Page 1 ENVIRONMENT PROTECTION ACTION PLAN FOR THE PIVOT AREA JIANGXI SHIHUTANG SHIPPING AND HYDROPOWER PIVOTAL PROJECT AT THE KAN RIVER CLIENT: NAVIGATIONAL AFFAIRS ADMINISTRATION, JIANGXI PROVINCIAL COMMUNICATIONS BUREAU EVALUATOR CCCC SECOND HARBOR CONSULTANTS CO., LTD. JIANGXI PROVINCIAL WATER RESOURCE PLANNING AND DESIGN INSTITUTE October 2007 WB Loan Application Project E1782 Vol. 3 Page 2 TABLE OF CONTENTS 1.0 GENERAL.......................................................................................................................................................1 1.1 B RIEF I NTRODUCTION TO THE P ROJECT ..........................................................................................................1 1.2 P REPARATION B ASIS .......................................................................................................................................9 1.3 EIA STANDARDS ............................................................................................................................................9 1.4 E NVIRONMENT P ROTECTION O BJECTIVES ....................................................................................................12 2.0 ENVIRONMENT MANAGEMENT...........................................................................................................17 2.1 E MVIRONMENT M ANAGEMENT O RGANS AND R ESPONSIBILITIES .................................................................17 2.2 E NVIRONMENT S UPERVISION .......................................................................................................................20 2.3 E NVIRONMENTAL P ROTECTION T RAINING ...................................................................................................25 2.4 L EGAL E FFECT OF E NVIRONMENT P ROTECTION A CTION P LAN ....................................................................27 3.0 ENVIRONMENT PROTECTION MEASURES........................................................................................30 3.1 E NVIRONMENT P ROTECTION M EASURES AT D ESIGN S TAGE .........................................................................30 3.2 E NVIRONMENT P ROTECTION M EASURES DURING C ONSTRUCTION ...............................................................30 3.3 E NVIRONMENT P ROTECTION M EASURES DURING O PERATION .....................................................................30 4.0 ENVIRONMENT MONITORING PLAN ..................................................................................................30 4.1 E NVIRONMENT M ONITORING P URPOSES ......................................................................................................30 4.2 E NVIRONMENTAL M ONITORING P LAN DURING C ONSTRUCTION ..................................................................30 4.3 E NVIRONMENTAL M ONITORING P LAN DURING O PERATION .........................................................................30 4.4 S UBMISSION OF E NVIRONMENTAL M ONITORING R EPORT ............................................................................30 5.0 ENVIRONMENT PROTECTION INVESTMENT ESTIMATE .............................................................44 5.1 P REPARATION P RINCIPLES AND B ASIS ..........................................................................................................44 5.2 I NVESTMENT I TEM C LASSIFICATION .............................................................................................................44 5.3 E NVIRONMENT P ROTECTION I NVESTMENT E STIMATE ..................................................................................45 Page 3 1 1.0 GENERAL 1.1 Brief Introduction to the Project 1.1.1 Project Class and standard The Project is is a multipurpose project, which takes shipping as the main purpose, gives consideration to power generation and flood control. The project belongs to second-class large (2) type project, with normal impounding level of 56.50m, total reservoir capacity of about 632 million m 3 , the reservoir area at normal level of 29.2km 2 backwater length of 38km 6 water turbine power generating sets, installed capacity of 117MW annual average power generating capacity of 4.8
Groupe de la Banque mondiale · Environmental Assessment
China - Jiangxi Shihutang Navigation and Hydropower Complex Project : environmental impact assessment (Vol. 3 of 5) : Environment protection action plan for the pivot area
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Environmental Assessment
Pays
Chine
Source
Banque mondiale