41515 1. Goods, Works, and Non Consulting Services Cost estimates for all packages include contingencies. PHASE 1 Est'd Bid Pckg's O Mon SS Costs IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. $ m $ m $ m Method Pref'nce Review Date Signed Period Goods 15.62 9.72 5.90 G1 Transformers 4.05 4.05 0.00 ICB NO YES YES 8/05 12/05 1/06-3/07 Substation Equipment (including Communication, protection, CB, CVT, DS, Outgoing bay 500kV Nha G2 Be Sub) 11.57 5.67 5.90 ICB NO YES YES 8/05 12/05 1/06-8/07 Works W1 Const. and Inst. works 3.33 0.00 3.33 * * * * 8/05 12/05 2/06-4/07 54 Subtotal 18.95 9.72 9.23 * Following Gov Regulations Est'd Bid Pckg's O mon - Nha Be TL (Stage 2) Costs IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. (Nha Be-Cai Lay) $ m $ m $ m Method Pref'nce Review Date Signed Period Goods 13.84 13.84 0.00 G3 Conductors 6.24 6.24 0.00 ICB NO YES YES 8/05 12/05 1/06-8/07 G4 Insulators and Fittings 3.36 3.36 0.00 ICB NO YES YES 8/05 12/05 1/06-8/07 G5 Steel Towers 3.90 3.90 0.00 ICB NO YES YES 8/05 12/05 1/06-8/07 G6 OPGW 0.34 0.34 0.00 ICB NO YES YES 8/05 12/05 1/06-8/07 Works W2 Construction and Erections works 9.90 0.00 9.90 * * * * 8/05 12/05 2/06-4/07 Subtotal 23.73 13.84 9.90 *Following Gov Regulations 220 kV GIS Substations Est'd Bid Pckg's 220 kV GIS SS Costs IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. $ m $ m $ m Method Pref'nce Review Date Signed Period G1 Transformers 8.95 8.95 0.00 ICB NO YES YES 1/06 5/06 6/06-4/08 S&I2 Supply and installation of GIS equipments, 25.48 22.55 2.93 ICB YES YES YES 1/06 5/06 6/06-4/08 substation construction and installation of equipments under G1 and G3 G3 Medium voltage substation equipment and end use 0.75 0.75 0.00 ICB NO YES YES 1/06 5/06 6/06-4/08 transformers S&I4 Supply and installation of control, protection, 6.74 6.74 0.00 ICB YES YES YES 1/06 5/06 6/06-4/08 measurement, SCADA and communication system Total 41.92 38.99 2.93 ICB YES YES YES 1/06 5/06 6/06-4/08 55 3. Consulting Services PHASE 1 No Description of Assignment Estimated cost $ Selection Expected Proposal Start of Method Prior Review Submission Assignment 1 Engineering consulting services for the 220 kV GIS 1,100,000 QCBS Yes 05-Jul 05-Nov Substations Total 1,100,000 F. Indicative Procurement Arrangement for Phase 2 of the Project (for reference only) 1. Goods, Works, and Non Consulting Services PHASE 2 Est'd Bid Pckg's O Mon - Phu Lam TL Costs IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. (Long An-Phu Lam) $ m $ m $ m Method Pref'nce Review Date Signed Period Goods 8.05 7.39 0.66 8.05 G7 Conductors 1.83 1.83 0.00 ICB NO YES YES 3/06 12/06 1/07-3/08 G8 Insulators and Fittings 1.03 1.03 0.00 ICB NO YES YES 3/06 12/06 1/07-3/08 G9 Steel Towers 2.70 2.70 0.00 ICB NO YES YES 3/06 12/06 1/07-3/08 G10 Outgoing bay including : CB, DS, 2.33 1.67 0.66 ICB NO YES YES 3/06 12/06 1/07-3/08 Telecommunication Equipment G11 OPGW 0.16 0.16 0.00 ICB NO YES YES 3/06 12/06 1/07-3/08 Works 56 W3 Construction and Erection works 4.51 0.00 4.51 ICB YES YES YES 4/06 01/07 2/07-5/08 Subtotal 12.56 7.39 5.17 Est'd Bid Pckg's Song May SS and Connection Costs IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. $ m $ m $ m Method Pref'nce Review Date Signed Period Goods 20.49 16.69 3.81 20.49 G12 Transformers 4.48 4.48 0.00 ICB NO YES YES 5/06 10/06 11/06-5/08 Substation Equipment (including Communication, G13 protection, CB, CVT, DS) 12.42 8.61 3.81 ICB NO YES YES 5/06 10/06 11/06-5/08 G14 Conductors and OPGW 2.16 2.16 0.00 ICB NO YES YES 5/06 10/06 11/06-5/08 G15 Insulators and Fittings 1.01 1.01 0.00 ICB NO YES YES 5/06 10/06 11/06-5/08 G16 Steel Towers 0.43 0.43 0.00 ICB NO YES YES 5/06 10/06 11/06-5/08 Works W4 Construction and Installation works 5.14 4.61 0.53 ICB YES YES YES 5/06 10/06 11/06-5/08 Subtotal 25.63 21.30 4.33 Est'd Bid Pckg's Phu My-Song May T/L Costs IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. Goods $ m $ m $ m Method Pref'nce Review Date Signed Period Goods 13.96 13.35 0.61 13.96 G17 Conductors 2.27 2.27 0.00 ICB NO YES YES 5/06 10/06 11/06-5/08 G18 Insulators and Fittings 1.25 1.25 0.00 ICB NO YES YES 5/06 10/06 11/06-5/08 G19 Steel Towers 8.70 8.70 0.00 ICB NO YES YES 5/06 10/06 11/06-5/08 Outgoing bay including : CB, DS, Telecommunication G20 Equipment 1.47 0.87 0.61 ICB NO YES YES 5/06 10/06 11/06-5/08 G21 OPGW 0.26 0.26 0.00 ICB NO YES YES 5/06 10/06 11/06-5/08 Works W5 Construction and Erections works 10.02 10.02 0.00 ICB YES YES YES 5/06 10/06 11/06-5/08 57 Subtotal 23.98 23.38 0.61 Est'd Bid Pckg's Song May-Tan Dinh T/L Costs IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. $ m $ m $ m Method Pref'nce Review Date Signed Period Goods 7.36 7.36 0.00 G22 Conductors 1.51 1.51 0.00 ICB NO Yes Yes 6/06 11/06 12/06-6/08 G23 Insulators and Fittings 0.83 0.83 0.00 ICB NO Yes Yes 6/06 11/06 12/06-6/08 G24 Steel Towers 4.76 4.76 0.00 ICB NO Yes Yes 6/06 11/06 12/06-6/08 G25 OPGW 0.26 0.26 0.00 ICB NO Yes Yes 6/06 11/06 12/06-6/08 Works W6 Construction and Erections works 4.32 4.32 0.00 ICB YES Yes Yes 5/06 11/06 12/06-6/08 Subtotal 11.69 11.69 0.00 Est'd Bid Pckg's Doc Soi SS Extension Costs IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. $ m $ m $ m Method Pref'nce Review Date Signed Period Goods 5.51 4.55 0.96 5.51 G33 Transformers 3.59 3.17 0.41 ICB NO YES YES in 2008 in 2008 08-10 G34 Substation Equipment (including Communication, 1.92 1.38 0.55 ICB NO YES YES in 2008 in 2008 08-10 protection, CB, CVT, DS, Outgoing bay 500kV Nha Be Sub) Works W7 Const. and Inst. works 0.52 0.52 0.00 NCB NO NO NO in 2008 in 2008 08-10 Subtotal 6.03 5.07 0.96 *Including Contingencies Est'd Bid 58 Pckg's Quang Ninh-Soc Son T/L Costs IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. $ m $ m $ m Method Pref'nce Review Date Signed Period Goods 19.85 18.98 0.87 19.85 G35 Conductors 4.06 4.06 0.00 ICB NO YES YES in 2008 in 2008 08-10 G36 Insulators and Fittings 3.27 3.27 0.00 ICB NO YES YES in 2008 in 2008 08-10 G37 Steel Towers 8.11 8.11 0.00 ICB NO YES YES in 2008 in 2008 08-10 G38 OPGW 0.65 0.65 0.00 ICB NO YES YES in 2008 in 2008 08-10 G39 Substation Equipment (including Communication, 3.77 2.90 0.87 ICB NO YES YES In 2008 In 2008 08-10 protection, CB, CVT, DS, Outgoing bays) Works W8 Construction and Erections works 16.12 16.12 0.00 ICB YES YES YES in 2008 in 2008 08-10 Subtotal 35.97 35.10 0.87 SCADA/EMS Upgrading Component Est'd Bid Pckg's Description Costs* IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. $ m $ m $ m Method Pref'nce Review Date Signed Period S&I 2 SCADA/EMS 21.70 20.70 1.00 ICB YES YES YES 1 Qt 06 1 Qt 06 /06-/08 *Including Contingencies 110 kV Substation and Transmission line connections Est'd Bid Pckg's Description Costs* IDA C'part Proc'ment PQ Dom. Prior Issue Contract Imp. $ m $ m $ m Method Pref'nce Review Signed Period Period Goods G26 Power transformers and auxiliary transformers Oct-05 Dec-05 7 months Lot 1 Binh Chanh 110kV s/s and branch 0.28 0.28 0.00 ICB NO NO NO Lot 2 Tam Quan 110kV s/s and branch 0.28 0.28 0.00 ICB NO NO NO Lot 3 Kong Plong 110kV s/s and branch 0.28 0.28 0.00 ICB NO NO NO Total value of package 0.84 0.84 - 59 G27 Substation equipment (excluding transformers) Oct-05 Dec-05 7 months Lot 1 Binh Chanh 110kV s/s and branch 0.86 0.86 0.00 ICB NO NO NO Lot 2 Tam Quan 110kV s/s and branch 0.46 0.46 0.00 ICB NO NO NO Lot 3 Kong Plong 110kV s/s and branch 0.55 0.55 0.00 ICB NO NO NO Total value of package 1.87 1.87 - G28 Insulators and accessories Oct-05 Dec-05 7 months Lot 1 Binh Chanh 110kV s/s and branch 0.04 0.04 0.00 ICB NO NO NO Lot 2 Tam Quan 110kV s/s and branch 0.02 0.02 0.00 ICB NO NO NO Lot 3 Kong Plong 110kV s/s and branch 0.18 0.18 0.00 ICB NO NO NO Total value of package 0.24 0.24 - G29 Conductors and accessories Oct-05 Dec-05 7 months Lot 1 Binh Chanh 110kV s/s and branch 0.03 0.03 0.00 ICB NO NO NO Lot 2 Tam Quan 110kV s/s and branch 0.01 0.01 0.00 ICB NO NO NO Lot 3 Kong Plong 110kV s/s and branch 0.19 0.19 0.00 ICB NO NO NO Total value of package 4 0.23 0.23 - G30 Steel towers Oct-05 Dec-05 7 months Lot 1 Binh Chanh 110kV s/s and branch 0.05 0.05 0.00 ICB NO NO NO Lot 2 Tam Quan 110kV s/s and branch 0.05 0.05 0.00 ICB NO NO NO Lot 3 Kong Plong 110kV s/s and branch 0.38 0.38 0.00 ICB NO NO NO Total value of package 5 0.48 0.48 - G31 Optical fibre and accessories Oct-05 Dec-05 7 months Lot 1 Binh Chanh 110kV s/s and branch 0.01 0.01 0.00 ICB NO NO NO Lot 2 Tam Quan 110kV s/s and branch 0.12 0.12 0.00 ICB NO NO NO Lot 3 Kong Plong 110kV s/s and branch 0.24 0.24 0.00 ICB NO NO NO Total value of package 6 0.37 0.37 - G32 Telecommunication and SCADA equipment Oct-05 Dec-05 7 months Lot 1 Binh Chanh 110kV s/s and branch 0.08 0.08 0.00 ICB NO NO NO Lot 2 Tam Quan 110kV s/s and branch 0.08 0.08 0.00 ICB NO NO NO Lot 3 Kong Plong 110kV s/s and branch 0.05 0.05 0.00 ICB NO NO NO Total value of package 7 0.21 0.21 - NO Total for Goods 4.24 4.24 B Civil works W8 Binh Chanh 110kV s/s and branch 0.50 0.50 0.00 NCB NO NO NO Sep-05 Nov-05 12 months W9 Tam Quan 110kV s/s and branch 0.51 0.51 0.00 NCB NO NO NO Sep-05 Nov-05 12 months W10 Kong Plong 110kV s/s and branch v - Substation portion 0.25 0.25 0.00 NCB NO NO NO Sep-05 Nov-05 12 months W11 Kong Plong 110kV s/s and branch v - 110kV line portion Sep-05 Nov-05 12 months 1.81 1.81 0.00 NCB NO NO NO Total for Works 3.07 3.07 - 60 Total 7.31 7.31 - 2. Consulting Service Expected No Description of Assignment Estimated Selection Prior Proposals Start of Cost $ Method Review Submission Assignment Date 1 Engineering Consultancy Service for 500 kV system 1,650,000 1.1 500 kV Quang Ninh
Groupe de la Banque mondiale · Procurement Plan
Vietnam - Second Transmission and Distribution Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Source
Banque mondiale