Page 1 icaronffffi H\03fi Funds Persentage QCBS 388.5 911.7 12.0 6.0 0 : ff 482.3 911.7 12.0 6.0 0 : ff arumlautffifl arumlautffifl \11dotaccentffl CQ arumlaut arumlaut taccentfl taccentfl fi\11fiffi IC 388.5 880.3 12.0 6.0 0 : fi arumlaut 476.3 880.3 12.0 12.0 0 : fifl n eff nfl 11dotaccenthungarumlaut Others ronbreve aronfl efflbreve reve\11ffifl Total 382.5 848.1 12.0 12.0 0 : fiff arumlaut fi evedotaccentfi ff ngarumlauthungarumlautbreve arumlautcaron\11fiff ICB NCB National Shopping(NS) 388.5 799.9 12.0 6.0 0 : fi 429.8 799.9 12.0 12.0 0 : fifl 476.3 799.9 12.0 12.0 0 : fifi \11ffbreve nbreve\11brevebreve ccentfl 11dotaccentcaron Total 388.5 783.8 12.0 6.0 0 : fi 429.8 783.8 12.0 12.0 0 : fifl 476.3 783.8 12.0 12.0 0 : fifi \11ffbreve nbreve\11brevebreve ccentfl 11dotaccentcaron NCB Small Works(SW) Force Account(FA) Total Total eve ngarumlaut f evehungarumlautbreve\11ffbreve ahungarumlaut\11brevebreve l\1abreve fl\11flfl QCBS 388.5 688.0 12.0 6.0 0 : ff 482.3 688.0 12.0 6.0 0 : ff ccentdotaccentfl ccentdotaccentfl i\11ffcaron CQ arumlaut arumlaut taccentfl taccentfl fi\11\1afl Single Consultant Selection (IC) 388.5 656.6 12.0 6.0 0 : fi ccent arumlaut n eff nfl 11hungarumlautcaron Others ronbreve aronfl efflbreve reve\11hungarumlautffi Total 382.5 624.4 12.0 12.0 0 : fiff ccent fl eveffifi ff ngarumlautffbreve arumlautcaron\11flbreve ICB NCB National Shopping(NS) 388.5 576.2 12.0 6.0 0 : fi 429.8 576.2 12.0 12.0 0 : fifl 476.3 576.2 12.0 12.0 0 : fifi \11ffbreve nbreve\11brevebreve ccentfl 11hungarumlautbreve Total 388.5 560.1 12.0 6.0 0 : fi 429.8 560.1 12.0 12.0 0 : fifl 476.3 560.1 12.0 12.0 0 : fifi \11ffbreve nbreve\11brevebreve ccentfl 11hungarumlautbreve NCB Small Works(SW) Force Account(FA) Total Total eve taccent fi eveffbreve\11ffbreve ahungarumlaut\11brevebreve lfflbreve fl\11flfl QCBS i arumlaut fl icaronbreve\11breve arumlautflfl lcaronbreve\11brevefl fl\11dotaccentdotaccent CQ ccent 435.8 449.0 12.0 6.0 0 : ff l eveffbreve\11ff fidotaccent\11\1a adotaccentff\11fifl ngarumlaut\11fiff IC 388.5 432.9 12.0 6.0 0 : fi ron a 11ffl idotaccent\11fi flbreve\11ffifl 11ffffl Others e edotaccentdotaccent\11dotaccentfl n\11ffiffl Total fl ungarumlaut ecaron 1afidotaccent\11fi ibrevecaron\11dotaccent ecaroncaronffi\11\1afl nfl\11\1abreve ICB NCB 388.5 368.6 12.0 6.0 0 : fi 435.8 368.6 12.0 6.0 0 : ffl 482.3 368.6 12.0 6.0 0 : ffi ffl lfl efffl\11flfl e\11\1ahungarumlaut National Shopping(NS) l n taccent lbrevebreve aronff\11hungarumlaut ronfihungarumlaut\11hungarumlautfl a\11ffi\1a Total 382.5 336.4 12.0 12.0 0 : fiff ccent fl ungarumlauthungarumlautbreve ncaronff\11hungarumlaut aronbrevehungarumlaut\11hungarumlautfl ungarumlaut\11fflbreve NCB Small Works(SW) Force Account(FA) Total Total aron 1a otaccent n\1afiffi\11fi aronfifl\11breve arumlautffifflffi\11caronfl fl\11flfl QCBS 388.5 235.1 12.0 6.0 0 : fi 435.8 235.1 12.0 6.0 0 : ffi 482.3 235.1 12.0 6.0 0 : ff fl ifl fl\11flfl \11brevefi CQ 388.5 219.8 12.0 6.0 0 : fi 435.8 219.8 12.0 6.0 0 : \1a ccent 525.1 219.8 12.0 12.0 0 : fifl fl fl\11flfl 11dotaccentffl Single Consultant Selection (IC) 388.5 203.7 12.0 6.0 0 : fi arumlaut 476.3 203.7 12.0 12.0 0 : fifl 531.1 203.7 12.0 6.0 0 : ffl taccent l\11flfl 1brevefi Others 482.3 187.6 12.0 6.0 0 : fl lfl\11hungarumlautfl a\11hungarumlaut\1a Total 388.5 171.5 12.0 6.0 0 : ffi ngarumlaut fl ffl ldotaccent lfffl\11hungarumlautfl i\11dotaccentffl ICB 388.5 155.5 12.0 6.0 0 : fi 435.8 155.5 12.0 6.0 0 : fl 482.3 155.5 12.0 6.0 0 : fi nflfl nflfl\11flfl eve\11ffidotaccent NCB 388.5 139.4 12.0 6.0 0 : fi 435.8 139.4 12.0 6.0 0 : fi 482.3 139.4 12.0 6.0 0 : ffl lfl lfl fl\11flfl \11fflcaron National Shopping(NS) 388.5 123.3 12.0 6.0 0 : fi 429.8 123.3 12.0 12.0 0 : fifi l l edotaccenthungarumlaut\11fi nbrevehungarumlaut\11fifl ron\11hungarumlautfl Total 388.5 107.2 12.0 6.0 0 : ffi l eve ccent\1afl otaccenthungarumlaut\11fi ronbrevehungarumlaut\11fifl l\11breveff NCB 388.5 91.1 12.0 6.0 0 : fi 435.8 91.1 12.0 6.0 0 : fl 482.3 91.1 12.0 6.0 0 : fi eflfl 586.5 91.1 12.0 6.0 0 : fl eflfl\11flfl l\11dotaccentffl Small Works(SW) 388.5 75.1 12.0 6.0 0 : fi 435.8 75.1 12.0 6.0 0 : fi 482.3 75.1 12.0 6.0 0 : ffl fl fl eflfl\11flfl l\11dotaccentffl Consultant Service Goods Civil Works Civil Works Consultant Service Goods Civil Works Remark Collection Tables of Procurement Plan of GEF Hai Basin Project Items Procurement Method Contructs for pre- review Contructs for after- review Total Contructs Pre-review Total of pre and after review PMO of MWR PMO of SEPA Unit After-review sum of money of total contructs Thousand USD Consultant Service Goods Civil Works Consultant Service Goods including 1500 thousand for data collection station PMO of Hai Basin PMO of Zhangwei nan Canal Sub-basin i\03 ifi\03 Page 2 OH\03fi Funds Persentage Remark Collection Tables of Procurement Plan of GEF Hai Basin Project Items Procurement Method Contructs for pre- review Contructs for after- review Total Contructs Pre-review Total of pre and after review Unit After-review sum of money of total contructs Thousand USD Force Account(FA) Total 388.5 909.5 12.0 6.0 0 : ffl 435.8 909.5 12.0 6.0 0 : fi 482.3 909.5 12.0 6.0 0 : ffi arumlautflfl fl flfl\11flfl reve\11caronff Total ccent fl 476.3 893.5 12.0 12.0 0 : fffl taccentdotaccentffl ifi\1a\11fi ungarumlautflfl\11flfl fl\11flfl Civil Works fl\03 ifi\03 Page 3 OH\03fi Funds Persentage Remark Collection Tables of Procurement Plan of GEF Hai Basin Project Items Procurement Method Contructs for pre- review Contructs for after- review Total Contructs Pre-review Total of pre and after review Unit After-review sum of money of total contructs Thousand USD QCBS 388.5 926.3 12.0 6.0 0 : ffl 435.8 926.3 12.0 6.0 0 : ffl 482.3 926.3 12.0 6.0 0 : ff fiffi\11caron fdotaccent\11breve icaronffl\11fi a\11flffi CQ 429.8 911.0 12.0 12.0 0 : fifl 476.3 911.0 12.0 12.0 0 : fifl e\1affl\11ff e\1affl\11ff 11ficaron IC l l evefl evefl 1dotaccentdotaccent Others 482.3 878.8 12.0 6.0 0 : fl evefl 1dotaccentdotaccent Total 388.5 862.7 12.0 6.0 0 : ffl l 476.3 862.7 12.0 12.0 0 : ffff fiffi\11caron arumlaut\1afl\11hungarumlaut flffiff\11breve 1a\11hungarumlautffi ICB 388.5 846.7 12.0 6.0 0 : ffi 482.3 846.7 12.0 6.0 0 : ffi arondotaccentfl arondotaccentfl ron\11flfl NCB 388.5 830.6 12.0 6.0 0 : \1a 435.8 830.6 12.0 6.0 0 : ffi 476.3 830.6 12.0 12.0 0 : fifl ifflfi iffl eveffiffi ngarumlaut\11ficaron National Shopping(NS) 388.5 814.5 12.0 6.0 0 : fi 435.8 814.5 12.0 6.0 0 : ffl 482.3 814.5 12.0 6.0 0 : ffi ronhungarumlaut ccentffi\11breve ebreveffl\11breve n\11hungarumlautfi Total 382.5 798.4 12.0 12.0 0 : fifi e ron eff\1afl ungarumlautbreve\11breve e\1acaronbreve\11breve fl\11fl\1a NCB Small Works(SW) Force Account(FA) Total Total i a nfl nbrevedotaccentffi\11caron lcaroncaron\11ff ccentflflfl fl\11flfl QCBS e 435.8 702.7 12.0 6.0 0 : ffi ccent ffdotaccent ibreve\11ff caronffi\11fffl f\11hungarumlautffi CQ 388.5 687.3 12.0 6.0 0 : fi 429.8 687.3 12.0 12.0 0 : fifi l a flff\11dotaccent ffi\11dotaccentfl ccent\11ficaron IC Others ccentfifl\11flfl ngarumlaut\11ffiffi Total n 429.8 639.1 12.0 12.0 0 : fiff l caronbreve nfffl\11ffl aronfibreve\11fflfl nffl\11ffffl ICB NCB 388.5 606.9 12.0 6.0 0 : fi 435.8 606.9 12.0 6.0 0 : ffi 482.3 606.9 12.0 6.0 0 : ff fi\11ffi idotaccent\11caron hungarumlaut\11hungarumlautfl \11flffl National Shopping(NS) 388.5 590.8 12.0 6.0 0 : fi 429.8 590.8 12.0 12.0 0 : fifi l effi\11breve taccentffi\11ffl efficaron\11\1afl l\11dotaccentfi Total 388.5 574.7 12.0 6.0 0 : ffl 429.8 574.7 12.0 12.0 0 : fiff ron eveff\11dotaccent ccentflfi\11dotaccent arumlautbrevecaron\11caronfl fl\11dotaccentffi NCB 388.5 558.7 12.0 6.0 0 : fi 482.3 558.7 12.0 6.0 0 : fi aronbreve aronbreve\11flfl n\11ffiffl Small Works(SW) 388.5 542.6 12.0 6.0 0 : fi 435.8 542.6 12.0 6.0 0 : ffl 482.3 542.6 12.0 6.0 0 : ffi eve\11ffl ldotaccent reveffi\11fflfl ccent\11ffffi Force Account(FA) Total 388.5 510.4 12.0 6.0 0 : ffl 435.8 510.4 12.0 6.0 0 : ffl 482.3 510.4 12.0 6.0 0 : ff ifl\11ffl ldotaccent nfidotaccent\11fflfl \11\1abreve Total 382.5 494.3 12.0 12.0 0 : fifl l 476.3 494.3 12.0 12.0 0 : fffl ronffifl abrevefl hungarumlautfl\11flfl fl\11flfl QCBS CQ arumlaut breve eveff affi lfflfi\11breve ihungarumlautff\11brevefl effl\11flfl IC Others Total arumlaut breve eveff affi lfflfi\11breve ihungarumlautff\11brevefl effl\11flfl ICB NCB 388.5 384.7 12.0 6.0 0 : fi 482.3 384.7 12.0 6.0 0 : fi taccentfl taccentfl\11flfl 11flfl National Shopping(NS) 388.5 368.6 12.0 6.0 0 : fi ungarumlaut i ccentfl revedotaccent fidotaccent\11flfl i\11flfl Total 388.5 352.5 12.0 6.0 0 : ffl ungarumlaut fl aronfl revedotaccent efidotaccent\11flfl ngarumlaut\11flfl NCB Small Works(SW) fl otaccent\1a\11breve otaccent\1a\11brevefl ungarumlaut\11flfl Force Account(FA) Total fl otaccent\1a\11breve otaccent\1a\11brevefl ungarumlaut\11flfl Total 382.5 272.1 12.0 12.0 0 : fifi aff otaccentcaron iffi flcaron\1a 1aflfl fl QCBS ungarumlaut a ron nffiffi\1a\11fi a\1affi\11hungarumlaut ccentfififi taccentffi\11caronfflflfldotaccentffi CQ 1a a\1a iff 1aflbreve\11ff fbreve\1a\11ff eficaronffl\11dotaccent icaron\11fiflffbreve\1a\1a IC 388.5 226.7 12.0 6.0 0 : ff fl aron i\11ffl ngarumlautff\11fi efibreve\11ffi \11caronbrevedotaccent\1ahungarumlautdotaccentffi Others 388.5 210.7 12.0 6.0 0 : fl 435.8 210.7 12.0 6.0 0 : fl e fifl flfl flhungarumlauthungarumlaut\11\1a arumlautcaron\11\1afflfldotaccentfflbrevefi Total l aroncaron ffi arumlautffihungarumlautffi\11\1a effffbreve\11ff afldotaccentdotaccent\11dotaccent l\1a\11fiflffffldotaccentffi ICB 388.5 178.5 12.0 6.0 0 : ff 435.8 178.5 12.0 6.0 0 : fl 482.3 178.5 12.0 6.0 0 : ff ldotaccentfl 586.5 178.5 12.0 6.0 0 : fl ldotaccentfl nfi\11ffidotaccentffcaronfibreveff NCB 382.5 162.4 12.0 12.0 0 : fifi arumlaut l lffffl\11ffi ffifl\11caron l\1affl\11hungarumlaut effl\11fflffifflfiffffffl National Shopping(NS) taccent ungarumlaut arumlautdotaccent ngarumlautbrevecaron\11ff ngarumlautflhungarumlaut\11dotaccent otaccentcaroncaron\11ffl f\11\1ahungarumlautbrevebreveffdotaccentff Total f ccentdotaccent lffi arumlaut\1a\1adotaccent\11\1a ungarumlautfffl\11ff l\1afihungarumlaut\11fi lffi\11breveflflbrevefiff NCB 388.5 114.2 12.0 6.0 0 : ffl 435.8 114.2 12.0 6.0 0 : fl 482.3 114.2 12.0 6.0 0 : ffl aronbreve 586.5 114.2 12.0 6.0 0 : fl aronbreve ngarumlaut\11fiffbreveflhungarumlautbreveffl Small Works(SW) 388.5 98.1 12.0 6.0 0 : ffl 435.8 98.1 12.0 6.0 0 : ffi breve breve\11ffl hungarumlautbreve\11breve ronfffl\11\1a efl\11fflbreveflfifl\1afi Force Account(FA) 388.5 82.0 12.0 53.3 0 : flfl 482.3 82.0 12.0 6.0 0 : fl 531.1 82.0 12.0 6.0 0 : fl 586.5 82.0 12.0 6.0 0 : fl 639.8 82.0 12.0 6.0 0 : fl 706.5 82.0 12.0 6.0 0 : fl Consultant Service Goods Civil Works Goods Civil Works Consultant Service Goods Civil Works Consultant Service Total Project PMO of Tianjin Municipali ty PMO of Beijing Municipali ty PMO of Hebei Province Consultant Service Goods Civil Works fi\03 ifi\03 Page 4 OH\03fi Funds Persentage Remark Collection Tables of Procurement Plan of GEF Hai Basin Project Items Procurement Method Contructs for pre- review Contructs for after- review Total Contructs Pre-review Total of pre and after review Unit After-review sum of money of total contructs Thousand USD Total 388.5 925.6 12.0 6.0 0 : ff 435.8 925.6 12.0 6.0 0 : ffi \1a lfifl\11ffl hungarumlautbreve\11breve fflbreve\11\1a nhungarumlaut\11ffihungarumlautbrevefflflfflffi Total dotaccent reve\1a e\1afi lffidotaccentffl\11caron fi\1afl\11fi flfflfiffi\11caron f\03 ifi\03 Page 5 OH\03ffl Beginning End MWR-1 MWR-1-1 To Employ International Experts on\1abreve fflflflff\11caron\11fi flflff\11dotaccent\11fi flflff\11dotaccent\11dotaccent 2005.6.30 6 \10ffl\10fi Strategic Study on Policy and Legal Framework lffl 6 10ffl\10ffl Strategic Study on Institutional Arrangements at the National Level ffl 635.5 990.9 5.8 11.5 0 : 4&%6 10ffl\10ffi Bohai Sea Strategic Study efi 635.5 979.1 5.8 11.5 0 : 4&%6 MWR-3 10ffi\10fi n \036HD\037UDLQLQJ aronfl fflflflff\11ff\11fflfl lflff\11caron\11fflfl lflff\11\1a\11ffl 2004.7.22 635.5 970.7 5.8 5.8 0 : &4 MWR-4 10ff\10fi 260.3 962.3 5.8 2.9 0 : ffi \036HD\036WXG\\037RXU lfl fflflflff\11caron\11ffl lflff\11dotaccent\11fi lflff\11dotaccent\11dotaccent 2004.8.16 635.5 962.3 5.8 5.8 0 : &4 MWR-5 10breve\10fi 3(PSOR\\031DWLRQDO\03([SHUWV n fflflflff\11caron\11fi lflff\11dotaccent\11fi lflff\11dotaccent\11dotaccent 2005.6.30 262.5 945.5 5.8 5.8 0 : fiff ficaron SEPA-1 \10fi\10fi To Employ International Experts n\1abreve fflflflff\11caron\11fi lflff\11dotaccent\11fi lflff\11dotaccent\11dotaccent lfldotaccent\11hungarumlaut 635.5 937.1 5.8 11.5 0 : 4&%6 \10ffl\10fi Strategic Study on Policy and Legal Framework efi 635.5 925.6 5.8 11.5 0 : 4&%6 \10ffl\10ffl Strategic Study on Institutional Arrangements at the National Level efi 635.5 911.5 5.8 11.5 0 : 4&%6 \10ffl\10ffi Bohai Sea Strategic Study ffi 635.5 899.2 5.8 11.5 0 : 4&%6 SEPA-3 \10ffi\10fi n \036HD\037UDLQLQJ aronfl fflflflff\11ff\11fflfl lflff\11caron\11fflfl lflff\11\1a\11ffl lflff\11\1a\11fflffl 635.5 887.5 5.8 5.8 0 : &4 SEPA-4 \10ff\10fi 263.2 874.7 5.8 2.9 0 : ffi \036HD\036WXG\\037RXU lfl fflflflff\11caron\11ffl lflff\11dotaccent\11fi lflff\11dotaccent\11dotaccent lflff\11dotaccent\11ficaron 635.5 874.7 5.8 5.8 0 : &4 SEPA-5 \10breve\10fi 3(PSOR\\031DWLRQDO\03([SHUWV n fflflflff\11caron\11fi lflff\11dotaccent\11fi lflff\11dotaccent\11dotaccent lfldotaccent\11hungarumlaut 635.5 864.4 5.8 5.8 0 : ,& total 262.5 855.8 5.8 5.8 0 : fiff icaroncaron 214.7 840.4 5.8 8.6 0 : +:fi \10fi Water Saving and High Efficiency Water Utilization in the Hai Basin Information collection, Consultant, Research, Report and Outputs reve\1a lflffi\11fifi lflff\11ffl lflff\11ff lflbreve\11fiffl l l\10fi Administration of Water Rights, Well Permits Information collection, Consultant, Research, Report and Outputs reve\1a lflffi\11fifi lflff\11ffl lflff\11ff lflbreve\11fiffl i i\10fi Sustainable Groundwater Exploitation in the Hai Basin Information collection, Consultant, Research, Report and Outputs reve\1a lflffi\11fiffl lflff\11ffi lflff\11ff lflbreve\11fiffl 214.7 772.0 5.8 8.6 0 : +:ff \10fi Strategic Study on Wastewater Reuse Information collection, Consultant, Research, Report and Outputs revedotaccent lflffi\11fiffl lflff\11ffi lflff\11ff lflbreve\11fiffl eve eve\10fi Water Pollution Planning and Management Information collection, Consultant, Research, Report and Outputs reve\1a lflffi\11fiffl lflff\11ffi lflff\11ff lflbreve\11fiffl ron ron\10fi Pollution Discharge Control and Industrial Adjustment in the Hai River Basin Information collection, Consultant, Research, Report and Outputs reve\1a lflffi\11fiffl lflff\11ffi lflff\11ff lflbreve\11fiffl a a\10fi Countermeasures for Protection and Management of the Water Ecological System, River Courses and Wetlands Information collection, Consultant, Research, Report and Outputs reve\1a lflffi\11fiffl lflff\11ffi lflff\11ff lflbreve\11fiffl taccent taccent\10fi Strategic Action Plan of IWEP in the Hai River asin Information collection, Report and Outputs taccentfl lflbreve\11\1a lflbreve\11fifi lflbreve\11fiffl lfldotaccent\11fiffl ngarumlaut\10fiffl Requierment analysis, Program Design Research and Design evefl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11hungarumlaut ngarumlaut\10fiffi Information Change System Information change system fl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11\1a ngarumlaut\10fiff Sharing Data Base Data base construction lfl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11\1a ngarumlaut\10fflff Personnel Training Personnel Training ffl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11\1a ngarumlaut\10fflbreve To develop standard and regulation Schedule Construction evefl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11caron ngarumlaut\10fflcaron Construction Management Construction management evefl lflffi\11fifi lflff\11ffl lflff\11ff lflcaron\11\1a fl\10ffl Digital information and graph Requirement of information progress, objective and others fl\11ffi lflffi\11fifl lflff\11ffi lflff\11ff lflff\11hungarumlaut fl\10ffi pre-progress of satellite data Requirement of information progress, objective and others lfl\11breve lflffi\11fifl lflff\11ffi lflff\11ff lflff\11hungarumlaut fl\10breve Monitoring and data progress Requirement of information progress, objective and others dotaccent\11ff lflffi\11fifl lflff\11ffi lflff\11ff lflff\11hungarumlaut fl\10caron Model index and model modify Requirement of information progress, objective and others iffl\11breve lflffi\11fifl lflff\11ffi lflff\11breve lflff\11fiffl fl\10\1a Model caculation and analysis, produce ET distribution map Requirement of information progress, objective and others evefl\11caron lflffi\11fifl lflff\11ffi lflff\11\1a lflbreve\11fi fl\10dotaccent Analysis and produce technical graph Requirement of information progress, objective and others iffl\11breve lflffi\11fifl lflff\11ffi lflbreve\11breve lflbreve\11fi fl\10fibreve Over Sea Study Tour Study Tour f\11fi lflffi\11fifl lflff\11ffi lflff\11ff lflff\11fi fl\10ficaron Domestic Consultant Consultant 11ffl lflffi\11fifl lflff\11ffi lflff\11ff lflbreve\11fi total fl 1afidotaccent\11fi ZWN1 i 251.7 501.5 5.8 2.9 0 : fi The consultant of Integrated Water and Environment Management fl lflffi\11fifi\11fibreve lflff\11ffi\11flfi lflff\11ff\11ficaron lfldotaccent\11flcaron\11ffifl ZWN2 fl 251.7 487.1 5.8 2.9 0 : fi Consultant of Demonstration project of pollution Control 484.7 487.1 5.8 5.8 0 : fifl lflffi\11fifi\11fibreve lflff\11ffi\11flfi lflff\11ff\11ficaron lfldotaccent\11flcaron\11ffifl ZWN4 f 251.7 472.5 5.8 2.9 0 : fi Working Consultant of PMO 487.6 472.5 5.8 2.9 0 : ffl lflffi\11fifi\11fibreve lflff\11ffi\11flfi lflff\11ff\11ficaron lfldotaccent\11flcaron\11ffifl total 265.4 461.2 5.8 2.9 0 : ffi ffl i i 251.7 449.9 5.8 2.9 0 : fi Dagu Canal Technical Support Information Collection, analysis and research,report compiling fffi\11caron lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lflbreve\11fiffl ungarumlaut ungarumlaut 251.7 431.7 5.8 2.9 0 : fi Financial Incentives for Tianjin Small City Demonstration Project Information Collection, analysis and research,report compiling ccent\1afl lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lflbreve\11fiffl total 265.4 416.1 5.8 2.9 0 : ffl ccent\1afl 205.6 401.5 5.8 8.6 0 : EMfi \10fi Demonstration Project of Real Water Saving and High Efficiency Water Utilization in Beijing Research of real water saving technology models ungarumlauthungarumlaut lflff\11ffi lflff\11\1a lflff lfldotaccent l l\10fi Inflow change analysis and countermeasures research of Miyun Reservoir Analysis and Research inflow change ffl\11\1a lflff\11fi lflff\11breve lflff lfldotaccent i i\10fi The research of comprehensive treatment of water pollution source of up reaches of Miyun Reservoir The research of measurses for pollution resource treatment ungarumlauthungarumlaut\11\1a lflff\11fi lflff\11breve lflff lfldotaccent 205.6 344.6 5.8 8.6 0 : EMff \10fi The research of water saving irrigation schedule of Apple in Xinchengzhi Township Research of water saving irrigation schedule of Apples afl\11ffl lflff\11ffi lflff\11caron lflff lfldotaccent eve eve\10fi The research of effect of reuse water irrigation to groundwater The research of effect of reuse water irrigation to groundwater idotaccent\11ff lflff\11ffl lflff\11ff lflff lflcaron ron ron\10fi The Integrated Water and Environment Management Plan of Miyun County To compile the Integrated Water and Environment Management Plan of Miyun County a lflffi\11fi lflff\11ffi lflff lflbreve total n caronbreve HB1 \10fi Strategic Action Plan of IWEM in Hebei Province l fflflflffi\11fifi\11fflfl lflff\11ffl\11fflfl lflff\11ffl\11fflfi lfldotaccent\11fiffl\11ffifi HB2 l\10fi National Technical Assistant fflflflffi\11fifi\11fflfl lflff\11ffl\11fflfl lflff\11ffl\11fflfi lflff\11fiffl\11ffifi HB3 i\10fi Monitoring and Evaluation e fflflflffi\11fifi\11fflfl lflff\11ffl\11fflfl lflff\11ffl\11fflfi lflff\11fiffl\11ffifi HB4 \10fi Over Sea Study Tour l fflflflffi\11fifi\11fflfl lflff\11ffl\11fflfl lflff\11ffl\11fflfi lflff\11fiffl\11ffifi HB5 eve\10fi Domestic Study Tour fflflflffi\11fifi\11fflfl lflff\11ffl\11fflfl lflff\11ffl\11fflfi lflff\11fiffl\11ffifi HB6 ron\10fi Over Sea Training l fflflflffi\11fifi\11fflfl lflff\11ffl\11fflfl lflff\11ffl\11fflfi lflff\11fiffl\11ffifi HB7 a\10fi Domestic Training fflflflffi\11fifi\11fflfl lflff\11ffl\11fflfl lflff\11ffl\11fflfi lflff\11fiffl\11ffifi HB8 taccent\10fi Project Program and Design e fflflflffi\11fifi\11fflfl lflff\11ffl\11fflfl lflff\11ffl\11fflfi lflff\11fiffl\11ffifi HB9 ngarumlaut\10fi Project Management l fflflflffi\11fifi\11fflfl lflff\11ffl\11fflfl lflff\11ffl\11fflfi lflff\11fiffl\11ffifi total arumlaut affi O l ccentdotaccentfflfl\11fi MWR-2 SEPA-2 Contracts of Consultant Service for World Bank Pre-review Price (10 3 USD) RFP for WB Review Evaluation Report for WB review Contract Bidding Number Contract Number Name of Contract WHQWV KRGV Unit Time Schedule for Contract 03RI\030:5 03RI\03 183.5 893.2 5.8 11.5 0 : 6(3$ 03RI\03 L\03 LQFH 03RI\03 JZHLQD VXEEDVLQ 03RI\03 MLQ 03RI\03 LQJ 03RI\03+DL\03 Q\03 Notes There are 3 Strategic Studies at central level, because the funds is divided into MWR part and SEPA part, the same with budget estimate, there 6 contracts. HW9 HW10 Page 6 OHffi LQQLQ 640.5 1036.3 10.1 5.3 0 : J 688.5 1042.5 10.1 15.8 0 : (QG MWR-5-2 To Employ Domestic Experts Managemnt on 2006.3.10 2006.5.10 2006.5.20 2006.6. MWR-5-3 To Employ Domestic Experts Financial n 2005.8.20 2005.10.2 2005.11.1 2005.11 MWR-5-4 To Employ Domestic Experts Policy and regulation n 2004.6.10 2004.8.11 2004.8.18 2005.9 MWR-5-5 To Employ Domestic Experts Procurement n 2004.6.1 2004.8.1 2004.8.8 2008.9 MWR-5-6 To Employ Domestic Experts Institute n 2004.6.10 2004.8.11 2004.8.18 2005.9 MWR-5-7 To Employ Domestic Experts Monitoring n 2005.8.20 2005.10.2 2005.11.1 2005.11 MWR-5-8 To Employ Domestic Experts ET n 2004.4.20 2004.6.20 2004.7.2 2008.7 MWR-5-9 To Employ Domestic Experts MIS n 2004.4.20 2004.6.20 2004.7.2 2008.7 MWR-5-10 To Employ Domestic Experts KM n 2004.4.20 2004.6.20 2004.7.2 2006.7 MWR-6 MWR-6-1~8 Domestic Training arumlautcaron 2004.5.8 2004.5. 15 MWR-7 MWR-7- 1~14 Domestic Study Tour nhungarumlaut O\03 i ihungarumlaut \10breve\10ffl To Employ Domestic Experts Management ccent lflcaron\11ffi\11fifl lflcaron\11breve\11fifl lflcaron\11breve\11ffl 680.3 783.5 10.1 5.0 0 : fl lflcaron\11caron\11 716.6 783.5 10.1 10.1 0 : fifl \10breve\10ffi To Employ Domestic Experts Financial ccent lflbreve\11dotaccent\11fflfl lflbreve\11fifl\11ffl 632.3 763.1 10.1 5.0 0 : fl lflbreve\11fifi\11 675.3 763.1 10.1 10.1 0 : fifl lflbreve\11fifi fifl \10breve\10ff To Employ Domestic Experts Policy and regulation n lflff\11caron\11fifl lflff\11dotaccent\11fifi lflff\11dotaccent\11fi ccent lflbreve\11hungarumlaut \10breve\10breve To Employ Domestic Experts Procurement ccent lflff\11caron\11fi lflff\11dotaccent\11fi lflff\11dotaccent\11dotaccent lfldotaccent\11hungarumlaut \10breve\10caron To Employ Domestic Experts Institute n lflff\11caron\11fifl lflff\11dotaccent\11fifi lflff\11dotaccent\11fi ccent lflbreve\11hungarumlaut \10breve\10\1a To Employ Domestic Experts Monitoring n lflbreve\11dotaccent\11fflfl lflbreve\11fifl\11ffl 632.3 693.5 10.1 5.0 0 : fl lflbreve\11fifi\11 675.3 693.5 10.1 10.1 0 : fifl lflbreve\11fifi fifl \10breve\10dotaccent To Employ Domestic Experts MIS n lflff\11ff\11fflfl lflff\11caron\11fflfl lflff\11\1a\11ffl lfldotaccent\11\1a \10breve\10hungarumlaut To Employ Domestic Experts KM n lflff\11ff\11fflfl lflff\11caron\11fflfl lflff\11\1a\11ffl lflcaron\11\1a SEPA-6 \10caron\10fiadotaccent Domestic Training arumlautcaron lflff\11breve\11dotaccent lflff\11breve\11 eve pre-review SEPA-7 \10\1a\10fiafiff Domestic Study Tour nhungarumlaut pre-review O\03 i ihungarumlaut ngarumlaut\10fibreve Surface Water Dynamic Management Subsystem System Construction fl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11dotaccent ngarumlaut\10ficaron Groundwater Dynamic Management Subsystem System Construction fl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11dotaccent ngarumlaut\10fi\1a Analysis and Evaluation System of Water Resources Supply and Demand System Construction fl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11dotaccent ngarumlaut\10fidotaccent Water resources managemnt expert system System Construction fl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11dotaccent ngarumlaut\10fihungarumlaut Water Environment Dynamic Monitoring Systen System Construction fl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11dotaccent ngarumlaut\10fflfl Water Environment Model Systen System Construction fl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11dotaccent ngarumlaut\10fflfi Pollution discharge control system System Construction fl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11dotaccent ngarumlaut\10fflffl Water Environment Expert System System Construction fl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11dotaccent ngarumlaut\10fflffi System Construction of IWEM IWEM System fl lflffi\11fifi lflff\11ffl lflff\11breve lflff\11fi Office Expenditure Office Expenditure ffl Others Others taccentfl fl\10ff Meteorological Data Pre-progress The Requirment of Data Progress, Objective and others taccent\11ffl lflffi\11fifl lflff\11ffi lflff\11ff lflff\11hungarumlaut fl\10fiffi System Construction System Construction arumlautcaron\11ff lflffi\11fifl lflff\11ffi lflff\11ff lflbreve\11fi fl\10fiff Fiel visit and testing Study Tour f\11fi lflffi\11fifl lflff\11ffi lflff\11ff lflff\11fi fl\10fi\1a Training Training taccent\11fi lflffi\11fifl lflff\11ffi lflff\11ff lflbreve\11fi Others nfl\11ffl lflffi\11fifl lflff\11ffi lflff\11ff lflbreve\11fiffl fi\10fia fi\10fibreve IC Consultant Contents lfl lflffi\11fifl lflff\11ffi lflff\11ff lfldotaccent\11fiffl fi\10caron training of GEF PMO training Requirement l lflffi\11fifl lflff\11ffi lflff\11ff lfldotaccent\11fiffl Others nbreve lflffi\11fifl lflff\11ffi lflff\11ff lfldotaccent\11fiffl Operation and Management fee of GEF PMO i\11caron lflffi\11fifl lflff\11ffi lflff\11ff lfldotaccent\11fiffl O\03 ungarumlaut ngarumlautffcaron i 186.7 91.1 10.1 5.0 0 : ffl Technical Assistant of IWEM fl lflffi\11fifi\11fibreve lflff\11ffi\11flfi i 186.7 69.5 10.1 5.0 0 : ffi Training of IWEM fl lflffi\11fifi\11fibreve lflff\11ffi\11flfi KRG HW9 ZWN1 HW10 HW11 Unit 03RI\03 77.2 903.8 10.1 15.1 0 : 0:5 03RI\03 74.6 695.5 10.1 20.2 0 : 6(3$ 03RI\03 03 Q Contracts of Consultant Service for World Bank After-review Price (10 3 USD ) \03IRU\03:%\03 LHZ OXDWLR 35HSRUW\03 \03:%\03 LHZ WUDFWV H\036FKHGXOH\03IRU\03&RQWUDFW\03 Bidding Number Contract Number Name of Contract WHQWV SEPA-5 IC MWR-5 IC Pre-review aron\03 ifi\03 Page 7 OHffi LQQLQ 640.5 1036.3 10.1 5.3 0 : J 688.5 1042.5 10.1 15.8 0 : (QG KRG Unit Contracts of Consultant Service for World Bank After-review Price (10 3 USD ) \03IRU\03:%\03 LHZ OXDWLR 35HSRUW\03 \03:%\03 LHZ WUDFWV H\036FKHGXOH\03IRU\03&RQWUDFW\03 Bidding Number Contract Number Name of Contract WHQWV fi 186.7 1010.6 10.1 5.0 0 : ff Study Tour of IWEM lfl flflffi\11fifi\11fibreve flflff\11ffi\11flfi fl 186.7 990.2 10.1 5.0 0 : ffl Technical Assistant of Demonstration Project of Pollution Control 508.7 990.2 10.1 10.1 0 : fifl lflffi\11fifi\11fibreve lflff\11ffi\11flfi fl 186.7 964.0 10.1 5.0 0 : ffi Training of Demonstration Project of Pollution Control 508.7 964.0 10.1 10.1 0 : fifl lflffi\11fifi\11fibreve lflff\11ffi\11flfi fl 186.7 933.3 10.1 5.0 0 : ff Study Tour of Demonstration Project of Pollution Control reve lflffi\11fifi\11fibreve lflff\11ffi\11flfi fi 186.7 896.3 10.1 5.0 0 : fi Consultant of Demonstration Project of Ecological Restoration 508.7 896.3 10.1 10.1 0 : fifl lflffi\11fifi\11fibreve lflff\11ffi\11flfi fi 186.7 862.3 10.1 5.0 0 : ffl Technical Assistant of Demonstration Project of Ecological Restoration 508.7 862.3 10.1 10.1 0 : fifl lflffi\11fifi\11fibreve lflff\11ffi\11flfi fi 186.7 834.2 10.1 5.0 0 : ffi Training of Demonstration Project of Ecological Restoration 508.7 834.2 10.1 10.1 0 : fifl lflffi\11fifi\11fibreve lflff\11ffi\11flfi fi 186.7 808.3 10.1 5.0 0 : ff Study Tour of Demonstration Project of Ecological Restoration reve lflffi\11fifi\11fibreve lflff\11ffi\11flfi f 186.7 783.3 10.1 5.0 0 : ffl Working Consultant of PMO 511.4 783.3 10.1 5.0 0 : ffl lflffi\11fifi\11fibreve lflff\11ffi\11flfi f 186.7 758.8 10.1 5.0 0 : ffi Working Consultant of PMO 511.4 758.8 10.1 5.0 0 : ffl lflffi\11fifi\11fibreve lflff\11ffi\11flfi f 186.7 734.3 10.1 5.0 0 : ff Working Consultant of PMO 511.4 734.3 10.1 5.0 0 : ffl lflffi\11fifi\11fibreve lflff\11ffi\11flfi f e Working Consultant of PMO 511.4 709.9 10.1 5.0 0 : ffl lflffi\11fifi\11fibreve lflff\11ffi\11flfi f n Working Consultant of PMO 511.4 685.4 10.1 5.0 0 : ffl lflffi\11fifi\11fibreve lflff\11ffi\11flfi f 186.7 664.7 10.1 5.0 0 : \1a Working Consultant of PMO 511.4 664.7 10.1 5.0 0 : ffl lflffi\11fifi\11fibreve lflff\11ffi\11flfi f ccent Working Consultant of PMO 511.4 644.1 10.1 5.0 0 : ffl lflffi\11fifi\11fibreve lflff\11ffi\11flfi f arumlaut Working Consultant of PMO 511.4 619.6 10.1 5.0 0 : ffl lflffi\11fifi\11fibreve lflff\11ffi\11flfi f 186.7 595.1 10.1 10.1 0 : fifl Working Consultant of PMO 511.4 595.1 10.1 5.0 0 : ffl lflffi\11fifi\11fibreve lflff\11ffi\11flfi O\03 ngarumlaut ldotaccent ZWN4 ZWN2 ZWN3 03RI\03 JZHL 03 O\03 03\03 Q 1a\03 ifi\03 Page 8 OHffi LQQLQ 640.5 1036.3 10.1 5.3 0 : J 688.5 1042.5 10.1 15.8 0 : (QG KRG Unit Contracts of Consultant Service for World Bank After-review Price (10 3 USD ) \03IRU\03:%\03 LHZ OXDWLR 35HSRUW\03 \03:%\03 LHZ WUDFWV H\036FKHGXOH\03IRU\03&RQWUDFW\03 Bidding Number Contract Number Name of Contract WHQWV ffl 186.7 1004.8 10.1 5.0 0 : fi Water Management Data Collection, Analysis and Report veffi\11breve flflffi\11fiffl flflff\11flcaron flflff\11flhungarumlaut flfldotaccent\11fifi fl 186.7 970.3 10.1 5.0 0 : ffl Water Environment Management Data Collection, Analysis and Report effi\11breve lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi fi fi 186.7 935.7 10.1 5.0 0 : fi Water Quality Research Data Collection, Analysis and Report lff\11breve lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi f 186.7 904.0 10.1 5.0 0 : fi Status Survey Analysis and prediction of supply and demand Data Collection, Analysis and Report nffl lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi f 186.7 872.6 10.1 5.0 0 : ffl High Efficiency Water Utilization Water Saving and Water Distribution Data Collection, Analysis and Report nffl\11breve lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi reve reve 186.7 846.4 10.1 5.0 0 : fi Groundwater Research Data Collection, Analysis and Report ccentffl lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi aron aron 186.7 820.3 10.1 5.0 0 : fi Agricultural Water Reuse Study Data Collection, Analysis and Report ccentffl lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi 1a 1a 186.7 794.1 10.1 5.0 0 : fi Aquatic Ecologicval Rehabilitation Study Data Collection, Analysis and Report n\1a lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi otaccent otaccent 186.7 767.9 10.1 5.0 0 : fi Rural and Urban Non-point Pollution Control Data Collection, Analysis and Report nfl lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi ungarumlaut 186.7 741.8 10.1 5.0 0 : ffl Tianjin subproject Technical Assistant Data Collection, Analysis and Report 1a lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi ungarumlaut 186.7 715.6 10.1 5.0 0 : ffi Small Cities Support Program Data Collection, Analysis and Report lff lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi ungarumlaut 186.7 689.5 10.1 5.0 0 : ff Workshop and Training Workshop and Training l\11hungarumlaut lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi ifl ifl 191.7 663.3 10.1 5.0 0 : fi Consultant 30 person. Month Technical Consultant evefl lflffi\11fiffl lflff\11flcaron lflff\11flhungarumlaut lfldotaccent\11fifi Total i flffibreve fi\10fi Waste Water Reuse Program of Daxing District Waste Water Reuse Program of Daxing District l\11brevefi lflff lflbreve fi\10ffl Check the reuse water price, Water fee collection Study of check the reuse water price, Water fee collection \11flfi lflff lflcaron ffl ffl\10fi Livestock and Birds Night Soil and Sewage Water Treatment Plan Research of the livestock pollution and work out the program of the livestock night soil i\11ff lflff lflcaron ffi ffi\10fi The Implementation Plan of United Water Managemnt of Pinggu District The study ofImplementation Plan of United Water Managemnt of Pinggu District l\11\1affl lflff lflbreve ff\10fi Water Pollution Control Program of Dashihe The study of Water Pollution Control Program of Dashihe reve\11flhungarumlaut lflff lflbreve ff\10ffl Ecological Restoration Project Program of Dashihe The Study of Ecological Restoration Project Program of Dashihe f\11fffi lflff lflbreve O\03 n nfffl\11ffl HB1 HB1-2 1-3 Strategic Action Plan of IWEM of Hebei Province 130 lflff\11ffl\11ffl 680.3 300.9 10.1 5.0 0 : fi lfldotaccent\11fiffl fifi HB2 HB2-2 2-10 Domestic Technical Assistant 86.2 lflff\11ffl\11ffl 680.3 275.5 10.1 5.0 0 : fi lfldotaccent\11fiffl fifi HB3 HB3-2 3-24 Monitoring and Evaluation 110.3 lflff\11ffl\11ffl 680.3 251.0 10.1 5.0 0 : fi lfldotaccent\11fiffl fifi HB4 HB4-2 4-5 Over Sea Study Tour 119.5 lflff\11ffl\11ffl 680.3 226.5 10.1 5.0 0 : fi lfldotaccent\11fiffl fifi HB5 HB5-2 5-30 Domestic Study Tour 83.1 lflff\11ffl\11ffl 680.3 202.0 10.1 5.0 0 : fi lfldotaccent\11fiffl fifi HB6 HB6-2 6-4 Over Sea Training 50.2 lflff\11ffl\11ffl 680.3 177.5 10.1 5.0 0 : fi lfldotaccent\11fiffl fifi HB7 HB7-2 7-30 Domestic Training 218.8 lflff\11ffl\11ffl 680.3 153.1 10.1 5.0 0 : fi lfldotaccent\11fiffl fifi HB8 HB8-2 8-18 Project Program and Design 95 lflff\11ffl\11ffl 680.3 128.6 10.1 5.0 0 : fi lfldotaccent\11fiffl fifi HB9 HB9-2 9-30 Project Management 292.9 lflff\11ffl\11ffl 680.3 104.1 10.1 5.0 0 : fi lfldotaccent\11fiffl fifi O\03 breve dotaccentcaron O\03 HFW 1aff ndotaccent\1affl ff fi f ungarumlaut 03RI\03 L 03RI\03 MLQ 03RI\03 LQJ fl otaccent\03 ifi\03 Page 9 Table 4 Remarks LQQL 635.5 1027.9 10.1 10.5 0 : QJ 680.6 1034.1 10.1 15.8 0 : (QG O O ngarumlaut\10fi Space Data base \03&ROOHFWLRQ\0f\03$QDO\VLV\03 036XEPLVVLRQ\03RI\03 LUHPHQW fifl lflffi\11fifi lflff\11ffl lflff\11ff lflbreve\11ffi ngarumlaut\10ffl Meteorology Data Base \03&ROOHFWLRQ\0f\03$QDO\VLV\03 036XEPLVVLRQ\03RI\03 LUHPHQW flfl lflffi\11fifi lflff\11ffl lflff\11ff lflbreve\11ffi ngarumlaut\10ffi Rain and Water Data Base \03&ROOHFWLRQ\0f\03$QDO\VLV\03 036XEPLVVLRQ\03RI\03 LUHPHQW flfl lflffi\11fifi lflff\11ffl lflff\11ff lflbreve\11ffi ngarumlaut\10ff Water Quality and Water Quatity \03&ROOHFWLRQ\0f\03$QDO\VLV\03 036XEPLVVLRQ\03RI\03 LUHPHQW fifl lflffi\11fifi lflff\11ffl lflff\11ff lflbreve\11ffi ngarumlaut\10breve 03VRIWZDUH\03RI\03 QGZDWHU 035HTXLUHPHQW\03RI\03VRIWZDUH\03 XHUPHQW l lflffi\11fifi lflff\11ffl lflff\11ff lflff\11breve Shopping, Because the special software ngarumlaut\10\1a 21$/\03VRIWZDUH 035HTXLUHPHQW\03RI\03VRIWZDUH\03 XHUPHQW revefl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11breve ngarumlaut\10dotaccent Procurement of Computer equipment ZDUH\033URFXUHPHQW ffl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11breve ngarumlaut\10hungarumlaut Data Collect Station HFWLRQ\036WDWLRQ eveflfl lflffi\11fifi lflff\11ffl lflff\11ff lflff\11caron With Counterpart Funds fi\10\1a Car XUHPHQW\03RI\032IILFH\03(TXLSPHQW l lflffi\11fifl lflff\11ffi lflff\11ff lflff\11breve fi\10dotaccent Computer XUHPHQW\03RI\032IILFH\03(TXLSPHQW l lflffi\11fifl lflff\11ffi lflff\11ff lflff\11breve fi\10hungarumlaut Air Condition XUHPHQW\03RI\032IILFH\03(TXLSPHQW e lflffi\11fifl lflff\11ffi lflff\11ff lflff\11breve fi\10fifl Coper XUHPHQW\03RI\032IILFH\03(TXLSPHQW 457.1 594.2 10.1 5.0 0 : ffi lflffi\11fifl lflff\11ffi lflff\11ff lflff\11breve fi\10fifi Fax-machine XUHPHQW\03RI\032IILFH\03(TXLSPHQW 457.1 574.3 10.1 5.0 0 : fi lflffi\11fifl lflff\11ffi lflff\11ff lflff\11breve fi\10fiffl Printer XUHPHQW\03RI\032IILFH\03(TXLSPHQW n lflffi\11fifl lflff\11ffi lflff\11ff lflff\11breve O 174.7 534.4 10.1 10.1 0 : fiff ungarumlauthungarumlautbreve i
Groupe de la Banque mondiale · Procurement Plan
China - Hai Basin Integrated Water and Environment Management Project
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Chine
Source
Banque mondiale