inde Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

3 45783 of 1 etaD ot derrucni 0 0 0 0 0 0 0 0 erutidnepxE 17 tcartnoC fo noitelpmoC fo etaD 16 NOV'2009 AUG'2008 MAY'2008 DEC'2008 JAN'2010 JAN'2010 JAN'2010 APR'2009 .ON ecnerefeR knaB dlroW 15 & ZIP & & LTD, CHINA INDIA INDIA Contractor/ 14 INDIA INDIA INDIA GUPTA, DEEPAK, of Code SIEMENS & INDIA OF GERMANY BHEL INDIA LTD, OF BHEL, ABB, ABB, ABB, Nationality JV L&T JV Name AG, SIEMENS XIANGFAN, APAR & No. 2317 13 2318 2342 2374 2426 2428 2430 Contract C-46002-S656- 1/2316, C-46014-L679-1/ 2408 C-13802-L179-1/ C-13804-S119A-1/ C-33021-S119A-1/ C-33022-S119A-1/ C-33023-S919A-1/ C-33025-L075-1/ 2449 (Date/ 12 02.03.07 24.12.07 29.01.08 29.01.08 29.01.08 21.02.08 Contract Signed Value/ Currency) 25.04.07 02.07.07 to ** ** ** No (Date) 11 '(1st Stage) Stage) NA 20.04.06 Stage) 15.02.07 15.12.06 19.02.07 N.A. N.A. 11.10.07 11.10.07 11.10.07 N.A. Bank's Objection Contract Award (2nd (2nd 25.09.2008) Award (Date/ 10 '(1st Stage) Stage) ON 22.02.06 Stage) 31.01.07 07.12.06 25.01.07 09.08.07 22.08.07 22.08.07 22.08.07 31.10.07 (2nd (2nd (AS Contract decided Value/ Currency) 26.03.07 22.05.07 on LOAN 9 Stage) Stage) Stage) 08.12.05 15.01.07 29.11.06 17.01.07 (2nd 26.10.06 13.06.07 13.06.07 13.06.07 20.06.07 Opened (Date) '(1st (2nd 22.12.06 20.02.07 Bids in PSDP-IV for (Date) Bid 8 Stage) Stage) Stage) 30.09.05 15.12.06 First 18.12.06 01.08.06 16.03.07 16.03.07 16.03.07 18.04.07 '(1st (2nd 30.10.06 Adjustment (2nd UNDER Invitation 15.05.06 21.11.06 Bank. to ** ** ** No PLAN 7 World by 21.09.05 N.A. N.A. 09.02.07 09.02.07 09.02.07 N.A. Bank's Objection Bidding Documents (Date) ** approved 6 as Bid 09.09.05 02.05.06 N.A. 18.12.06 18.12.06 18.12.06 15.04.07 Preparation of Document (Date) PROCUREMENT of documents 5 ICB (S+I) ICB (S) ICB (S) ICB (S+I) ICB (S+I) ICB (S+I) ICB (S+I) ICB (S) Method ICB/NCB procurement review 0.60 1.15 prior $) (in 4 335.90 10.73 21.98 19.26 6.15 on 22.30 Estimated Cost Million (1$=Rs.40.5) based & Ballia PKG- kV T1 ready BALIA at ROD T/L (GEB), Sub- 400 are Tower AT LONG (FOR Sub-station and ZERDA SUBSTATIONS (New) and Aurangabad (for awarded 3 Package SCHEME (SET-B) (New) Parli Sub-stations (SET-D) yet review Works/Goods PKG-C1 PACKAGE 400kV kV Not- of Pune A Sholapur C ALONGWITH of (MSEB) Package post Terminal COMPOSITE GWALIOR, KANKROLI 400 STATIONS & PACKAGE-B are NYA Bhiwadi KN KV SYSTEM (MBD) Package-U Description HVDC and 210 INSULATORS INSULATOR A1) 400 AGRA EXTENSION SCHEME-II SYSTEM 400/220kV PACKAGE- 400/220kV station Extension (MSEB), Kolhapur PACKAGE- SCHEME-II Conductor T2) BIPOLE TRANSMISSION XXX XXI XXII documents Applicable, STRENGTHENING NO.- NO.- NO.- REGION REGION These Not- HVDC ** NA 2 CONVERTOR WEST- No. MW BHIWADI DOCUMENT DOCUMENT DOCUMENT Package 2500 BIPOLE & C-46002-S656-1 C-46014-L679-1 NORTH CORRIDOR C-13802-L179-1 C-13804-S119A-1 WESTERN STRENGTHENING BID C-33021-S119A-1 C-33022-S1919A-1 C-33023-S119A-1 WESTERN STRENGTHENING BID C-33025-L075-1 BID 1 3 4 1 1.1 1.2 2 2.1 2.2 3.1 3.2 3.3 4.1 S. No. 3 of 2 etaD ot derrucni 0 0 0 0 0 0 0 0 0 0 0 0 0 0 erutidnepxE 17 tcartnoC fo noitelpmoC fo etaD 16 FEB'2009 FEB'2009 MAY'2009 MAY'2009 MAY'2009 AUG'2009 AUG'2009 AUG'2009 MAY'2009 AUG'2009 JAN'2010 NOV'2009 OCT'2009 JULY'2009 .ON ecnerefeR knaB dlroW 15 ZIP & & CHINA CHINA INDIA INDIA INDIA LTD., INDIA ASTER, A INDIA ASTER, A INDIA Contractor/ 14 INDIA INDIA TATA TELE, of Code SPIC-SMO, & INDI SPIC-SMO, & INDI INDIA of INDIA of KALPATARU of WSI, KEC, JV Nationality JV INDIA POWER, JV INDIA BHEL, CROMPTON PROJECTS ASTER SIEMENS, Name NANJING, NANJING, STERLITE, STERLITE, STERLITE, GREAVES No. 13 1/2422 2379 Contract C-46201-L195A- C-33025-L079-1/ 2440 C-33026-L079-1/ 2442 C-33006-L195A-1/ 2348 C-33007-L195A-1/ 2350 C-33008-L195A-1/ 2350 C-33006-L175-1/ 2446 C-33007-L175-1/ 2447 C-33008-L175-1/ 2448 C-33006-L179-1/ 2438 C-33007-L179-1/ 2439 C-33009-S117- 1/2565 C-33009-S119A-1/ 2444 C-46202-L195A-1/ (Date/ 12 20.02.08 20.02.08 14.05.07 15.05.07 14.05.07 20.02.08 20.02.08 20.02.08 19.02.08 19.02.08 04.07.08 20.02.08 18.01.08 10.07.07 Contract Signed Value/ Currency) to ** ** ** No (Date) 11 NA NA N.A. N.A. 05.04.07 05.04.07 05.04.07 04.01.08 04.01.08 04.01.08 23.10.07 23.10.07 22.05.08 N.A. Bank's Objection Contract Award Award (Date/ 10 26.12.07 26.12.07 14.02.07 14.02.07 14.02.07 31.10.07 31.10.07 31.10.07 21.09.07 21.09.07 06.05.08 22.08.07 02.08.07 27.02.07 Contract decided Value/ Currency) on 9 15.06.07 15.06.07 02.02.07 02.02.07 02.02.07 29.05.07 29.05.07 29.05.07 31.05.07 31.05.07 07.03.08 29.05.07 05.02.07 05.02.07 Opened (Date) Bids (Date) 8 17.04.07 17.04.07 28.10.06 28.10.06 28.10.06 11.04.07 11.04.07 11.04.07 11.04.07 11.04.07 08.06.07 11.04.07 22.11.06 22.11.06 Invitation Bank. to ** ** ** No 7 World NA NA by N.A. N.A. 11.01.07 11.01.07 11.01.07 28.03.07 28.03.07 28.03.07 28.03.07 28.03.07 15.02.08(*) N.A. Bank's Objection Bidding Documents (Date) approved 6 as Bid 13.04.07 15.04.07 29.11.06 29.11.06 29.11.06 21.12.06 21.12.06 21.12.06 21.12.06 21.12.06 05.06.07 27.11.06 28.04.06 28.04.06 Preparation of Document (Date) of I) I) documents 5 ICB (S) ICB (S) ICB (S+I) ICB (S+I) ICB (S+I) ICB (S) ICB (S) ICB (S) ICB (S) ICB (S) + + ICB ICB ICB (S+I) ICB (S+I) Method ICB/NCB (S (S procurement review prior $) (in 4 1.96 1.33 22.63 20.00 18.43 18.10 18.00 17.33 2.29 3.88 7.51 8.86 on 14.04 21.01 Estimated Cost Million (1$=Rs.40.5) based - - & - - kV T1) T2) line line -234 W1) W2) W3) W1) W2 Korba TL TL ready line 400 kV (MPSEB) are Tower Tower Tower Tower Tower 2 Tower Tower 1 and W1 W (for (for (for 400 Damoh, Bhopal A Raigarh- A2 awarded 3 (for (for (for (for Rourkela- Bina, kV STRENGTHENING yet Works/Goods W3- Package review 400kV kV Not- of Korba-Birsinghpur Birsinghpur-Damoh Damoh-Bhopal Package X1 Package X2 Package X3 400 Ranchi Rourkela post Package Package Package- Package- Package Package of D/C D/C D/C 400 and D/C PACKAGE- D/C PACKAGE- Reactor are NYA kV kms. kV kms. kV Package (MBD) (MBD) PACKAGE-Y2 CORRIDOR KV kms KV kms Description Insulator PACKAGE-V1 Insulator PACKAGE-V2 400 227 400 254 400 kms. Conductor PACKAGE- Conductor PACKAGE- Conductor PACKAGE- Insulator PACKAGE-Y1 Insulator W3) Shunt Extension Gwalior, (NTPC) Sub-stations 400 170 400 220 XXIII XXIV XXV XXXIII XXXIV I documents Applicable, NO.- NO.- NO.- NO.- NO.- NO.- These Not- TRANSMISSION ** NA 2 No. WEST- DOCUMENT DOCUMENT DOCUMENT DOCUMENT DOCUMENT DOCUMENT Package C-33025-L079-1 C-33026-L079-1 BID C-33006-L195A-1 C-33007-L195A-1 C-33008-L195A-1 BID C-33006-L175-1 C-33007-L175-1 C-33008-L175-1 BID C-33006-L179-1 C-33007-L179-1 BID C-33009-S117-1 BID C-33009-S119A-1 EAST SCHEME BID C-46201-L195A-1 C-46202-L195A-1 1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 5 5.1 5.2 S. No. 3 of 3 etaD ot derrucni 0 0 0 0 0 0 0 0 0 erutidnepxE 17 tcartnoC Documents. fo noitelpmoC 09 fo etaD 16 JULY'2009 JAN'2009 NOV'2009 SEPT'08 SEPT'08 NOV'08 NOV'08 AUG'2009 OCT' Bidding to .ON ecnerefeR knaB dlroW 15 ction Obje ZIP No & & INDIA MAN India LTD, TELE, BIRLA, INDIA Unitech, ASTER, CHINA Contractor/ 14 B&C TATA & TATA & India India Bank's of Code of INDIA INDIA T&D, of Abengoa, & of of JV KEC, JV of JV GURGAON Nationality ICOMM ADITYA Projects Structures, JV Spain date Name AREVA Projects NANJING, SIEMENS the the No. 13 than 2381 2334 2336 2452 Contract earlier C-46203-L195A-1/ C-46201-L179- 1/2451 C-46204-S119A-1/ 2436 C-46801-L195A-1/ 2352 C-46802-L195A-1/ 2354 C-46803-L195A-1/ C-46804-L195A-1/ C-46801-L179-1/ 2616 C-46806-S119A-1/ is (Date/ 12 invitation 10.07.07 22.02.08 18.02.08 15.05.07 15.05.07 30.03.07 30.03.07 12.08.08 26.02.08 bid Contract Signed Value/ Currency) of to No date (Date) 11 NA NA NA NA NA NA NA NA NA the Bank's Objection Contract Award Therefore, Award (Date/ 10 27.02.07 02.08.07 22.08.07 27.02.07 27.02.07 27.02.07 27.02.07 24.06.08 26.09.07 Review". Contract decided Value/ Currency) "Prior on 9 05.02.07 14.06.07 25.05.07 07.02.07 07.02.07 09.02.07 09.02.07 27.02.08 24.05.07 under Opened (Date) Bids covered (Date) 8 be to 22.11.06 27.04.07 06.03.07 21.11.06 21.11.06 24.11.06 24.11.06 28.05.07 07.03.07 Invitation Bank. ecidedd to ** ** ** No 7 NA NA NA NA NA NA wasit World by N.A. N.A. N.A. Bank's Objection Bidding Documents (Date) approved 6 subsequently, as Bid 28.04.06 26.04.07 05.03.07 17.11.06 17.11.06 21.11.06 21.11.06 22.05.07 05.03.07 Preparation of Document (Date) of I) I) However, documents 5 ICB (S+I) ICB (S) + + ICB (S ICB (S+I) ICB (S+I) ICB (S+I) ICB (S+I) ICB (S) ICB Method ICB/NCB (S procurement review Review". prior $) (in 4 "Post 19.77 5.65 15.13 19.61 16.33 14.12 18.92 3.17 on 19.57 Estimated Cost Million (1$=Rs.40.5) Bank's based - kV kV TL TL A3 A4 400 & TL World ready 400 400 Tower and 1A Baripada- are A2 the Tower Baripada Siliguri Raipur- Sub-stations and A3 (for Ranchi, SCHEME-I Jamshedpur- Mendhasal- Mendhasal- PACKAGE- PACKAGE- (for Durgapur, kV kV awarded under 3 Raipur yet kms 400 400 of review Works/Goods 400kV kV kms of Raigarh of Durgapur PACKAGE- Jamshedpur PACKAGE- Baripada Baripada A4) 400kV covered Not- 400 & of Mendhasal post D/C PACKAGE- Package-C A3) Sub-stations & D/C kms D/C kms D/C 127.5- D/C 127.5- Package-D A3 kV S/Stns. was are NYA KV kms KV 181- KV 135- KV KV Jamshedpur, 400 renovation Description 400 225 Insulator A1,A2 Extensions Rourkela, Raigarh 400 TL 400 TL 400 (Part-I) 400 (Part-II) Insulator A1,A2, Extensions kV and and Purnea III V STRENGTHENING I II VI VII package the documents Applicable, NO.- NO.- NO.- NO.- NO.- NO.- These Not- 2 REGION invitation ** NA No. bid of DOCUMENT DOCUMENT DOCUMENT DOCUMENT DOCUMENT DOCUMENT time Package C-46203-L195A-1 BID C-46201-L179-1 BID C-46204-S119A-1 EASTERN BID C-46801-L195A-1 C-46802-L195A-1 BID C-46803-L195A-1 C-46804-L195A-1 BID C-46801-L179-1 BID C-46806-S119A-1 the 1 5.3 5.4 5.5 6 6.1 6.2 6.3 6.4 6.5 6.6 At S. No. (*)

Informations clés
Type de document Procurement Plan
Date d'adoption
Pays Inde
Source Banque mondiale