Page 1 Procurement Plan-Goods Country/Organisation: Malawi / Electricity Supply Corporation of Malawi Limited (ESCOM) Project/Programme: Southern Africa Power Market Project, APL 2 Description* Financin g Categor y Package Number Lot No. Est. Amount US$ Proc. Method Pre-or Post Qualificati on Prior or Post Review List of Contracts Component A Component C Ca Supply of goods for the Replacement of obsolete and worn-out critical Equipment for 132kV Substations 2 1 1,000,000.00 Cc1 Supply of goods for the Urgent Distribution Rehabilitation 2 2 1,000,000.00 2,000,000.00 Post-Q Prior Prior Prior Prior 1 Post-Q Prior ICB Post-Q Cd 2 2 1 4 ICB LIB 420,000.00 1 2 2 Supply of Generation Equipment Spares for Generation Stations ( Nkula A, Nkula B, Tedzani, etc) - Total Cost (Goods) 8,720,000.00 Supply of meters for Revenue Improvement Measures. 2 1 3,000,000.00 5 Supply of Equipment for better maintenance and operations (ERS, Hotline maintenance, etc.) 3 1 1,300,000.00 Supply of Geo-referenced Aerial Survey Digital Data for the Transmission Line (Assignment already complete) ICB Post-Q ICB Post-Q Ad Ae3 Cc2 542120PROP0P081lan01rev1LJN104Nov08.xls 1 of 6 04/27/2010 3:20 AM Page 2 Procurement Plan-Works Country/Organisation: Malawi / Electricity Supply Corporation of Malawi Limited (ESCOM) ISSUED ON:- Project/Programme: Southern Africa Power Market Project, APL 2 UPDATED ON IDA Credit #: 4353-0 MAI Spec Proc Notice Advert Description* Financing Category Package Number No. of Lots Lumpsum or Bill of Quantities Proc Method Est. Amount US$ Pre-or Post Qualificati on Prior or Post Review Plan vs. Actual Prep & Submission by ESCOM No-objection Date On-line UNDB Gateway Nat Press Pre-Q Closing Date Submission PQ Eval Rpt No- objection Date Prep & Submission by ESCOM No- objection Date Bid Invitation Date Bid Closing- Opening Submission Bid Eval Rpt No- objection Date Contract Negotiatio ns Contract Amount in US$ Date Contract Award Mobilization Advance Payment Substantial Completion Final Acceptance List of Contracts (Works) Component A Overhead Transmission Line and Substation Plan 05/15/07 06/05/07 06/12/07 07/24/07 12/31/08 01/21/09 03/11/09 04/08/09 04/22/09 07/22/09 09/02/09 09/23/09 10/07/09 18,950,000.00 10/14/09 12/02/09 08/31/11 10/19/11 Actual 05/15/07 06/08/07 09/05/07 10/25/07 Plan 05/15/07 06/05/07 06/12/07 07/24/07 12/31/08 01/21/09 03/11/09 04/08/09 04/22/09 07/22/09 09/02/09 09/23/09 10/07/09 17,140,000.00 10/14/09 12/02/09 10/30/11 12/25/11 Actual 05/15/07 06/08/07 09/05/07 10/25/07 Subtotal (Component A) 36,090,000.00 Component C Plan POST QUALIFICATION 12/15/08 01/12/09 01/26/09 04/27/09 06/08/09 06/29/09 06/22/09 1,630,000.00 06/29/09 07/27/09 01/28/11 03/18/11 Actual Plan POST QUALIFICATION 12/31/08 01/28/09 02/11/09 05/13/09 06/24/09 07/15/09 07/08/09 1,200,000.00 07/15/09 08/12/09 02/13/11 04/03/11 Actual Subtotal (Component C) 2,830,000.00 Plan 38,920,000.00 Actual Cb Cc3 Pre-Q ICB Aa Ab 4 1 2 1 Prior Prior Post 18,950,000.00 17,140,000.00 Contract Implementation 18 April 2008 Prior Pre-Q ICB Post Bill of Quantities (Supply & Install) 1,630,000.00 1,200,000.00 Bill of Quantities (Supply & Install) ICB Bill of Quantities (Supply & Install) Bill of Quantities (Supply & Install) 1 1 Contract Finalization Basic Data Bidding Period Draft Prequalification Documents, including IFP Draft Bid Documents, including specs and quantities, draft SPN Prequalification Evaluation New Phombeya Substation 220/132/33 kV, including SCADA, Protection and Telecommunication and Spare Bays Replacement of obsolete and worn-out critical Communications Equipment and missing communication links with NCC including SCADA 1(b) 220 kV Double-Circuit Transmission Line from Mozambique-Malawi border to new Phombeya Substation-Malawi 1(a) 1(a) 04 November 2008 Total Cost (Works) 38,920,000.00 Other Urgent Transmission Rehabilitation (Bunda T/Off Integration & Repair of 6 x 66kV OHL towers at Manjawira) Bid Evaluation Prior ICB 1(b) 3 1 542120PROP0P081lan01rev1LJN104Nov08.xls 2 of 6 04/27/2010 3:20 AM Page 3 Procurement Plan-Consultants Country/Organisation: Malawi / Electricity Supply Corporation of Malawi Limited (ESCOM) ISSUED ON:- Project/Programme: Southern Africa Power Market Project, APL 2 UPDATED ON IDA Credit #: 4353-0 MAI Contract Type Description* Finacing Category Selection Method Lumpsum or Time-Based Estimated Amount in US$ '000 Prior/ Post Review Plan vs. Actual Prep & Submission by ESCOM No- objection Date On-line UNDB Gateway Nat Press Submissio n Date No- objection Date Prep & Submissio n by ESCOM No- objection Date Invitation Date Submission/ Opening Date Submission Evaluation Report (T) No-objection Evaluation Report (T) Opening Financial Proposals Preparation Eval Report (T) (F) Negotiations (N) Contract Amount in US$ Contract Award Mobilization Advance Payment Draft Report Final Report List of Contracts (Consultancy Services) Component A Plan 03/15/02 03/29/02 04/08/02 05/20/02 06/03/07 07/15/02 07/29/02 08/12/02 11/04/02 11/25/02 12/09/02 12/23/02 01/06/03 01/20/03 1,580,000.00 03/11/03 04/24/03 07/17/03 08/28/03 Actual 03/25/02 04/08/02 04/16/02 07/24/02 11/29/02 08/12/02 11/29/02 12/11/02 03/07/03 04/15/03 05/13/03 05/30/03 07/29/03 03/11/04 3,566,784.99(50%) ( 2,243,261.00) 09/30/04 10/14/04 07/30/05 12/19/07 Plan 12/31/08 01/14/09 01/24/09 03/17/09 03/31/09 04/28/09 05/12/09 05/26/09 08/04/09 08/25/09 09/01/09 09/15/09 09/29/09 10/13/09 680,000.00 11/10/09 12/08/09 01/19/10 02/16/10 Actual Plan (PAYMENTS AS COMPENSATION IS REQUIRED) 1,000,000.00 Actual Total Component A (consultancy services) 3,260,000.00 Component B Support for Upgrade and Expansion of Power Network to support power trading Plan 11/30/08 12/14/08 12/24/08 02/14/09 02/28/09 03/14/09 03/28/09 04/11/09 06/20/09 07/11/09 07/18/09 08/01/09 08/15/09 08/29/09 2,000,000.00 09/26/09 10/10/09 01/08/10 03/09/10 Actual Bb Finacial Sustainability and revenue enhancement Plan 08/20/07 09/03/07 09/13/07 10/31/07 11/14/07 11/14/07 11/28/07 12/14/07 02/22/08 03/14/08 03/28/08 04/11/08 04/25/08 05/09/08 500,000.00 03/31/09 04/30/09 07/02/09 07/23/09 Actual 08/20/07 09/03/07 09/13/07 10/31/07 11/14/07 11/14/07 11/28/07 12/14/07 02/22/08 03/14/08 03/28/08 04/11/08 Plan 08/20/07 09/03/07 09/13/07 10/31/07 11/14/07 11/14/07 11/28/07 12/14/07 02/22/08 03/14/08 03/28/08 04/11/08 04/25/08 05/09/08 500,000.00 03/31/09 04/30/09 06/11/09 06/25/09 Actual 08/20/07 09/03/07 09/13/07 10/31/07 11/14/07 11/14/07 11/28/07 12/14/07 02/22/08 03/14/08 03/28/08 04/11/08 Bc Training & Other Studies Plan 12/31/08 01/14/09 01/24/09 03/17/09 03/31/09 04/28/09 05/12/09 05/26/09 08/04/09 08/25/09 09/01/09 09/15/09 09/29/09 10/13/09 230,000.00 11/10/09 12/08/09 01/19/10 02/16/10 Actual Plan 12/31/08 01/14/09 01/24/09 03/17/09 03/31/09 04/28/09 05/12/09 05/26/09 08/04/09 08/25/09 09/01/09 09/15/09 09/29/09 10/13/09 300,000.00 11/10/09 12/08/09 01/19/10 02/16/10 Actual Plan 12/31/08 01/14/09 01/24/09 03/17/09 03/31/09 04/28/09 05/12/09 05/26/09 08/04/09 08/25/09 09/01/09 09/15/09 09/29/09 10/13/09 160,000.00 11/10/09 12/08/09 01/19/10 02/16/10 Actual Total Component B 3,690,000.00 6,950,000.00 Plan 6,950,000.00 Actual 18 April 2008 2 QCBS Time-Based 300,000.00 QCBS Time-Based 230,000.00 Prior QCBS Prior Prior QCBS Time-Based 500,000.00 Prior 2 160,000.00 Prior Contract Implementation Technical Assistance and Training for Financial Sustainability Plan: Design and parallel Implementation Preparation Request For Proposal (RFP) Engineering, Supervision and Project Management - Phase A & 'B' ( Contract already awarded and signed) 50% of Contract only Assessment of ESCOM's maintenance aspects including specifications of equipment/tools and Training 1,580,000.00 QCBS Time-Based 500,000.00 2 2 Short List Lumpsum QCBS Time-Based QCBS Lumpsum Request for EOI (where required) 2 1(a) QCBS Prior 680,000.00 Ac Ae1 Time-Based Ba Bb1 Other Training/Capacity Building within ESCOM 2 Environmental and Social Assessment and Management, Preparation of RAP Revenue Stream Diagonostic Study and Implementation of Study Recommendations Power System Modernization and Expansion (G, T & D) including Communication System 2 Contract Finalization Proposal Evaluation and Negotiation for Projects after May 2002 Technical (T) & Financial (F) and Negotions (N) 2,000,000.00 Prior Prior Consultant Proposals Preparation Terms of Reference 1,000,000.00 04 November 2008 Total Cost (consultancy services) Ae2 Resettlement and Compensation 2 Bb2 Bc1 Bd Bc2 Capacity Building and Strengthening of Project Management Unit (PMU) 542120PROP0P081lan01rev1LJN104Nov08.xls 3 of 6 04/27/2010 3:20 AM Page 4 Procurement Plan-Goods print version Description* Financing Category Package Number Lot No. Est. Amount US$ Proc. Method Pre-or Post Qualification Prior or Post Review List of Contracts Component A Component C Ca Supply of goods for the Replacement of obsolete and worn-out critical Equipment for 132kV Substations 2 1 1,000,000 Cc1 Supply of goods for the Urgent Distribution Rehabilitation 2 2 1,000,000 Total Cost (Goods) 8,720,000 Supply of meters for Revenue Improvement Measures. 2 1 3,000,000 5 Supply of Equipment for better maintenance and operations (ERS, Hotline maintenance, etc.) 3 Cd 2 2 1 Ae3 Cc2 2 2 Supply of Generation Equipment Spares for Generation Stations ( Nkula A, Nkula B, Tedzani, etc) - Ad 420,000 1 1 Supply of Geo-referenced Aerial Survey Digital Data for the Transmission Line (Assignment already complete) ICB LIB Prior Prior 4 1 Post-Q Prior ICB Post-Q ICB Prior Prior 2,000,000 Post-Q 1,300,000 ICB Post-Q Post-Q 542120PROP0P081lan01rev1LJN104Nov08.xls 4 of 6 04/27/2010 3:20 AM Page 5 Procurement Plan-Works print version Description* Financing Category Package Number No. of Lots Lumpsum or Bill of Quantities Proc Method Est. Amount US$ Pre-or Post Qualification Prior or Post Review List of Contracts Component A Overhead Transmission Line and Substation Subtotal (Component A) 36,090,000 Component C Subtotal (Component C) 2,830,000 Prior ICB 1(b) 3 1 Bill of Quantities (Supply & Install) Bill of Quantities (Supply & Install) Total Cost (Works) 38,920,000 Other Urgent Transmission Rehabilitation (Bunda T/Off Integration & Repair of 6 x 66kV OHL towers at Manjawira) New Phombeya Substation 220/132/33 kV, including SCADA, Protection and Telecommunication and Spare Bays Replacement of obsolete and worn-out critical Communications Equipment and missing communication links with NCC including SCADA 1(b) 220 kV Double-Circuit Transmission Line from Mozambique-Malawi border to new Phombeya Substation-Malawi 1(a) 1(a) Prior Pre-Q ICB Prior Prior Post 18,950,000 17,140,000 1,630,000 1,200,000 Cb Cc3 Pre-Q ICB Aa Ab 4 1 1 1 2 1 ICB Post Bill of Quantities (Supply & Install) Bill of Quantities (Supply & Install) 542120PROP0P081lan01rev1LJN104Nov08.xls 5 of 6 04/27/2010 3:20 AM Page 6 Procurement Plan-Consultants print version Description* Finacing Category Selection Method Lumpsum or Time-Based Est. Amount US$ Prior/ Post Review List of Contracts Component A Total Component A (consultancy services) 3,260,000 Component B Support for Upgrade and Expansion of Power Network to support power trading Bb Finacial Sustainability and revenue enhancement Bc Training & Other Studies Total Component B 3,690,000 6,950,000 Capacity Building and Strengthening of Project Management Unit (PMU) Prior 680,000 Total Cost (consultancy services) Ae2 Resettlement and Compensation 2 Bb2 Bc1 Bd Bc2 Assessment of ESCOM's maintenance aspects including specifications of equipment/tools and Training 2,000,000 Prior Prior 1,000,000 2 2 Ac Ae1 Ba Bb1 Other Training/Capacity Building within ESCOM 2 Environmental and Social Assessment and Management, Preparation of RAP Engineering, Supervision and Project Management - Phase A & 'B' ( Contract already awarded and signed) 50% of Contract only 1,580,000 QCBS 2 1(a) QCBS Time-Based 2 QCBS Lumpsum Technical Assistance and Training for Financial Sustainability Plan: Design and parallel Implementation Revenue Stream Diagonostic Study and Implementation of Study Recommendations Power System Modernization and Expansion (G, T & D) including Communication System 2 QCBS Time-Based Prior Prior QCBS Time-Based 500,000 Prior 2 Time-Based 300,000 160,000 Prior Time-Based 230,000 Prior QCBS Time-Based 500,000 QCBS QCBS Lumpsum 542120PROP0P081lan01rev1LJN104Nov08.xls 6 of 6 04/27/2010 3:20 AM
Groupe de la Banque mondiale · Procurement Plan
Africa - Southern African Power Market Program (APL2) : Mozambique - Malawi Transmission Interconnection Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Source
Banque mondiale