/oci 4/e. 4830 - C A Attachment 1 Project Procurement Plan Estimated Proror Ref. Contract Cost Procurment Post Start Data End Date No. No. Contract Deecrt"on (US$ M) Method Review (mnVd*) (mw/ty) ... ... ... ... ... ... ... ... (I) Sub rode works 10/05/06 1 10/05/09 - ASI K31+000-K42+000, l1kn 24.23 ICB/Works Prior 2 AS2 K42+000 K51+100,9.l1hn 23.17 ICB/Works Prior 3 AS3 K51+ 100K60+300, 9.2'km 26.96 ICB/Works Prior 4 AS4 K60+300 K65+700, 5.4hn 23.17 ICB/Works Prior S AS5 K65+700-K69+100, 3.4kn 23.17 ICB/Works Prior 6 AS6 K69 100K73+720,4.62km 24.23 ICB/Works Prior 7 AS7 K73+720-K80+700, 6.98kn 18.96 ICB/Works Prior 8 AS8 K80+700 K86+500, 5.8kn 27.39 ICB/Works Prior 9 AS9 K86+500-K94-6oCC. 8. ikm 25.28I ICB/Works Prior 10 ASIO K94+600KK103+000, 8.4km 26.33 ICB/Works Prior 11 ASI I K103+000'K107+300,4.3km 25.28 ICB/Works Prior 12 AS12 K107+300-K114+200, 6.9km 25.28 ICB/Works Prior 13 AS13 K114+200-K120+900, 6.7km 26.33 ICB/Works Prior 14 AS 14 K120+900-K130+500, 9.6km 25.28 ICB/Works Prior I S AS15 K130+500-K137+100, 6.6kn 26.33 ICB/Works Prior 16 AS16 K137+100-K148+053, 10.95km 25.28 ICB/Works- Prior Subtotal 16 contracts 396.67 - (2) Pavement works 10/05/06 10/05/09 17 API K31+000-K65+700, 34.7kn 16.85 ICB/Works Prior 18 AP2 K65+700-K94+600,28.9km 14.75 ICB/Works Prior 19 AP3 K94+600 K120+900,26.3km 13.69 ICB/Works Prior 20 AP4 K120+900-K148+053, 27.2kn 13.69 ICB/Works Prior Subtotal 4 contracts 58.98 _ (3) Tr C safety facif/ties works 012208 10/05/09 21 JTI K31+000-K65+700, 34.7kn 2.76 NCB/Works Prior 22 JT2 K65+700-K94+600,28.9kn 2.56 NCB/Works Post 23 JT3 K94+600-K120+900,26.3km 2.20 NCB/Works Post 24 JT4 K120+900-K148+053, 27.2kmn 2.25 NCB/Works Post Subtotal 4 contracts 9.77 (4) Greenin works __01/22V08 T10/05/09 25 LH1 K3 1+000-K65+700, 34.7km | 4.09 NBF/LCP 26 LH2 K65+700-K94+600,28.9km 3.79 NBF/LCP 27 LH3 K94+600-K120+900,26.3km 3.26 NBF/LCP 28 LH4 K120+900-K148+053, 27.2knm 3.33 NBF/LCP | Subtotal 4 contracts 14.47 15) M&E Works _ 01/22/08 10/05/09 Tolling system, telecomnnunication system, surveillance systemn 29 JDI (K31+000-K147+800) . 9.94 NBF/LCP Ventilation, lighting, fire-fighting, 30 JD2 power-supplying for tunnels 7.76 | NBF/LCP Subtotal 2 contracts 17.70 1 ... Continued 47 rEstimated Prior or Ref. Contract Cost Procurement Post Start Dab End Date No. No. Contact Dc tipon (USS M) Metod Review (mi/dd) (mi (6) Building construction works 01/22/08 10/05/09 31 FJI Xijiang service area 2.40 NBF/LCP North Huichang management 32 FJ2 station 0.93 NBF/LCP 33 FJ3 Yuyang parking area 0.41 NBF/LCP Zhonggong tunnel management 34 FJ4 station 0.87 NBF/LCP 35 FJ5 Yudu management station 1.03 NBF/LCP 36 FJ6 Yudu service area 2.44 NBF/LCP 37 FJ7 Xiasan Tunnel management station 2.37 NBF/LCP .- 38 FJ8 Gan County parking area 0.41 NBF/LCP 39 FJ9 Gan County management station 1.07 NBF/LCP Sub-center of Ruigan surveillance, 40 FJIO telecommunication and tolling 2.00 NBF/l.CP Subtotal 10 contracts 13.94 (7) Supervsion Cons utants 02/22/08 10/05/09 41 SCI Domestic supervision consultant 11.32 NBF/LCP | 42Foreign consultant 0.40 IC/CQ Po Subtotal t contrant0 11.72 Total of RGE 023.27 1(I)Firstophase contracts 04/17/06 | 12/18/07 Chuengyi to Fengzhou K0+000 - 43 CF-0 3 K20+000, Subgrade works 5.27 NCB/Works Prior Chuengyi to Fengzhou K20+000 - 44 CF-02 K35+000, Sub-grade works 6.11 NCB/Works Prior Chuengyi to Fengzhou K305+000 - 45 CF-03- K48+869.6, Subgrade works 6.84 NCB/Works Prior Chuengyi to Fengzhou K0+000 - 46 CF-04 K20+000, Pavement works 2.32 NCB/Works Post Meicun to Longbu KO+000 - 47 MR-0 1 K15+666.91,Subgarde works 5.79 NCB/Works Prior Meicun to Longbu 64+900 - 48 MR-02 K84+003.58,Subgarde works 7.64 NCB/Works Prior Meicun to Longbu, Pavement 49 MR-03 works 1.61 NCB/Works Post Subtotal 7 contracts 35.58 (2) Second phase coetracts 01/01/07 10/5/09 F I To be identified later 25.00 NCB/Works (8) Supervision Consultant 04/17/06 10/5/09 50 SC3 O Domestic supervision consultant l 0.80 NBF/LCP . Total of LRIP 61.38 ... Continued 48 I tstimated I I Prior or I , -ler. Contract Cost Procurement Post Start Date End Date No. No. Contract Descption (USS M Method Review (mnV Y (mindriy) Studies: (a) Traffic safety operations for tunnels; (b) Traffic safety improvement for expressway; (c) ETC implementation; (d) micro- 51 Ci enterprise for road maintenancz . o3 NBF, LCP 12/25i06 10/05/09 _ -On annual 52 C2 Foreign study tours and training 1.06 CQ/SOE basis 01/01/08 10/05/09 Equipment Procurement - 53 C3 Domestic 3.01 NBF/Goods 02/22/08 10/05/09 54 C3 Equipment Procurement - Foreign 5.75 ICB/Goods Prior 02/22/08 10/05/09 Subtotal 10.45 Total of IS T 10.45 T - i Notes: CQ = Selection Based on Consultant's Qualifications IC = Individual Consultant Selection ICB = Intemational Competitive Bidding LCP Local Competitive Procedures NBF = Not Ba3k-Financed NCB = National Competitive Bidding SOE = Statement of Expenditures 49 -.-...-----
Groupe de la Banque mondiale · Procurement Plan
China - Third Jiangxi Highway Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Chine