Page 1 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) 20.11 12fi\11fi Water Treatment Plant 150,000 m3/d water plant 11caron\1a 136.7 495.3 6.7 10.1 90 : 1&% No No Post 2008.6 2008.6-2008.12 12fi\11ffl Water Transmission pipeline D 500-800mm, DI pipe, 50,397M ccent\11ffhungarumlaut 145.6 495.3 6.7 10.1 90 : 1&% No No Prior 2008.6 2008.7-2010.10 12fi\11ffi Water distribution network - Tiexi area D 50-500mm DI pipe, 50,937M 1hungarumlautffl 158.3 495.3 6.7 10.1 90 : 1&% No No Post 2008.6 2008.6-2009.10 12fi\11ff\10$ Water distribution network - Tiedong area D 50-500mm DI pipes, 16630M 1flhungarumlaut 170.8 495.3 6.7 10.1 90 : 1&% No No Post 2009.6 2009.6-2010.6 12fi\11ff\10% Water distribution network - Lishan area D 50-600mm DI pipes, 30375M 1hungarumlauthungarumlaut 179.7 495.3 6.7 10.1 90 : 1&% No No Post 2009.6 2009.6-2010.6 12fi\11breve Water-meter system upgrading-A 2,215 water meter chambers/pipe replacement 11fflhungarumlaut 188.6 495.3 6.7 10.1 90 : 1&% No No Post 2008.6 2008.6-2009.10 12fi\11caron Water-meter system upgrading-B 2,585 water meter chambers/pipe replacement 11caron\1a 197.5 495.3 6.7 10.1 90 : 1&% No No Post 2009.6 2009.6-2010.10 e\11\1ahungarumlaut 12fflfi\11fi Water Treatment Plant Equipment for 150,000 m3/d water plant 11ffdotaccent ICB No No Prior 2008.9 2008.10-2009.4 12fflfi\11ffl Water-meter -A 30,000 sets 1ffiffi ICB No No Prior 2008.5 2008.6-2008.10 12fflfi\11ffi Water-meter -B 35,000 sets 1brevebreve ICB No No Prior 2009.5 2009.6-2009.10 12fflfi\11ff Equipment of leakage testing, Lab. device, vehicle & office (it may be splited in several bids according to the detailed requirement) Pipeline leakage detection/maintenance, Lab. Equipment, engineering vehicles/bus, PCs, printer, photocopier, etc. 1ffff NCB No No Post 2008.4 2008.4-2008.10 reve\11hungarumlautfi Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 1. Civil Work 2. Equipment & Material Anshan Water Supply 3. Subtotal 418600LMC21pp.xls 1 12/17/2007 Page 2 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 9.71 HWS/1.1 Water Transmission pipeline D 300-900mm DI/steel pipes, 12,800 m 2.41 NCB No No Post 2008.6 2008.6-12 HWS/1.2 Distribution network - south area D 200-600mm DI/steel pipes, 29,745m 2.00 NCB No No Post 2008.6 2008.7-11 HWS/1.3 Distribution network - north area D 200-1,200mm DI/steel pipes, 31,586m 3.05 NCB No No Post 2008.4 2008.5-11 HWS/1.4 Water-meter system upgrading 1,700 water-meter chambers/pipe replacement 1.28 NCB No No Post 2008.6 2008.7-2009.8 HWS/1.5 Enlarging of civil works for Yuhuangshan & Zhongyangpu water plants 40,000 m3/d to100,00 m3/d for Yuhaungshan plant; 20,000 m3/d to 30,000 m3/d for Zhongyangpu plant 0.96 NCB No No Post 2008.8 2008.9-2009.11 2.76 HWS/21.1 Equipment supply & installation of Yuhuangshan and Zhongyangpu plants 40,000 m3/d to100,00 m3/d for Yuhaungshan plant; 20,000 m3/d to 30,000 m3/d for Zhongyangpu plant 0.93 ICB No No Prior 2008.10 2008.11 -2009.10 HWS/21.2 Procurement of water-meter 25,000 sets 1.49 ICB No No Prior 2008.5 2008.6-2008.11 HWS/21.3 Equipment of leakage testing, Lab. device, Engineering vehicle & Office equipment (it may be splited in several bids according to the detailed requirement) Pipeline leakage detection/maintenance, Lab. Equipment, Engineering vehicles/bus, Office equipment, etc. 1ffiff\03 NCB No No Post 2008.4 2008.4 -2009.6 12.46 3. Subtotal 2. Equipment & Material Haicheng Water Supply 1. Civil Work 418600LMC21pp.xls 2 12/17/2007 Page 3 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) f\11fidotaccent FWW/1.1 Upgrading of drainage networks in Wanghua area; Wastewater collection pipeline work in Liujia area Wanghua area: D=300-1,200mm reinforced concrete pipe, eve 149.9 263.2 6.7 3.4 90 : \0f ifi m; Liujia area: D=500-900mm drainage pipe, 3,550 149.9 413.5 6.7 6.7 90 : P\03 11flffl NCB No No Post 2008.3 2008.4-10 FWW/1.2 Wastewater collection pipeline in Guchengzhi area; Upgrading of drainage systems in Zhanqian & Gongyuan areas & Changnab open ditch Guchengzhi: D=300-1500mm reinforced concrete pipe, 9,048m; Zhanqian & Gongyuan: D=300-1200mm RCP, 6,558m; Changnan open ditch: 9,770m. 1caronffl NCB No No Post 2008.6 2008.7-11 FWW/1.3 River-dyke rehabilitation (0 - 0+360) Dyke-filling:92,000 m 3 ,Roads:90,000 m 2 , Bridge: 8,280m 2 e\11hungarumlautff NCB No No Prior 2008.3 2008.4-11 FWW/1.4 River-dyke rehabilitation (0+360 - end) 580,000 m 3 dyke-filling, 120,000 m 2 roads, 22km sewer \11caronfi NCB No No Prior 2009.3 2009.4-2010.10 f\11fidotaccent Fushun Wastewater 1. Civil Work 2. Subtotal 418600LMC21pp.xls 3 12/17/2007 Page 4 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) e\11dotaccentffl\03 FSW/1.1 New sanitary landfill construction and existing dump upgrading 250,000 m3 soil/stone excavation, 250,000 m3 earth filling, 188,000 m3 membrane, leakage/gas collection works, etc. e\11dotaccentffl\03 NCB No No Prior 2009.3 2009.4-2009.10 1\1adotaccent\03 FSW/21.1 Equipment of solid waste backfill, transportation & Lab. Device Package A: compressor (2) 1\1adotaccent\03 ICB No No Prior 2009.6 2009.7-10 Package B: bulldozer (2), excavator (2) Package C: chemical spreading vehicle (1), sludge collection vehicle (5), wangon (1) Package D: vehicles of compressing (17), self-unload (3 sets, 8T), van (1), wangon (1) Package E: Lab. Devices 1ffifl\03 FSW/31.1 Consulting service of sanitary landfill 1ffifl\03 QCBS 11hungarumlautfl\03 3. Technical assistance 1. Civil Work 2. Equipment/material Fushun Solid Waste . Subtotal 418600LMC21pp.xls 4 12/17/2007 Page 5 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 30.79 YWW/1.1-A Wastewater interceptor & collection pipeline for Qinghua street D=300-1,200mm, L=20.21km 11ffiff\03 NCB No No Post 2009.10 2009.11-2010.5 YWW/1.1-B Interceptor of Donghuan road D=300-2,000 x 2,200mm,L=15.17km 1hungarumlauthungarumlaut\03 NCB No No Post 2009.4 2009.5-2009.10 YWW/1.2-A Wastewater collection pipeline from Haibin road to No. 14 pumping station D=1,100-2,000 x 2,200mm. L=7.21km 11dotaccentbreve\03 NCB No No Post 2009.4 2009.5-10 YWW/1.2-B Wastewater collection pipeline from No. 14 pumping station to Donghuan road D=1,100-2,000 x 2,200mm, L=9.67km 1ff\1a\03 NCB No No Post 2009.4 2009.5-10 YWW/1.3 Interceptor of Liaobian district D=700-2,200 x 2,200mm, L=11.46km 1dotaccentdotaccent\03 NCB No No Post 2008.4 2008.5-2009.10 YWW/1.4 Interceptor from the Plant to Donghuan road DN=1,600mm, L=3.4km 1fl\1a\03 NCB No No Post 2008.4 2008.4-10 YWW/1.5 Civil work of pumping station 6 new pumping stations 1brevebreve\03 NCB No No Post 2008.4 2008.5-2009.6 YWW/1.6 Civil work of W.W.T 100,000 m3/d wastewater treatment plant n\11caronff\03 NCB No No Prior 2009.3 2009.4-2010.8 arumlaut\11flffl\03 YWW/21.1 Equipment supply and installation of W.W.T 100,000 m3/d wastewater treatment plant e\11caroncaron\03 ICB No No Prior 2009.4 2009.6-2010.11 YWW/21.2 Equipment supply and installation of pumping stations 8 pumping stations 11ffi\1a\03 ICB No No Prior 2009.7 2009.8-2010.12 YWW/21.3-A Vehicles for W.W.T YWW/21.3-B Lab. Devices for W.W.T YWW/21.4 Office equipment for W.W.T 1flff\03 NS No No Post 2010.2 2010.3-2010.6 39.81 2010.5 2010.6-2010.11 No No Yingkou Wastewater 1hungarumlautbreve\03 ICB Prior 1. Civil Work 2. Equipment & Material 3. Subtotal 418600LMC21pp.xls 5 12/17/2007 Page 6 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 27.04 DI pipe, DN800-500, 12,371m UPVC pipe, DN400-200, 19,528m DI pipes, DN800-500, 5,149m UPVCpipe, DN400-200, 30,895m DI pipe, DN500, 9,147m UPVC pipe, DN400-200, 37,740m YWS/1.4 - A Transportation pipeline (1) DI pipe, DN1200mm L=12.00KM 1breveff NCB No No Post 2008.1 2008.1-11 YWS/1.4 - B Transportation pipeline (2) DI pipe, DN1200mm L=12.00KM 1breveff NCB No No Post 2008.1 2008.1-11 YWS/1.4 - C Transportation pipeline (3) DI pipe, DN1200mm L=7.30KM 11\1a\1a NCB No No Post 2008.1 2008.1-11 YWS/1.5 Water treatment plant 70,000 m3/d WTP 11hungarumlautffi NCB No No Post 2007.11 2007.12-2008.11 11hungarumlautbreve YWS/21.1 Water treatment plant equipment supply & installation (70,000 m3/d) 11fiffi ICB No No Prior 2007.12 2008.1-12 YWS/21.2 Equipment of leakage testing, Lab. device, vehicle & office (it may be splited in several bids according to the detailed requirement) pipeline leakage detection/maintenance, Lab. Equipment, engineering vehicles/bus, PCs, printer, photocopier, etc. 1dotaccentffl NCB No No Post 2008.6 2008.7-12 31.00 No No NCB 11ffcaron NCB No lfldotaccent\11ffi lfldotaccent\11ffi lfldotaccent\11ffi Post Post No lfl ccent 158.8 750.4 6.7 3.4 90 : \11 158.8 753.8 6.7 3.4 90 : ff 158.8 757.1 6.7 3.4 90 : \10 l Post lfl ccent 141.1 750.4 6.7 3.4 90 : \11 141.1 753.8 6.7 3.4 90 : ff 141.1 757.1 6.7 3.4 90 : \10 l No No lfl ccent 176.6 750.4 6.7 3.4 90 : \11 176.6 753.8 6.7 3.4 90 : ff 176.6 757.1 6.7 3.4 90 : \10 l NCB YWS/1.2 Distribution network (2) 1brevebreve YWS/1.1 3. Subtotal 2. Equipment & Material Distribution network (1) 11ffl\1a YWS/1.3 Distribution network (3) Yingkou Water Supply 1. Civil Work 418600LMC21pp.xls 6 12/17/2007 Page 7 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 4.26 YSW/1.1 Sanitary backfill plant 1.0726 million m3 earth/stone excavation,165,000 m2 membrane, leakage/gas collection work, access , etc. 3.65 NCB No No Post 2008.1 2008.2-2008.10 YSW/1.2 Sealing of existing pump Sealing work (56,800 m3 earth work, anti-leakage/gas leading), etc 0.61 NCB No No Post 2008.10 2008.10 - 2009.9 1.88 YSW/21.1 Equipment of landfill plant and transportation bulldozer (2), compossor (2), excavator (2), solid waste collection vehicles (25) 1.83 ICB No No Prior 2008.5 2008.6 - 2008.10 YSW/21.2 Office equipment & Lab. Devices 0.05 NCB No No Post 2008.8 2008.9 -2008. 12 6.13 1. Civil Work 2. Equipment & Material 3. Subtotal Yingkou Solid Waste 418600LMC21pp.xls 7 12/17/2007 Page 8 Ref. No. Contract Name Description Estimated Cost (USD x 10 6 ) Procurement Method Prequalificatio n (Yes/No) Domestic Preference (Yes/No) Review by Bank (Prior/Post) Expected Bid- Opening Date Comments (Implementation time) Procurement Packages with Methods and Time SCHEDULE for Liaoning Medium Cities Urban Infrastructure Project(LMC-2) Contract Packaging (Draft) 18.70 PWW/1.1 Drainage pipe upgrading for Xinghongtai district FRP, DN800-2,000, 4,880m; RC culvert B x H 2,400
Groupe de la Banque mondiale · Procurement Plan
China - Second Liaoning Medium Cities Infrastructure Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Chine
Source
Banque mondiale