Groupe de la Banque mondiale · Procurement Plan

India - Uttar Pradesh Water Sector Restructuring Project : procurement plan of civil works, as of February 6, 2007

Inde Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

Page 1 of 56 U.P. WATER SECTOR RESTRUCTURING PROJECT 41560 Procurement Plan of Civil Works As on 06 February, 2007 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Rehabilitaiton of Jaunpur Branch from 0.0 Km to 119.6 Km. and Haidergarh Branch from 0.0 Km. to 22.98 Km. ( Earth Work in internal & outer sections, Construction of Parallel Pre-qualification 1 A1 Branches minors, Construction of cross 6315.00 11/2/2005 12/19/2005 1/9/2006 1/20/2006 1/25/2006 2/5/2006 2/15/2006 3/6/2006 13/03/06 ICB/ Pre Review regulators, minor head gates and measuring structu (B1 and B2 combined) Rehabilitation of Distributaries Tikri, Kalyanur Gopalpur, Nagapur, Deeh, Shahmau & Dautara & Its The Evaluation Committee in its meeting dated 22-01-2007 decided to reject the bid as it wa Pre-qualification 2 B Canal offtaking minors Earth work in 4970.00 10/30/2006 12/22/2006 higher by 40% than the Engineer's estimate. 6 Packages as per distributery as Mile Stone a ICB/ Pre Review internal & outer sections , bed being prepared by the field Engineers and the bids are likely to be s profile pillars, repair of old structures, construct 3 A3 Roads- JB Jaunpur branch 2200.00 ICB/Pre-Rev. 4/25/2007 10-06--07 7/1/2007 7/20/2007 7/25/2007 8/10/2007 8/18/2007 9/12/2007 10/15/2007 4 A3 Roads- HB Haidargarh branchh 425.00 ICB/Pre-Rev. 4/25/2007 10-06--07 7/1/2007 7/20/2007 7/25/2007 8/10/2007 8/18/2007 9/12/2007 10/15/2007 5 Package B-1-1 1 Drain Moong Tal 64.15 NCB/Post-Rev. 1/23/2007 3/7/2007 3/17/2007 3/20/2007 - - 3/22/2007 3/31/2007 4/10/2007 1 Maidha Drain 2 Hamai Tal Drain 3 Sarai Mahasha Drain 4 Ragana Tal Drain 5 Ham Rajpur Drain 6 Faridpur Drain 7 Udwa Drain Package-B-1-2 6 8 Pidhi Drain 9 Dhahira Mau Drain 10 Dhahira Mau Cut Drain 11 Brahmani Drain 12 Sagar Tal Drain 13 Rampur Jamalpur Drain Procurement0Pl1nexure12102010312007.xls Page 2 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 14 Kesariya Salimpur Drain Total 44.39 NCB/PostRev. 1/23/2007 3/7/2007 3/17/2007 3/20/2007 - - 3/22/2007 3/31/2007 4/10/2007 1 Rupana Drain 2 Goora Dih Drain 3 Badehara Drain 4 Mohammadpur Drain 5 Chandarpur Drain Package-B-1-3 8 6 Mohammadpur Cut Drain 7 Sijri Drain 8 Bahadur Nagar Drain 9 Kuma Gada Drain Total 28.32 NCB/PostRev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Ondih Drian 2 Barenda Drain 3 Nariyapur Drain 4 Tale ka Purwa Drain 5 Haliya Tal Drain 6 Maharapur Drain Package-B-1-4 7 Bandrarapur Drain 9 8 Dautra Drain 9 Maharajpur Drain 10 Janai Drain 11 Chandapur Drain Ist 12 Chandapur Drain 2nd 13 Janai Tal Drian Total 14.27 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Domapur Drian 2 Andupur Drain 3 Tisakhanpur Drain 4 Tisakhanpur CutDrain 5 Bukawanpur Drain 6 Tomar Das ka purwa Package-B-1-5 10 7 Piparaha Drain 8 Hanumant singh ka purwa 9 Bandawa Tal Drain 10 Mahabal Ganj Drain 11 Mahabal Ganj Cut Drain Total 7.38 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Kamalpur drain 2 Gautampur drain 3 Jagdishpur drain Package-B-2-1 4 Audaha Tal drain 11 Drain Sewa Tal 5 hasani 6 Khasua drain 7 Santosh Rai drain Total 6.44 NCB/Post-Rev. 1/9/2007 2/20/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Asani Tal drain Procurement0Pl1nexure12102010312007.xls Page 3 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 2 Rani Tal drain 3 Bani Tal drain 4 Sahamau drain 5 shahamau drain 1 Package-B-2-2 13 6 shahamau cul drain 7 Ahiya Tal drain 8 Godiya Tal drain 9 Detiya Tal drain 10 Pure Bade Rai drain Total 9.00 NCB/Post-Rev. 1/9/2007 2/20/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Satehara Alampur drain 2 Basupur drain 3 Bijai drain 4 Bannena drain-1 Package-B-3-1 5 Bannena drain-2 Drain Satehra 14 6 Bijai Cut drain Alampur 7 Maidapur drain 8 Maidapur cut-1 drain 9 Maidapur cut-2 drain 10 Chhatoh drain Total 20.43 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 Package-B-4-1 15 1 Odhari drain 1.21 NCB/Post-Rev. 1/9/2007 2/20/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 Drain Mau Drain 1 Jogital drain 2 Jamalpur huriya drain 3 Teduwa drain Bhadaiya Mahamoodpur 4 drain Package-B-4-2 5 Kothi drain 16 6 Fursatganj cut drain 7 Fursatganj drain 8 Fatherpur Maviya drain 9 Amin Nagar drain 10 Basauni drain Total 11.67 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Mohiya Keseriya drain 2 Khairana drain Package-B-4-3 17 3 Daulatpur drain 4 Asthai drain Total 12.68 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Rokha cut drain 2 Khaitan ka purwa drain 3 Tiwaripur drain 4 Jalim ka purwa drain Ganga Singh ka purwa 5 drain Package-B-4-4 18 6 Pothai drain 7 Pothai cut drain Procurement0Pl1nexure12102010312007.xls Page 4 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 8 Dhauri drain kallu Mishra ka purwa 9 drain 10 Nidhu purwa ka drain Total 5.27 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 19 Package-B-5-1 1 Majhiliha 37.07 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Thauri 2 Endai 3 Malhani 4 Lokaikapurwa Package-B-5-2 5 Patakpur 20 6 Gopalpur 7 Kalika Ka purwa 8 Kamalpur Bedela 9 Machara Total 5.39 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Umraon 2 Kandev 3 Vishram 4 Mahatalpur 5 Kuttital 6 Bhatankapurwa Package-B-5-3 21 7 Durgapur 8 Durgapurcut 9 Daulatpur 10 Nigoha 11 Chandaliya 12 Bhagwandeen Total 23.09 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Solai Pur Drain Package-B-6-1 22 2 Manga Pur Drain Total 27.07 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Rajapur-2 Drain 2 Kedhitha Drain 3 Kesariya Pur Drain Package-B-6-2 4 Daulatpur Drain 23 5 Baba ka purwa 6 Hausan ka purwa 7 Revlee I Drain 8 Revlee I Drain Total 7.01 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Ranjanpur Drain 2 Pandi Drain 3 Mainapur Drain 4 Bishwapur Drain 5 Dariya Tal Drain 6 Dariya Tal-1 Drain Procurement0Pl1nexure12102010312007.xls Page 5 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 7 Kotali Drain Package-B-6-3 24 8 Chandhawahipur-1 Drain 9 Chandawahipur-2 Drain 10 Kapurpur Drain 11 Amiliha Tal Drain 12 Satya Narayanpur Drain 13 Ganeshpur Drain 14 Beekapur Drain Total 7.24 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Bhuwal pur Drain 2 Raja-1 Drain 3 Jagatpur Drain 4 Baura-1st Drain Package-B-6-4 5 Baura -2 Drain 25 6 Dharapur 7 Sisnee Drain 8 Pederiya Drain 9 Rankee Drain 10 Bathuwa Drain Total 10.31 NCB/Post-Rev. 12/30/2006 2/13/2007 2/20/2007 2/27/2007 - - 3/3/2007 3/10/2007 3/20/2007 1 Rajmathipur drain 2 Katra drain Package-B-7-1 3 Muraini drain 26 Drain Mattan Nala 4 Harnampur drain 5 shivcharan drain 6 Nandu tiwari ka purwa drain Total 22.00 NCB/Post-Rev. 1/9/2007 2/20/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Ateha drain 2 Kanipur drain 3 Udaipur drain 4 Murduwa drain 5 semra drain 6 Kushauli drain 7 Chauhan ka purwa drain 8 puduwa drain Package-B-7-2 27 9 Nimiya drain 10 Rajapur drain 11 Rajapur-1 drain 12 Dhatha drain 13 Sushil Garh drain 14 Bibitharva drain 15 Naseerpur drain 16 Bewalpur drain Total 15.20 NCB/Post-Rev. 1/9/2007 2/20/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Kurumin ka purwa drain 2 Pariya Namaksar drain 3 Ghada drain Procurement0Pl1nexure12102010312007.xls Page 6 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 4 Rani ka purwa drain 5 Sujavaria drain Package-B-7-3 28 6 Ghada cut drain 7 Lehanga drain 8 Lehanga-1 drain 9 Lehanga-2 drain 10 Lehanga-3 drain Total 36.00 NCB/Post-Rev. 1/9/2007 2/20/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Asrafpur drain 2 Behaliya drain 3 Barkhurdarpur drain 4 Tezi drain 5 Nasirabad drain Package-B-7-4 6 Barkhurdarpur-1 drain 29 7 Baazigadi drain 8 Nakdiyapur drain 9 Taniyapur drain 10 Taniyapur- 2 drain 11 Taniyapur-1 drain Total 26.30 NCB/Post-Rev. 1/9/2007 2/20/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 30 Package-B-8-1 1 Painga Cut Drain 82.00 NCB/Post-Rev. 1/24/2007 3/1/2007 3/7/2007 3/15/2007 - - 3/22/2007 4/1/2007 4/10/2007 1 Sujakhar Drain 2 Chhatoni Cut Drain 3 Chhatoni Drain Package-B-8-2 31 4 Nawatara Drain 5 Ramkhedwa Drain 6 Sainta Drain Total 3.60 NCB/Post-Rev. 1/9/2007 2/20/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Bhuwanshahpur Drain 2 Loga Drain 3 Dhanapur Drain 4 Itraura Drain 5 Makdhampur Drain 6 Abdmau Drain 7 Nanutal Drain 8 Gubi Drain Package-B-8-3 32 9 Abdmau-I Drain 10 Abdmau-II Drain 11 Sandha Drain 12 Sandha-I Drain 13 Amila Tal Drain 14 Pure Fazil Drain 15 Sariya Drain 16 Hazipur Tal Drain Total 25.00 NCB/Post-Rev. 1/9/2007 2/20/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Gulalpur drain 2 Benipur drain Package-B-9-1 3 Sumerpur drain 33 Procurement0Pl1nexure12102010312007.xls Page 7 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 33 4 Tulsipur drain 5 Sujansnagar drain Total 9.50 NCB/Post-Rev. 12/22/2006 2/7/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Dalo drain 2 Bhushivawan drain Package-B-9-2 34 3 purabgaon 4 Paliya drain Total 9.86 NCB/Post-Rev. 12/22/2006 2/7/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Chawaniya drain 2 dhanijalalpur drain 3 Darpipur drain 4 Dhanijalalpur-1 drain 5 Darpipur-1 drain 6 Gauripur drain-1 7 Madhopur drain 8 Madhopur drain-1 Package-B-9-3 9 Anandpur drain 35 10 Harakhpur 11 Bishundaspur drain-1 12 Bishundaspur drain-2 13 Gauripur drain 14 Samrath drain 15 Dulapur Khurd -1 16 Dulapur Khurd -2 17 Kheman Dal drain Total 10.07 NCB/Post-Rev. 12/22/2006 2/7/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Dulapur drain 2 Patkhauli drain 3 Dakhin gaon drain 4 Kasarawan drain 5 Dakhin gaon drain -1 6 Dakhin gaon drain -2 Package-B-9-4 7 Eksara-II drain 36 8 Eksara-I drain 9 Eksara drain 10 Paitra Tal drain 11 Paitra Tal-1 drain 12 Sahagarh drain 13 Ruruwa Tal drain Total 12.67 NCB/Post-Rev. 12/22/2006 2/7/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Rauja Tal drain 2 Tulsidaspur drain 3 Rauja-II drain 4 Atrauliya drain 5 Maharajpur drain 6 Gusiyana drain-2 7 Gusiyana drain-1 8 Atrauliya-1 drain 9 Angrawan drain Procurement0Pl1nexure12102010312007.xls Page 8 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 10 Bhola ka purwa drain 11 Rauja drain -1 Package-B-9-5 37 12 Nimi drain 13 Gogamau drain 14 Basti dei drain 15 Basti dei-1 drain 16 Sarmey drain 17 Bhagatgaon drain 18 Biripur drain 19 Sirkhari drain 20 Sarmey drain-1 21 Resi drain 22 Lorikpur drain Total 6.29 NCB/Post Rev. 12/22/2006 2/7/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Thaura drain 2 Pindoriya-1 drain Package-B-10-1 38 3 Pindoriya-2 drain 4 Dharaimafi drain Total 6.34 NCB/Post-Rev. 12/6/2006 2/7/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Badlapur drain 2 Badlapur drain-1 3 Bharetha drain 4 Mandauli drain Package-B-10-2 5 Lalaka purwa drain 39 6 Tikarmafi drain 7 Tikarmafi-1 drain 8 Patkauli drain 9 Bhimi drain Total 13.08 NCB/Post-Rev. 12/22/2006 2/7/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Bandoriya drain Package-B-10-3 2 Tikari drain 40 3 Shivgarh jalalpur drain Total 3.12 NCB/Post-Rev. 12/22/2006 2/7/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 41 Package-B-11-1 1 Piparpur drain 390.00 NCB/Pre-Rev. 12/4/2006 1/9/2007 1/16/2007 2/9/2007 2/12/2007 2/18/2007 2/25/2007 3/5/2007 3/12/2007 1 Newadhiya drain 2 Ismailpur drain 3 Raipur-I drain 4 Raipur-II drain 5 Barkhandipur drain 6 Hirapur drain 7 Husepur saraiya drain 8 Mai drain 9 Tikawar drain Package-B-11-2 10 Udhanpur drain 42 11 Rajapur drain 12 Nurpur mamapur drain 13 sanichara drain 14 Bhati drain 15 Hajjipatti -II drain Procurement0Pl1nexure12102010312007.xls Page 9 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 Hajjipatti -I drain 17 Devalpur-I drain 18 Devalpur-II drain 19 Sinduri drain Total 34.00 NCB/Post-Rev. 12/22/2006 2/9/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Baulaha drain 2 Sawangi-II drain 3 Sawangi-I drain 4 Kasturipur drain 5 Saraiya Mohan drain Package-B-11-3 6 Pure Kumarshah drain 43 7 Amaimafi -II drain 8 Amaimafi -I drain 9 Ghuraha-I drain 10 Ghuraha-II drain 11 Tikri-II drain Total 55.57 NCB/Post-Rev. 12/4/2006 1/18/2007 1/25/2007 2/3/2007 - - 2/10/2007 2/25/2007 3/3/2007 1 Tikari-I drain 2 Purabgaun-I drain 3 Dalshampur drain 4 Paschim dwara drain 5 Sarwawan-I drain 6 Sarwawan-II drain Package-B-11-4 6 Manderika drain 44 7 Semra-I drain 8 Semra-II drain 9 Korai Heer shah-I drain 10 Korai Heer shah-II drain 11 Korarilachanshah drain 12 Raibhanatal drain Total 39.00 NCB/Post-Rev. 12/4/2006 1/18/2007 1/25/2007 2/3/2007 - - 2/10/2007 2/25/2007 3/3/2007 1 Soraon drain 2 Jalama drain 3 Kesavpur drain 4 Paniyar drain 5 Newadakshungarh-I drain 6 Newadakshungarh-II drain 7 Hardoiya drain 8 Chandoki drain 9 Ulra-I drain 10 Ajayawardevi drain-II 11 Bhusiyari drain 12 Kisundaspur drain 13 Ulra-II drain Package-B-11-5 14 Nandaura drain 45 15 Basera drain 16 Basera-I drain Procurement0Pl1nexure12102010312007.xls Page 10 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 17 Basera paschim drain 18 Khodiya drain 19 Rudauli drain 20 Ramayapur drain 21 Kapurchandpur-I drain 22 Kapurchandpur-II drain 22 Bhikhipur drain 23 Pindra drain 24 Tarsara drain 25 Ajayawardevi drain-I 26 Unchgaon drain-II 27 Mayas drain 28 Surpur Kashipur drain Total 23.00 NCB/Post-Rev. 12/4/2006 1/18/2007 1/25/2007 2/3/2007 - - 2/10/2007 2/25/2007 3/3/2007 Direct outfalling ( in Sai 46 Package-B-13 1 59.08 NCB/Post-Rev. 1/23/2007 3/7/2007 3/17/2007 3/20/2007 - - 3/25/2007 4/5/2007 4/12/2007 River) C1 Canal- Ruchaura, Jais, Ateha Dy System 47 1700.00 ICB/Pre-Rev. 1/6/2007 2/20/2007 2/27/2007 3/3/2007 3/5/2007 3/15/2007 3/20/2007 3/25/2007 3/31/2007 including minors C2 Canal- Amethi, Bherawpur, Aurangabad, Chilbila Dy System including minors 2000.00 ICB/Pre-Rev. 12/4/2006 2/1/2007 2/8/2007 2/15/2007 2/17/2007 2/27/2007 3/2/2007 3/12/2007 3/20/2007 48 Revised ICB/Pre-Rev. 2/9/2007 3/3/2007 3/12/2007 3/15/2007 3/20/2007 3/30/2007 4/4/2007 4/10/2007 4/17/2007 1 Kachnawa Drain 2 Azmatpur Drain 3 Garikpur Drain Package-C-1-1 49 4 Bikna Drain 5 Trilokpur Drain 6 Karampur Drain Total 47.50 NCB/Post-Rev. 12/23/2006 2/9/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 50 Package-C-2-1 1 Lahana Drain 74.10 NCB/Post-Rev. 1/24/2007 3/7/2007 3/17/2007 3/20/2007 - - 3/27/2007 4/5/2007 4/12/2007 51 Package-C-3-1 1 1. Chamraura Nala Drain 917.00 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 1 Lohangipur Drain 2 Biharganj Drain 3 Biharganj Cut Drain 4 Chaura Drain 5 Banduwa (Kuwan) Drain 6 Narharpur Drain Package-C-3-2 7 Narharpur I Drain 52 8 Pure Chandhi Drain 9 Shivpur Drain 10 Dube Patti Drain 11 Kandharpur Drain 12 Kandharpur Cut Drain 13 Para Drain Procurement0Pl1nexure12102010312007.xls Page 11 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Total 43.43 NCB/Post-Rev. 12/25/2006 2/9/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Jogipur Drain 2 Thaurara Drain 3 Banmala Drain 4 Banamala -I Drain Package-C-4-1 5 Banamala -II Drain 53 Drain Thenga 6 Arjunpur Drain 7 Kamaludinpur Drain Upadahay Ka Purva 8 Drain 9 Sangrampur Drain Total 149.00 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 1 Thenga Drain 2 Chikulahi Drain 3 Tiwari Ka Purva Drain Package-C-4-2 4 Gaudaha / Gaderi Drain 54 5 Narayanpur Drain 6 Umapur Drain 7 Mishrauli Drain Total 705.00 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 1 Samdha tal Drain 2 Jagipatti Drain 3 Amethi Drain 4 Bahorapur Drain 5 Parsauli Drain Package-C-4-3 55 6 Vita Drain 7 Nuwawan Drain 8 Raipur Phulwari Drain 9 Kaithi Drain 10 Kharha Drain Total 86.00 NCB/Post-Rev. 12/25/2006 2/9/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1. Padaipur Drain 2. Dhanwantara Drain 3. Dhanwantara-I Drain 4. Suvagmati Drain Package-C-5-1 5. Ramgarh Drain 56 Drain Masion 6. Nareni Drain 7. Katahri Drain 8. Sunderpur Drain 9. Mochiha Drain Total 36.87 NCB/Post-Rev. 1/25/2007 3/9/2007 3/18/2007 3/21/2007 - - 3/28/2007 4/6/2007 4/13/2007 1. Maharajpur Drain 2. Sarai Heeramati Drain 3. Tala-1 Drain 4.Tala-2 Drain 5.Tala-3 Drain Package-C-5-2 6. Kajuri Tal Drain 57 7. Tikaria Drain Procurement0Pl1nexure12102010312007.xls Page 12 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 8. Agrawan Drain 9. Varanatikar Drain 10.Sarai Hridayashah Drain 11. Kariman Drain Total 25.00 NCB/Post-Rev. 1/25/2007 3/9/2007 3/18/2007 3/21/2007 - - 3/28/2007 4/6/2007 4/13/2007 1. Kazipatti Drain 2. Nawariya Drain 3. Dighuwa Drain 4. Murdak Ka Purwa Drain 5. Oripur Drain Package-C-5-3 58 6. Narauli Drain 7. Pure shov das Drain 8. Karumva Drain 9. Jaisan ka purwa Drain 10. Harkaranpur Drain Total 6.00 NCB/Post-Rev. 1/25/2007 3/9/2007 3/18/2007 3/21/2007 - - 3/28/2007 4/6/2007 4/13/2007 1 1. Masion Drain 1 1. Hardo Drain 2 2. Aindhi Drain 3 3. Pure Ausan Singh Drain 4 4. Aindhi-1 Drain 5 5. Hardo-1 Drain 6 6. Mawai Drain 7 7. Mawai Cut Drain 8. Barasasingh ka Purwa 8 Package-C-5-4 Drain 59 9 9. Baroliya-2 Drain 10 10. Mankara Tal Drain 11 11. Baroliya-3 Drain 12 12. Goriya Bad-1 Drain 13 13. Godiya Dandha Drain 14 14. Dandha Cut Drain 15 15. Boroliya Cut Drain 16 16. Boroliya Drain 17 17. Boroliya-1 Drain Total 12.00 NCB/Post-Rev. 1/25/2007 3/9/2007 3/18/2007 3/21/2007 - - 3/28/2007 4/6/2007 4/13/2007 1. Gisanka Tal-1 Drain 2. Gisanka Tal Drain 3. Taliya Tal-1 Drain 4. Taliya Tal Drain 5. Paikatal Drain 6. Goriya Bad Drain 7. Goriya Bad Cut Drain 8. Kundha Tal Drain Procurement0Pl1nexure12102010312007.xls Page 13 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 9. Kahaidha Drain Package-C-5-5 60 10. Majahan Drain 11. Majahan tal-1 Drain 12. Majahan tal-2 Drain 13. Majahan tal-3 Drain 14. Pure chati Drain 15. Dorka Drain 16. Ahurigarh Drain 17. Navanipur Drain 18. Sarkurikibagiya Drain Total 38.00 NCB/Post-Rev. 1/25/2007 3/9/2007 3/18/2007 3/21/2007 - - 3/28/2007 4/6/2007 4/13/2007 1 1. Khaji kala Drain 2 2.Biramau Drain 3 3. Sri Nathpur Drain 4 4. Tala Drain 5 5. Isurapur Drain 6 6. Benipur Drain 7 7. Benipur - II Drain Procurement0Pl1nexure12102010312007.xls Page 14 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package-C-6-2 8 8. Ishanpur Drain 61 9 9. Ishanpur - I Drain 10 10. Jagipur Drain 11 10. Jagipur - I Drain 12 12. Bhathli Drain 13 13. Mubarakpur Drain 14 14. Ojhala Drain 15 15. Mandeh Drain Total 56.93 NCB/Post-Rev. 1/24/2007 3/7/2007 3/17/2007 3/20/2007 - - 3/27/2007 4/5/2007 4/12/2007 1 1. Jagrapur -II Drain 2 2Jagrapur- II Drain 3 3. Majhauri Drain 4 4. Shirpur Drain 5 5.Majhauri- I Drain 6 6. Neara Kanjas Drain 7 7. Pargaspur Drain 8 8.Sarai Jamuanr Drain Package-C-6-3 62 9 9.GangehtiI Drain 10 10. Koni Drain 11 10. Sabhpur Kanjas Drain 12 12. Dharampur Drain 13. Salihpur Kanjas 13 Escape Drain 14 14. USKA Drain Total 8.92 NCB/Post-Rev. 1/6/2007 2/15/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Dulahipur Bhagipur Drain 2 Bawapur Drain 3 Dharauli Drain 4 Dharauli I Drain 5 Lauli Kham Drain Package-C-7-1 6 Agresar Drain 63 7 Dharauli II Drain 8 Madhupur Drain 9 Raghurampur Drain 10 Parsupur I Drain 11 Attarsand Drain 12 Daudpatti Drain 13 Raipur Drain Total 56.90 NCB/Post-Rev. 12/25/2006 2/9/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Haswa Tal Drain 2 Farsi Drain 3 Baghani Drain 4 Talara Drain 5 Talara Cut Drain Procurement0Pl1nexure12102010312007.xls Page 15 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 6 Punda Drain Package-C-8-1 7 Benipur Drain 64 8 Sikanderpur Drain 9 Sikanderpur Cut Drain 10 Rajapur Jamuria Drain 11 Maugarbi Drain 12 Achali Drain 13 Deeparmau Drain 14 Majhgaon Drain Total 17.58 NCB/Post-Rev. 1/16/2007 2/28/2007 3/3/2007 3/5/2007 - - 3/10/2007 3/15/2007 3/22/2007 1 Resi Escape Drain 2 barethi Drain 3 Sukhi Drain 4 Sukhi-I Drain 5 Kasma Tal Drain 6 Rampur Drain 7 Kalyanpur Drain 8 bakaispur Drain Package-C-9-2 9 HargaonDrain 65 10 Balbhadrapur Drain 11 Bhawanigarh Drain 12 Bhawanigarh-1 Drain 13 Umradih Drain 14 Khaitana Ka Purwa Drain 15 Garhi lal Shah Pur Drain 16 Toderpur Drain Total 75.66 NCB/Post-Rev. 1/24/2007 3/7/2007 3/17/2007 3/20/2007 - - 3/27/2007 4/5/2007 4/12/2007 1 Mendula Drain 2 Chaluli Drain 3 Chaluli Cut Drain 4 Tiloi Drain 5 Deokhara Drain 6 Bhawani Nagar Drain 7 Bhadmar Drain 8 Ram nagar Drain 9 Pure Gaura Drain 10 Ausan Ka Purwa Drain Dev Nagar Mohammadpur Package-C-10-2 11 66 Drain 12 Baldash Pur Drain 13 Kamai Drain 14 Babu Ka Purwa Drain 15 RajaPur Haleem Cut Drain 16 RajaPur Haleem Drain 17 Ratwaliya Majhar Drain 18 Semarauta Drain 19 Tiwaripur Drain Procurement0Pl1nexure12102010312007.xls Page 16 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 20 Tiwaripur Cut Drain Total 20.59 NCB/Post-Rev. 1/16/2007 2/28/2007 3/3/2007 3/5/2007 - - 3/10/2007 3/15/2007 3/22/2007 1 Kotwa Drain 2 Barigohanna Drain 3 Barigohanna Cut Drain 4 Kundariya Drain 5 Rampur Drain 6 Kasranwan Drain Package-C-10-3 67 7 Seewan Drain 8 Kasranwan Cut Drain 9 Guwawan Drain 10 Achhai Drain 11 Narethua Tal Drain 12 Narethua Tal Cut Drain Total 1.27 NCB/Post-Rev. 1/16/2007 2/28/2007 3/3/2007 3/5/2007 - - 3/10/2007 3/15/2007 3/22/2007 68 Package-C-11-1 1 Kadu nala Drain 654.54 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 1 Ranjitpur Drain 2 Ranjitpur- I Drain 3 Kudhela Drain 4 Raujitpur Drain 5 Pandey Ka Purwa Drain 6 Dadhra Drain 7 Gautampur Drain 8 Kusumatal Drain Matha URF Bhusanda- 1 9 Drain Package-C-11-2 Matha URF Bhusanda- 2 10 69 Drain Matha URF Bhusanda- 4 11 Drain Matha URF Bhusanda- 5 12 Drain 13 Dobika Tel Drain 14 Pindara Karnai Drain 15 Umapur Drain 16 Dharmagatpur Drain 17 Goveratal Drain 18 Shiva Ka Purwa Drain Total 58.17 NCB/Post-Rev. 1/24/2007 3/7/2007 3/17/2007 3/20/2007 - - 3/27/2007 4/5/2007 4/12/2007 1 Kamalpur Drain 2 Chitoola Drain 3 Badhuwa Drain 4 Kujuran Drain 5 Gadehri Drain 6 Khanapur Drain 7 Rajapur Drain Package-C-11-3 8 Sankarkanj Drain 70 9 Bharahi Drain 10 Rajamau Drain Procurement0Pl1nexure12102010312007.xls Page 17 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 11 saraiya Drain 12 Nusratpur Drain 13 Ratwapur Drain 14 Rajamau-1 Drain 15 Tiloi Drain 16 Lodhwariya Drain Total 108.72 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 71 Package-C-12-1 1. Patti Nala Drain 82.92 NCB/Post-Rev. 1/24/2007 3/7/2007 3/17/2007 3/20/2007 - - 3/27/2007 4/5/2007 4/12/2007 1 Patti Khas Drain 2 Patti Khas Cut Drain 3 Kundanpur I Drain 4 Kundanpur I Drain 5 Raipur Drain 6 Belsandi Drain 7 Ramkola escape 8 Gadauri Drain Package-C-12-2 9 Bhadeora Drain 72 10 Daudpur Drain 11 Hosiyarpur Drain 12 Birauti Drain 13 Bani Drain 14 Basuratpur Drain 15 Korar Drain 16 Majeethi Drain 17 Itwatal Drain Total 25.03 NCB/Post-Rev. 1/6/2007 2/15/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Biga Drain 2 Behedpur Drain 3 Sarsi Kham -2 Drain 4 Sarsi Kham -2 Cut Drain 5 Deheri Drain 6 Mandeha I Drain 7 Darchhut Drain 8 Preetam Sari Drain 9 Umarpur Drain Package-C-12-3 10 Para Drain 73 11 Deheri Cut Drain 12 Jaitipur Drain 13 Sarsi Dih Link Drain 14 Sarsi Dih Drain 15 Utras Drain 16 Amsona Drain 17 Sarsi Kham I Drain 18 Kahaniya Drain 19 Ahaliya Cut Drain Total 34.19 NCB/Post-Rev. 1/6/2007 2/15/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 D1 Canal- Jaunpur, Dhauri, Bheempur Dy System 74 2817.00 ICB/Pre-Rev. 1/4/2007 2/17/2007 2/28/2007 3/5/2007 3/10/2007 3/15/2007 3/20/2007 3/31/2007 4/8/2007 including Minors Procurement0Pl1nexure12102010312007.xls Page 18 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 D2 Canal- Ramganj, Chanda, Sigramau Dy System 75 2218.00 ICB/Pre-Rev. 1/4/2007 2/17/2007 2/28/2007 3/5/2007 3/10/2007 3/15/2007 3/20/2007 3/31/2007 4/8/2007 including Minors D3 Canal- Bharauli, Shahpur, Banti, Haswanpur Dy 76 983.00 ICB/Pre-Rev. 1/4/2007 2/21/2007 2/28/2007 3/5/2007 3/10/2007 3/15/2007 3/20/2007 3/31/2007 4/8/2007 System including Minors 1 Bhada Drain 2 Chharauli Drain Package-D-1-1 3 Johana Drain Drain Kahurawa 77 4 Ahimane Drain Tal 5 Pitambarpur Drain 6 Ittri Drain Total 44.97 NCB/Post Rev. 12/25/2006 2/13/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Karahuwa Tal Drain 2 Katawa Drain 3 Amhat-I Drain 4 Dadupur Drain 5 Amhat Drain 6 Hasanpur Drain Package-D-1-2 7 Hasanpur - I Drain 78 8 Bandhau Kala Drain 9 Brainjitpur Drain 10 Shapur Sarkanda Drain 11 Narahi- I Drain 12 Narahai- II Drain 13 Karahuwa Drain Total 130.00 NCB/Pre-Rev. 1/28/2007 3/10/2007 3/16/2007 3/21/2007 3/26/2007 3/31/2007 3/26/2007 4/16/2007 4/24/2007 1 Parsipur Drain 2 Miranpur Drain 3 Ajhui Drain 4 Rankey Deeh Drain 5 Naugaon Drain 6 Naugaon-1 Drain 7 Sarkoda Drain Package-D-1-3 8 Naugaon-2 Drain 79 9 Bahlolpur Drain 10 Domanpur Drain 11 Maniyari Drain 12 Lachhu Deeh Drain 13 Masetawa Drain 14 Uttargaon Drain 15 Dhudpur Drain Total 66.33 NCB/Post Rev. 12/25/2006 2/13/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Baithi Kalan drain 2 Maharani paschim drain 3 Isepur drain 4 Semri khurd 5 Garapur drain Package-D-2-1 6 Diwalipur drain 80 Drain Pili 7 Arjunpur escape 8 Bagiyapur drain Procurement0Pl1nexure12102010312007.xls Page 19 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 9 Batheda drain 10 Saitapur drain 11 Bharhara drain Total 115.00 NCB/Pre-Rev. 1/12/2007 2/23/2007 2/28/2007 3/5/2007 3/10/2007 3/15/2007 3/20/2007 3/31/2007 4/8/2007 81 Package-D-3 1 Drain Balrampur 56.20 NCB/Post Rev. 1/9/2007 2/20/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Banpurwa Drain 2 Rai Chand Patti Drain 3 Saifabad Drain 4 Tiduhi Drain 5 Baluna Purwa-1Drain 6 Balunapurwa Drain 7 Maraini escape Package-D-3-1 82 8 Ratanpur Drain 9 Kisapurwa Drain 10 Pauli Drain 11 Jamuwavan Ratan Drain 12 Bukarpur Drain 13 Bhikapur Drain 14 Nimwanha Drain Total 59.00 NCB/Post Rev. 1/16/2007 2/26/2007 3/5/2007 3/10/2007 - - 3/15/2007 3/25/2007 4/5/2007 83 Package-D-4-1 1 Pili Nadi 349.87 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 1 Leduka dr. 2 Machri dr. 3 Machri-I dr. 4 Moradpur Kotila dr. 5 Udpur Gelhawa dr. 6 Daudpur dr. 7 Shahpur dr. 8 Chandapur dr. Package -D-4-2 84 9 Kasthuripur dr. 10 Santha dr. 11 Labdhayi dr. 12 Mallupur dr. 13 Babura dr. 14 Shadpur dr. 15 Shadpur-I dr. 16 Khusha dr. Total 56-95 NCB/Post Rev. 1/16/2007 2/26/2007 3/5/2007 3/10/2007 - - 3/15/2007 3/25/2007 4/5/2007 1 Davsara dr. 2 Kevtali dr. 3 Nabhipur dr. 4 Dharupur -II dr. Package-D-4-3 5 Dharupur -I dr. 85 6 Lakandiah dr. 7 Labeda dr. 8 Banapur dr. 9 Arola dr. Total 19.97 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 86 Package-D-5-1 1 Attarsand Drain 182.14 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 Procurement0Pl1nexure12102010312007.xls Page 20 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Amar Garh Drain 2 Virkram Drain 3 Aspur Deovsara Drain 4 Vijhala Drain 5 Dhanipur Drain 6 Bind Drain 7 Bhusahar Drain 8 Andewari Drain 9 Bhadeora Drain 10 Khargu Tal Drain 11 Khargu Tal- I Drain Package-D-5-2 12 Pandit Ka Purwa Drain 87 13 Maraha Drain 14 Amuwahi Drain 15 Pindra Drain 16 Pindra-I Drain 17 Pure Kishangiri Drain 18 Pure Kishangiri - I Drain 19 Vari Kalan Drain 20 Barhupur Drain 21 Barhupur-I Drain 22 Deokali Drain 23 Sarai Rajai Drain Total 21.89 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Tambura Nala dr. 2 Sagapur dr. 3 Chittkapur dr. 4 Ashapur dr. Package-D-6-1 88 5 Elahi dr. 6 Chilawa dr. 7 Karaundaha dr. 8 Bankot dr. Total 207.10 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 1 Madaha dr. 2 Dhadhar dr. 3 Sapaha dr. 4 Belharampur dr. Package-D-6-2 89 5 Belha dr. 6 Marimpur dr. 7 Barhupur dr. 8 Madaha Cut dr. Total 22.16 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Bahuta dr. 2 Usrauli dr. 3 Besar dr. 4 Bhopalpur dr. Package-D-6-3 5 Newada dr. 90 6 Berauti dr. 7 Sarsathpur-I dr. Procurement0Pl1nexure12102010312007.xls Page 21 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 8 Sarsathpur dr. 9 Bibipur dr. Total 30.24 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Dompur dr. 2 Mirsadpur dr 3 Muradpur dr. Package-D-7-1 4 Pattidayal dr. 91 Drain Likiya 5 Bhelwahi dr. 6 Karerepur dr. 7 Dompur -1 dr. Total 28.58 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Agraura dr. 2 Balua dr. 3 Brahmanpur dr. 4 Inamipur dr. 5 Inamipur -1 dr. 6 Umari dr. 7 Garwaspur dr. 8 Savansa dr. Package-D-7-2 92 9 Puragambhir shah dr. 10 Shid dr. 11 Gudiwan dr. 12 Kailawan dr. 13 Gaddopur dr. 14 Banbaha dr. 15 Bairma dr. 16 Bahari dr. Total 28.58 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Rajapur Ranaiya Drain 2 Gangapur Drain 3 Barai Drain 4 Kesvapur Drain 5 Bajhan Drain 6 Kolbajardih Drain Package-D-8-1 7 Battera Tal Drain DrainD/O in Sai 8 Newada kalan Drain 93 River 9 Sangrampur Kalan Drain 10 Shipur -I Drain 11 Ishipur Drain 12 Chilbila Drain 13 Mahuli Drain 14 Sarai Ganai Drain 15 Pipri Khalasa Drain Total 102.20 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 1 Prem Drain 2 Maruvan Drain 3 Sinjthi Khalsa Drain 4 Kharagpur Drain 5 Rasoiya Drain Procurement0Pl1nexure12102010312007.xls Page 22 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 6 Banbirpur Drain 7 Besar Drain 8 Kotwa Drain 9 Sarai Padri Drain 10 Rajapur Drain Package-D-8-2 11 Dalpur Sari-I Drain 94 12 Ramnath Hatiya Drain 13 Muhkucha Drain 14 Rasikapur Drain 15 Karva Drain 16 Neveda Drain 17 Mansi Tal Drain 18 Manjithi Drain 19 Kalyanpur Drain 20 Bariyarepur-I Drain 21 Bariyarepur-II Drain Total 11.13 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Attra Pipri Drain 2 Margupur Drain 3 Attra Pipri- I Drain 4 Attra Pipri-2 Drain 5 Bhosila Drain 6 Gairkala Drain Package-D-8-3 7 Gairkala Drain-I 95 8 Haderpur Drain 9 Alhadiya Drain 10 Murthika Drain 11 Tarsada Drain 12 Utaru Kalan Drain 13 Kunsapur Drain Total 17.53 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 1.Wirbhanpur dr. 2 2.Wirbhanpur-I dr. 3 3.Belchha dr. 4 4.Badauli ahiran dr. 5 5.Zanewra dr. 6 6.Suruvor Patti dr. 7 7.Ahirauli dr. 8 8.Chakrajepur Package-D-8-4 9 9.Jamalpur dr. 96 10 10.Kuwarda dr. 11 11.Saidpur dr. 12 12.Devkali dr. 13 13.Pure chaiti dr. 14 14.Dorka dr. 15 15.Ahurigarh dr. 16 16.Navanipur dr. 17 17.Sarkurikivagiya dr. Total 29.51 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 Procurement0Pl1nexure12102010312007.xls Page 23 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Gulam Haider dr. 2 Pipri dr. 3 Aurangbad dr. 4 Puresidhi dr. 5 Gulam Haider-I dr. 6 Gulam Haider-II dr. 7 Kotya dr. Package-D-9-1 8 Bela Paschim dr. 97 Drain Gomti 9 Bela Paschim-I dr. 10 Bela Paschim-II dr. 11 Bela Paschim-III dr. 12 Domapur-Idr. 13 Gopalpur dr. 14 Belamohan dr. 15 Madhapur dr. 16 Sarai Achal dr. Total 25.74 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Satanpur dr. 2 Bhadhaiya dr. 3 Gautampur dr. 4 Lodipur dr. 5 Gaura dr. Package-D-9-2 6 Sarai Gopal dr. 98 7 Sultanpur dr. 8 Naugarahi dr. 9 Haridaspatti dr. 10 .Baluva dr. 11 Barbaspur dr. Total 42.82 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Newapeda dr. 2 Dhakulganj dr. 3 Goryapur dr. 4 Saderi dr. 5 Madai dr. 6 Shambuganj dr. 7 Majharauli dr. Package-D-9-3 99 8 Bibipur dr. 9 Sarai Raichand dr. 10 Harkaripur dr. 11 Harinathpatti dr. 12 Aliganj dr. 13 Sihipur dr. 14 Ahmedpur dr. Total 33.86 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Rajepur dr. 2 Kudwa dr. 3 Chakbeda dr. 4 Mahrupur dr. 5 Mukhtarpur dr. Procurement0Pl1nexure12102010312007.xls Page 24 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package-D-9-4 6 Nawabad dr. 100 7 Jagdishpur dr. 8 Tiwaripur dr. 9 Barapur dr. 10 Chapar dr. 11 Banbhokar dr. Total 6.16 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 1 Tajanpur dr. 2 Madanpur Paniyar dr. 3 Holpur dr. 4 Maksudhanpur dr. 5 Malhipur dr. 6 Mampur dr. Package-D-9-5 101 7 Narendrapur dr. 8 Naugawan dr. 9 Nurampatti dr. 10 Sarai Jujhar dr. 11 Gopinathpur dr. 12 Juras dr. Total 4.02 NCB/Post Rev. 12/23/2006 2/10/2007 2/27/2007 3/5/2007 - - 3/12/2007 3/22/2007 3/30/2007 102 Package-D-10-1 1 Kubna dr. 3.11 NCB/Post Rev. 1/16/2007 2/28/2007 3/5/2007 3/10/2007 - - 3/15/2007 3/25/2007 4/4/2007 1 Dela dr. 2 Prem ka purwa dr. 3 Narayan ka purwa dr. 4 Narayan ka purwa cut dr. 5 Tekari dr. 6 Tekari cut dr. 7 Roop ka purwa dr. 8 Tekari dandu dr. 9 Rokha dr. 10 Tekari sahan dr. Package-D-10-2 103 11 Betaura dr. 12 Betaura escape 13 Betaura cut dr. 14 Itaha dr. 15 Kulahi dr. 16 Rewari saeedpur dr. 17 Sembsi dr. 18 Kotwar mau dr. 19 Kotwar mau cut dr. 20 Lalai ka purwa dr. 21 Hawai adda dr. Total 66.49 NCB/PO-Rev. 1/16/2007 2/28/2007 3/5/2007 3/10/2007 - - 3/15/2007 3/25/2007 4/4/2007 1 Hariyawan dr. 2 Sandi dr. 3 Sidhauna dr. 4 Bairampur dr. 5 Amawan dr. Procurement0Pl1nexure12102010312007.xls Page 25 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 6 Pathri dr. 7 Makhdoompur dr. Package-D-10-3 8 Asharfabad dr. 104 9 Paharemau dr. 10 Bahawa dr. 11 Kasmaura dr. 12 Moun dr. 13 Kodariya dr. 14 Muraini dr. 15 Kerawa dr. Total 24.47 NCB/Post Rev. 1/16/2007 2/28/2007 3/5/2007 3/10/2007 - - 3/15/2007 3/25/2007 4/4/2007 105 Package D-10-4 1 .Maharajganj drain 818.00 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 1 Shivgarh dr. Package-D-11-1 106 2 Firozabad dr. Total 118.00 NCB/Pre-Rev. 2/9/2007 3/10/2007 3/15/2007 3/20/2007 3/25/2007 4/5/2007 4/12/2007 4/20/2007 4/27/2007 1 Basanthpur dr. 2 Sallour dr. 3 Jamuwaran dr. 4 Jamuni dr. 5 Rewan dr. 6 Chilola dr. 7 Bhiki kheda dr. 8 Sahawar dr. 9 Bahuta dr. Package-D-11-2 10 Bastiganj dr. 107 11 Dayalganj dr. 12 Taranjan dr. 13 Korina dr. 14 Bainte dr. 15 Bante-1 dr. 16 Surajpur dr. 17 Surajpur -1 dr. 18 Dehli -1 dr. 19 Dehli dr. Total 13.00 NCB/Post Rev. 1/16/2007 2/28/2007 3/5/2007 3/10/2007 - - 3/15/2007 3/25/2007 4/4/2007 1 Narayanpur dr. 2 Khandipur dr. 3 khandipur -1 dr. 4 Bidaura dr. 5 Khaira Kanu dr. 6 Hasanpur dr. 7 Dahila dr. Package-D-12-2 8 Shivnam dr. 108 9 Kaboolpur dr. 10 Kaboolpur-1 dr. Procurement0Pl1nexure12102010312007.xls Page 26 of 56 Estimated Procurement Approval Date of Sl. Date of Bid Date of Bid Bid Submissio Clearance Letter of Date of Package Package Description Cost in Lac Method/ Review by Agreemen No. invitation opening Evaluation n to WB from WB intent Start Rs. Method Committee t 1 2 3 4 5 6 7 8 9 10 11 12 13 14 11 Kaboolpur cut dr. 12 .Jagan nathpur dr. 13 Fatehpur Jamurawan dr. 14 Khaira Birur dr. 15 Shambha dr. Total 13.00 NCB/PO-Rev. 1/16/2007 2/28/2007 3/5/2007 3/10/2007 - - 3/15/2007 3/25/2007 4/4/2007 1 Tilokpur dr. 2 Lakshamangarh dr. 3 Nawal khera dr. 4 .Hasanpur -1 dr. Package-D-13-1 109 5 Kolhanda Link dr. 6 Saidullapur dr. g 7 Shahpur dr. 8 Manadharpur dr. Total 13.78 NCB/Post Rev. 1/16/2007 2/28/2007 3/5/2007 3/10/2007 - - 3/15/2007 3/25/2007 4/4/2007 1 .Bahrauli dr. 2 Bahrauli-1 dr. 3 Ghorsara dr. 4 Mitauli dr. Package-D-13-2 110 5 Mitauli Adampur dr. 6 Mitauli Adampur-1 dr. 7 Kanjauva dr. 8 Hardoiya dr Total 49.00 NCB/Post Rev. 1/16/2007 2/28/2007 3/5/2007 3/10/2007 - - 3/15/2007 3/25/2007 4/4/2007 111 Development of Wetlands-Ist Package 250.00 112 Development of Wetlands- IInd Package 150.00 NCB/Post Rev. 113 Development of Wetlands- IIIrd Package 150.00 114 Rain Water Harvesting- Ist Package 150.00 NCB/Post Rev. 115 Rain Water Harvesting- IInd Package 150.00 116 A2 Silt Trap 400.00 ICB/Pre-Rev. Grand Total 32197.24 Procurement0Pl1nexure12102010312007.xls Page 27 of 56 Due Date of Remarks Completio n 15 The work will not be completed in the due time. The balance works shall be 3/12/2007 devided in to another 3 packages and shall be procured as per rules The Evaluation Committee in its meeting dated 22-01-2007 decided to reject the bid as it was higher by 40% than the Engineer's estimate. 6 Packages as per distributery as Mile Stone are 4/14/2009 4/14/2009 10/9/2008 Procurement0Pl1nexure12102010312007.xls Page 28 of 56 Due Date of Remarks Completio n 15 10/9/2008 6/19/2008 6/19/2008 6/19/2008 6/29/2008 Procurement0Pl1nexure12102010312007.xls Page 29 of 56 Due Date of Remarks Completio n 15 6/29/2008 6/19/2008 6/29/2008 6/19/2008 6/19/2008 Procurement0Pl1nexure12102010312007.xls Page 30 of 56 Due Date of Remarks Completio n 15 6/19/2008 6/19/2008 6/19/2008 6/19/2008 6/19/2008 6/19/2008 Procurement0Pl1nexure12102010312007.xls Page 31 of 56 Due Date of Remarks Completio n 15 6/19/2008 6/19/2008 6/29/2008 6/29/2008 Procurement0Pl1nexure12102010312007.xls Page 32 of 56 Due Date of Remarks Completio n 15 6/29/2008 6/29/2008 6/9/2008 6/29/2008 6/29/2008 Procurement0Pl1nexure12102010312007.xls Page 33 of 56 Due Date of Remarks Completio n 15 6/29/2008 6/29/2008 6/29/2008 6/29/2008 Procurement0Pl1nexure12102010312007.xls Page 34 of 56 Due Date of Remarks Completio n 15 6/29/2008 6/29/2008 6/29/2008 6/29/2008 9/11/2008 Procurement0Pl1nexure12102010312007.xls Page 35 of 56 Due Date of Remarks Completio n 15 6/29/2008 6/2/2008 6/2/2008 Procurement0Pl1nexure12102010312007.xls Page 36 of 56 Due Date of Remarks Completio n 15 6/2/2008 10/11/2008 9/30/2008 7 Bidders 9/19/2008 purchased the document but no bid was received on the 10/16/2008 date of opening. 6/29/2008 10/11/2008 10/26/2008 Procurement0Pl1nexure12102010312007.xls Page 37 of 56 Due Date of Remarks Completio n 15 6/29/2008 10/26/2008 10/26/2008 6/29/2008 10/12/2008 Procurement0Pl1nexure12102010312007.xls Page 38 of 56 Due Date of Remarks Completio n 15 10/12/2008 10/12/2008 10/12/2008 Procurement0Pl1nexure12102010312007.xls Page 39 of 56 Due Date of Remarks Completio n 15 10/12/2008 Procurement0Pl1nexure12102010312007.xls Page 40 of 56 Due Date of Remarks Completio n 15 10/11/2008 6/29/2008 6/29/2008 Procurement0Pl1nexure12102010312007.xls Page 41 of 56 Due Date of Remarks Completio n 15 9/21/2008 10/11/2008 Procurement0Pl1nexure12102010312007.xls Page 42 of 56 Due Date of Remarks Completio n 15 9/21/2008 9/21/2008 10/26/2008 10/11/2008 Procurement0Pl1nexure12102010312007.xls Page 43 of 56 Due Date of Remarks Completio n 15 10/26/2008 10/11/2008 6/29/2008 6/29/2008 10/7/2008 Procurement0Pl1nexure12102010312007.xls Page 44 of 56 Due Date of Remarks Completio n 15 10/7/2008 10/7/2008 6/29/2008 10/23/2008 6/29/2008 Procurement0Pl1nexure12102010312007.xls Page 45 of 56 Due Date of Remarks Completio n 15 10/7/2008 6/29/2008 10/4/2008 10/26/2008 10/4/2008 6/29/2008 10/26/2008 Procurement0Pl1nexure12102010312007.xls Page 46 of 56 Due Date of Remarks Completio n 15 6/29/2008 10/26/2008 6/29/2008 Procurement0Pl1nexure12102010312007.xls Page 47 of 56 Due Date of Remarks Completio n 15 6/29/2008 6/29/2008 6/29/2008 10/26/2008 Procurement0Pl1nexure12102010312007.xls Page 48 of 56 Due Date of Remarks Completio n 15 6/29/2008 6/29/2008 6/29/2008 Procurement0Pl1nexure12102010312007.xls Page 49 of 56 Due Date of Remarks Completio n 15 6/29/2008 6/29/2008 6/29/2008 Procurement0Pl1nexure12102010312007.xls Page 50 of 56 Due Date of Remarks Completio n 15 6/29/2008 6/29/2008 10/3/2008 10/3/2008 Procurement0Pl1nexure12102010312007.xls Page 51 of 56 Due Date of Remarks Completio n 15 10/3/2008 10/26/2008 10/26/2008 10/3/2008 Procurement0Pl1nexure12102010312007.xls Page 52 of 56 Due Date of Remarks Completio n 15 10/3/2008 10/3/2008 10/3/2008 Procurement0Pl1nexure12102010312007.xls U.P. Water Sector Restructuring Project Details of Bids received in various packages Annexure- 1 No of Estimated cost No of Bids Status of Bid Sl.No Package Document Responsi-veness Agreement of Bid (in Lacs) received % higher or Lower sold 1 2 3 4 5 6 7 8 1 B- Canal 4970 6 3 Responsive 40% Higher Rejected 2 B-10-1 6.34 4 2 Responsive Within estimate Acceptance issued 3 B-10-2 13.08 3 2 Responsive Within estimate Acceptance issued 4 B-10-3 3.12 6 2 Responsive Within estimate Acceptance issued Evaluation under 5 B-1-1 64.15 SE rbl process 6 B-11-1 390.00 6 1 Responsive 0.1% Higher Acceptance issued Recommended for Re- 7 B-11-2 33.45 4 1 Responsive 30% Higher tender 8 B-11-3 34.76 3 3 Responsive 8.20% 9 B-11-4 39.80 3 3 Responsive 2.6% Lower Acceptance issued 10 B-11-5 20.70 5 5 Responsive 14.62 Lower Acceptance issued Evaluation under 11 B-1-2 44.39 SE rbl process Evaluation under 12 B-13 59.08 SE rbl process 13 B-1-3 28.015 2 2 Responsive 4.07 Higher 14 B-1-4 13.793 4 1 Responsive 0.16 Higher 15 B-1-5 7.672 2 1 Responsive 0.65 Lower Evaluation under 16 B-2-1 6.44 5 3 SSK-41 process Evaluation under 17 B-2-2 9.00 8 2 SSK-41 process 18 B-3-1 & B-3-2 24.747 4 2 Responsive 0.53 Lower 19 B-4-2 11.910 1 1 Responsive 3.39 Higher 20 B-4-3 11.574 3 2 Responsive 0.30 Higher 21 B-4-4 5.426 2 1 Responsive 1.33 Higher 22 B-5-1 39.186 5 4 Responsive 22.21 Lower 23 B-5-2 6.070 1 1 Responsive 26.80 Lower 24 B-5-3 23.545 1 1 Responsive 0.33 Lower 25 B-6-1 27.586 6 4 Responsive 28.44 Lower 26 B-6-2 8.036 5 4 Responsive 3.22 Higher 27 B-6-3 8.203 3 2 Responsive 0.09 Lower 28 B-6-4 9.018 3 2 Responsive 2.33 Lower Evaluation under 29 B-7-1 22.00 4 1 SSK-41 process Evaluation under 30 B-7-2 15.20 7 3 SSK-41 process Evaluation under 31 B-7-3 36.00 8 4 SSK-41 process Evaluation under 32 B-7-4 26.30 5 2 SSK-41 process Evaluation under 33 B-8-2 3.60 4 1 SSK-41 process Evaluation under 34 B-8-3 25.00 5 1 SSK-41 process 35 B-9-1 9.50 3 1 Responsive Within estimate Acceptance issued 36 B-9-2 9.86 5 2 Responsive Within estimate Acceptance issued 37 B-9-3 10.07 7 2 Responsive Within estimate Acceptance issued 38 B-9-4 12.67 2 2 Responsive Within estimate Acceptance issued 39 B-9-5 6.29 6 2 Responsive Within estimate Acceptance issued 40 C-1 Canal 1700.00 4 Nil - - - 41 C-10-2 16.65 4 4 Responsive 10.99 Lower 42 C-10-3 2.32 2 2 Responsive 1.29 Lower 43 C-1-1 44.80 3 2 Non-Responsive 4.15% Lower To be opened on 44 C-11-1 654.54 se sltp 26-03-07 Evaluation under 45 C-11-2 58.17 SE rbl process To be opened on 46 C-11-3 108.72 se sltp 26-03-07 Evaluation under 47 C-12-1 82.92 SE rbl process 48 C-12-2 25.03 6 2 Responsive 11.3% Higher 49 C-12-3 34.19 7 2 Responsive 15.1% Higher 50 C-2 Canal 2000.00 7 Nil - - - Evaluation under 51 C-2-1 74.10 SE rbl process To be opened on 52 C-3-1 917.71 se sltp 21-03-07 53 C-3-2 35.15 8 1 Responsive 4.51% Lower To be opened on 54 C-4-1 149.00 se sltp 21-03-07 To be opened on 55 C-4-2 705.00 se sltp 21-03-07 56 C-4-3 41.18 5 2 Responsive 30% Higher Evaluation under 57 C-5-1 36.87 3 1 SE rbl process Evaluation under 58 C-5-2 25.00 2 2 SE rbl process Evaluation under 59 C-5-3 6.00 1 1 SE rbl process Evaluation under 60 C-5-4 12.00 4 1 SE rbl process Evaluation under 61 C-5-5 38.00 2 1 SE rbl process 62 C-6-2 18.56 7 5 Responsive Within estimate 63 C-6-3 8.92 7 2 Responsive Within estimate Acceptance issued 64 C-7-1 56.87 5 2 Responsive Within estimate 65 C-8-1 16.69 7 2 Responsive 8.87 Lower Evaluation under 66 C-9-2 75.66 SE rbl process 67 D-1 Canal 2817.00 7 Nil - - - 68 D-10-1 2.89 2 2 Responsive 1.38 Lower Evaluation under 69 D-10-2 66.49 SE rbl process 70 D-10-3 23.97 3 2 Responsive 0.33 Lower To be opened on 71 D-10-4 818.00 SE rbl 29-03-07 72 D-1-1 44.56 9 2 Responsive Within estimate To be opened on 73 D-11-1 118.00 SE rbl 26-03-07 74 D-11-2 12.55 7 5 Responsive 24.22 Lower To be opened on 75 D-1-2 130.00 se sltp 21-03-07 76 D-12-2 12.55 3 3 Responsive 13.86 Lower 77 D-1-3 66.90 4 1 Responsive 3.8% higher 78 D-13-1 12.43 4 2 Responsive 20.11 Lower Evaluation under 79 D-13-2 49.00 SE rbl process committee decided to 80 D-2 Canal 2218.00 8 1 Responsive 3.4% Higher reject the tender on 15- 03-07 To be opened on 81 D-2-1 110.07 21.03.07 21-03-07 Evaluation under 82 D-2-2 124.37 21.03.07 process Evaluation under 83 D-3 56.20 SE rbl process 84 D-3 Canal 983.00 7 1 Being evaulated 20% Higher Evaluation under 85 D-3-1 59.00 SE sltp process To be opened on 86 D-4-1 349.87 SE sltp 21-03-07 Evaluation under 87 D-4-2 56-95 SE sltp process 88 D-4-3 17.09 5 1 Responsive Within estimate To be opened on 89 D-5-1 182.14 SE sltp 22-03-07 90 D-5-2 21.89 7 1 Responsive Within estimate To be opened on 91 D-6-1 207.10 SE sltp 22-03-07 92 D-6-2 18.56 7 5 Responsive Within estimate 93 D-6-3 28.03 8 7 Responsive Within estimate 94 D-7-1 6.81 6 4 Responsive Within estimate 95 D-7-2 25.80 3 2 Responsive Within estimate To be opened on 96 D-8-1 102.20 SE sltp 22-03-07 97 D-8-2 9.79 3 2 Responsive Within estimate 98 D-8-3 39.17 4 1 Responsive Within estimate 99 D-8-4 20.71 3 1 Responsive Within estimate 100 D-9-1 21.18 4 2 Responsive Within estimate 101 D-9-2 37.48 5 2 Responsive Within estimate 102 D-9-3 33.86 3 2 Responsive Within estimate 103 D-9-4 6.66 3 3 Responsive Within estimate 104 D-9-5 3.44 4 2 Responsive Within estimate Total 21896.391 354 162 U.P. Water Sector Restructuring Project Details of Bids Scheduled to be opened today on wards Annexure- 2 Sl. No. of Estimated Procurement Date of Date of Sl. Name of Procurement Package Cost in Method/ Bid Bid No. Circle Plan Lac Rs. Review Method invitation opening 1 2 3 4 5 6 7 8 1 11 WSRP, Rbl B-2-1 6.44 NCB/Post-Rev. 1/9/2007 3/13/2007 2 13 WSRP, Rbl B-2-2 9.00 NCB/Post-Rev. 1/9/2007 3/13/2007 3 26 WSRP, Rbl B-7-1 22.00 NCB/Post-Rev. 1/9/2007 3/13/2007 4 27 WSRP, Rbl B-7-2 15.20 NCB/Post-Rev. 1/9/2007 3/13/2007 5 28 WSRP, Rbl B-7-3 36.00 NCB/Post-Rev. 1/9/2007 3/13/2007 6 29 WSRP, Rbl B-7-4 26.30 NCB/Post-Rev. 1/9/2007 3/13/2007 7 31 WSRP, Rbl B-8-2 3.60 NCB/Post-Rev. 1/9/2007 3/13/2007 8 32 WSRP, Rbl B-8-3 25.00 NCB/Post-Rev. 1/9/2007 3/13/2007 9 80 WSRP, Sltp. D-2-1 115.00 NCB/Pre-Rev. 1/12/2007 3/21/2007 10 51 WSRP, Sltp. C-3-1 917.00 NCB/Pre-Rev. 2/9/2007 3/21/2007 11 53 WSRP, Sltp. C-4-1 149.00 NCB/Pre-Rev. 2/9/2007 3/21/2007 12 54 WSRP, Sltp. C-4-2 705.00 NCB/Pre-Rev. 2/9/2007 3/21/2007 13 78 WSRP, Sltp. D-1-2 130.00 NCB/Pre-Rev. 1/28/2007 3/21/2007 14 83 WSRP, Sltp. D-4-1 349.87 NCB/Pre-Rev. 2/9/2007 3/21/2007 15 43 WSRP, Sltp. B-11-3 55.57 NCB/Post-Rev. 12/4/2006 3/22/2007 16 86 WSRP, Sltp. D-5-1 182.14 NCB/Pre-Rev. 2/9/2007 3/22/2007 17 88 WSRP, Sltp. D-6-1 207.10 NCB/Pre-Rev. 2/9/2007 3/22/2007 18 93 WSRP, Sltp. D-8-1 102.20 NCB/Pre-Rev. 2/9/2007 3/22/2007 19 68 WSRP, Rbl C-11-1 654.54 NCB/Pre-Rev. 2/9/2007 3/26/2007 20 70 WSRP, Rbl C-11-3 108.72 NCB/Pre-Rev. 2/9/2007 3/26/2007 21 106 WSRP, Rbl D-11-1 118.00 NCB/Pre-Rev. 2/9/2007 3/26/2007 22 105 WSRP, Rbl D-10-4 818.00 NCB/Pre-Rev. 2/9/2007 3/29/2007

Informations clés
Type de document Procurement Plan
Date d'adoption
Pays Inde
Source Banque mondiale