Groupe de la Banque mondiale · Staff Appraisal Report

Zambia - Kafue Hydroelectric Project - Stage Two

Zambie Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

FILE COPY' DOCUMENT OF INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMEN'- INTERNATIONAL DEVELOPMENT ASSOCIATION Not For Public Use Report No. 86a--A APPRAISAL OF KAFUE HYDROELECTRIC PROJECT (STAGE II) ZAMBIA May 7, 1973 EAST ArRICA PROJECTS DEF.RTMENT PUBLIC UTILITIES DIVISION This report was prepared for official use only by the Bank Group. It may not be published, quoted or cited without Bank Group authorization. The Bank Group does not accept responsibiUty for the ac.uracy or completeness of the report. CUR1OICY EQUIVALWITJ US$ 1 = kwacha (K) o.643 K 100 ngwee K 1 = 3s$ 1.v55 K 1 million = US$ 1.555 million WEIGHTS AND MEA3UL'GS 1 meter (m) 2 3 ,.28 feet 1 Iquare meter (m ) 2 10.75 square feet 1 kilometer (km) 2 0.621 miles 1 square kilometer (km ) = 0.386 square miles 1 cubic meter (m3) = 35.3 cubic feet 1 cubic meter per second (m3/s) = 35.3 cubic feet per seconi 1 nillion cubic meters (Nm3) 810.7 acre ft 1 kilovolt (kV) = 1000 volts 1 kilowatt (kW) - 1000 watts 1 kilowat'. hour (kW) = 1000 watt hours 1 megawatt (1l.:) = 1000 kilowatts 1 gigawatt hour (GA) = 1 million kilowatt hours GWSSARY OF ABBREVIATIONS CAPC - Central African Power Corporation CEC - Central Electricity Corporation (Zambia) CPC - Copperbelt Power Company (Zambia) Gecamines - Nationalized Sopper Company 'Zaire) GRZ - Government of the Republic of Zambia KNBC - Kariba North Bank Company (Zambia) NESCO - Northern Electricity Supply Corporation (Zambia) SRESC - Couthern Rhodesia Eltctricity Supply Commission SGECO - Swedish

Informations clés
Type de document Staff Appraisal Report
Date d'adoption
Pays Zambie
Source Banque mondiale