Groupe de la Banque mondiale · Resettlement Plan

China - Fujian Highway Sector Investment Project : resettlement plan (Vol. 1 of 2) : Resettlement action plan for Yongan-Wuping expressway

Chine Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

RP422 Fujian Provincial Highway Development World Bank Loan Project Yongan-Wuping Expressway Part of Changchun-Shenzhen National Expressway in Fujian Province Resettlement Action Plan Entrusted by: Fujian Provincial Expressway Construction Directorate Sanming Yong-Wu Expressway Co.Ltd. Longyan Yong-Wu Expressway Co.Ltd. Prepared By: Research Institute of Highway of MOC March 2006 Fujian Provincial Highway Development World Bank Loan Project Yongan-Wuping Expressway Part of Changchun-Shenzhen National Expressway in Fujian Province Resettlement Action Plan Prepared by: RIOH of MOC Person in charge: Yao Zhenzhong, Director Chief Engineer: Lu Chengzhang (Deputy) Division Head: Li Yaru (Researcher) Project Team Leader: Liu Dongli (Senior Engineer) Project Team Member: Cai Cui (Engineer) Jiang Shan (Engineer) Shu Mingxin (Researcher) Dai Gang (Engineer) Chen Yong (Assistant Researcher) Shang Jinping (Assistant Researcher) Foreword This Resettlement Action Plan (RAP) is for the Yongan-Wuping Expressway (YWE), one section in Fujian province of the national expressway of Changchun-Shenzhen, and the southern section of the second south-north route of the Provincial "Three South-north, Four East-West Routes" expressway network in Fujian province. The Changchun-Shenzhen expressway is part of the transport corridor connecting the Bohai Bay area, the Yangtze delta area, and the south-east coastal area of China. This road project is an important link in the regions and between the cities; and the completion of this road project will improve the provincial network connection, the regional economic development and the local rural area accessibility, for the benefits of regional socio-economic development as well as poverty reduction. Entrusted by Fujian Provincial Expressway Construction Directorate (FPECD), Sanming Yong-Wu Expressway Co. Ltd. and Longyan Yong-Wu Expressway Co. Ltd., the Fujian Provincial Communications Planning and Design Institute (FPCPDI) undertook the preliminary design for the YWE project and completed the preliminary design in November 2005 and the construction plan design will be completed in May 2006. The Research Institute of Highway (RIOH) of the Ministry of Communications (MOC) undertakes the preparation of the Resettlement Action Plan (RAP) for the YWE project, with field survey conducted in February, September and October respectively. The draft RAP was completed at the end of November 2005 and reviewed by the World Bank, the FPECD and the Longyan and Samming companies. The draft RAP was revised based on the feedback comments from the World Bank, the said companies and local governments and the field survey done during March 6 -10 2006. The RAP (draft) is prepared in accordance with the laws and regulations of the People's Republic of China (PRC) and the Provinces where the engineering project is located; the World Bank document OP 4.12 BP 4.12 Involuntary Resettlement; and the "Model Resettlement Action Plan for Highway Project in China (Draft)". The purpose of this document is to set forth an action plan for resettlement and rehabilitation of the project affected persons (PAPs) to make sure that they will benefit from the project and their living standards will improve or at least be restored after the project impact. Since the preparation of the RAP was conducted concurrently with the design of the YWE project with the project impact data mainly based on the preliminary design, the data will have to be finalized according to the construction design later on. Geographical Location o f Yongan-Wuping Expressway Project ,.si -U4 :M0 4Nt ' I ^ ,p - 1. C t: . E,., fI"> IL -oga n y I. - 'he R-S!vS t y;* Et o lt~~I F v 4l 1 I- ,,, flM i n fl I, m | tnhI.. y- .. .. r 10 1 i I df XfnIgB s Contents LIST OF ACRONYMS ............................................2 1. A Brief Introduction to the Project ..............................3 1.1 Yong-Wu Expressway ....................................3 1.2 Outlines of the Project ....................................3 1.3 The YWE ProjectAffectedArea ..............................4 1.4 Objectives of the RAP ....................................4 1.5 Project Owner and Organizations ............................5 1.6 Time Schedule of the Preparation and implementation of the RAP .......5 2. Project Impact ............................................6 2.1 Measures to minimize the impact ............................6 2.2 General Description of the Project Impact Survey ..................................7 2.3 Land Acquisition ...........................................................8 2.4 Temporary Land Use .....................................8 2.5 Affected Buildings .......................................8 2.6 Affected Infrastructures ........................................................... 17 2.7 Loss of Crops and Woodland .............................. 18 2.8 Other Affected Properties ................................. 22 2.9 Affected Enterprises ..................................... 24 2.10 Affected Population .................................... 25 2.11 Affected vulnerable groups ............................... 25 2.12 Other Impacts ......................................... 25 3. Social Economic Survey of the Affected Areas .................................... 32 3.1 Outlines of the Socioeconomic Status ....................... 32 3.2 Social/resettlement Survey ................................ 36 3.3 Impact Assessment ..................................... 48 3.4 Points of Attention for the Resettlement Action Plan ............. 48 4. Legal Framework .........................................0.... s 4.1 Policies ............................................... 50 4.2 State Laws and Regulations ........................................................ 50 4.3 The main provisions of the LandAdministration Law of the PRC ....... 51 4.4 Recently Provisions Concerning Land Compensation and Resettlement ........................................................................................................................ 54 4.5 Regulations Issued by Fujian Provincial Government ............ 57 4.6 World Bank document OP 4.12 ............................. 62 4.7 Principles for Compensations for the YWE project .............................. 64 4.8 The Criteria for Compensations for the YWE project ............. 65 5. Resettlement and Economic Rehabilitation Planning ............... 77 5.1 Resettlement Demand and Alternative Schemes .................................. 77 5.2 Resefflement Policy and Management ....................... 77 5.3 Overall Scheme of the Resettlement Action Plan ................ 78 0 5.4 Resefflement Capacity Analysis ............................ 79 5.5 Production Rehabilitation Plan ............................. 80 5.6 Demolition and Reconstruction of Affected Houses ............. 84 5.7 Restoration of Public Facilities ....................................................... 85 5.8 Rehabilitation of Land for Temporary Use ..................... 86 5.9 Assistance to the Affected Vulnerable Groups .................. 86 5.10 Time Schedule of Implementation of Resettlement Work Activities.. 87 5.11 Supervision of the Resettlement Activities .................... 87 5.12 Resettlement Information Booklet .......................... 87 6. Focal Point of the Resettlement and Rehabilitation Action Plan ........ 89 6.1 Introduction ......................................................... 89 6.2 Serious Affected Villages and Rehabilitation Action Plan .................... 89 7. Compensation Cost Estimation ............................... 95 7.1 Compensation Cost Estimation ............................. 95 7.2 Estimation of Other Costs ......................................................... 100 7.3 Total Land Acquisition and Resefflement Compensation Cost ..... 100 7.4 Compensation Payment ................................. 101 8. Public Participation and Consultation .......................... 104 8.1 Public Consultation in the Preparation Period ................. 104 8.2 Public Participation in the Implementation Period of the RAP ..... 104 8.3 Regular public consultation meeting ........................ 104 8.4 Incorporation of the PAPs' Recommendation in the RAP .................. 105 9. Organizations for the Implementation of the RAP ................. 106 9.1 Organization Frame ..................................... 106 9.2 Organization Chart of Leading Group ....................... 107 9.3 Duties for each of the organizations ........................ 108 9.4 Staffing for Each of the Resefflement Offices ..................................... 110 9.5 Professional Training Plan and Institutional Strengthening ............... 110 9.6 Complain andAppeal ......................................................... 111 10. Monitoring and Appraisal .................................. 113 10.1 Internal Monitoring .................................... 113 10.2 External Monitoring .................................... 115 10.3 Report .............................................. 117 11. List of Responsibilities for Resettlement Compensation .......................... 121 LIST OF ACRONYMS AAOV Annual average output value BP Bank Procedures CLOMU Collective Land Operation Management Unit CNY China Yuan CRO County Resettlement Office FPCPDI Fujian Provincial Communications Planning and Design Institute FPECD Fujian Provincial Expressway Construction Directorate HH Household IMO Independent Monitoring Organization MOC Ministry of Communications OP Operational Policies PAP Project Affected Person PRC People's Republic of China RO Resettlement Office RAP Resettlement Action Plan RIB Resettlement Information Booklet RIOH Research Institute of Highway RO Resettlement Office TRO Township Resettlement Office VRO Village Resettlement Office WB World Bank WBPO World Bank Project Office YWE Yongan-Wuping Expressway 2 1. A Brief Introduction to the Project 1.1 Yong-Wu Expressway The Yong-Wu Expressway (YWE) is part of the national expressway of Changchun-Shenzhen expressway from Yongan to Wuping in Fujian province, and is also the southern section of the second south-north route of the Provincial "Three South-north, Eight East-West and Twenty Connection Routes" expressway network in Fujian province. Changchun-Shenzhen Expressway is in an important transport corridor connecting the Bohai Bay Surrounding Area, the Yangtze Delta Area, the Western Bank Economic Zone and the Zujiang (Pear River) Delta Area. Most of the Yong-Wu Expressway affected area are poverty mountain area. The YWE project will improve the provincial network connection and play important role in the regional and local economic development and the poverty reduction for the mountain area. 1.2 Outlines of the Project The YWE is located in the municipalities of Sanming and Longyan in the mid and western areas of Fujian, passing through four cities of the two municipalities, i.e. Yongan (Sanming); Liancheng, Shanghang and Wuping (Longyan). It starts from Yanxi in Yongan, passing through 15 towns of Yanxi, Hongtian, Xiaotao, in Yongan county; Gutian, Quxi, Wenheng, Pengkou, Xinquan, Nanyang, Caixi, Jiuxian, Lincheng, Huyang in Liancheng county; Shifang and Yanqian in Wuping county; after which it reaches the border between Fujian and Guangdong. The main control points of the YWE are Jishan, Hongtian, Xiaotao in Yongan; Gutian, Wenheng, the median of the airport emergency runway, Pengkou, Xinquan in Liancheng; Jiuxian, Linjiang, Huyang in Shanghang; Shifang, Yanqian in Wuping and the Fujian and Guangdong provincial border. Total length of the YWE is 196.565 km, to be built by four-lane dual direction expressway standard, with design speed of 80km per hour for Yongan-Wenheng section and 100 km per hour for Wenheng-Wuping section. The geographical position of the YWE is shown in Figure 1-1 and the bill of quantities of the main engineering work shown in Table 1-1. 3 Table 1-1 Bill of Quantities of the Main Engineering Work Quantity Unit Samming Longyan Total Section I Section I Section 2 Section 3 Total length km 40.130 34.974 81.142 40.319 196.565 Design speed km/h 80 80 100 100 Subgrade width m 24.5 24.5 26.0 26.0 8736.5 9867 17635.75 2906.25 Large bridge m/Num. 39145/126 /28 /33 /55 /10 Tunnel m/Num. 8186/10 7032.5/7 6393/8 3346/2 24957.5/27 Interchange Num. 3 2 4 2 11 Permanent use Mu 4707.32 3442.95 10050.8 4539.19 22740.32 Temporary use Mu 2667.16 House resettled M2 63790.7 12131.5 136958 70112.6 272092.8 Total cost CNYmil. 2684.576 2405.218 4932.111 2265.515 12287.4 Average cost CNYmil./km 66.897 68.7716 60.7837 56.1893 62.51 Note: Figures are from preliminary design report. 1.3 The YWE Project Affected Area The YWE affected areas mainly include 15 towns in the four counties, i.e. Yanxi, Hongtian, Xiaotao in Yongan; Gutian, Quxi, Wenheng, Pengkou and Xinquan in Liancheng; Nanyang, Caixi, Jiuxian, Lincheng, Linjinag and Huyang in Shanghang; Shifang and Yanqian in Wuping; and 69 administrative villages. A summary of the affected townships, villages and households is shown in Table 1-2. Table 1-2 Summary of the Affected Townships, Villages and Households Household Municipality County Township Village Affected Resettled Sanming Yongan 3 13 1692 310 Liancheng 5 25 3155 272 Longyan Shanghang 5 21 2237 511 Wuping 2 10 2247 421 1.4 Objectives of the RAP The objectives of the RAP are as the following. (1) Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project design, to minimize the negative 4 impact caused by the YWE project. (2) Displaced persons should be assisted in their efforts to improve their livelihoods and standards of living or at least to restore them, in real terms, to pre-displacement levels or to levels prevailing prior to the beginning of project implementation, whichever is higher, with particular attention paid to the poor and vulnerable groups. (3) Where it is not feasible to avoid resettlement, resettlement activities should be conceived and executed as sustainable development programs, providing sufficient investment resources with detailed resettlement action plan. (4) The resettlement should be arranged in the local area as much as possible to enable the persons displaced by the project and the local residents to share in project benefits. (5) More compensations should be given to those with per capita annual income less than CNY1000 (provincial poverty level). 1.5 Project Owner and Organizations The YWE Project is divided into two sections, i.e. Samming section and Longyan section, with two project owners of Sanming YWE Co. Ltd. and Longyan YWE Co. Ltd. To carry out the resettlement work for the YWE project smoothly, resettlement offices from provincial level to local village level are set up, i.e. Fujian Provincial Resettlement Office set at FPECD, Sanming Municipal Resettlement Office (SMRO), Longyan Municipal Resettlement Office (LMRO), Sanming YWE Co. Ltd. Resettlement Office (SYWERO), Longyan YWE Co. Ltd. Resettlement Office (LYWERO), county level resettlement office (CRO) in each of the four counties, township resettlement office (TRO) in each of the townships and village resettlement office in each of the villages. 1.6 Time Schedule of the Preparation and implementation of the RAP The preparation of the RAP started from September 2005. The field survey for the RAP was conducted in October The compilation of the draft RAP was completed in the end November 2005. The compilation of the final RAP will be completed at the end of March 2006. Some modifications may be necessary in accordance to the design of the construction plan in early July 2006. Resettlement Information Booklets (RIBs) will be distributes to those affected by the Project and the time schedule for the resettlement will be announced by the end of July 2006. The locations of the resettlement and the land adjustment scheme will be finalized in August 2006. Overall implementation of the RAP will commence in October 2006. Independent monitoring organization (IMO) will conduct the monitoring work from November 2006 to December 2009. 5 2. Project Impact 2.1 Measures to minimize the impact It is almost inevitable for the YWE project such impacts arising from the land acquisition, relocation of houses infrastructures and other facilities, which will affect the local people's production, living and employment. In the design of the YWE project, measures have been taken to minimize and mitigate the possible impact and when resettlement is necessary thoughfful RAP should be worker out and implemented to make sure the quality of life not be lowered for the affected persons, with particular attentions to be paid to the affected vulnerable groups. 2.1.1 To reduce the scale of the land acquisition and resettlement The following principles are adhered in the design of the expressway alignment. (1) To avoid the densely populated areas such as urban, town and resident areas. (2) To reduce land acquisition as much as possible. (3) To avoid relocation of houses and building facilities as far as possible and to reduce occupation of arable land, with service and rest areas, interchanges to be set at waste land areas as much as possible. 2.1.2 Facility design and construction measures Facility design and construction measures have been taken for the YWE project to minimized the impact as the following. (1) Passages have been designed to facilitate the local people passing across the expressway for going to school and for farm work. (2) Proper arrangement of the construction work has been made to reduce the construction period as much as possible and to ensure timely restoration of the damaged farm land irrigation system. (3) Balanced cutting and filling work has been considered as far as possible to reduce the amount of the wastes, to make use and proper treatment of the wastes. 2.1.3 Formulation of concrete & effective resettlement action plan Concrete and effective resettlement action is to be worked out in accordance with the relevant laws and regulations of the PRC and the Fujian province and the World Bank document OP 4.12 BP 4.12 Involuntary Resettlement, with particular attentions paid to the followings. (1) To strengthen the internal monitoring work and the external monitoring work done by the IMO based on effective and efficient information communication system to reduce information process cycle, so as to make ensure the issues occurred during the implementation timely addressed. (2) To strengthen the public participation before the construction work through public awareness campaign of the project by notifying the time schedule of the project and the land acquisition and resettlement compensation policies, and to give 6 priority to the use of local construction materials and the local labor force to work for the YWE project during the construction period, subject to the same prerequisites. 2.2 General Description of the Project Impact Survey Over September - October 2005, people from Sanming and Longyan expressway companies, the RIOH, the Fujian Provincial Communications Planning and Design Institute and the Resettlement Offices for the Yong-Wu Expressway conducted detailed socio-economic and resettlement survey, based on the preliminary design, to get first hand information about the project impact, including the data about permanent land acquisition, temporary land use, the affected buildings, facilities, enterprises, households, crops and woodland, other properties, affected population and vulnerable groups, and etc., which have been listed in the draft report of the RAP and acknowledged by the local governments and the affected people. However, it should be noted that these data is based on the preliminary design, which have to be reviewed and approved later on and may be changed according to the final construction plan. (1) Scope and object of the survey Scope: all the affected 15 townships along the Yong-Wu Expressway and the selected sample villages of the all the 69 affected villages. Object: the YWE project affected land, the land attachments, facilities and the affected people. (2) Survey contents Classification and quantities of the affected groups and individuals; the details of the affected houses, lands, properties, including the income and living standards of the affected households, their comments and requests, as well as the comparisons between different groups and areas. (3) Survey method A Land Acquisition and Socio-economic Survey Form for the Expressway was prepared, and the survey was carried out, taking into account of the consistency among the design plan, the concrete physical conditions and the survey data. (4) Survey process Over 10 - 18 September 2005, the FPECD presided over the "Work Meeting for the Basic Data Survey for the Expressway Land Acquisition and Resettlement, with 20 participants from the Resettlement Office of the FPECD, the RIOH and the Resettlement Offices of the Sanming and Longyan Expressway Companies, and the affected local governments. During the meeting preparation work was organized to clarify the task of the land acquisition and resettlement survey for the YWE project, with training materials for the survey in accordance with the World Bank policy requirements. In October 2005, the RAP team from the RIOH divided into three groups went to the affected four cities of Yongan, Liancheng, Shanghang and Wuping and conducted the survey, together with people from the FPCPDI and the local resettlement offices, with support from the resettlement offices of the Sanming 7 Yong-Wu Expressway Co. Ltd. And the Longyan Yong-Wu Expressway Co. Ltd. A total of 125 persons participated in the survey, with a total of 1126 materials collected and a total of 920 affected households investigated. In the light of the World Bank expert's comments on the RAP draft report, further field survey was carried out over 18 - 20 January 2006, with assistance from each of the affected townships and villages. The detailed lists of the project impact are as follows. 2.3 Land Acquisition The land acquisition data in this RAP draft report is based on the alignment recommended by the preliminary design, which may be changed in accordance with review and approval procedures, so that the final land acquisition and resettlement data of the affected villages and population shall be based on the actual construction plan. According to the field survey based on the preliminary design, the total land acquisition will be 22740.32 mu, 9291.51 mu of which are arable land accounting for 40% of the total, including 1167.18 mu dry land, accounting for 12.6%, paddy field 7829.94 mu, accounting for 84.3%; and 13448.81 mu of which are non-arable land accounting for 59.1% of the total, including 11378.42 mu wood land, accounting for 84.6%, 276 mu waste land accounting for 2.1 %. Table 2.1 shows the summary of the land acquisition for the YWE project. 2.4 Temporary Land Use Temporary land use will be rented mainly for work shed, materials storage or processing yard, waste disposal, earth borrowing area, detour road, and etc. and will be returned back to the original user once the work is completed in due course. A total of temporary land use will be 2667.16 mu, and the details of the land for temporary use are shown in Table 2-2. So far at the preliminary design stage of the YWE project, the temporary land use in terms of quantity and location has not been finalized. The time period of the temporary land use is about two years. 2.5 Affected Buildings Based on the alignment recommended by the preliminary design, a total of 272092.8 square meters of building areas need to be relocated, 107273.6 square meters of which are brick concrete structured buildings, accounting for 39.4% of the total; 2700 square meters of which are cement concrete structure buildings, accounting for 1% of the total; 75101.7 square meters of which are brick wood stone structured buildings, accounting for 27.6%; 82853.5 square meters of which are earth wood structured buildings, accounting for 30.5%; 4164 square meters of which are simple houses, accounting for 1.5% of the total. A summary of the classified buildings need to be resettled is shown in Table 2-3. 8 Table 2-1 Summary of Land Acquisition in Yongan County Arable land Non-arable land Town Village Vegeta Farm use Not Total Subtotal Paddy Dry be Subtotal Ocad Frs Otes Building ue ble Orchard Forest Others used Shangshanji 389.27 155.46 125.49 108.32 189.44 99.26 17.52 5.81 66.85 0 578.71 Yanxi Xialing 81.94 54.71 0.55 26.68 58.03 0 47.09 3.84 0.63 6.47 139.97 Dalian 109.68 83.18 22.22 4.28 301.39 2.31 284.84 11.45 0 2.79 411.07 Jinglong 93.34 64.58 9.94 18.82 215.03 96.11 105.98 7.34 1.62 3.98 308.37 Hong Guihu 138.17 121.34 12.7 4.13 233.58 51.02 160.17 0 13.95 8.44 371.75 tian Hongtiancun 276.81 195.75 32.69 48.37 207.42 13.83 149.28 23.75 16.69 3.87 484.23 Shuixi 35.05 28.63 2.89 3.53 136.06 47.47 76.41 0 2.73 9.45 171.11 Mahong 196.13 174.4 17.12 4.61 384.17 143.46 228.4 1.96 0 10.35 580.3 Shangji 58.6 46.74 0 11.86 46.31 4.09 35.62 0.79 0 5.81 104.91 Xiao Jlancun 208.51 172.31 31.02 5.18 273.62 63.1 195.94 0 0 14.58 482.13 tao Dataokou 211.86 181.93 4.43 25.5 220.29 23.9 188.41 0 7.98 0 432.15 Meiban 46.13 46.13 0 0 142.65 19.38 119.44 1.07 0 2.76 188.78 Zhongban 238.05 214.15 23.9 0 215.8 10.46 191.65 7.71 1.71 4.27 453.85 Total 2083.54 1539.31 282.95 261.28 2623.79 574.39 1800.75 63.72 112.16 72.77 4707.33 9 Table 2-1 Summary of Land Acquisition in Liancheng County Arable land Non-arable land Town Village Vege Farm use Not Total Subtotal Paddy Dry Building table Subtotal Orchard Forest Others used Chengdou 0 0 0 0 70.91 0 70.91 0 0 0 70.91 Xiabao 90.84 90.84 0 0 419.97 0 414.46 0 3.55 1.96 510.81 Gutian Zhongbao 223.75 221.13 2.62 0 173.58 15.55 148.69 4.69 4.65 0 397.33 Shangbao 202.05 165.28 36.77 0 314.97 67.93 233.5 2.02 10.65 0.87 517.02 Quxi Quxicun 49.09 43.23 5.86 0 328.22 16.55 302.75 0 8.92 0 377.31 Dadi 222.12 221.79 0.33 0 262.89 17.33 243.73 0 0.11 1.72 485.01 Fudi 48.99 48.72 0.27 0 356.14 0 348.92 0 2.62 4.6 405.13 Wenpi 372.52 363.77 8.75 0 425.84 0 395.47 15.29 13.65 1.43 798.36 Weng Wenbao 176.26 167.63 8.63 0 43.91 0 0 0 42.7 1.21 220.17 hengI Longgang 11.75 11.75 0 0 0.06 0 0 0 0 0.06 11.81 Zhugang 301.73 299.8 1.93 0 376.79 61.38 297.92 5.66 9.46 2.37 678.52 Nankeng 54.97 42.37 12.6 0 341.29 0 339.2 0.42 0.04 1.63 396.26 10 Table 2-1 Summary of Land Acquisition in Liancheng County Arable land Non-arable land Town Village Veget Farm use Not Total Subtotal Paddy Dry Subtotal Building able Orchard Forest Others used Tianma 150.25 142.87 7.38 0 340.9 9.31 327.35 0.43 2.25 1.56 491.15 Peng- Pengkoucun 209.3 198.71 10.59 0 625.75 18.26 585.76 7.1 9.2 5.43 835.05 kou Wangcheng 43.09 39.67 3.42 0 108.54 0 108.5 0 0.04 0 151.63 Liangzeng 94.51 86.61 7.9 0 325.59 3.56 309.53 0 4.12 8.38 420.1 Liangfu 33.32 33.32 0 0 52.59 0 51.56 1.03 0 0 85.91 Liangmeng 39.91 35.33 4.58 0 109.7 0 100.37 4.46 2.48 2.39 149.61 Qingan 91.44 86.66 4.78 0 227.53 3.95 200.55 3.6 4.59 14.84 318.97 Lianxi 43.7 40.38 3.32 0 82.34 0 66.2 1.48 0 14.66 126.04 Lelian 105.16 100.78 4.38 0 115.71 0 104.87 1.8 2.46 6.58 220.87 quan Lejiang 76.51 76.02 0.49 0 163.88 0 157.79 5.61 0 0.48 240.39 Beicun 424.37 308.57 115.8 0 142.09 0 49.51 17.32 71.14 4.12 566.46 Xicun 116.8 111.86 4.94 0 72.22 0 58.25 3.54 5.02 5.41 189.02 Xinquancun 18.22 18.22 0 0 19.69 0 17.05 0 0 2.64 37.91 Total 3200.65 2955.31 245.34 0 5501.1 213.82 4932.84 74.45 197.65 82.34 8701.75 11 Table 2-1 Summary of Land Acquisition in Shanghang County Arable land Non-arable land Town Village Veget Subtotal Farm use_Build_ng Not Total Subtotal Paddy Dry able Sub total Building used Orchard Forest Others Xiache 101.41 92.83 8.58 0 266.18 0 230.26 13.35 11.55 11.02 367.59 Nan- Mayangdong 39.65 39.17 0.48 0 294.59 0 268.6 2.49 14.07 9.43 334.24 yang Haodong 349.04 333.46 15.58 0 341.97 0 322.26 10.44 3.97 5.3 691.01 Sheshan 115.04 110.09 4.95 0 188.14 0 173.08 5.45 9.23 0.38 303.18 Shuangxi 200.28 194.13 6.15 0 227.53 4.99 213.36 0.31 6.34 2.53 427.81 Chenkeng 24.2 24.2 0 0 46.8 0 43.81 0.74 0 2.25 71 Caixi Xiawang 45.77 34.23 11.54 0 106.22 0 79.23 2.35 14.33 10.31 151.99 Rongshi 195.41 173.28 22.13 0 316.38 0 259.3 8.69 32.9 15.49 511.79 Tiechang 23.75 23.75 0 0 168.93 0 168.57 0 0 0.36 192.68 Jiu Shizhen 48.49 45.43 3.06 0 274.37 0 260.88 7.86 5.09 0.54 322.86 Meixi 145.59 137.8 7.79 0 275.89 0 243.22 17.83 10.75 4.09 421.48 Shiqi 34.81 28.7 6.11 0 53.27 0 37.45 0 10.99 4.83 88.08 Gushi 74.83 74.83 0 0 96.54 0 92.15 1.86 0 2.53 171.37 Jiuzhou 41 40.22 0.78 0 95.24 9.7 67.33 3.46 1.46 13.29 136.24 Lin- Fugu 22.6 17.75 4.85 0 176.55 0 155.52 15.9 2.66 2.47 199.15 cheng Xijiao 72.83 45.93 26.9 0 34.77 0 27.37 7.4 0 0 107.6 Chengbei 59.43 36.88 22.55 0 234.57 8.2 191.71 23.16 11.5 0 294 Xinan 107.81 90.45 17.36 0 328.27 5.91 295.29 12.14 14.93 0 436.08 Wenguang 27.79 25.95 1.84 0 207.23 76.66 130.57 0 0 0 235.02 yHaun Anshan 24.07 19.33 3.68 1.06 57.86 0 56.41 0 1.45 0 81.93 Tongqiao 215.17 189.23 24.91 1.03 152.52 0 144.98 0.22 7.32 0 367.69 Total 1968.97 1777.64 189.24 2.09 3943.82 105.46 3461.35 133.65 158.54 84.82 5912.79 12 Table 2-1 Summary of Land Acquisition in Wuping County Arable land Non-arable land Town Village Veget Farm use Building Not Total Subtotal Pady Dry able Subtotal Orchard Forest Others Building used Xiongxin 139.22 128.86 10.36 0 97.31 1.56 91.85 0.32 2.23 1.35 236.53 Gaowu 326.09 293.04 33.05 0 67.74 1.21 62.03 0.02 4.48 0 393.83 Shi- Liming 130.92 94.84 36.08 0 58.07 12.3 40.83 0 4.94 0 188.99 fang Sanfang 393.96 299.46 94.5 0 370.18 3.23 340.35 0.68 23.34 2.58 764.14 Xianshui 271.04 227.85 34.55 8.64 151.7 0 133.2 4.4 9.52 4.58 422.74 Niushentang 167.78 98.2 68.29 1.29 47.53 0 35.58 0 1.21 10.74 215.31 Longjing 20 20 0 0 79.77 3.34 62.71 1.46 0.58 11.68 99.77 Yan- Shuangfang 136.56 100.76 35.8 0 209.05 0 194.02 2.13 9.64 3.26 345.61 qian Fenggui 234.99 202.74 28.1 4.15 167.68 11 152.64 0.23 3.13 0.68 402.67 _ Lingqian 217.79 91.93 108.92 16.94 131.07 12.23 70.27 13.73 33.64 1.2 348.86 Total 2038.35 1557.68 449.65 31.02 1380.1 44.87 1183.48 22.97 92.71 36.07 3418.45 13 Table 2-2 List of Land for Temporary Use City_ Town_Land Classification City Town Paddy Dry Vegetable Orchard Wood Unused Yong- Yanxi 35.93 1.31 0 2.7 109.02 0 an Hongtian 141.11 0 6.73 21.98 109.91 0 Xiaotao 196.01 0 0 7.84 234.3 0 Total 373.05 1.31 6.73 32.53 453.23 0 Lian- Gutian 30.02 0 0 0 604.42 10.45 cheng Quxi 6.57 0 0 0 67.66 1.63 Wenheng 191.11 0 0 0 432.6 41.26 Pengkou 140.18 0 0 0 141.64 0 Xinquan 11.7 0 0 0 11.3 0 Total 379.58 0 0 0 1257.62 53.34 Nanyang 0.3 0 0 0 6.5 0 Shang- Jiuxian 0 0 0 0 5.2 0 hang Linzhen 4.5 0 0 0 7.5 0 Huyang 17.85 0 0 0 4.51 0 Total 22.65 0 0 0 23.71 0 Wu- Shifang 9.75 0 0 0 25.9 0 ping Yanqian 23.25 0 0 0 4.51 0 Total 33 0 0 0 30.41 0 Table 2-3 Summary of Affected Buildings in Yongan County Type of building affected House- People Cement Brick Brick Earth Simple hold affected concrete concrete wood wood house Yanxi Shangshanji 0 4946 1168 155 360 54 287 Xialing 0 1886 2685 76 62 36 173 Hongtian Jinglong 0 3232 1339 418 202 41 201 Guihu 0 1833 2007 208 115 26 124 Hongtiancun 0 0 0 100 0 1 5 Mahong 0 999 2078 207 0 15 78 Shuixi 0 2460 4556 1288 0 32 163 Xiaotao Shangji 0 749 2988 1867 0 18 87 Jiancun 0 1100 1888 2388 164 12 54 Meiban 0 0 0 9899 0 51 243 Zhongban 0 0 266 2866 0 24 117 Total 0 17205 18975 19472 903 310 1532 14 Table 2-3 Summary of Affected Buildings in Liancheng County Township Type of building affected House- People Administrative Cement Brick Brick Earth Simple hold affected villages concrete concrete wood wood house Gutian I Zhongbao 0 0 0 45 0 1 4 Shangbao 0 1425.8 2138 4466.7 525.0 59 304 Quxi Quxicun 0 772 0 1834 0 11 49 Wenheng Dadi 0 0 145 0 0 3 10 Fudi 0 0 0 120 0 1 4 Wenpi 0 6781.5 526.3 0 11.5 49 231 Wenbao 0 6887.4 503.0 0 25.0 43 208 Zhugang 0 0 719.3 99.5 0 2 11 Pengkou I Tianma 0 161.5 510.1 25.3 45.5 2 10 Pengkoucun 0 1731.5 2198.9 743.0 15.0 11 51 Wangcheng 0 0 0 28.4 0 1 6 Liangzeng 0 579.4 186.3 0 0 5 23 Xinquan Liangmeng 0 774.5 216.8 178 69 4 21 Qingan 0 795 99 1421 224 7 33 Lelian 0 0 185 0 635 2 10 Lejiang 0 386 98 0 0 2 11 Beicun 0 7124 5333 19464 223 57 268 Xicun 0 1258 160 1040 0 12 58 Total 0 28676.6 13018.7 29464.9 1773 272 1312 15 Table 2-3 Summary of Affected Buildings in Shanghang County Township Type of building affected House- People Administrative Cement Brick Brick Earth Simple hold affected villages concrete concrete wood wood house Nanyang Xiache 0 810 475 3464 97 33 176 Mayangdong 0 0 114 120 0 2 9 Haodong 0 403 250 1056 68 15 62 Sheshan 0 1458 1431 0 0 26 148 Shuangxi 0 2127 1906 167 52 28 157 Caixi Xiawang 0 5470 1757 64 21 52 278 Rongshi 0 8098 2215 4913 28 98 520 Jiuxian Shizhen 0 1969 183 0 8 18 97 Meixi 0 2109 1438 751 0 18 91 Lincheng Shiqi 0 2671 662 645 0 28 142 Jiuzhou 0 56 312 0 30 3 14 Fugu 0 0 857 0 0 5 22 Xijiao 0 0 307 0 0 2 10 Chengbei 2700 19153 1420 0 0 142 708 Xinan 0 0 762 340.6 68 5 21 Huyang Anshan 0 0 828 713 0 6 32 Tongqiao 0 0 3384 896 14 30 160 Total 2700 44324 18301 13129.6 386 511 2647 16 Table 2-3 Summary of Affected Buildings in Wuping County Township Type of building affected House- People Administrative Cement Brick Brick Earth Simple hold affected villages concrete concrete wood wood house Shifang Xiongxin 0 1680 2164 1104 0 35 176 Gaowu 0 824 1152 356 0 18 98 Liming 0 1974 3381 2714 0 58 301 Sanfang 0 2276 3166 308 0 42 213 Jixian 0 0 1356 870 0 5 27 Xianshui 0 4462 6822 3625 276 105 536 Niushentang 0 508 240 166 0 8 45 Yanqian Longjing 0 192 360 96 0 5 26 Shuangfang 0 876 848 1271 0 12 54 Fenggui 0 2116 1954 1064 94 35 189 Lingqian 0 2160 3364 9213 732 98 487 Total 0 17068 24807 20787 1102 421 2152 2.6 Affected Infrastructures There are some infrastructures will be affected by the YWE project, including power supply lines, broadcasting lines, telecommunication lines, rural road and irrigation channel, owned by the power supply department, telecommunications department and water conservancy & irrigation department respectively, as shown in Table 2-4. 17 Table 2-4 Summary of Affected Public Utilities and Infrastructure Item Unit Quantity Remarks Power supply lines m 159700 Communication lines m 73180 Broadcasting and TV lines 8260 Underground cables m 32240 Underground optical cables m 9430 Transformer Number I Small microwave station Number 5 2.7 Loss of Crops and Woodland The affected crops and woodland are shown in Table 2-5 and Table 2-6 respectively. 18 Table 2-5 Summary of Affected Crops (Unit: mu) Town Village Rice Dry crops Vegetable Yongan County Yan- Shangshanji 125.03 125.49 108.32 xi Xialing 54.71 0.55 26.68 Dalian 83.18 22.22 4.28 Jinglong 64.58 9.94 18.82 Guihu 121.34 12.7 4.13 Hong- Hongtian 195.75 32.69 48.37 Mahong 28.63 2.89 3.53 Shuixi 174.4 17.12 4.61 Shangji 46.74 0 11.86 Jiancun 172.31 31.02 5.18 Xtiao- Dataokou 181.93 4.43 25.50 Meiban 46.13 0 0 Zhongban 214.15 23.9 0 Yongan Total 1539.31 282.95 261.28 Liancheng County Gu- Xiabao 90.84 0 0 tian Zhongbao 221.13 2.62 0 Shangbao 165.28 36.77 0 Quxi Quxicun 43.23 5.86 0 Dadi 221.79 0.33 0 Fudi 48.72 0.27 0 Wen- Wenpi 363.77 8.75 0 Weng Wenbao 167.63 8.63 0 heng Longgang 11.75 0 0 Zhugang 299.8 1.93 0 Nankeng 42.37 12.6 0 Tianma 142.87 7.38 0 Peng- Pengkou 198.71 10.59 0 kou Wangcheng 39.67 3.42 0 Liangzeng 86.61 7.9 0 Liangfu 33.32 0 0 Liangmeng 35.33 4.58 0 Qingan 86.66 4.78 0 Xin- Lianxi 40.38 3.32 0 quan Lelian 100.78 4.38 0 Lejiang 76.02 0.49 0 Beicun 305.57 115.8 0 Xicun 111.86 4.94 0 Xinquancun 18.22 0 0 Liancheng Total 2955.31 245.34 0 19 Table 2-5 Summary of Affected Crops (Unit: mu) Town Village Rice Dry crops Vegetable Shanghang Xiache 92.83 8.58 0 Nan- Mayangdong 39.17 0.48 0 Haodong 333.46 15.58 0 yang Sheshan 110.09 4.95 0 Shuangxi 194.13 6.15 0 Cai- Chenkeng 24.2 0 0 Xiawang 34.23 11.54 0 Rongshi 173.28 22.13 0 Tiechang 23.75 0 0 Jiu- Shizhen 45.43 3.06 0 xian Meixi 137.8 7.79 0 Shiqi 28.7 6.11 0 Gushi 74.83 0 0 Jiuzhou 40.22 0.78 0 Lin- cheng Fugu 17.75 4.85 0 Xijiao 45.93 26.9 0 Chengbei 36.88 22.55 0 Xinan 90.45 17.36 0 Hu- Wenguang 25.95 1.84 0 Anshan 19.33 3.68 1.06 yang Tongqiao 189.23 24.91 1.03 Shanghang Total 1777.64 189.24 2.09 Wuping County Xiongxin 128.86 10.36 0 Gaowu 293.04 33.05 0 Shi- Liming 94.84 36.08 0 fang Sanfang 299.46 94.5 0 Xianshui 227.85 34.55 8.64 Niushentang 98.2 68.29 1.29 Longjing 20.0 0.0 0.0 Yan- Shuangfang 100.76 35.8 0 qian Fenggui 202.74 28.10 4.15 Lingqian 91.93 108.92 16.94 Wuping Total 1557.68 449.65 31.02 20 Table 2-6 Summary of Affected Wood Land Fruit Pine Fir County Town FutPn i Poplar Bamboo Other County Town Orange Apple Pear Others Mature Middle Young Mature Middle Young Poplar Bamboo Other Yanxi 101.56 0 0 0 216.32 0 0 77.15 0 0 0 55.99 0 Yong- Hongtian 343.21 0 8.68 0 286.85 0 0 262.5 0 0 0 73.87 97.01 an Xiaotao 112.01 0 0 8.91 403.51 0 0 227.10 0 0 34.89 49.07 16.49 Total 556.78 0 8.68 8.91 906.68 0 0 566.75 0 0 34.89 178.93 113.5 Gutian 83.49 0 0 0 270.41 496.52 0 0 100.63 0 0 0 0 Quxi 16.55 0 0 0 285.31 0 0 17.44 0 0 0 0 Lian- Wenheng 78.71 0 0 0 155.22 1371.55 0 81.2 17.27 0 0 0 0 cheng Pengkou 31.13 0 0 0 0 1331.1 0 0 0 0 0 0 0 Xinquan 3.95 0 0 0 0 699.92 106.23 0 0 0 0 0 0 Total 213.83 0 0 0 425.63 4184.4 106.23 81.2 135.34 0 0 0 0 Nanyang 4.99 0 0 0 0 1155.76 0 0 34.74 0 0 17 0 Caixi 0 0 0 0 0 207.43 0 0 128.04 8.89 0 38 0 Shang- Jiuxian 0 0 0 0 0 644.32 28.35 0 0 0 0 0 0 hang Lincheng 23.81 0 0 0 104.54 713.47 19.47 29.34 0 0 0 0 0 Huyang 76.66 0 0 0 122.13 192.12 0 8.72 0 0 0 8.99 0 Total 105.46 0 0 0 226.67 2913.1 47.82 38.06 162.78 8.89 0 63.99 0 Shifang 18.30 0 0 0 186.90 414.71 0 79.59 0 0 0 22.64 0 Wu- Yanqian 26.57 0 0 0 132.83 238.89 0 36.74 0 0 0 71.18 0 ping Total 44.87 0 0 0 319.73 653.6 0 116.33 0 0 0 93.82 0 21 2.8 Other Affected Properties The other properties affected by the YWE project mainly include WC/pigsty, enclosure, cement ground, well, methane pit, tomb, and etc. There are quite a number of ancestor tombs of the affected households need to be resettled with special values. Discussions and consultations were conducted during the survey with the affected households. Eventually consensus has been reached as for the compensation criteria and resettlement schemes for the affected tombs. Table 2-7 shows the summary of the affected properties. Table 2-7 Summary of Other Affected Properties WC/ Enclo- Cement Methane Town Village Well Pool Tomb Kiln pigsty sure ground pit Yongan County Yan- Shangshanji 80 135 391 1 0 0 87 0 xi Xialing 97 30 766 0 0 0 0 0 Jinglong 0 0 110 2 0 0 0 0 Guihu 76 0 295 0 0 0 121 0 Hong- Hongtian 0 0 0 1 0 0 68 0 tian __ __ Mahong 0 0 0 0 0 0 56 0 Shuixi 0 0 837 0 0 0 111 0 Shangji 0 126 481 0 0 0 86 0 Xiao- Jiancun 0 48 462 0 0 0 45 0 tao Meiban 0 268 0 0 0 0 23 0 Zhongban 0 173 60 1 0 0 21 0 Yongan Total 253 780 3402 5 0 0 618 0 Liancheng County Chengdou 0 0 0 0 0 0 6 0 Gu- Xiabao 0 0 0 0 0 0 29 0 tian Zhongbao 0 0 0 0 0 0 26 0 Shangbao 15 35 0 10 0 0 70 0 Quxi Quxicun 0 0 0 10 0 0 13 0 Dadi 0 0 0 0 0 0 17 0 Fudi 0 0 0 0 0 0 30 0 Wen- Wenpi 161.3 7 0 0 0 0 206 0 heng Wenbao 0 168 46.9 0 0 0 85 0 Zhugang 38 9 57.6 0 0 0 178 0 Nankeng 0 0 0 0 0 0 91 0 To be continued 22 Continue WC/ Enclo- Cement Methane Town Village Well Pool Tomb Kiln pigsty sure ground - pit Tianma 133.8 30 0 0 0 62 0 Peng- Pengkou 71.9 50 0 1 0 0 83 0 kou Wangcheng 0 0 0 0 0 0 46 0 Liangzeng 81.2 48 0 0 0 0 103 0 Liangfu 0 0 0 0 0 0 25 0 Liangmeng 99 0 0 0 0 0 184 0 Qingan 0 13 0 0 0 0 632 0 Xin- Lianxi 0 45 0 0 0 0 403 0 Lelian 0 0 0 0 0 0 236 0 Lejiang 20 0 0 0 0 0 312 0 Beicun 2993 502 1372 2 0 0 199 0 Xicun 0 121 0 0 0 0 302 0 Xinquancun 3612 0 0 0 0 0 256 0 Liancheng Total 3613.2 1309 1255.5 13 0 0 3594 0 Shanghang County | Xiache 18 182 0 0 0 0 378 0 Nan- Mayangdong 0 0 0 0 0 0 568 0 Haodong 16 53 0 0 0 0 813 0 Sheshan 151 0 0 0 0 537 0 Shuangxi 63 16 0 0 0 0 452 0 Chenkeng 0 0 0 0 0 0 103 0 Caixi Xiawang 45 25 0 0 0 0 670 0 Rongshi 177 37 0 0 0 0 631 0 Jiu- Tiechang 0 0 0 0 0 0 461 0 Shizhen 21 0 0 0 0 0 823 0 xian Meixi 150 21 0 0 0 0 647 0 Shiqi 67 10 0 0 0 0 672 0 Gushi 0 0 0 0 0 0 425 0 Lin- Jiuzhou 0 0 0 0 0 0 637 0 Fugu 0 0 0 0 0 0 486 0 Xijiao 0 0 0 0 0 0 337 0 Chengbei 0 0 0 0 0 0 753 0 Xinan 65 0 0 0 0 0 70 0 yang Wenguang 0 0 0 0 0 0 70 0 _ Tongqiao 1160 0 0 0 0 0 110 0 Shanghang Total 1933 344 0 0 0 0 9643 0 To be continued 23 Continue WC/ Enclo- Cement Methane Town Village Well Pool Tomb Kiln ____________pigsty sure ground pit Xiongxin 0 0 0 0 0 0 12 0 Gaowu 0 0 0 0 0 0 52 0 Liming 0 466 580 0 0 0 23 0 Shi- fang Sanfang 0 191 0 0 0 0 11 0 Jixian 0 40 0 0 0 0 13 0 Xianshui 958 572 0 0 0 15 62 2320 Niushentang 0 0 0 0 0 0 2 0 Longjing 264 24 0 0 0 0 0 0 Yan- Shuangfang 0 20 0 0 0 0 13 0 qian Fenggui 150 140 0 0 0 0 0 0 Lingqian 0 926 0 0 0 0 57 0 Wuping Total 1372 2411 580 0 0 15 248 2320 2.9 Affected Enterprises There are mainly seven enterprises affected by the YWE project, including Yongan Jitong Sheet Manufacturing Co.Ltd., Yangmeilong Industrial Park, Hongtian Spirochaete Algae Manufactruer, and Pingan Incense Plant. One of the workshop and some material storage facilities of Yongan Jitong Sheet Manufacturing Co.Ltd. located in Shangshanji village snf Xialinjg village respectively will be affected and resettled, which will have impact on its production. The compensation for the enterprise shall be made not only for the loss of the production, but also for the relevant workers associated with the production loss. However, there is no need to resettle the workers, since they will be back to work once the affected workshop and storage facilities are resettled. The impact on the village plant at Shangshanji village is limited to the resettlement of 33300 square meters of simple house, since so far there is no worker employed by this village plant and there is not any product output. The impact on the Hongtian Spirochaete Algae Manufactruer is the relocation of 634 square meters of living quarter for the employees. The employer of the Manufacturer has promised to build new living quarter for the employees before the resettlement, so that there is no impact on the living conditions of the employees. Some of the workshop facilities of Pingan Incense Plant will have to be resettled with certain impact on its production. The compensation for this plant shall be made 24 not only for the loss of the production, but also for the relevant workers associated with the production loss. However, there is no need to resettle the workers, since they will be back to work once the affected workshop facilities are resettled. There is a little impact on Wenheng Township Runxiang Metallurgical Company, Wenheng Township Guilding Company, Wuping Yanqian Cement Plant, only limited to demolition of some enclosure walls without any impact on production. Table 2-9 shows the list of the affected enterprises. 2.10 Affected Population There are a total 69 villages affected by the land acquisition and resettlement, including 9331 households; 8064 households of which are affected by the land acquisition and 1514 households are affected by the resettlement; and 247 households of which are affected by both of the land acquisition and resettlement, with total affected population of 45578, including 39141 persons involved with land acquisition, and 39046 agricultural population. Table 2-10 show the summary of the affected population. 2.11 Affected vulnerable groups Vulnerable groups refer to such individuals as single parent household, single elders, household with living standard under poverty level, and those handicapped or sick. There is no vulnerable group in many of the 69 villages affected by the YWE project. Table 2-11 shows the summary of the vulnerable groups affected by the road project. It can be seen from the table that most of the affected vulnerable group are affected by the land acquisition. Special attention has been paid to their resettlement in the preparation of the RAP. 2.12 Other Impacts (1) Minority nationality The survey shows that there is no minority nationality village or population involved in the land acquisition and resettlement for the YWE project. (2) Shops and business around the towns There is no shop and business affected around the towns. (3) Urban resettlement The YWE project is away from any urban areas, there is no urban resettlement involved in the YWE project. 25 Table 2-9 List of Affected Enterprises Affected building structure Enclo-sure Loca- Owner- (m2) wall Name Staff tion ship Brick Earth Simple (m) Wood wood Jitong Sheet 3446 Shang- Manufacturing Co.Ttd 225 0 0 Work- 0 Co.Ltd. shop Jitong Sheet 2530 Manufacturing Xialing Co.Ttd 225 0 0 Work- 0 Co. Ltd. Shop 33300 Village Shang- Collec- 0 0 0 Work- 0 Enterprise shanji tive _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _sh o p _ _ _ _ _ _ Spirochaete 529 105 Algae tian Private 11 Living Living 0 0 Manufactruer quarter quarter 822 60 Pingan Incense Plan Guihu Private 15 Work- Work- 0 0 Plant shop shop Runxiang Metallurgical Wenpi Private 15 0 0 0 101 Co. Wenheng Joint Wenpi 8 0 0 0 120 Building Co. venture Yanqian Water Ling- Collec- 10 0 0 0 32 Plant qian tive 26 Table 2-10 Summary of Affected Population Land acquisition Resettlement Land & Town Village resettlement HH P Agr. P HH P HH P Yongan Yan- Shangshanji 158 813 807 62 386 18 82 Xialing 52 254 251 36 185 8 37 Dalian 73 345 221 0 0 0 0 Jlnggong 41 197 194 35 198 9 48 Guihu 108 502 498 26 156 6 27 tian Hongtian 489 2405 2405 13 68 1 4 Mahong 172 803 803 25 136 2 9 Shuixi 0 0 0 65 355 0 0 Shangji 57 274 271 43 225 3 13 Jiancun 81 387 387 38 198 3 14 Xiao- Dataokou 132 612 612 0 0 0 0 tao Meiban 57 276 276 72 376 5 18 Zhongban 156 780 775 24 145 2 11 Yongan Total 1576 7648 7500 377 2428 57 263 Liancheng Chengdou 8 38 38 0 0 0 0 Gu- Xiabao 98 432 432 0 0 0 0 tian Zhongbao 245 1050 1043 1 5 0 0 Shangbao 221 1132 1118 59 308 5 22 Quxi Quxicun 39 185 185 42 228 4 17 Dadi 211 1002 998 16 86 1 5 Fudi 58 276 276 1 4 0 0 Wenpi 392 1862 1853 5 26 5 23 Wen- Wenbao 72 342 342 14 72 3 13 heng Longgang 13 62 62 0 0 0 0 Zhugang 321 1525 1520 8 35 5 21 Nankeng 57 271 271 0 0 0 0 27 Table 2-7 Summary of Affected Population Land & Land acquisition Resettlement Town Village ___________resettlement HH P Agr. P HH | P HH |P Yongan Ya Shangshanji 154 786 778 54 287 12 67 Xialing 98 484 480 36 173 8 38 xi Dalian 121 600 587 0 0 0 0 Jlnggong 77 385 385 41 201 9 45 Guihu 86 435 435 26 124 0 0 Hong- Hongtian 154 734 734 1 5 0 0 tia n__ _ _ Mahong 21 94 94 15 78 1 6 Shuixi 119 563 563 32 163 5 23 Shangji 34 169 169 18 87 0 0 Jiancun 167 796 796 12 54 2 9 Xiao- Dataokou 154 689 689 0 0 0 0 tao Meiban 30 144 144 51 243 6 29 Zhongban 211 1001 1001 24 117 1 4 Yongan Total 1426 6880 6855 310 1532 44 221 Liancheng Chengdou 2 9 9 0 0 0 0 Gu- Xiabao 83 388 388 0 0 0 0 tian Zhongbao 201 939 939 1 4 0 0 Shangbao 182 850 850 59 304 11 51 Quxi Quxicun 34 159 159 11 49 0 0 Dadi 185 864 864 3 10 0 0 Fudi 35 163 163 1 4 0 0 Wen- Wenpi 284 1326 1318 49 231 3 14 Wenbao 154 719 713 43 208 2 9 heng Longgang 263 1228 1228 0 0 0 0 Zhugang 255 1191 1191 2 11 0 0 Nankeng 43 201 201 0 0 0 0 To be continued 28 Continue Land & Land acquisition Resettlement Town Village resettlement HH P Agr. P HH P HH P Tianma 132 638 638 2 10 1 5 Peng- Pengkou 187 903 903 11 51 2 11 kou Wangcheng 35 169 169 1 6 0 0 Liangzeng 66 319 319 5 23 0 0 Liangfu 21 101 101 0 0 0 0 Liangmeng 25 121 121 4 21 0 0 Qingan 69 333 333 7 33 0 0 Lianxi 28 135 135 0 0 0 0 Xin- Lelian 98 473 473 2 10 0 0 quan Lejiang 61 295 295 2 11 0 0 Beicun 365 1763 1763 57 268 18 94 Xicun 102 493 493 12 58 5 26 Xinquan 15 72 72 0 0 0 0 Liancheng Total 2925 13852 13838 272 1312 42 210 Shanghang Xiache 85 431 429 33 176 6 29 Mayangdong 34 163 163 2 9 0 0 Nan- Haodong 301 1498 1487 15 62 5 27 yang Sheshan 98 481 481 26 148 3 16 Shuangxi 187 956 956 28 157 12 54 Chenkeng 19 87 87 0 0 0 0 Caixi Xiawang 41 211 211 52 278 2 11 Rongshi 179 913 911 98 520 3 13 Jiu- Tiechang 18 95 95 0 0 0 0 Shizhen 51 261 261 18 97 0 0 xian _ _Meixi 143 701 701 18 91 1 5 To be continued 29 Continue Land & Land acquisition Resettlement Town Village ____resettlement HH P Agr. P HH P HH P Shiqi 29 142 140 28 142 1 6 Gushi 66 321 321 0 0 0 0 Jiuzhou 34 168 168 3 14 0 0 cheng Fugu 20 99 99 5 22 1 4 Xijiao 64 321 317 2 10 0 0 Chengbei 57 286 283 142 708 12 58 Xinan 101 498 498 5 21 0 0 Hu- Wenguang 21 101 101 0 0 0 0 yang Anshan 26 127 127 6 32 0 0 Tongqiao 201 989 980 30 160 3 11 Shanghang Total 1775 8849 8816 511 2647 49 234 Wuping County Xiongxin 128 631 631 35 176 10 48 Gaowu 305 1489 1481 18 98 8 41 Liming 129 635 633 58 301 19 94 fang Sanfang 374 1846 1841 42 213 13 68 Jixian 0 0 0 5 27 0 0 Xianshui 254 1268 1260 105 536 42 216 Niushentang 158 778 778 8 45 1 5 Longjing 16 77 77 5 26 1 4 Yan- Shuangfang 143 705 705 12 54 0 0 qian Fenggui 223 1101 1101 35 189 3 16 Lingqian 208 1030 1030 98 487 15 49 Wuping Total 1938 9560 9537 421 2152 112 541 30 Table 2-11 Summary of Affected Vulnerable Groups Single Olders Single Town Village woman ___ older Poverty Total HH P. HH R HH P. HH P. HH P. Shangshanji 0 0 1 3 0 0 1 5 2 8 Xialing 0 0 0 0 0 0 1 4 1 4 Yong- Guihu 0 0 1 4 0 0 1 3 2 7 an Hongtian 1 2 1 3 0 0 2 7 4 12 Meiban 0 0 1 3 0 0 0 0 1 3 Zhongban 0 0 1 5 0 0 0 0 1 5 Yongan Total 1 2 5 18 0 0 5 19 10 39 Shangbao 0 0 1 4 0 0 0 0 1 4 Dadi 0 0 1 3 0 0 0 0 1 3 Fudi 0 0 0 0 0 0 2 8 2 8 Lian- Wenpi 1 2 0 0 0 0 1 3 2 5 cheng Zhugang 0 0 0 0 1 1 0 0 1 1 Pengkou 0 0 1 3 0 0 1 5 2 8 Qingan 0 0 1 2 0 0 0 0 1 2 Xicun 0 0 1 4 0 0 1 4 2 8 Liancheng Total 1 2 5 16 1 1 5 20 12 39 Xiache 0 0 0 0 0 0 1 5 1 5 Haodong 1 3 1 4 2 4 1 4 5 15 Shang- Shuangxi 0 0 1 4 0 0 0 0 1 4 hang Rongshi 0 0 0 0 1 2 1 3 2 8 Xijiao 1 2 0 0 0 0 0 0 1 2 Tongqiao 0 0 1 4 1 2 0 0 2 6 Shanghang Total 2 5 3 12 4 8 3 12 12 37 Xiongxin 0 0 0 0 1 2 2 7 3 9 Gaowu 1 2 0 0 0 0 0 0 1 2 Wu- ping Liming 0 0 0 0 0 0 1 5 1 5 Shuangfang 0 0 1 3 0 0 0 0 1 3 Lingqian 0 0 1 4 1 2 0 0 2 6 Wuping Total 1 2 2 7 2 4 3 12 8 25 31 3. Social Economic Survey of the Affected Areas 3.1 Outlines of the Socioeconomic Status The YWE project passes through Yongan county of Sanming municipality and three counties of Liancheng, Shanghang and Wuping of Longyan municipality. Therefore the socioeconomic survey of the project affected area covered the two municipalities and the four counties. 3.1.1 Outlines of socioeconomic status of Sanming and Longyan (1) Sanming Sanming is located in the mid and northwest part of Fujian provice, with land area of 22959 square kilometers, with hilly area accounting for 82% of the total, arable land area only accounting for 8.3%of the total, with water and other land area accounting for 9.7% of the total. There are a total of 10 counties under the jurisdiction of Sanming municipality, and Yongan is the only one big county known as "the municipal level county". Total population of the municipality is 2.6794 million, including 1.8154 million in rural area. Sanming is one of the three forest areas in Fujian province, with forest coverage of 76.8 percent. In 2004, the output of wood product reached 1.963 million cubic meters, artificial wood plate 0.689 million cubic meters and pulp 0.597 million tons. Sanming is an important industrial base of Fujian province, with such industries as iron and steel, chemical, coal mineral, electricity power generation, machinery, forest products, textile, printing, paper manufacturer, electronics, and food production. GDP in 2004 reached CNY37.584 billion, increased by 10.6% over the previous year, with the annual growth of the first industry and secondary industry and the tertiary industry being by 4.8%, 13.9% and 10.7% respectively. Annual per capita disposable income of urban households reached CNY9968, increased by 7.6% compared with that in 2003. Annual per capita net income for farmers reached CNY3886, increased by 9.3%. (2) Yongan county Yongan is located in the Midwest area of Fujian with land area of 2942 square kilometers, 90 percent of which are hilly area. Per capita arable land area was 0.7mu in 2004. Total population was 319119 in 2004, including 147797 in rural area. There are 3.82 million mu of woodland area in Yongan with forest coverage of 83.2%. It is a production base of artificial bamboo plate in Fujian province. Yongan has rich tourism resources with 4A grade national level scenic spot of Linyin Stone Forest, the national natural reserve of Tianbaoyan (Heaven Treasure Rock) known as the Natural Biological Specie Gene Bank and historical cultural sites, such as Huannan Anzenbao and etc. 32 GDP in 2004 reached CNY7.475 billion, increased by 11.0% over the previous year, with the annual growth of the first industry and secondary industry and the tertiary industry being 6.1%, 14.2% and 9.1% respectively. 3.1.2 Outlines of socioeconomic status of Longyan and the four counties (1) Longyan Longyan is located in the center of the golden triangle area of Xiamen, Zhangzhou and Quanzhou, and also a transport hub at the border area of the three provinces of Fujian, Jiangxi and Guangdong for physical distribution, a transition area and economic corridor linking the coastal area and the hinterland area, with rich mineral and forest resources. Total land area of Longyan is 19100 square kilometers. There are five counties under the jurisdiction of Longyan municipality. Total population in 2004 was 2.8698 million, including 2.0298 million in rural area. Longyan is rich in mineral resources, with annual coal output about 5 million tons accounting for 50% of the provincial total. Longyan is also one of the three forest areas in Fujian province, with forest coverage of 78%. GDP in 2004 reached CNY34.92 billion, increased by 10.5% over the previous year, with per capita GDP of CNY12792. Annual per capita disposable income of urban households reached CNY10230.4, increased by 12.3% compared with that in 2003. Annual per capita net income for farmers reached CNY3769, increased by 11.7%. Per capita floor space of houses for urban residents was 31.91 square meters, and that for rural residents 35.6 square meters in 2004. (2) Liancheng county Liancheng county is located in the west part of Fujian province with total land area of 2595.54 square kilometers and with hilly land accounting for 90% of the total. Its population was 326900 in 2004, including 276900 in rural areas. Liancheng has rich natural resources with woodland over 3 million mu and forest coverage of 82.8%. In recent years the industries of tourism, food, bamboo and wood products, chemicals and minerals were given priority in the economic development based on the local resources. GDP in 2004 reached CNY3.016 billion, increased by 10.0% over the previous year, with the annual growth of the first industry and secondary industry and the tertiary industry being 6.1%, 16.5% and 8.0% respectively, with per capita GDP of 33 CNY9212 increased by 9.9%. Annual per capita disposable income of urban residents reached CNY7330, increased by 15.2% compared with that in 2003. Annual per capita net income for farmers reached CNY3460, increased by 11.1%. (3) Shanghang county Located in the southwest of Longyan, Shanghang borders on Meizhou and Jiaoling of Guangdong province in the south. It has total land area of 2860 square kilometers, with hilly land accounting for 80% of the total. Its population was 481900 in 2004, including 392100 in rural areas. Shanghang has rich mineral resources, including gold, copper, silver, porcelain clay, and etc. There are grade A natural reserve of scenic spots and historical sites. GDP in 2004 reached CNY3.982 billion, increased by 10.0% over the previous year, with the annual growth of the first industry and secondary industry and the tertiary industry being 8.6%, 11.5% and 9.8% respectively, with per capita GDP of CNY8249 increased by 19.3%. Annual per capita disposable income of urban residents reached CNY7265, increased by 13.6% compared with that in 2003. Annual per capita net income for farmers reached CNY3476, increased by 11.9%. Per capita floor space of houses for urban residents was 26.37 square meters, and that for rural residents 41.50 square meters in 2004. (4) Wuping county Located in the area known as "golden triangle" of southwest Fujian province, Wuping borders Shanghang in the east and Xunwu/Huichang of Jiangxi province in the west, and Jiaoling of Guangdong province in the south. It is in the south of Wuyi mountain, with hilly land accounting for 85% of the total 2630 square kilometers land. Its population was 365000 in 2004, including 295000 in rural areas. Total arable land in Wuping was 321400 mu in 2004, with paddy land accounting for 96% of the total. It is one of major national and provincial grain production bases and a demonstration county for non-pollution vegetable production. GDP in 2004 reached CNY2.822 billion, increased by 9.3% over the previous year, with the annual growth of the first industry and secondary industry and the tertiary industry being 6%, 9.1% and 9.24% respectively, with per capita GDP of CNY7731. Annual per capita disposable income of urban residents reached CNY7595.5, 34 increased by 8.8% compared with that in 2003. Annual per capita net income for farmers reached CNY3538, increased by 6.1%. Per capita floor space of houses for urban residents was 26.46 square meters, and that for rural residents 21.44 square meters in 2004. 3.1.3 Socioeconomic analysis of the affected counties Table 3-1 and Table 3-2 list some basic socioeconomic indicators of the affected counties. It can be seen from table 3-1 that the per capita arable land area for the four counties is over 0.70 - 1.152 mu, still higher than the provincial average (0.60 mu; and that the average per mu rice output for the four counties is over 345 - 389 kg. As can be seen from Table 3-2, the annual GDP growth rate for the four counties is lower than the provincial average; and the annual per capita disposable income of urban residents is far less than the provincial average, particularly for the three counties of Longyan it is below CNY7600, CNY3500 less than the provincial average. As for farmer's annual net income, it is CNY4398 for Yongan county, higher than the provincial average, and it is about CNY3500 for the counties of Wuping, Shanghang and Liancheng, which is CNY500 less than the provincial average. On the whole, the three counties of Longyan municipality are in the west Fujian mountain area, with weak industrial foundation and under developed infrastructures, so that their socioeconomic development relatively lags behind that of the coastal area. Yongan county is located in the mid west Fujian province, a transport hub area, relatively economically developed as one of the top ten counties in Fujian province, with farmer's annual net income CNY900 more than the average of the other three counties. 35 Table 3-1 Some Socioeconomic Indicators of the Affected Areas (2004) Population (000) Per capita Rice Per capita floor space Total Farmer Land area Output Urban Rural (mu) (kg/mu) (mZ) (m Sanming 2679.4 1815.4 - 39.7 Yongan 319.1 147.8 0.70 389 40.6(town) Longyan 2869.8 2029.8 - - 31.91 35.6 Liancheng 326.9 276.9 0.77 376 36.36 28.3 Shanghang 481.9 392.1 0.80 345 26.37 41.50 Wuping 365 295 1.152 349 26.46 21.44 Table 3-2 Some Socioeconomic Indicators of the Affected Areas (2004) Output Value Resident income Total Growth Industry Agricultural Urban Rural (CNY bil.) (%) (CNY bil.) (CNY bil.) (CNY/P) (CNY/P) Fujian 605.314 12.1 885.6 131.728 11175 4089 Sanming 37.584 10.6 35.969 13.886 9968 3886 Yongan 7.475 11.0 7.533 1.613 9415 4398 Longyan 34.92 10.5 31.195 12.358 10230.4 3769 Liancheng 3.016 10.0 1.979 1.532 7330 3460 Shanghang 3.982 10.0 3.270 2.120 7265 3476 Wuping 2.822 9.3 1.770 1.633 7595.5 3538 3.2 Social/resettlement Survey 3.2.1 Survey of the affected towns A total of 15 towns and 280 villages affected by the YWE project, with total population of 423000, including 358400 in rural areas accounting for 85% of the total. Table 3-3 shows the summary of the outlines of the affected towns of the four counties. 36 Table 3-3 Some Socioeconomic Indicators of the Affected Areas (2004) Vil. Population(000) Floor Net Farm Rice city Town No. space income land output Total Rural (m2/P) (CNY/P) (mu/P) (kglmu) Yanxi 9 26.9 6.4 25 4902 1.19 426 X Hongtian 20 16.6 15.1 42 4705 1.42 398 Xiaotao 34 28.3 26.0 12.66 4155 1.41 392 Xinquan 19 30.8 29.0 37 2560 0.63 450 a Pengkou 21 27.9 21.2 23 2863 1.01 413 . Quxi 9 5.2 5.2 3639 1.33 311 Gutian 15 20.9 12.2 2989 0.90 410 Wenheng 19 27.5 26.9 29 2705 1.06 365 Lincheng 23 39.6 30.0 4050 0.67 416 . Huyang 22 29.8 29.8 3318 0.77 332 X Nanyang 20 42.3 42.3 3562 0.66 371 Un Caixi 15 24.2 24.2 3724 0.60 391 Jiuxian 19 27.8 27.8 3408 0.55 386 Shifang 19 38.6 33.8 41.2 4028 0.82 362 Yanqian 16 36.6 28.5 40.8 3766 0.97 352 It can be seen from the table that Yongan is the county with relative higher farmer's annual net income, with Yanxi the highest up to CNY4902 owing to the fact that it is close to the county urban area. In terms of the per capita farm land area, Shanghang county is the lowest, over 0.55 - 0.77 mu, followed by Liancheng and Wuping, about 1.4 mu; with the towns of Hongtian and Xiaotao of Yongan county the highest over 1.4 mu. Of the total affected villages, there are 69 villages will be involved in the land acquisition and the resettlement, accounting for 26% of the total, 13 of which are in Yongan county, with 25 in Liancheng county, 20 in Shanghang and 11 in Wuping county. Table 3-4 shows some basic facts of the affected villages. The laborers refer to those of 16 - 60 years old, and the other land mainly including hilly land, orchard, house site, waste land, path for farm-use tractors, etc. 37 Table 3-4 Some Basic Facts of the Affected Areas (2004) Population Arable land Other Town Village -ln Total |Femal Labower Total Pady | Dry Pool land _ _ _ _ _(mu) Yongan County Shangjishan 697 320 409 429 339 40 50 6985 Yan- Xialing 494 250 290 924 800 119 5 9932 xi Dalian 1098 508 618 2106 1671 412 23 15585 Jinglong 748 402 580 1010 1010 0 0 9746 Hong- Guihu 730 350 401 950 780 170 0 8550 tian Hongtian 890 458 476 1001 993 8 0 6550 Mahong 1316 586 785 1336 500 800 36 16664 Shuixi 834 415 620 1035 857 173 5 10965 Shangji 424 207 328 617 617 0 0 7554.4 Xiao- Jiancun 1173 437 667 1605 1530 75 0 19395 tao Dataokou 1335 658 809 1709 1709 0 0 8204.8 Meiban 1085 517 591 1495 1495 0 0 12444 Zhongban 806 376 395 934 934 0 0 16942 Liancheng County Lelian 2371 1263 1096 1026 910 105 11 12542 Lejiang 2688 1341 1152 1318 1000 310 8 600 Liangmeng 1350 705 450 895 769 106 20 8350 Xinquan 4233 2016 1988 1092 1082 0 10 7368 Xin- Liangfu 2580 1223 1068 1209 975 230 4 1050 qan Qingan 1135 535 450 740 640 80 20 10780 Beicun 3217 1683 1716 1018 900 105 13 1798 Lianxi 2288 1136 915 696 400 250 46 19600 Xicun 1973 980 980 900 500 390 10 5245 Tianma 1722 712 864 1914 1620 120 174 14165 Peng- Pengkou 5210 3050 2750 2455 2294 105 56 26026 kou Wangcheng 932 419 460 868 692 122 54 7843 Liangzeng 1682 890 706 1165 1100 50 15 14155 Dadi 340 210 280 615 615 0 0 11250 Fudi 1217 617 720 2580 2000 80 500 24974 Wenbao 2017 1000 900 1730 1500 200 30 19445 heng Wenpi 3820 1920 2100 2233 2200 33 0 8650 heng Zhugang 1711 821 1200 1510 1510 0 60 6960 Longgang 2002 970 850 1984.8 1624.8 240 120 12211 Nankeng 1385 623 621 1937.8 1917.8 0 20 20402 To be continued 38 Table 3-4 Some Basic Facts of the Affected Areas (2004) Population Arable land Other Town Village l ll l lland Total Femal L|aborer Total Pady Dry Pool Liancheng County Chengdou 1048 500 600 524 424 100 0 41000 Xiabao 3324 1669 1994 1109 1016 82 11 20749 Gu- Zhongbao 3866 1938 1440 1856 1645 182 29 18078 tian Shangbao 3069 1490 1285 1895 1877 18 0 26710 Quxicun 1786 862 1120 1689 1595 94 0 2846.4 Shanghang County Xiache 1061 525 375 715 715 0 0 27500 Mayangdong 751 380 320 527 350 175 2 10020 Nan- Haodong 3428 1650 1200 2570 2400 140 30 27000 yang Sheshan 4619 2402 1386 3010 1000 2000 10 19504 Shuangxi 1480 720 650 940 940 0 0 7000 Chenkeng 516 315 300 268 208 50 10 3369 Caixi Xiawang 1350 720 580 980 950 28 2 6350 Rongshi 1127 545 525 977 890 57 30 20939 Tiechang 1182 582 807 810 400 400 10 6120 Jiuxian Shizhen 2128 1017 1163 1505 1125 367 13 3810 Meixi 3178 1713 1300 2421 1871 500 50 6608 Shiqi 779 370 510 500 500 0 0 1800 Lin- Gushi 1081 431 386 892 657 222 13 7925 cheng Jiuzhou 2600 1680 1500 1700 1000 600 100 15000 Fugu 886 465 460 650 470 150 30 2850 Lin- Xijiao 1936 986 950 3100 1300 1500 300 7480 cheng Chengbei 2300 1640 1180 880 650 130 100 1200 Xinan 2167 1115 923 2180 1800 80 300 10160 Wenguang 1485 738 680 1600 1230 320 50 12190 Huyang __I Tongqiao 1694 855 860 1230 1122 108 0 6864 To be continued 39 Table 3-4 Some Basic Facts of the Affected Areas (2004) Population Arable land Other TownTotal Femal Total Pady Dry Pool land Wuping County Shuangfang 3043 1450 1200 2850 1850 700 300 18338 Fenggui 2005 650 1180 1740 740 800 200 11700 Yanqian Longjing 1055 650 400 600 500 50 50 14400 Lingqian 4725 2890 3200 1960 1200 760 0 6122 Liming 1730 830 810 1350 960 370 20 8750 Xiongxin 1846 956 752 1248 1217 21 10 1500 Sanfang 1584 768 610 588 500 40 48 2870 Shifang Gaowu 4800 2500 1600 3000 2900 80 20 300 Jixian 2314 1204 1230 1457 1200 240 17 2100 Niushentang 2507 1373 893 1548 1506 21 21 19056 Xianshui 2600 1300 1150 1400 900 480 20 6700 Of the total affected villages, there are a total of 27107 households, with total population of 132553, with average of 4.89 per household. 98.5 of the affected population are in rural areas, with females of 67477, accounting for 50.91% of the total; laborers of 63745 accounting for 48.10% of the total. Total arable land area of the affected 69 villages is 95306.6 mu, including 77092.6 mu of paddy land accounting for 80.89% of the total, 15188 mu of dry land accounting for 15.94% of the total, 3086 mu of pool accounting for 3.24% of the total. The per capita arable land area is 0.73 mu, including 0.59 mu of paddy land, 0.12 mu of dry land. Table 3-5 show the variation and distribution of per capita arable land area of the affected 69 villages. Table 3-5 Per Capita Arable land Area Affected by the Project Variation Total B2.00 1.50-2.00 1.00-1.50 0.60-1.00 <0.60 No. of Village 69 1 4 15 31 18 Share of total 100% 1.45% 5.80% 21.74% 44.93% 26.09% As can be seen from the table that the affected villages with per capita arable land area over 1.50 mu account for less than 7.5% of the total; that over 0.60 - 1.00 accounting for about 45% of the total, that over 1.00 - 1.50 accounting for about 22% 40 of the total and that less than 0.60 accounting for 26% of the total. To assess the nature and magnitude of the resettlement sample survey was conducted during the socioeconomic survey, covering a total of 33 affected villages and 920 affected households with interviews and questionnaire. The selected 33 samples of the affected villages include those at the interchange areas, involving great amount of land acquisition and resettlement activities, and at places with more poverty populations or at historical culture sites. The sample survey covers about 68% of the affected houses and 60% of the land acquisition. There is no minority nationality in the YWE project area. 3.2.3 Sample survey of the affected households The sample survey of the affected households was conducted over September - October 2005. (1) Sampling There are a total 9331 households and population of 45578 affected by the land acquisition and resettlement for the YWE project. There are 1692 households are in Yongan accounting for 18.13% of the total, 3155 households in Liancheng accounting for 33.81% of the total, 2237 households in Shanghang accounting for 23.97% of the total, and 2247 households in Wuping accounting for 24.08% of the total. Sampling approach was taken for the survey, taking into account of different types and extents of the impacts. A total of 920 affected households was selected as samples, including 388 households need to be relocated. Of the total sampled households, 165 are in Yongan copunty, accounting for 17.93% of the total; 375 in Liancheng accounting for 40.76%; 230 in Shanghang accounting for 25.00%; 150 in Wuping accounting for 16.30% of the total. The sampled 920 households accounts for 9.86% of the total affected households. The samples possess typicalness and representativeness and can be taken as the basis for the impact analysis. Table 3-6 shows the outlines of the sample distribution of the affected households. (2) Sample survey results and analysis (i) Basic conditions The sample survey of the affected households mainly covers the basic conditions of the households, including farm production activities, annual income and expense. Table 3-7 shows the summary of the sample survey results. Total population of the 920 sample households is 4558, with average of 4.95 per household, with female accounting for 50.25% of the total, average laborer of 2.45 per household, with female accounting for 50.36% of the total. The average contracted land per household is 6.25 mu, including 2.60 mu of 41 crops production land, 1.82 mu of orchard and 1.83 mu of woodland. Typical products are rice, vegetables, sweet potato, tobacco and bamboo shoot. The average annual rice output is about 755 kg with little difference among the four counties. The output of sweet potato in Liancheng county and that of bamboo shoot in Yongan county are higher than those in other counties. The average annual income per household is about CNY17328, with the highest of CNY23400 for Yongan and the lowest of CNY14680 for Liancheng. The income is mainly from agricultural activities, accounting for 67.1% of the total, followed by salaries from enterprises. Income from animal husbandry accounts for 24.19% of the total from agricultural activities. Table 3-6 Sampling of the Affected Villages and Households in the Survey City Town Affected village Affected household Total Sampled (%) Total Sampled (%) Yanxi 3 1 33.33% 355 30 8.45% a Hongtian 5 3 60.00% 956 80 8.37% o Xiaotao 5 2 40.00% 647 55 8.50% Subtotal 13 6 46.15% 1958 165 8.43% Xinquan 9 5 55.56% 651 160 24.58% Pengkou 4 2 50.00% 636 55 8.65% cn c Wenheng 7 3 42.86% 1154 75 6.50% . Gutian 4 2 50.00% 627 60 9.57% Quxi 1 1 100.00% 77 25 32.47% Subtotal 25 13 52.00% 3145 375 11.92% Nanyang 5 2 40.00% 1087 60 5.52% Caixi 3 1 33.33% 355 30 8.45% C0 co Jiuxian 3 1 33.33% 312 30 9.62% 0) CN X Lincheng 7 3 42.86% 782 80 10.23% cn Huyang 2 1 50.00% 351 30 8.55% Subtotal 20 8 40.00% 2887 230 7.97% Yantian 4 2 50.00% 858 50 5.83% C . Shifang 7 4 57.14% 1936 100 5.17% Subtotal 11 6 54.55% 2794 150 5.37% Total 69 33 47.83% 10784 920 8.53% The annual average total expenses per household is CNY12548, of which CNY4233 is for subsistence accounting for 33.74% of the total; CNY3433 for agricultural production costs accounting for 27.36% of the total; CNY2972 for education accounting for 23.68% of the total; with other costs for social activities 42 accounting for about 6.5% of the total and less than 2% of the total for tax due. (ii) Survey of vulnerable groups In accordance to the criteria set forth by Fujian provincial and local governments, per capita annual average income less than CNY1 000 is the poverty line. Those with per capita annual average income over CNY1001 - 1500 are defined as low income household or population. Of the total 920 sample households, there are 40 households are of poverty and low income accounting for 4.35% of the total, with population of 138, including 16 households under the poverty line, 12 households with sick person, 8 single elder households, 3 single female parent family and one low income household. (iii) Sex-role homogeneity The status and role of females in the Project affected area were included in the survey. It is found that the status and role of women in the YWE project area are basically equal and husband and wife have decision-making rights with major family decisions usually jointly made based on consultation. Men would be given the role to work and secure income for the family, while women would have more opportunities taking part in public meetings in the village. It is found from the survey that women earn over 20% - 60% of the family income. Boys and girls have equal educational opportunity. Parents usually do their best to send their children to study in school, but there are more girls discontinue their study than boys. (iv) Issues mostly concerned by the affected persons It is found from the survey that the issues mostly concerned by the affected persons are as the following. * Full payment of the compensation directly to the affected households; * The relocation site should be properly selected taking into account of accessibility and mobility and the living environment; * More area for the new house site to facilitate animal husbandry activity; * Demolition and relocation activities should be arranged in slack season with little interference with farm work; * Those with loss of contracted land arising from the land acquisition hope to get enough compensation by land reallocation; * Women, particularly those under the age of 30, hope to get professional trainings, such as hairdressing, hotel and restaurant, for employment opportunity. 3.2.4 Affected enterprises Most of the affected enterprises are small ones, private owned based on the land rent from household contracted land. The employees are local farmers. Measures 43 have been taken in the preliminary design to minimize the enterprise relocation activities, so that there are only a few enterprise land and buildings affected. For the managers of the affected enterprises, they do not care about the relocation, since their land is rent and it is an opportunity for them to find a better place and they concerned more about full compensation. For those not involved in the land acquisition and resettlement activities, they hope that the YWE project should have little impact as far as possible on their normal production and living condition of their employees. The survey shows that about 63% of the employees of the affected enterprises surveyed do not want their enterprises to be relocated, because of the possible loss of their job; and 30% of the employees do not care about the relocation and their job and seem confident to find better job. However, they all hope to get enough compensation and assistance from the resettlement office to find a better job. 44 Table 3-7 Basic Facts of the Affected Households from the Sample Survey Item Unit Sampled Yongan Liancheng Shanghang Wuping Total Average Total Average Total Average Total Average Total Average A. Household Sampled Num. 920 165 375 230 150 1. Total members P 4558 4.95 809 4.90 1883 5.02 1134 4.93 734 4.89 Num. of female P 2291 2.49 382 2.31 939 2.50 590 2.56 380 2.53 2. Laborer P 2259 2.45 485 2.94 921 2.45 513 2.23 340 2.27 Num. of female P 1137 1.24 232 1.41 460 1.23 272 1.18 174 1.16 B. Farm production 1. Contracted land mu 5749.15 6.25 1287.00 7.80 2051.25 5.47 1501.90 6.53 909.00 6.06 (1) Plough mu 2390.95 2.60 582.45 3.53 787.50 2.10 632.50 2.75 388.50 2.59 Paddy mu 1810.50 1.97 445.50 2.70 585.00 1.56 483.00 2.10 297.00 1.98 Dry mu 485.15 0.53 117.15 0.71 165.00 0.44 126.50 0.55 76.50 0.51 Pool mu 95.30 0.10 19.80 0.12 37.50 0.10 23.00 0.10 15.00 0.10 (2) Orchard mu 1678.75 1.82 338.25 2.05 645.00 1.72 425.50 1.85 270.00 1.80 To be continued 45 Table 3-7 Basic Facts of the Affected Households from the Sample Survey Item Unit Sampled Yongan Liancheng Shanghang Wuping Total Average Total Average Total Average Total Average Total Average (3) Woodland mu 1679.45 1.83 366.30 2.22 618.75 1.65 443.90 1.93 250.50 1.67 2. Crop output Kg 1587145 1725 266145 1613 731250 1950 359950 1565 229800 1532 Rice Kg 694830 755 132000 800 277500 740 173880 756 111450 743 Vegtable Kg 116505 127 31845 193 42750 114 23460 102 18450 123 Sweet potato Kg 448525 488 12375 75 307500 820 80500 350 48150 321 Tabaco kg 120650 131 4125 25 48375 129 40250 175 27900 186 Bamboo shoot 206635 225 85800 520 55125 147 41860 182 23850 159 C. Annual income CNY/hh 15942210 17328 3861000 23400 5505000 14680 3873660 16842 2702550 18017 1. A.H.F. 10696580 11627 2527305 15317 3640125 9707 2682950 11665 1846200 12308 Crops 6839915 7435 1502160 9104 2253375 6009 1790780 7786 1293600 8624 Forestry 574990 625 184800 1120 157500 420 184690 803 48000 320 Fruit 694020 754 162195 983 248625 663 193200 840 90000 600 Husbandry 2587655 2813 678150 4110 980625 2615 514280 2236 414600 2764 2. Industry 196355 213 52800 320 81375 217 38180 166 24000 160 To be continued 46 Table 3-7 Basic Facts of the Affected Households from the Sample Survey Item Unit Sampled Yongan Liancheng Shanghang Wuping Total Average Total Average Total Average Total Average Total Average 3. Building CNY 266805 290 124740 756 48375 129 66240 288 27450 183 4. Transport CNY 200000 217 55770 338 66750 178 34730 151 42750 285 5. Trade, food CNY 963775 1048 283635 1719 259500 692 212290 923 208350 1389 6. Salary CNY 2927450 3182 651750 3950 1209750 3226 630200 2740 435750 2905 7. Other nonfarm CNY 691245 751 165000 1000 199125 531 209070 909 118050 787 D. Annual expense CNY/HH 11544350 12548 2755500 16700 3956250 10550 2845100 12370 1987500 13250 1. Subsistance 3894800 4233 915750 5550 1353750 3610 968300 4210 657000 4380 2. Social activity 779570 847 182820 1108 266250 710 195500 850 135000 900 3. Education 2733975 2972 612975 3715 960000 2560 690000 3000 471000 3140 4. Farming cost 3158200 3433 673200 4080 1140000 3040 805000 3500 540000 3600 5. Tax 223920 243 52635 319 112125 299 23460 102 35700 238 6. Others 753885 819 318120 1928 124125 331 162840 708 148800 992 47 3.3 Impact Assessment The major source of the rural household income is from agricultural production, accounting for 67% of the total in average, followed by work for local enterprise or in other places, accounting over 18% in average. Therefore, there are more rural residents to develop animal husbandry or to go to cities to find work, particularly for youths with higher education. The YWE project will have the following impacts on the local production system and the local people' life. (1) Arable land is the major source for rural residents' subsistence, the land acquisition of the YWE project will result in the loss of the arable land for affected households, which need to be compensated through resettlement, including giving employment opportunity, the improvement of production and living environment. For those to be locally resettled in farm land with little change of traditional production mode, their living standards would be restored and improved before long, so the impact may not be so great. For those to be resettled in the field other than farmland, they have to select a new life style by learning new ways for subsistence and to be familiar to new work, so it would take time for them to adapt to the new environment and their living standard may be lowered for the time being. (2) There are certain impacts on those with their household income mainly from places other than farm land, the impact of the land acquisition and resettlement for the YWE project would be relatively limited. (3) A lot of work will be needed in the process of the relocation of the houses, which are time consuming and labor intensive, not convenient for daily life. Despite all these impacts caused by the YWE project, the opportunities for the reform of the local socioeconomic system created by the same will be attractive. After completion of the YWE project, it will play an important role in the facilitation of the commodity flow in the western Fujian province and further improvement of the living standards the people in the mountain area. 3.4 Points of Attention for the Resettlement Action Plan Based on the socioeconomic survey of the affected area, attentions need to be paid to the following issues. (1) Three of the four affected counties are poverty counties by the national criteria of the poverty line. Thoughfful resettlement action plan should be formulated for all the counties affected, so that the living standards of the affected should be improved, or at least to restore them, in real terms, to pre-displacement levels or to levels prevailing prior to he beginning of project implementation, whichever is higher. 48 (2) Agricultural production is the major revenue source of the affected households, the impact arising from the requisition of the arable land will be substantial for the affected households, so it is necessary to reallocate the arable land for the affected households as much as possible for the affected people. (3) The compensation money should be directly paid to the affected persons to reduce intermediate hand as far as possible. Supervision should be strengthened over the handover of the compensation payment to prevent the compensation fees from being embezzled or diverted. (4) The relocation site should properly selected in local area not far from local village, taking into consideration of accessibility and mobility as well as living environment. 49 4. Legal Framework The RAP is prepared in accordance with the World Bank document OP 4.12 BP 4.12 Involuntary Resettlement as well as the laws and regulations of the People's Republic of China (PRC) and the Provinces where the engineering project is located. 4.1 Policies There three levels of the policies related to land acquisition and resettlement in China as the following. (1) The central government of the PRC promulgates national laws and regulations and implementation guidelines to establish basic policy frame. (2) The governments at provincial level publish comprehensive or special regulations to the implementation of the national laws and regulations. (3) The governments at local level, prefectures, cities and counties, may set forth rules for particular items. The resettlement action plan shall be prepared in accordance with the following laws, regulations, the World Bank documents of Involuntary Resettlement, OP 4.12 and BP 4.12 and the sample resettlement action plan for highway projects in China (draft). 4.2 State Laws and Regulations The following laws include the key policies relating to land, grassland and forest. (1) The Land Administration Law of the PRC (adopted at the Sixteenth Meeting of the Standing Committee of the 6th National People's Congress on June 25, 1986, amended in accordance the Decision on Amending the Land Administration Law of the People's Republic of China made at the Eleventh Meeting of the Standing committee of the Tenth National People's Congress on August 28, 2004) and the Rules for the Implementation of the Land Administration Law of the PRC. (2) The Grasslands Law of the PRC (adopted at the Eleventh Meeting of the Standing Committee of the 6th National People's Congress on June 18, 1985 and revised at the Thirty-first Meeting of the Standing Committee of the Ninth National People's Congress in December 2002). (3) The Forest Law of the PRC (adopted at the Seventh Meeting of the Standing Committee of the 6th National People's Congress on June 20,1984 and revised at the Second Meeting of the Standing Committee of the Ninth National People's Congress on 29, April 1998) and the Rules for the Implementation of the Forest Law of the PRC. (4) State Council Decisions on Deepening Reform and Tightening Land Management, (Document No. [2004] 28), issued by the State Council on October 21, 2004; (5) Guidelines for Improvement of Land Compensation and Resettlement System, (Ministry of Land Resources Issued File No.[2004]238), Ministry of Land Resource, November 3, 2004. 50 4.3 The main provisions of the Land Administration Law of the PRC The State applies a system of control over the purposes of land-use. The State formulates overall plans for land utilization in which to define the purposes of land-use and classify land into land for agriculture, land for construction and unused land. It shall rigidly restrict conversion of land for agriculture to land for construction, keep the total area of the land for construction under control and give special protection to arable land. 4.3.1 Ownership of land and right to the use of land Land in the urban areas of cities is owned by the State. Land in rural and suburban areas is owned by peasant collectives, except for those of land which belong to the State as provided for by law; house sites and private plots of cropland and hilly land are owned by peasant collectives. State-owned land and land owned by peasant collectives may be lawfully determined to be used by units or individuals. Units and individuals that use land shall have the obligation to protect and manage the land and make rational use of it. Land owned by peasant collectives that belongs lawfully to peasant collectives of a village shall be operated and managed by collective economic organizations of the village or by villagers' committees; land already owned by different peasant collectives that belong to two or more different collective economic organizations in the village shall be operated and managed by the rural collective economic organizations in the village or by villagers' groups; land already owned by a peasant collective of a township (town) shall be operated and managed by the rural collective economic organization of the township (town). Land owned by peasant collectives shall be registered with and recorded by people's governments at the county level, which shall, upon verification, issue certificates to confirm the ownership of such land. Land owned by peasant collectives to be lawfully used for non-agricultural construction shall be registered with and recorded by people's governments at the county level, which shall, upon verification, issue certificates to confirm their right to the use of such land. The specific organs for registration and issue of certificates for State-owned land to be used by central or State organs shall be determined by the State Council. Ownership or the right to the use of forest land or grassland and the right to the use of water surface for aquaculture shall be confirmed respectively in accordance with the relevant provisions of the Forest Law, the Grassland Law and the Fisheries Law of the People's Republic of China. 51 Any change to be lawfully made in land ownership, in the right to the use of land or in the purpose of use of land shall be registered. The lawfully registered ownership of land and right to the use of land shall be protected by law and may not be infringed by any units or individuals. State-owned land may be operated under a contract by units or individuals for crop cultivation, forestry, animal husbandry or fishery. Land owned by peasant collectives may be operated under a contract for crop cultivation, forestry, animal husbandry or fishery by units or individuals that do not belong to the economic organizations of the said collective. The party that gives out the contract and the party that undertakes it shall sign a contract in which to stipulate the rights and obligations of both parties. The duration of such contract shall be provided for by the contract. The units or individuals that contract to operate the land shall have the obligation to protect such land and make rational use of it in conformity with the purpose of use provided for in the contract. Land owned by peasant collectives shall be operated under a contract by units or individuals that do not belong to the economic organizations of the said collectives, with the agreement of at least two-thirds of the members of the villagers assembly or of the representatives of villagers, and the matter shall be submitted to the township (town) people's government for approval. 4.3.2 Land to be used for construction Whereas occupation of land for construction purposes involves the conversion of agricultural land into land for construction purposes, the examination and approval procedures in this regard shall be required. For projects of roads, pipelines and large infrastructure approved by the people's governments of provinces, autonomous regions and municipalities, land for construction has to be approved by the State Council whereas conversion of agricultural land is involved. The requisition of the following land shall be approved by the State Council: Basic farmland; Land exceeding 35 hectares outside the basic farmland; Other land exceeding 70 hectares. Requisition of land other than prescribed in the preceding paragraph shall be approved by the people's governments of provinces, autonomous regions and municipalities and submitted to the State Council for the record. For requisition of land by the State the local people's governments at and above the county level shall make an announcement and organize the implementation after 52 the approval according to the legal procedures. Owners or users of the land requisitioned should, within the time limit specified in the announcement, go through the compensation registration for requisitioned land with the land administrative departments of the local people's governments on the strength of the land certificate. In the case of temporary using State-owned land or land owned by peasant collectives by construction projects or geological survey teams, approval should be obtained from the land administrative departments of local people's governments at and above the county level. Whereas the land to be temporarily used is within the urban planned areas, the consent of the urban planning departments should be obtained before being submitted for approval. Land users should sign contracts for temporary use of land with related land administrative departments or rural collective organizations or villagers committees depending on the ownership of the land and pay land compensation fees for the temporary use of the land according to the standard specified in the contracts. Users who use the land temporarily should use the land according to the purposes agreed upon in the contract for the temporary use of land and should not build permanent structures. The term for the temporary use of land shall not usually exceed two years. 4.3.3 Compensation for requisitioned land In requisitioning land, compensation should be made according to the original purposes of the land requisitioned. Compensation fees for land requisitioned include land compensation fees, resettlement fees and compensation for attachments to or green crops on the land. The land compensation fees shall be 6-10 times the average output value of the three years preceding the requisition of the arable land. The resettlement fee shall be calculated according to the number of agricultural population to be resettled. The number of agricultural population to be resettled shall be calculated by dividing the amount of arable land requisitioned by the per capital land occupied of the unit whose land is requisitioned. The resettlement fees for each agricultural person to be resettled shall be 4-6 times the average annual output value of the three years preceding the requisition of the arable land. But the maximum resettlement fee per hectare of land requisitioned shall not exceed 15 times of the average annual output value of the three years prior to the requisition. The standards for land compensation and resettlement fees for land requisitioned shall be determined by various provinces, autonomous regions and municipalities in reference to the land compensation fees and resettlement fees for arable land requisitioned. 53 The standards for compensating for ground attachments and green crops on the land requisitioned shall be determined by various provinces, autonomous regions and municipalities. In requisitioning vegetable fields in suburban areas, the units using the land should pay new vegetable field development and construction fund. Whereas the land compensation fees and resettlement fees paid according to the provisions of the second paragraph of this article are not enough to maintain the original level of living, the resettlement fees may be increased with the approval of the people's governments of provinces, autonomous regions and municipalities. But the combined total of land compensation fees and resettlement fees shall not exceed 30 times the average output value of the three years prior to the requisition. In special circumstances, the State Council may raise the standards for land compensation and resettlement fees for land requisitioned according to the social and economic development level. After the plan for land compensation and resettlement fees is finalized, related local people's governments shall make an announcement and hear the opinions of the rural collective economic organizations and peasants whose land has been requisitioned. Rural collective economic organizations shall make public to its members the receipts and expenditures of the land compensation fees for land requisitioned and accept their supervision. It is forbidden to embezzle or divert the land compensation fees and other related expenses. Local people's governments at all levels shall support rural collective economic organizations and peasants in their efforts toward development and operations or in starting up enterprises. 4.4 Recently Provisions Concerning Land Compensation and Resettlement 4.4.1 State Council Decisions on Deepening Reform and Tightening Land Management Improvement of land acquisition compensation measures: The people's government, at the county level and the above, shall take concrete measures to make sure the living standards of farmers affected by the land acquisition will not be lowered owing to the requisition of their land, to make sure full payment of the compensation fees for the land, the resettlement and the attachments on the land to 54 be carried out in time. The compensation for the land acquisition and resettlement should reach the legal upper limit on the amount of financial compensation and if it still fails to improve their livelihoods and or at least to restore the standards of living, in real terms, to pre-displacement levels, the local governments may use the revenue from the state owned land use fee as the government grant to the compensation. The people's government at provincial level should develop and publish uniform criteria for land output value or integrated land price in a region, so as to carry out land compensation based on the same price within the region, and the full amount of the land compensation for state key project should be included in the government budget. Proper resettlement of the farmers affected by the land acquisition: The people's government at and above the county level shall take concrete measures to secure long term subsistence of the farmers whose land have been requisitioned. For projects expected to have stable revenue, the farmers may be the stakeholders of the said project with their land use right as their equity share. Farmers within urban planning area have lost their land owing to the land acquisition, shall be included in the employment program of the urban area and the social security system. Outside urban planning area, when collectively owned land is requisitioned, necessary arable land shall be reallocated to the affected farmers, or proper employment opportunity shall be provided to the affected. Otherwise, resettlement of the affected to other places shall be arranged. The labor and social security department shall set forth employment and training program for the affected farmers in consultation with the relevant departments. To improve and tighten the land acquisition procedures: During the process of the land acquisition, it is necessary and imperative to protect the collective ownership of the land and the farmers' contracted land operation right. Prior to the submit of the land acquisition application document for approval, the farmers shall be informed of the event of the land acquisition, including the purpose use, location, compensation criteria, resettlement arrangement and etc; the results of the current status survey of the land to be requisitioned shall be endorsed by the collective economic organization and the relevant farmer households; and public hearings should be carried out as organized by the land resource administration department whenever it is necessary. The endorsement and the relevant materials concerning the public awareness shall be indispensable material in the submitted land application document. It is necessary and imperative to speed up and perfect the coordination and arbitration mechanism for the land acquisition and resettlement, for the purpose to protect the lawful right of the farmers and the land users. All the land acquisition approved shall be announced to the general public, except for some special cases. To strengthen the process monitoring and supervision of the land acquisition: The people's government at provincial level shall develop measures concerning the 55 allocation of the compensation payment within the rural collective economic organizations in accordance to the principles of the compensation fee mainly used for the households whose land have been requisitioned. The receipt and allocation of the compensation payment shall be announced to the collective economic organization members and accept the supervision and monitoring by the agricultural and civil administration departments; and the internal and external monitoring of the land acquisition and resettlement compensation payment, allocation and use shall also be strengthened. 4.4.2 Guidelines Concerning the Improvement of the Land Compensation and Resettlement System Issued by the Ministry of Land Resources Based on the requirements of the documents issued by the State Council, the Ministry of Land Resources quickly released two decisions on enhancing rural housing land administration and improving compensation system to guarantee the rights and interests of those farmers whose land has been requisitioned. (1) Land acquisition compensation criteria Uniform criteria of annual average output value: The provincial land resource administration department shall, in conjunction with the relevant departments, formulate the criteria of minimum annual average output value for arable land for each of the counties (cities), taking into considerations of the arable land type, quality, farmers' input, farm products' prices and etc., subject to the approval of the provincial people's government. Uniform compensation times of the annual average output value: The land acquisition and resettlement compensation shall be calculated in terms of the times of the annual average output value from the arable land and it shall follow the principles of maintain the original level of living for farmers whose land have been requisitioned. Where the land compensation fees and resettlement fees paid according to the laws and regulations are not enough to maintain the original level of living or not enough to pay the social security fee of the affected farmers, the compensation and resettlement fees may be increased with the approval of the provincial level people's governments. In the case of the combined total of land and resettlement compensation fees up to 30 times the average output value of the three years prior to the requisition still not enough to maintain the original level of living, the local governments may use the revenue from the state owned land use fee as the government grant to the compensation. The compensation for the land acquisition and resettlement should reach the legal upper limit on the amount of financial compensation for the approved farmland occupation. (2) Ways of resettlement of the farmers whose land have been requisitioned Resettlement through agricultural production: 56 Those affected by the acquisition of the land outside urban planning areas owned by peasant collectives should be resettled with necessary arable land for them to continue agricultural production, through readjustment of contracted land by use of land reserved by collective economic organization, land turned back on a voluntary basis by contractors, land increased through reclamation, or by transfer of the right to land contractual management. Resettlement with provision of employment opportunity: Employment opportunities should be provided to the farmers whose land has been requisitioned. Farmers affected by land acquisition of projects in the urban planning areas should have priority to get the employment opportunity and the project owner should provide job training to the affected farmers free of charge. Farmer with permanent loss of their farm land should be included in urban employment program and the social security system. Resettlement with equity rights: For projects with long term stable revenue, the compensations for the land acquisition or the land use right may be used for investment as shareholding, through consultation between the rural collective economic organization representing the farmers and the project owner, on volunteer basis. Resettlement by migrating to other places: Where no basic production and living conditions can be provided to the affected farmers, the government may organize those affected to migrate to other place subject to full consultation and the agreement of the rural collective economic organization and the affected farmers. 4.5 Regulations Issued by Fujian Provincial Government 4.5.1 Measures for the Implementation of the Land Administration Law of the People's Republic of China in Fujian Province There are particular regulations promulgated by Fujian provincial government for the purpose to implement the stat e laws and regulations, mainly including the following. "Measures for the Implementation of the Land Administration Law of the People's Republic of China in Fujian Province" (effective as of January 1, 2000) The following is a summary of its main provisions concerning land acquisition and resettlement. Article 25 Compensation paid by the land user for requisitioned arable land shall include the compensation for land, resettlement subsidies and compensation for young crops and attachments on the land. Article 26 Land compensation shall be paid to the collective land operation 57 management unit (CLOMU, hereinafter) who is entitled to exercise the land ownership right for the collective-owned land. For the land, however, having been contracted out to individual farmers, or the land of private plot, no less than 70% of the land compensation should be paid to the said farmer, if the CLOMU fails to arrange other land with similar quantity and quality for the said farmers to continue the contract. Where conditions allow the CLOMU to use the land compensation revenue to create the farmer's means of subsistence by developing production, it should be arranged uniformly, subject to the consent of the said farmers. Other types of land may be arranged for the affected farmers, however, the compensation shared by the affected farmers and the CLOMU should be determined after consultation, if the quantity and quality of the arranged land are not comparable to the original ones. The land compensation kept by the CLOMU should be deposited in a special bank account used for productive development, arrangement of excess labor force and grant-in-aid to the affected farmers. The use of the land compensation should be determined by the members of collective economic organizations through voting; and the financial account of the income and expenditure should be made known to the public every 6 months to be supervised by the members of the collective economic organizations. No units or individuals may withhold, misappropriate, seize or use in any illegal form the compensation. Article 27 Land compensation shall be paid in accordance with the criteria as follows. (1) For requisitioned arable land, which belongs to paddy field, vegetable plot, fish pond, the amount of compensation shall be equal to 8 - 10 times the average annual output value of the acquired land in the previous 3 years; for the taken-over for use of the other types of arable land, the amount of compensation shall be equal to 6 - 8 times the average annual output value of the acquired land in the previous 3 years. (2) For requisitioned orchard or other types of economic woodland, the amount of compensation shall be 60 - 70 % of that for the paddy field; or that for similar type of land if the land originally belong to arable land. (3) For requisitioned non-economic woodland, the amount of compensation shall be 40 % of that for the paddy field. (4) For requisitioned aquatic production water area, beach, the amount of compensation shall be 60 - 70 % of that for the paddy field. (5) For requisitioned salt pan, the compensation shall be 50 % of that for the 58 paddy field. (6) For requisitioned unused land, the compensation shall be 15% of that for the paddy field. Article 28 For resettlement of the PAPs needing to be arranged by the collective economic organizations, the resettlement subsidies shall be paid to the CLOMU; or to other unit which has the authority over the arrangement of the resettlement. For the resettlement of the PAPs needing no uniform arrangement, the resettlement subsidies shall be paid to the individuals to be resettled or paid as his/her insurance premium subject to the recipient's consent. Article 29 Resettlement subsidies for requisition of arable land should be estimated based on the agricultural population to be resettled. The number of the agricultural population to be resettled shall be calculated by the total area of requisitioned arable land divided by the average per capita arable land area of the land loser before the land acquisition. The compensation criteria for each of the agricultural population to be resettled should be equal to 4 - 6 times the average annual output value of the requisitioned arable land calculated on the basis of 3 years preceding such requisition. For requisitioned orchards or other economic woodland, the resettlement subsidies shall be 3 to 5 times the average annual output value of the requisitioned land, calculated on the basis of 4 years preceding such requisition. For requisitioned salt pan, the aquatic production water and beach area, the resettlement subsidies shall be 2 to 4 times the average annual output value of the requisitioned land, calculated on the basis of 4 years preceding such requisition. Article 30 Compensation for damaged young crops and ground attachments arising from the requisition of the land should be paid to the land contractor or the owner of the attachments, with the compensation criteria as follows. (1) The compensation for damaged crops shall be equal to twice as much as the annual average output value of the crops in the previous 3 years. (2) The compensation for damaged man-made aquatic production facility shall be on the basis of its replacement cost combined with consideration of the years it having been in use and that for loss of fingerling shall be equal to 60% of the original cost. (3) The compensation for houses and other buildings and structures shall be on the basis of their replacement costs combined with consideration of the years they having been in use. The compensation criteria may be set forth by the governments at city/county level and should be submitted to the higher-level government for approval. 59 The cut-down ground attachments, such as trees (fruit tree, bamboo) on requisitioned land shall be handed over to the owner of the attachments and the compensation criteria shall be as the following. (1) For damaged young trees, the compensation shall be 1 to 2 times the production cost verified by the local forestry administration authority. For damaged middle age forest, the compensation shall be 40 - 60% of the accumulated per-mu output value of the grown-up trees. For damaged grown-up forest, the compensation shall be 30% of the accumulated per-mu output value of the grown-up trees. (2) For damaged bamboos, the compensation shall be 2 times the output value of the accumulated cut-down bamboos. (3) For requisitioned fruit trees growing land or other economic woodland the compensation shall be 2 to 7 times the annual average output value of the requisitioned land calculated on the basis of 4 years preceding such requisition. For trees with no fruits ever produced, the compensation shall be 2 times of the original cost. For trees with fruits produced, the compensation shall be 4 to 7 times the average annual output value of the requisitioned land on the basis of the harvesting cycle and the state of growing of the fruit trees. (4) For woodland with special purpose trees and shelter forest, the compensation shall be 4 to 7 times as much as that for similar trees. (5) For fuel forest the compensation shall be 40 - 60 % of that for commercial forest with similar trees. No compensation should be made for illegally build buildings and crops rush-planted and ground attachments rush-built after the land acquisition having been made to the public. Article 32 When the land compensation and the resettlement subsidies released according to the Measures for the Implementation of the Land Administration in Fujian Province are still insufficient to enable those who need to be resettled to maintain their original living standards, the resettlement subsidies may be increased appropriately provided it is approved by the provincial people's government. But the resettlement subsidies shall not be more than 15 times the average annual output value of the requisitioned land calculated on the basis of 3 years preceding such requisition. When the State Council has adjusted the criteria for land compensation and the resettlement subsidies for the requisitioned land, the provincial government shall adjust the compensation criteria accordingly based on the actual condition of the province. 60 Article 33 The average annual output value shall be calculated by the average annual yield in the previous 3 years (4 years for fruit trees and economic wood) times the state specified price. In case no state specified price is available, it shall be done at the market price published or accepted by the local price administration department. The average annual yield mentioned above should be the average of the sum of that harvested from the requisitioned land calculated on the basis of 3 years preceding such requisition, as recorded by the local statistic department of the township. Article 34 For requisitioned land for non-agricultural use of the state-owned land previously used as agricultural, wood, pasture, fruits, tea and fish raising farms, or the collective-owned land, the resettlement subsidies shall be paid in accordance with the land acquisition compensation criteria and the measures. 4.5.2 Other relevant requirements To protect the legal rights of the farmer affected by land acquisition and resettlement, to make sure proper arrangement of necessary land use for social economic development, and to maintain social stability of the rural society, the Fujian People's Government issued a document of "Notice of Fujian Provincial People's Government Concerning Strengthening the Administration of the Land Acquisition Compensation to Protect the Legal Rights of the Affected Farmers" on 14 January 2004. The main contents of the Notice are as the following. (1) Strictly implementation of the legal compensation criteria The compensation for the land requisitioned at the municipal and county levels shall not be lower than the criteria provided by the law, except for the for the projects defined under Article 31 of the Measures for the Implementation of the Land Administration Law of the People's Republic of China in Fujian Province. For requisitioned cultivated land, which belongs to paddy field, vegetable plot, fish pond, the amount of compensation shall not be lower than 8.5 times the average annual output value of the acquired land in the previous 3 years; for the taken-over for use of the other types of arable land, the amount of compensation shall not be lower than 6.5 times the average annual output value of the acquired land in the previous 3 years. The compensation criteria for the land acquisition and resettlement for each of the affected persons shall not be lower than 4.5 times the average annual output value of the acquired land in the previous 3 years for the cultivated land, and shall not be lower than 3.5 times the average annual output value of the acquired land in the previous 4 years for orchard and other economic woodland. (2) Make sure full payment of the land compensation To make sure full payment of the land compensation fee to the PAPs, special 61 bank account for the land acquisition shall be established with no less than 50% of the land acquisition compensation fund deposited in the said bank account. The certificate of the said bank account shall be presented together with the application documents for the conversion of use and acquisition of farm land submitted for approval. Full payment of the land compensation fee shall be made to the affected rural collective economic organization and the farmer in three months after the approval of the land acquisition and resettlement scheme. Before the full payment of the compensation fee, the affected rural collective economic organization and the farmer shall have rights to refuse handing over the land to be requisitioned. (3) Reform of payment of land compensation The land compensation fee shall be paid directly to the PAPs by the municipal and county land resource administration department, in accordance with the list of the PAPs and the compensation scheme submitted by the rural collective economic organization. Compensations for young crops and the ground attachments should be paid to entitled land contractors or the ground building owners. No less than 70% of the land compensations should be paid to the farmers, who can not get proper contracted land in terms of quantity and quality through the land readjustment. For concentrated resettlement organized by the collective economic organization or unit, the compensation shall be paid to the said organization or unit, otherwise the compensation fee shall be paid to the PAPs. (4) To strengthen the supervision of the land compensation administration The compensations paid to the collective economic organization or unit in accordance with the laws and regulations shall be used specifically for the PAPs and shall not be withheld or misappropriated. Any infringement or dereliction of duty shall be punished by law, and the government also released relevant laws and regulations on the punishments (including criminal and civil liabilities). 4.6 World Bank document OP 4.12 4.6.1 Policy objectives Involuntary resettlement may cause severe long-term hardship, impoverishment, and environmental damage unless appropriate measures are carefully planned and carried out. For these reasons, the overall objectives of the Bank's policy on involuntary resettlement are the following: (1) Involuntary resettlement should be avoided where feasible, or minimized, exploring all viable alternative project designs. (2) Where it is not feasible to avoid resettlement, resettlement activities should be conceived and executed as sustainable development programs, providing sufficient investment resources to enable the persons displaced by the project to share in project benefits. Displaced persons should be meaningfully consulted and should have opportunities to participate in planning and implementing resettlement 62 programs. (3) Displaced persons should be assisted in their efforts to improve their livelihoods and standards of living or at least to restore them, in real terms, to pre-displacement levels or to levels prevailing prior to he beginning of project implementation, whichever is higher. 4.6.2 Those in need of compensation and resettlement People in need of compensation and resettlement including those who are caused by the involuntary taking of land resulting in: (1) relocation or loss of shelter; lost of assets or access to assets; or loss of income sources or means of livelihood, whether or not the affected persons must move to another location; or (2) the involuntary restriction of access9 to legally designated parks and protected areas resulting in adverse impacts on the livelihoods of the displaced persons. 4.6.3 Required measures The resettlement plan or resettlement policy framework includes measures to ensure that the displaced persons are: (1) provided prompt and effective compensation at full replacement cost for losses of assets attributable directly to the project. (2) If the impacts include physical relocation, the resettlement plan or resettlement policy framework includes measures to ensure that the displaced persons are provided assistance (such as moving allowances) during relocation; and provided with residential housing, or housing sites, or, as required, agricultural sites for which a combination of productive potential, locational advantages, and other factors is at least equivalent to the advantages of the old site. (3) The resettlement plan or resettlement policy framework also include measures to ensure that displaced persons are offered support after displacement, for a transition period, based on a reasonable estimate of the time likely to be needed to restore their livelihood and standards of living; and provided with development assistance in addition to compensation measures as mentioned above; such as land preparation, credit facilities, training, or job opportunities. (4) To achieve the objectives of this policy, particular attention is paid to the needs of vulnerable groups among those displaced, especially those below the poverty line, the landless, the elderly, women and children, indigenous peoples, ethnic minorities, or other displaced persons who may not be protected through national land compensation legislation. (5) Preference should be given to land-based resettlement strategies for displaced persons whose livelihoods are land-based. These strategies may include resettlement on public land, or on private land acquired or purchased for resettlement. Whenever replacement land is offered, resettlers are provided with land for which a combination of productive potential, locational advantages, and other factors is at least equivalent to the advantages of the land taken. 63 If land is not the preferred option of the displaced persons, the provision of land would adversely affect the sustainability of a park or protected area, or sufficient land is not available at a reasonable price, non-land-based options built around opportunities for employment or self-employment should be provided in addition to cash compensation for land and other assets lost. The lack of adequate land must be demonstrated and documented to the satisfaction of the Bank. (6) Payment of cash compensation for lost assets may be appropriate where (a) livelihoods are land-based but the land taken for the project is a small fraction of the affected asset and the residual is economically viable; (b) active markets for land, housing, and labor exist, displaced persons use such markets, and there is sufficient supply of land and housing; or (c) livelihoods are not land-based. Cash compensation levels should be sufficient to replace the lost land and other assets at full replacement cost in local markets. 4.7 Principles for Compensations for the YWE project The following principles should be adhered in accordance with the World Bank policy on involuntary resettlement, to make sure that the PAPs' living standard can be restored in short period and get improved rapidly. * The amount of compensation for any property shall be equal to the cost of its replacement, not to its depreciated cost. * All the PAPs should have rights to get the compensation even though they may have no legal entitlement of the land, the house or productive activity, except for those unauthorized occupy or use the land and the house in the project area beyond the specified time limit. * The compensatory damages shall be paid before the requisition of the land and property. * When rehabilitation needs time, e.g. construction of the house or part of the house, the compensatory damages shall be paid to the affected persons at the time he/she needs money to start the restoration of his/her property. * The final aim for compensation to the PAPs is to improve their living standards above the present level. * When the PAPs can not maintain their previous living standards after the total land compensation and resettlement subsidies having been raised up to 25 times criteria, the local governments may use the revenue from the state owned land use fee as the government grant to the compensation, but the compensation criteria for the land acquisition and resettlement for each of the affected persons shall not be higher than 30 times the average annual output value of the acquired land in the previous 3 years. * The ratio of compensation shall be negotiated and agreed on between the resettlement office and the representatives of the affected people (a production group or collective economic organization of village/town). * The resettlement subsidy shall be paid to the person (unit or collective economic organization) to be resettled in its amount. The recipient of the 64 compensation and subsidy is not subject to pay tax for those incomes. * During temporary land occupation, the arable layer of arable land should be preserved. Once the temporary land occupation is over, the arable layer of arable land should be put back. If the productivity of the land cannot be restored immediately, the difference in the income produced by the land before and after the project will be paid to the PAPs until the previous productivity of the land is restored. * In accordance to the provisions issued by Fujian provincial people's government, the relocation of the power supply, water supply, underground communications broadcasting and TV cables within the expressway land use area shall be carried out by the affected units. 4.8 The Criteria for Compensations for the YWE project The compensation criteria for the YWE project are determined with reference to those for other similar projects. Since the design of the YWE project is still going on, some of the criteria for particular items may be different, further adjustment of the criteria may be necessary once all the affected items are finalized. 4.8.1 Criteria for land compensation The land compensation criteria is based on the land classification of cultivated land (including paddy, dry and vegetable land), orchards, non-economic woodland, non-used land (waste land) and built-up area land. The compensation criteria for vegetable land are the same as that for paddy land. Table 4-1 - Table 4-4 show the criteria, which are the averages and may be different according to the particular plant. (1) Compensation criteria for cultivated land Compensation criteria for cultivated land are shown in Table 4-1. (2) Compensation criteria for orchard The compensation for orchard shall be calculated according to the criteria as the following: * For land compensation for orchard shall be 60% of that for the paddy field (the criteria adopted for Yanxi of Yongan should be the same those for each of the other towns of Yongan). * The resettlement compensation shall be no less than 3 times the average annual output value of the requisitioned land calculated on the basis of 4 years preceding such requisition. * There are two cases for compensation for young plants and ground attachments: for young trees with no fruits ever produced, the compensation shall be 2 times of the original cost. For trees with fruits produced, the compensation shall be 4 to 7 times the average annual output value of the requisitioned land on the basis of the harvesting cycle and the state of growing of the fruit trees, with the details shown in Table 4-2. * Compensation criteria for scattered fruit trees are shown in Table 4-3. For orange tree, big tree refers to that with crown diameter over 1.8m, median 65 tree refers to that with crown diameter over 1.0 - 1 .8m, and small tree refers to that with crown diameter less than 1.0m. For other fruit trees, big tree refers to that with crown diameter over 2.5m, median tree refers to that with crown diameter over 1.5 - 2.5m, and small tree refers to that with crown diameter less than 1.5m. Compensation for saplings is CNY2 each. Table 4-1 Ccompensations Criteria for Cultivated land AAOV Arable land Resettlement Young crops Total Unit CNY/mu Times CNY/mu Times CNY/mu Times CNY/mu CNY/mu Yanxi of Paddy 1300 10 1300 15 19500 1 1300 33800 Yongan Vegetable county Dry 1000 10 10000 15 15000 1 1000 26000 Hongtian Paddy/ 1100 10 11000 15 16500 1 1100 28600 Xiaotao of vegetable Yongan Dry 1000 10 10000 15 15000 1 1000 26000 Paddy 1000 10 10000 15 15000 1000 26000 Other three vegetable 1 counties Dry 900 10 9000 15 13500 1 900 23400 AAOV - Annual average output value Table 4-2 Compensation Criteria for Orchard (Unit: CNY/mu) Fruit tree Land Resettlement Young crops AAOV No fruit Bear fruit Orange 969 2907 2538 3876 Yongan Apple 750 Calculated at 2250 1776 3000 county Pear 750 60 percent of 2250 1776 3000 Others 700 the 2100 1776 2800 Orange 950 compensation 2850 2538 3876 Other Apple 720 criteria for 2160 1776 3000 Three Pear 720 paddy land 2160 1776 3000 counties Others 700 2100 1776 2800 AAOV - Annual average output value Table 4-3 Compensation Criteria for Scattered Fruit Trees (Unit: CNY/tree) = Orange Apple Plum Persimmon Pear Peach Loquat Chestnut Bayberry Big 85 75 75 98 80 68 80 85 85 Mid 55 40 45 54 45 40 45 45 45 Small 15 10 10 15 15 10 15 15 15 (3) Compensation criteria for non-economic woodland 66 Compensation criteria for non-economic woodland are as the following: * For land compensation for non-economic woodland shall be 40% of that for the paddy field (the criteria adopted for Yanxi of Yongan should be the same those for each of the other towns of Yongan). * There are three cases for compensation for woodland trees: For damaged grown-up forest, the compensation shall be 30% of the accumulated per-mu output value of the grown-up trees. For damaged middle age forest, the compensation shall be 40% of the accumulated per-mu output value of the grown-up trees. For damaged young trees, the compensation shall be 2 times the production cost verified by the local forestry administration authority. The details are shown in Table 4-4. For orange tree, big tree refers to those with crown diameter over 1.8m; Table 4-4 Compensation Criteria for Noneconomic Woodland (Unit: CNY/mu) Plant AAOV Land Young crops Mature 2000 4400 600 Pine Middle 4400 800 Young 4400 450 Mature 2100 4400 630 Yongan Fir Middle 4400 840 county Young 4400 480 Bamboo 600 4400 1200 Poplar 1750 4400 700 Others 1300 4400 500 Mature 2000 4000 600 Pine Middle 4000 800 Young 4000 450 Other Mature 2100 4000 630 Three Fir Middle 4000 840 counties Young 4000 480 Bamboo 600 4000 1200 Poplar 1750 4000 700 Others 1300 4000 500 67 (4) Compensation criteria for other requisitioned lands Compensation criteria for other requisitioned lands are as the following. * Land compensation for non-used land shall be 15% of that for the paddy field (the criteria adopted for Yanxi of Yongan should be the same those for each of the other towns of Yongan). * Land compensation for built-up area land shall be the same as that for non-used land, with the details shown in Table 4-5. Table 4-5 Compensation criteria for other land (Unit: CNY/mu) County Unused land Built-up area land Yongan county 1650 1650 Other 3 counties 1500 1500 4.8.2 Compensation for temporary land use Compensation for temporary land use includes that for young crops, that for loss of land and that for reclamation of land. (1) Compensation criteria for loss of land Compensation for loss of land is mainly to compensate all the expected product output or revenue from the land requisitioned. The compensation is calculated based on the annual output of the land and the occupation time period of the land. According to the time schedule of the YWE project, construction work shall start at the end of 2006 and end at the end of 2009, with total construction period of three years. Based on the consultation with the affected units and persons, the compensation criteria for temporary land use have been determined preliminarily as shown in Table 4-6. Table 4-6 Compensation Criteria for Temporary Land Use (Unit: CNY/mu) Land type Paddy I Vegetable Dry Orchard Wood Unused Area\ Pdy/Vgtbe Dr rhr od Uue Yongan Yanxi 1400 1100 900 700 200 county Others 1200 1000 900 700 200 Other 3 counties 1200 1000 900 700 200 (2) Compensation criteria for young crops Compensation criteria for young crops on temporary use land are calculated in accordance to those as shown in Table 4-1 - Table 4-3. (3) Compensation for reclamation of land Compensation for reclamation of land is used for reclamation of the turned back of the temporary used land. The compensation criteria are determined according to the actual needs. Since the reclamation work should be carried out by the Employer 68 of the project, the compensation criteria are considered in this RAP report. 4.8.3 Compensation criteria for houses and ground attachments According to Article 30 under the "Measures for the Implementation of the Land Administration Law of the People's Republic of China in Fujian Province", no compensation should be made for illegally build buildings and crops rush-planted and ground attachments rush-built after the land acquisition having been made to the public. However, as required by the World Bank policy, all the PAPs should have rights to get the compensation even though they may have no legal entitlement of the land, the house or productive activity, except for those unauthorized occupy or use the land and the house in the project area beyond the specified time limit; and the amount of compensation for any property shall be equal to the cost of its replacement, not to its depreciated cost. Therefore the World Bank policy shall be followed for the YWE project. In October 2005, the Fujian provincial and local Resettlement Offices and the RAP study team investigated the replacement costs of houses with typical structures such as concrete frame, brick/concrete, brick/wood/stone, and etc. with the results shown as follows. Replacement cost for building of brick concrete structure Shangjishan village, Yanxi township of Yongan county Household owner: Chen Weiqing The house is a 2-story building 1.5km away from Yongan urban area, and it was built in September 2003 with floor area of 300 square meters. The costs of the building are as the following: Steel bar: CNY17540 (including transport cost), purchased from Yongan building material market, with transport distance of 1.5 km. Cement: total 35 tons cost CNY10500, with unit cost of CNY300/ton (including transport cost), purchased from cement plant with transport distance of 2.5 km. Wood: total five cubic meters cost CNY41 00, with unit cost CNY820/cubic meter (including transport cost), purchased from Yongan building material market, with transport distance of 1.5 km. Stone: total 59 truck load cost CNY4284, with unit cost CNY72 per truck load about 2.7tons (including transport cost), purchased location 2.7km from the house site. Pre-manufactured plate: total 136 meters cost CNY2040, with unit cost CNY15 per meter (including transport cost), purchased from Yongan building material market, with transport distance of 1.5 km. Aluminum alloy: total 27 kg cost CNY8910, with unit cost CNY27 per kg (including transport cost), purchased from Yongan building material market, with transport distance of 1.5 km. Bricks: total 71000 pieces cost CNY 13490, with unit cost CNYO.19 per piece 69 (including transport cost), purchased from local brick plant with transport distance of 1.5km. Sand: total 100 cubic meters cost CNY2600, with unit cost CNY26 per cubic meter (including transport cost), purchased locally with transport distance 1.5km. Glass: total 45 square meters cost CNY720 with unit cost CNY16 per square meter (including transport cost), purchased from Yongan building material market, with transport distance of 1.5 km. Outsourced man-hour: total 400 man-day cost CNY1 0000, with unit cost CNY25 per man-day. Electrician and carpenter: cost CNY6000. Cables, electric wires, TV, telephone: CNY2200. Other materials: CNY2000. House site and formality costs: CNY9000 Total construction cost excluding house site and formality costs: CNY92348. According Mr. Chen, the house is above the average standard level and quite new. Based on this cost estimation, taking into possible cost increase of the building materials in the year of 2005, the compensation criteria for buildings over CNY360 - CNY400 per square meter should be acceptable, excluding house site and formality costs. For other type buildings, similar cost estimation was made based on the building material cost in the year of 2005. Table 4-7 shows the summary of the cost estimation and the preliminary compensation criteria for each type of buildings are shown in Table 4-8, which is the results of consultation with the project affected persons. The field survey shows that of the PAPs living in earth wood structured houses some are low income households and some are planning to build new houses in the near future. Therefore, it is necessary to conduct feasibility analysis of the compensation criteria for earth wooden structured houses. The sample survey shows that the average population per household affected by the project is 5.3 persons, with average floor area of 172 square meters per household, per capita floor area of 32.5 square meters. 78% - 85% of the houses were built 15 years ago, the earliest over 30 years ago. So about 40% of the households are going to build their new houses in 3 to 5 years, and about 70% of the households will build brick wooden structured houses, and the rests have not decided as for which structure they are going to select. Through consultation with the PAPs living in earth wooden structured houses, the compensation criteria for the said house is set at CNY260 per square meter of floor area. For those still hope to build earth wooden structured houses, they will build new houses of the same structure and size as before. For those hope to build brick wooden structured houses, the compensation for average household with 172 70 square meters of floor area, per capita floor area of 32.5 square meters, will be enough for building brick wooden structured houses with floor area of 149 square meters, with per capital floor area over 28 square meters, up to or above the standard for a well-off society as specified by the State. Therefore it can be sure that the compensation criteria for earth wooden structured houses will not lower the living standard for the PAPs. Table 4-7 Summary of the Replacement Cost Estimation of the Houses Unit price Concrete Bricklconcret Brick/wood Earth/wood Item Ui rc (CNY) Num. CNY Num. CNY Num. CNY Num. CNY Material 407.4 307.1 231.7 199.9 1. Steel bar 3.80/kg 46 174.8 15 57 2 7.6 2. Cement 0.34/kg 196 66.64 120 40.8 22 7.48 3. Tile 0.30/piece 154 46.2 200 60 4. Wood 995/ m3 0.004 3.98 0.05 49.75 0.09 89.55 0.082 81.59 5. Plate 18/rm 0.90 16.2 0.4 7.2 6. Stone 80 / truck load 0.35 28 0.23 18.40 0.11 8.8 0.06 4.8 7. Lime 0.28/ kg 41 11.48 37 10.36 42 11.76 8. Earth 50/truck load 0.6 30 9. Grass 30/truckload 0.04 1.2 1 0. Brick 0.22 /piece 118 25.96 240 52.80 210 46.2 75 16.5 11. Sand 38/rm3 0.25 9.5 0.33 12.54 0.20 7.6 12. Glass 18/rM2 0.19 3.42 0.17 3.06 0.10 1.8 0.08 1.44 13. Aluminum 29/ kg 1.50 43.5 1.20 34.80 0 14. Nails 6.50 / kg 0.17 1.11 0.50 3.25 0.50 3.25 0.45 2.93 15. Felt 14/m2 1.1 15A 0.8 11.2 0 16. Asphalt 3.70/ kg 1.3 4.81 1 3.7 17. Wire 5/rm 0.53 2.65 0.44 2.2 0.3 1.5 0.28 1.4 Others 12.22 9.21 6.95 6.00 Man-hour 25/ man-day 4 100 3 75 2 50 1.2 30 Total cost Per M2 floor 520 391 289 236 71 It shoud be noted that: (1) The costs for others are estimated based on 30% of the costs of the items from 1 to 17 in Table 4-7. (2) Transport cost has been included in each of the unit costs. (3) The house site purchase cost and the formality cost are not included in the cost estimation. Table 4-8 Compensation Criteria for House Relocation (Unit: CNY/m2) Structure Concrete Brick/concrete Brick/wood/stone Earth/wood Simple For farmer 550 400 300 260 60 For enterprise 570 420 330 280 80 Note: The compensation criteria for enterprise building relocation is for reference only, and the criteria shall be determined according to the assessment conducted by eligible cost estimation agency and the agreement with the affected enterprise. 4.8.4 Compensation criteria for attached facilities The cost estimation based on consultation with the PAPs, the compensation criteria for the attached facilities of the households are listed in Table 4-9. Table 4-9 Compensation criteria for attachments Item Unit Criteria WC/pigsty CNY/m2 60 Enclosure wall CNY/m 30 Cement land CNY/m2 30 Well CNY/well 350 Methane pit CNY/pit 300 Pool CNY/m3 40 Tomb CNY/tomb 400 Kiln CNY/m2 80 Note: The data in the table are for reference only. The final criteria shall be determined based on actual structure of the attached facilities. Local people attached great importance to their ancestor tombs, so that they would select proper place to build tombs in memory of their ancestors regularly. Therefore special attentions have been paid to the relocation of the ancestor tombs affected by the YWE project, and the compensation criteria for the tomb relocation have been preliminarily set based on the consultations with the PAPs taking into account of the tomb structure, as shown in Table 4-10. 72 Table 4-10 Compensation Criteria for Tomb Relocation Structure Type CNY / tomb Single 200 Earth Double 300 Single 400 Brick Double 500 Single 600 Stone Double 700 4.8.5 Compensation criteria for scattered resettlement To make sure the living standard of the PAPs not being lowered, compensation criteria for scattered resettlement of the PAPs within existing villages, should include relocation fee, transitional residence fee, and the costs for relocation site leveling, water/power supply, and road access necessary for the resettlement. Taking into consideration of the impact on PAPs physical conditions, which may happen during the relocation process, some medical fees may be paid by the project resettlement office for those who might be injured or have disease during the relocation. Table 4-11 shows the resettlement compensation criteria for scattered resettlement. It should be noted that the road access will be the responsibility of the project resettlement office. Table 4-11 Compensation criteria for scattered resettlement Item Unit Criteria Remarks Relocation CNY/m2 3 Based on two times of relocation Transition CNY/m2.month 2 Based on 6 months Paid for injuries/disease during Medical service CNY/person 400 relocation 4.8.6 Compensation criteria for concentrated resettlement For some villages with great number of PAPs to be relocated, concentrated resettlement is necessary and in need of detailed thoughtful planning. In addition to the relocation fee, transitional residence fee, and the costs for relocation site leveling, water/power supply, and road access, the following fees should be taken into account for compensation for concentrated resettlement. (1) Green plantation: to create an amiable living environment, for concentrated 73 resettlement site , it is necessary to plant trees and grasses surrounding the resettlement sites. (2) Drainage system: drainage system necessry for concentrated residential area should be provided. (3) Threshing ground: it is indispensable for agricultural production to have threshing ground for concentrated resettlement site, and its construction cost should be considered. (4) Education and medical service: if the concentrated resettlement site is far from the original living place of the PAPs, new education and medical service facilities may be necessary for the site, together with necessary services and employees. (5) Fuel supply: traditionally, local people depend on wood and coal from near-by mountains used for daily life. If wood and coal are not available at the resettlement site, fuel supply necessary for people's daily life should be taken into account at the site. (6) Shopping facility: shopping facility may be necessary for the resettlement site, if shopping is not convenient. (7) Administration facility or offices: if the resettlement site is large enough to form an administrative village, it is necessary to have administration facility or offices for the site. (8) Other fees: in addition to the items mentioned above, some other contingencies may arise during the process of the resettlement, which should be taken into account. Since the costs for concentrated resettlement are rather complicated, depending on the location, the number of relocated PAPs, the relocation and construction time, the difference of the resettlement cost may be great. Therefore, the criteria for construction costs are considered in this RAP report. The resettlement office of the project has promised that compensation budget will be made for concentrated resettlement to provide enough fund to build the concentrated resettlement site, in accordance with the actual needs, to make sure the living standards of the PAPs will not be lowered after the resettlement. 4.8.7 Compensation criteria for infrastructures The compensation criteria for infrastructures should follow the principle that the relocated and reconstructed infrastructure should be at least the same as the original one, and the price should be determined based on the budget of the said infrastructure owner and the consultation between the local government and the owner. Table 4-12 shows the reference criteria. 74 Table 4-12 Compensation criteria for public facilities Item Unit Criteria 380V CNY/km 25000 Power supply 10KV CNY/km 50000 line 35KV CNY/km 120000 110KV CNY/km 300000 Telecommunication line CNY/km 80000 Broadcasting & television lines CNY/km 50000 Underground cable CNY/km 200000 Underground optical cable CNY/km 200000 Transformer CNY/unit 15000 Small microwave station CNY/unit 30000 Note: The compensation criteria in this table is for reference only, the final compensation criteria shall be in accordance with the compensation agreement with the affected owner of the facility. 4.8.8 Compensation criteria for affected enterprises The Yongan Jietong Sheet Material Manufacturer Co. Ltd. (YJSMM) and the Liancheng Pengkou Pingan Incense Plant are the enterprises' production will be affected and have to stop working for about half a year. Other affected enterprises only have some buildings, living quarters and walls to be relocated without any impact on production. Based on the consultation with each of the legal representatives of the affected enterprises, the compensation at the moment for each of the enterprises are as the following. (1) CNY350000 for YJSMM as compensation for loss of production per year, and compensation for each of the employees is CNY880 per month as compensation for loss of production. During the down-time period the taxes for the enterprise will be exempted. (2) CNY140000 for the Pingan Incense Plant as compensation for loss of production per year, and compensation for each of the employees is CNY500 per month as compensation for loss of production. During the down-time period the taxes for the enterprise will be exempted. (3) For other affected enterprises only with part of building relocation without production loss, compensation will be paid based on the relocation of building or land acquisition only, with the compensation criteria shown in Table 4-13. 75 Table 4-13 Compensation criteria for building relocation for enterprises Concrete Brick/con Brick/ Earth/ Simple Enclosur crete wood wood wall Unit CNY/m' CNY/m2 CNY/m2 CNY/m2 CNY/m2 CNY/m Criteria 570 420 330 280 80 60 4.8.9 Vulnerable groups For affected vulnerable groups identified during the field survey, including those newly discovered during the YWE project implementation period, need to be compensated based on the criteria no less than CNY3000 per household. 76 5. Resettlement and Economic Rehabilitation Planning 5.1 Resettlement Demand and Alternative Schemes There are four types of the resettlement demand affected by the YWE project as the following. (1) Private houses in the affected villages; (2) Resident houses in the affected towns; (3) Small enterprises in the affected areas; (4) Public facilities in the affected areas. Of the affected four counties, there is no particularly serious impact concentrated in one area, except for individual village. The field survey shows that most of the affected households would like to be resettled in their original villages/townships or near-by areas. 5.2 Resettlement Policy and Management 5.2.1 Resettlement policy and principles The involuntary resettlement scheme shall be based on participatory method and concept. The resettlement shall be implemented under the guiding principle of respecting the wishes of the affected persons to keep up their traditional living habits and customs. The economic rehabilitation activities for the affected areas shall be carried out locally based on available alternative agricultural resources based on full consultation with the affected persons. Plantation would be the core of the economic rehabilitation strategy by opening up wasteland and improving the existing arable land, supplemented by making use of other revenue generating opportunities in the YWE project area. In other words, the economic rehabilitation strategy for the resettlement shall be based on the establishment of a solid production foundation for the affected groups, by making full use of local land and natural resources for long term sustainable development. The fundamental principle is to ensure basic cultivated land for each of the PAPs, on the base of which other revenue generating activities might be encouraged. In accordance with the guiding principles mentioned above, a series resettlement and economic rehabilitation principles have been summarized as follows. (1) The resettlement plan shall be based on the detailed lists of the land acquisition and resettlement needs and in accordance with the compensation criteria set forth by the national and Fujian provincial governments. (2) The resettlement shall be implemented in combination with local socioeconomic development, local resources use and environmental protection 77 activities, creating conditions for long term sustainable development. (3) The resettlement action plan shall be made by following the principle of "facilitating production and convenient for daily life". (4) The principle of overall arrangement shall be adhered in the RAP, taking into consideration of the relationships between and among the state, collectives and individuals interests. The standard and scale of the reconstruction shall be based on the principle of the restoration to the original standard and scale. Any investment cost arising from enhanced standard and extended scale necessary for the relocated public facilities' future development shall be funded by the local government or relevant department concerned. The PAPs' living standard may be maintained or enhanced over the original level by making full use of local natural resources, developing water reservation and irrigation system, reclaiming unused land, improving arable land quality. (5) The resettlement action plan shall include measures to improve the living standards of the affected vulnerable groups. (6) Long term monitoring regime shall be established for the RAP for the YWE project. 5.2.2 Management of the RAP Management of the RAP shall follow the guiding principles as follows. For villages with a few resettlement of affected households (less than 20), the relocation site shall be selected locally to minimize the impact. For villages with resettlement of affected households more than 20 but less than 60, which is difficult to be resettled locally, proper relocation site might be selected suitable for farm production or close to the expressway suitable for future development. For villages with resettlement of affected households more than 60, comprehensive and integrated resettlement plan shall be worked out to ensure the realization of the objectives of the resettlement to be achieved. 5.3 Overall Scheme of the Resettlement Action Plan Since the relocation site needed for the resettlement for the YWE project land is limited and available along the YWE project area, the impact on the affected villages is not so great. Based on the local conditions as well as the comments and recommendations gotten from the consultation and public meetings during the field survey, some basic resettlement and restoration schemes have been identified as the following. (1) The affected groups to be resettled in their original villages; (2) To minimize the impact of the resettlement on the production and daily life of the affected, the houses to be resettled shall not be demolished until the completion of the new houses at the relocation sites. The construction of the new houses can either be arranged by the affected themselves by making use of materials of their 78 own, or arranged by agencies authorized by the local government for the purpose of urbanization development and effective use of farmland. (3) The affected households to be resettled in their original village area. For those who have lost part of their contracted farmland, reallocation of the farmland shall be carried out combined with the compensation payment. 5.4 Resettlement Capacity Analysis 5.4.1 Natural conditions and land resources It is important to conduct overall and in-depth analysis of the local resettlement capacity based on the locally available resources and natural conditions for locally resettled affected groups. The socioeconomic survey of 33 affected villages shows that there are enough resources, including available farmland for reallocation for the resettlement and economic rehabilitation. Of the total 69 affected villages, there are 68 villages with per capita cultivated land less than 2 mu, 49 of which (accounting for 71% of the total) with per capital cultivated land less than 1 mu. Despite the low per capita cultivated land area, for most of the 33 villages surveyed, the requisitioned land area is relatively small, so the impact on the affected villages is small. Particularly the existing cultivated land allocation is usually made in such a way that one mu of first class cultivated land in one place is shared by three to five households. Therefore, the requisition of cultivated land will not have great impact on individual household. On the contrary, the land compensation may provide opportunity for the affected household to participate activities other than the farm work. In addition, the requisitioned land only accounts for small par of each of affected villages, the agricultural production based resettlement can be implemented by making use of land reserved by collective organization, the land turned back on voluntary basis by contractors, assignment of right to land contractual management, for the PAPs to proceed with agricultural production. According to the latest land acquisition policy in Fujian province, higher compensation criteria will be implemented, including that for paddy field, which is no less than CNY26000 per mu, for dry land no less than CNY23000. Most of the compensation payment will go to the affected persons with small part retained by the village collective organization used for public welfare and community service. 5.4.2 Economic development potentials of the affected area The economy of the rural area affected by the YWE project is dominated by agricultural plantation. In recent years there were more people left for cities to find work. There are great potentials in the development of vegetable and fruit production, animal husbandry and tourism. With the improvement of transport infrastructure, the inherent advantage of the local resources will be brought in to full play. Therefore, 79 there are revenue generation opportunities for the improvement of local people's living standards, so long as comprehensive and systematic development of the local resources in agricultural, forestry, sideline production, industry combined with trade and transport service, can be materialized through investment in technology and continuous improvement in management. 5.5 Production Rehabilitation Plan During the field survey for preparation of the RAP consultation meetings were held in each of the affected counties, townships and villages with participants from the resettlement offices of the Expressway Construction Directorate of Sanming and Longyan municipalities, the consultants, local government officers, villager committee members, and representatives of the affected groups. In the meetings the guidelines for the resettlement and economic rehabilitation activities were discussed and established. Agricultural production based resettlement shall be adopted combined with cash compensation and employment opportunity provided by enterprises for the PAPs to select based on concrete conditions. The agricultural production resettlement mainly includes reallocation of the reserved arable land, reclamation of unused land, and assignment of the right to land contractual management. Agricultural production resettlement is mainly adopted for PAPs engaging farm land work supplemented with cash compensation. For the PAPs living in areas close to cities, where little reserved land and reclaimable land are available, the employment resettlement will be adopted supplemented with cash compensation. For villages with great number of PAPs to be relocated, it is necessary to work out detailed resettlement action plan at village level, taking into consideration of the following issues. Based on village or PAPs group, part of the compensation fees may be used for investment in agricultural production, to ensure health, sustainable and stable development of agricultural production. The target of maintaining and improving the living standards of the PAPs can be achieved by increasing the income per unit land area. The investment plan may be as the following. (1) Making full use of the potentials of the existing land resource, by dissemination of advanced technologies of agricultural production, introduction improved breeds into farm production, so as to increase unit land output and farmers' income. (2) To strengthen capital construction of irrigation system for the farm land to improve the capacity against flood and draught disaster, to improve agricultural production conditions, so as to maintain high and stable output of the crops. 80 (3) To restructure agricultural production output by diversified rural economy in line with local conditions, developing secondary and tertiary industries, to transform traditional agriculture and rural economy into modern ones. (4) To improve agricultural production and service system for agricultural production, with biotechnology, to develop ecological agriculture; taking the geographical advantage of being close to the expressway, to develop agricultural production related economic activities, such as processing, storage and logistics and distribution services. The above mentioned investment plan will be organized and implemented by township/villager committees subject to the approval by county level resettlement offices, under the guidance of the Provincial and municipal Resettlement Offices and supervision ands consultation of the independent monitoring agency, and will be technically supported by various departments of agricultural, water conservancy/irrigation, sideline production, husbandry and village enterprises. The investment project planning at village level shall be carried out based on full discussion and consultation between the villager committee and the representatives of the PAPs, according to the local conditions. Optimal investment project scheme shall be determined through analysis of the feedbacks from the PAPs. During the implementation of the investment project, technical assistance will be provided by County Resettlement Office and relevant agency. The County Resettlement Office will review the progress and status of the investment project plan at the village level. The Provincial and Municipal Resettlement Offices and the independent monitoring agency will irregularly examine the village level investment project, so that any problem arise during the implementation can be discovered and rectified in time and to materialize the expected target. The village level investment plan shall be submitted to the County Resettlement Office for approval and the County Resettlement Office shall pay the compensation fees by stages. 5.5.1 Land adjustment and production development plan The impact of the land acquisition and resettlement for each of the affected villages is quite different, so the resettlement scheme and economic rehabilitation plan for each of the affected villages should be developed based on the magnitude of the impact, the available land resource and the wishes of the PAPs. (1) Resettlement with agricultural production land The PAPs from 16 to 60 years old are eligible to get land, including contracted or family reserved land. There are reclaimed waste land, reclaimed unused land, lands turned back by villagers and reserved land in the project affected villages 81 available for land adjustment or reallocation for the land acquisition compensation and resettlement with arable land. Even if there is not enough arable land, there are great areas of wood land and hilly land for each of the villages, which can be used for the compensation and resettlement. Detailed adjustment or reallocation schemes may be based on the concrete conditions of each of the villages to assist forestry economic development, so as to make sure long term subsistence of the PAPs and their sustainable development. The resettlement with agricultural production also includes reallocation of the land among the PAPs and all the villagers. For villages with enough reserved land, part of the reserved land may be used to be allocated to the PAPs. For villages with reserved land not enough for the land adjustment, but with per capita arable land area greater than the township average, then reallocation of all the available land to all the PAPs and the other villagers may be carried out. The villager committee will be responsible to go through the legal formalities necessary for those going to get rights to land contractual management. (2) Employment opportunity and other ways for the resettlement Villages with reserved land not enough for overall land readjustment and with per capita arable area less than the township average, the following measures may be adopted: part of the reserved lands to be allocated to the PAPs, supplemented with wood land and hilly land; for PAPs without land allocation, employment opportunities provide by near-by village/township enterprises or the development of secondary and tertiary industries may be adopted. Enterprises with development prospects and economic benefits shall be selected to provide the employment opportunities for the PAPs and shall be able to provide the PAPs to get five-year work contracts at least for them to have enough income to be better-off. Therefore the enterprises meeting with the following requirements should be selected. * Those registered with the industrial and commercial department and have legal representatives; * Those having been in operation for over three years with products sale well in the market; * Those with annual growth rate over the previous three years above 10%; * Those can pay to the employed PAP monthly salary more than his/her income from agricultural production; 0 Those with productivity growth higher than their staff growth; * Those have capacity to increase production scale and receive new employees; * Those not far from places where the resettled PAPs are living; * Those well managed with good production conditions and environmental 82 protection measures. (3) To establish shareholding township and village companies Under the guidance of provincial and municipal resettlement offices and the assistance of municipal and township enterprise bureaus, investment projects in line with local conditions might be selected based on market survey, such as agricultural products processing, storage, agricultural related logistics and distribution services. The local government may provide preferential three year tax exemption policy for the newly established enterprises by the PAPs. Taking into consideration of the local conditions and the economic development of Yongan and Longyan counties, the following enterprises may be developed in each of the project affected villages. * Food processing: the project affected area is rich in such agricultural products as peanuts, bamboo shoots, lotus root, edible fungus, and various vegetables, food processing enterprise based on local farm products may be feasible. * Animal husbandry: pigs rich in lean meat is popular in Fujian and Guangdong provinces, with market share accounting for over 30%, and it is relatively easy for farmer to grasp the pig raising technology, to extend the pig raising business may provide employment opportunity for the PAPs. * Building material and metallurgical industry: there are abundant mineral resources in the project affected area, over 60 different kinds of minerals, which provide good conditions for the development of township and village enterprise in building and metallurgical industry. The above mentioned (2) and (3) are recommendations based on the field survey for the YWE project affected areas. The final optimal investment scheme should be discussed and determined by the PAPs and the resettlement offices at different levels, with the final scheme submitted by the YWE project resettlement office to the higher level people's government for approval. 5.5.2 Other measures for economic rehabilitation To make sure the restoration of the affected production and living standard as quickly as possible, the following measures might be taken. (1) The affected persons may have priority to get labor work and to provide local construction materials construction for the construction of the YWE project; (2) The PAPs shall be given priority to get opportunity in laborer output organized by the agencies in the YWE project area; (3) To reclaim arable land for the affected; (4) Personnel training program shall be provided for the PAPs to learn professional skills including those for agricultural and non-agricultural activities, as 83 organized by local agricultural bureau, animal husbandry bureau or the local resettlement offices with lecturers invited from county agricultural technical stations and relevant trade associations. At least two training courses shall be provided for the affected persons with cost paid by the YWE project. 5.6 Demolition and Reconstruction of Affected Houses 5.6.1 House relocation site selection and criteria There are a total of 1514 households need to be relocated in 69 villages, with 22 affected households for each of the village in average. There are 2141 households affected by arable land acquisition and 624 households need to be relocated in ten affected villages close to the interchanges, with 116 households affected by both arable land acquisition and relocation of houses. It is easy to find relocation sites for all the households to be resettled in their original villages. Some relocation sites will be arranged along the existing road area or the waste land area of the villages. The villager committees will provide assistance to the selection of the relocation sites and to go through the formalities for the resettlement. 5.6.2 Ground leveling and public facility planning (1) Relocation site leveling For relocation site involved with individual household only, the leveling of the house site will be conducted by the said household itself. For relocation site involved with quite a number of households (more than 60), the local government will assist to make uniform arrangement for the development of the house site. (2) Provision of public facilities The leveling and preparation work for the house site for the resettlement shall be carried out by contractors, who will also provide the service of connection to the public utility facilities such as water supply, power supply, broadcasting and television receiving equipment, etc. The contractor's work will be monitored by supervision company, to the satisfaction of the RAP implementation agency (the YWE project Owner) and the environmental protection department. 5.6.3 Newly built houses A total of 273736 square meters floor area of newly built houses will be constructed for the resettlement of the affected households. The construction of the new houses and demolition of the old houses for the affected households shall follow the rules as the following. (1) Compensation payment The amount of compensation for any property shall be equal to the cost of its replacement. No deduction, tax or depreciation shall be applied. The intermediary offices shall not withhold the compensation funds or spend the funds on behalf of the 84 recipients. The old and waste materials in old buildings belong to the PAPs who may use these materials in construction of the new building. In this case, no deduction will be made from the compensation to be paid to the PAPs. Compensation will be directly paid to the recipients of the compensation. The compensation should be paid to the PAPs before the new building are constructed. (2) Time schedule At least 3 months will be given for the people (households) to be resettled to select the sites for construction of new buildings, and 4 months to construction the new buildings. The sites for new buildings will be selected in the principle of local area relocation, convenient to access to public service, power and water supply, production and travel. Enough time should be given for full consultation between the township level resettlement office and villager committee and the people (households) whose buildings are to be relocated. The wishes of those who decline to be resettled in places far away from their hometown will be taken into full consideration. All the resettlement measures are comply with the relevant policies, laws and regulations and will be implemented in accordance with the World Bank policies. The alternative measures for the compensation and resettlement will be consulted about with the affected and the measures will not be implemented until they have satisfied the affected and approved by the resettlement offices at various levels and the competent authorities. (3) Public consultation The field survey shows that if temporary living houses are available under uniform overall arrangement, 96% of the affected households are in favor of the resettlement scheme of demolition of the old houses first followed by construction of the new houses. By this way, it is possible to make full use of the materials from the old houses. 5.7 Restoration of Public Facilities The affected public facilities need to relocated mainly include irrigation water channel, paths for farm-use tractors, power supply lines, and telecommunication lines. In the YWE project survey and design stage, public participation meetings were held and questionnaires were issued to collect comments and recommendations from the affected groups and the general public, which have been taken into consideration in and reflected in the resettlement action plan. 5.7.1 Relocation of affected power supply and communication facilities A number of affected power supply facilities will be relocated including a total of 159700 meters of electricity power supply lines, 73180 meters of telecommunication lines, 8620 meters of broadcasting lines, 32240 meters of underground cable, 9430 meters of underground optical cables, one transformer, five small microwave stations. According to the preliminary design, the electricity power supply lines crossing over the expressway will be heightened by enhancing the height of the poles and those need to be relocated will be rebuilt at new sites. For communication lines, those 85 crossing over the expressway will be heightened by enhancing the height of the poles and those need to be relocated will be moved away from the expressway. The county power supply bureau and communications bureau will be responsible for the relocation of the said affected facilities respectively. 5.7.2 Relocation of road and water channel A total of 12.3km of rural road and 3580 meters of water channel will be affected by the YWE project. Comments and recommendations were solicited from the affected public during the field survey made at the design stage. According to the recommendations made by the affected public, relocation of the affected road and water channel has been fully taken into account at the design stage and the relocation of the affected road and water channel will be given priority and be carried out by the contractor in accordance to the design requirements. The relocation work may be undertaken by the contractor who will carry out the YWE project or by the affected unit. All the costs of the relocation work will be defrayed by the YWE project Owner. 5.8 Rehabilitation of Land for Temporary Use Land for temporary use includes that used for sand and tone material storage, mixing plant, soil disposal site, labor camp, and temporary road. The data for temporary use land is according to the preliminary design at present. More accurate data should be based on the construction plan and it may be changed during the construction period. The temporary use land shall be rented based on the agreement between the Project Owner and the local government along the YWE project area, with rent as specified by the provincial government. The rented land for temporary use will be returned back, once the construction work is completed, and be rehabilitated to the state for its original use or farm work. Hilly land and wood land rented for temporary use should be recovered with plantation. The time period of the temporary use land is two year in principle. The turning back and rehabilitation of the temporary use land should be examined and accepted under the supervision of local environmental protection bureau. 5.9 Assistance to the Affected Vulnerable Groups The affected vulnerable groups will be given priorities in the land acquisition and resettlement in the selection of relocation site and land allocation. The township resettlement offices and villager committees shall take effective measures to take care of the vulnerable PAPs (the old, weak, sick, disabled, and female single parent families),and organize labor force to help the vulnerable groups construct new houses and move out so that they can happily move into new houses. Preference policies such as tax and fee exemption, subsidy for education, and etc will be provided for the affected groups in terms of money or in kind. 86 5.10 Time Schedule of Implementation of Resettlement Work Activities The time schedule of implementation of resettlement work activities is shown Table 5-1. Table 5-1 Time Schedule for Land Acquisition and Resettlement No. Activities Time I Project preparation 1, Preliminary design Nov. 30 2005 2, Aproval of preliminary design Mar. 2006 3, Design of construction plans May 31 2006 4, Review and examination of construction plans July 2006 11 Land acquisition and resettlement 1,Set up different level resettlement offices and training Feb. - Mar. 2006 2, Distribution of draft RAP to the affected counties May 2006 3, Distribution of the resettlement information booket July 2006 4, Survey of resettlement impact July - August 2006 5, Consultation with local government and PAPs/ units August 2006 6, Finalize relocation sites and land reallocation August 2006 7, Payment of compensation fee August 2006 8, Construction of new houses August - Oct. 2006 9, Trainings for economic rehabilitation Sep. 2006 10, Demolition of old houses and move into new houses Oct. 2006 III To start capital construction of the expressway Nov. - Dec. 2006 June 2006 - IV Independent monitoring activities Dec. 2009 5.11 Supervision of the Resettlement Activities The implementation of resettlement action plan mentioned above will be carried out by each of the resettlement offices at provincial, county and township levels and each of the village resettlement groups (VRGs), as directed by Fujian Expressway Construction Directorate, Sanming YWE Company and Longyan YWE Company and supervised by independent monitoring organization. 5.12 Resettlement Information Booklet In order to let all the PAPs and their representatives as well as local governments fully understand all the details about the resettlement and relevant regulations about the compensation and rehabilitation, the YWE Project Resettlement Office will prepare an Resettlement Information Booklet (RIB) and 87 distribute it to each of the township resettlement offices (TROs) before the resettlement funds are released to the TROs. The RAP and RIB shall be available at each of the TROs for the PAPs to examine. The RIB includes the following information: The first part mainly includes the following contents: * Brief introduction to the YWE project; * Impact caused by the YWE project; * Policies on the resettlement and rehabilitation for different kinds of impacts; * Organization in charge of the resettlement; * Timetable for implementation of relevant contracts and the link of civil engineering work progress; * Channel of participation by the PAPs; * Detailed procedures to express discontents and lodge appeals; and * A brief introduction to the monitoring process. The second part mainly includes the following contents. * Detailed description of the impact on the affected households; * Detailed compensation criteria for each kind of impact; * Total of entitlements due to each of the affected households; * Total of the land and resettlement compensation due to each of the villages; * Resettlement and rehabilitation plan; * Favorable measures for the vulnerable groups; and * Timetable for implementation of the measures. 88 6. Focal Point of the Resettlement and Rehabilitation Action Plan 6.1 Introduction To achieve the objectives of the resettlement, detailed impact assessment has been made based on the field survey of the project affected villages with land acquisition accounting for over 20% of the village total arable land and the number of project affected households over 60, taken as the focal point of the resettlement and rehabilitation action plan. It should be noted that since the planning of the RAP is still being going on, the rehabilitation action plan has not been finalized. 6.2 Serious Affected Villages and Rehabilitation Action Plan The outlines and rehabilitation action plans of the seriously affected 10 villages are as follows. (1) Shangjishan village Outlines: the village is at Yanxi township of Yongan city, the start point of YWE project, with total population of 697, total land area of 7414 mu in the village, of which 429 mu are arable land. The revenue source of the village is mainly from transport, factory and grocery. Land acquisition and resettlement impact: Total land acquisition is 578.71 mu, including 389.27 mu of arable land, 189.44 mu of non-arable land. The acquisitioned land area accounts for 7.8% of total land area of the village and the acquisitioned arable land accounts for 90.7% of the total arable land of the village. A total of 154 households are affected by land acquisition. There are 54 households need to be relocated with total floor area of the houses about 6629 square meters, including 4946 square meters of brick concrete house, 1168 square meters of brick wood house, 155 square meters of earth wood house, 360 square meters of simple house. There are 12 households affected by both house relocation and land acquisition. Resettlement and rehabilitation action plan: This village is close to the suburb of Yongan county, with three expressways in its surrounding areas. Quite a number of households are engaged in transport service, groceries and labor work in urban area. Two schemes have been figured out for the use of the land acquisition and resettlement compensation payment. One is used to build shop/grocery. And another is to use the compensation payment as part of the investment combined with bank loan and investment from enterprises to develop a new resident area for the resettled households. (2) Hongtian village Outlines: the village is located at Hongtian township of Yongan city, with total; 89 population of 890, land area of 7551 mu, of which 1001 mu are arable land. The acquisitioned land area accounts for 6.41% of total land area of the village and the acquisitioned arable land accounts for 27.65% of the total arable land of the village. There are a total 154 households are affected by land acquisition, with average acquisitioned land per household about 1.8 mu. Only one household is affected by house relocation with floor area of 100 square meters house need to be relocated. Economic rehabilitation: the village is located at Hongtian interchange of the YWE, mainly affected by land acquisition. The villager committee is going to adopt two measures for the affected households for economic rehabilitation. One is reallocation of land by making use of land reserved by the village, the land turned back voluntarily by contractors who migrated to cities and woodland for the PAPs to continue agricultural production. Meanwhile, the village is planning to prepare a village level development program, to develop small processing factories, commercial business/shops and transport service by taking advantage of the improvement of the transport infrastructure system, supplemented by new land use planning to attract investors to create more employment opportunities. (3) Zhongban village Outlines: the village is located at Xiaotao township of Yongan city, with total population of 806, total land area of 17876 mu, of which 934 mu are arable land. Land acquisition and resettlement impact: there are 24 households need to be relocated with total floor area of the houses about 3132 square meters, including 266 square meters of brick wood houses, 2866 square meters of earth wood houses. There is only one household affected by both house relocation and land acquisition. Economic rehabilitation: the village has many woodlands and is going to implement land reallocation for the PAPs combined with revenue generation activities in line with local conditions, such as small processing factories, sideline production, and etc. (4) Beicun village Outlines: the village is located at Xinquan township of Liancheng county under Longyan municipality, with total population of 3217, total land area of 2816 mu, of which 1018 mu are arable land. Land acquisition and resettlement impact: the village is located at an important hub interchange of YWE linked with the existing Xiamen-Chengdu expressway, with total land acquisition of 566.46 mu, including 424.37 mu of arable land and 142.09 mu of non-arable land. The acquisitioned land area accounts for 20.12% of total land area of the village and the acquisitioned arable land accounts for 41.69% of the total arable land of the village. A total of 365 households are affected by land acquisition. There are 57 households need to be relocated with total floor area of the houses about 30175 square meters, including 7124 square meters of brick concrete house, 90 3364 square meters of brick wood house, 19464 square meters of earth wood house, 223 square meters of simple house. Economic rehabilitation: the villager committee has learnt the experience and lessons from the land acquisition and resettlement for the Xiamen-Chengdu expressway, by detailed village level economic rehabilitation planning for the PAPs. For PAPs with more loss of arable land, land reallocation combined cash compensation and employment opportunity provision will be adopted for their resettlement. For the majority of the other PAPs, development of village enterprises and commercial business will be organized to provide employment opportunities for the PAPs, combined with cash compensation. In addition, other measures such as land use planning will be used to attract investors to create more employment opportunities. (5) Dadi village Outlines: the village is located at Wenheng township of Liancheng county under Longyan municipality, with total population of 340, total land area of 11865 mu, of which 615 mu are arable land. Land acquisition and resettlement impact: land acquisition is 485.01 mu, including 222.12 mu arable land, 262.89 mu non-arable land. The acquisitioned land area accounts for 4.09% of total land area of the village and the acquisitioned arable land accounts for 36.12% of the total arable land of the village. A total of 185 households are affected by land acquisition. There are 3 households need to be relocated with total floor area of the houses about 145 square meters. The acquisition of arable land is the major impact. Economic rehabilitation: the village is characteristics of less population with more wood land area. The villager committee has worked out a resettlement plan based on local resource conditions by taking advantage of its economic wood land to be allocated to the PAPs, combined with cash compensation for them to proceed with agricultural production. (6) Rongshi village Outlines: The village is located at Caixi township of Shanghang county under Longyan municipality, with total population of 1127, and total land area of 21916 mu, of which 977 mu are arable land. Land acquisition and resettlement impact: Total land acquisition is 511.79 mu, including 195.41 mu arable land and 316.38 mu non-arable land. The acquisitioned land area accounts for 2.34% of total land area of the village and the acquisitioned arable land accounts for 20% of the total arable land of the village. A total of 179 households are affected by land acquisition. There are 98 households need to be relocated with total floor area of the houses about 15254 square meters, including 8098 square meters of brick concrete house, 2215 square meters of brick wood 91 house, 4913 square meters of earth wood house, 29 square meters of simple house. Resettlement and rehabilitation action plan: Most of the households are in favor of overall uniform arrangement of the relocation site. They would like to develop a new site convenient for production and easily accessible to accommodate all the households to be resettled under the assistance from the county resettlement office. Professional training will be provided for PAPs to improve their capability to take the revenue generating opportunities in the local area, combined with the development of small manufacturing plants. (7) Chengbei village Outlines: The village is located at Lincheng township of Shanghang county under Longyan municipality, with total population of 2300 and land area of 2080 mu, of which 880 mu are arable land. Land acquisition and resettlement impact: A total of 294 mu of land are to be requisitioned, including 59.43 mu arable land and 234.57 mu non-arable land. A total of 57 households are affected by land acquisition. There are 142 households need to be relocated with total floor area of the houses about 23273 square meters, including 2700 square meters of concrete frame structured house, 19153 square meters of brick concrete house, 1420 square meters of brick wood house, without any earth wood house and simple house. Resettlement and rehabilitation action plan: Located in the suburb of Lincheng township the village is surrounded by areas where urbanization is going on. Agricultural production is no longer the major source of the village households' income. The great amount of house relocation is related to the interchange of the expressway. The land price of the village area is high, since the area is covered by the Lincheng urban road development plan. Higher criterion of the resettlement compensation will be adopted for this village. (8) Sanfang village Outlines: the village is located at Shifang township of Wuping county under Longyan municipality, with total population of 1584, and total land area of 3458 mu, of which 588 mu are arable land. Land acquisition and resettlement impact: total land acquisition is 764.14 mu, including 393.96 mu arable land, and 370.18 mu non-arable land. The acquisitioned land area accounts for 22.1% of total land area of the village and the acquisitioned arable land accounts for 67% of the total arable land of the village. A total of 374 households are affected by land acquisition. There are 42 households need to be relocated with total floor area of the houses about 5750 square meters, including 2276 square meters of brick concrete house, 3166 square meters of brick wood house, 308 square meters of earth wood house. 92 Economic rehabilitation: the village is close to Guangdong province, and many local farmers have experience in finding job in other places. Based on many time consultations with the PAPs, the villager committee is going to carry out economic rehabilitation by making use of the local agricultural product resources such as tea, fruits, edible fungus, bamboo, coal and limestone and etc., to develop local resource related industry and to provide trainings for the PAPs for long term development. (9) Xianshui village Outlines: The village is located at Shifang township of Wuping county under LOngyan municipality, with total population of 2600 and land area of 8100 mu, og which 1400 mu are arable land. Land acquisition and resettlement impact: A total of 422.74 mu of land are to be requisitioned including 271.04 mu arable land and 151.7 mu non-arable land. The acquisitioned land area accounts for 5.22% of total land area of the village and the acquisitioned arable land accounts for 19.36% of the total arable land of the village. A total of 254 households are affected by land acquisition. There are 105 households need to be relocated with total floor area of the houses about 15185 square meters, including 4462 square meters of brick concrete house, 6822 square meters of brick wood house, 3625 square meters of earth wood house and 276 square meters of simple house. This is a village seriously affected by the YWE project under the route alignment scheme adjusted by the design institute. Since the field survey conducted by the RAP work team in October 2005 didn't cover the village, in January 2006 another field survey of this village was conducted to find out the details of the impact and work out the action plan based on full consultation with the PAPs and the villager committee. Resettlement and rehabilitation action plan: household relocation for this village is substantial and will be a focus of the resettlement and rehabilitation. The villager committee has held a number of consultations with the PAPs about the resettlement. Most of the affected households prefer concentrated resettlement site convenient for production and daily life easily accessible to transport service. So the concentrated resettlement site is under consideration to meet the requirement with assistance from county resettlement office. As for economic rehabilitation, small processing factories and professional training courses will be developed for the PAPs. (10) Lingqian village Outlines: The village is located at Yanqian township of Wuping county under Longyan municipality, with total population of 4725 and land area of 8082 mu, of which 1960 mu are arable land. 93 Land acquisition and resettlement impact: A total of 348.86 mu of land are to be requisitioned, including 217.79 mu arable land and 131.07 mu non-arable land. The acquisitioned land area accounts for 4.32% of total land area of the village and the acquisitioned arable land accounts for 11.11% of the total arable land of the village. A total of 208 households are affected by land acquisition. There are 98 households need to be relocated with total floor area of the houses about 15469 square meters, including 2160 square meters of brick concrete house, 3364 square meters of brick wood house, 9213 square meters of earth wood house and 732 square meters of simple house. Resettlement and rehabilitation action plan: Located in the border area between Fujian and Guangdong provinces, this village is at the end of the YWE. The living standards and economic development level of the village are similar to those of neighboring villages in Guangdong province. Most labor force of the village have experience to find work in the outside world. Household relocation is the major work for the resettlement. According to the villager committee's plan, concentrated relocation sites is under consideration taking advantage of the improved transport infrastructure system and land use planning to attract investor to create more employment opportunities for the PAPs. 94 7. Compensation Cost Estimation The land acquisition and resettlement compensation costs have been included in the total cost of the YWE project. To implement the resettlement action plan, the compensation cost for each year will be included in the annual investment plan for the YWE project. Total cost for the land acquisition and resettlement for the YWE project will amount to CNY577.97 million based on December 2005 price. 7.1 Compensation Cost Estimation 7.1.1 Compensation for permanent land acquisition It is estimated that total compensation cost for the permanent land occupation (including compensations for land, resettlement and crops) will amount to CNY322.1116 million, with the details shown in Table 7-1. Table 7-1 Cost estimation for permanent land acquisition compensation Paddy vegetable Dry | Orchard Woodland Others Total Yongan | Land(mu) 1800.59 282.95 574.37 1800.75 248.65 4707.31 CNY 53746550 7356700 7629368 9120250 410273 78263140 Liancheng Land(mu) 2955.31 245.34 213.83 4932.8 354.44 8701.72 CNY 76838060 5740956 2721201 23546743 531660 109378620 Shanghang _ Land(mu) 1779.73 189.24 105.46 3461.31 377.01 5912.75 CNY j 46272980 4428216 1342084 16575009 565515 69183804 Wuping Land(mu) 1588.7 449.65 44.87 | 1183.48 151.75 3418.45 CNY 41306200 10521810 571016 5634510 227625 58261161 Total 315086724 7.1.2 Compensation for temporary land acquisition The estimated total cost of compensation for temporary land acquisition (including compensations for land, resettlement and crops) is about CNY9.1942 million, with the details shown in Table 7-2. 95 Table 7-2 Cost estimation for temporary land acquisition compensation Paddy Vegetable Dry Orchard Woodland Others Total Yongan | Land(mu) 379.78 1.31 3252 453.23 0 866.84 CNY 1779325 5633 185364 1314367 0 3284689 Liancheng Land(mu) 379.58 | 0 | 0 1257.62 | 53.34 1690.54 CNY 1746068 0 0 3647098 32004 5425170 Shanghang Land(mu) 22.65 0 0 23.71 0 46.36 CNY 1041901 0 0 68759 0 172949 Wuping __ Land(mu) 33 0 0 30.41 0 63.41 CNY 151800 0 0 88189 0 239989 Total 9122797 7.1.3 Compensation for affected houses and attachments A total of 1514 households are affected by house relocation, with estimated compensation cost amounting to CNY88.7167 million, the compensation cost for the affected attachments CNY925200 and that for tombs CNY4785000. The details of the cost estimation for the compensation for the affected houses, attachments and tombs are shown in Table 7-3, 7-4 and 7-5 respectively. Table 7-3 Resettlement compensation cost estimation for houses Item Area (m2) Unit cost (CNY/ M2) Compensation cost (CNY) Concrete 2700 550 1485000 Brick/concrete 107273.6 400 42909440 Brick/wood/stone 75101.7 300 22530510 Earth/wood 82853.5 260 21541910 Simple 4164 60 249840 Total (CNY) 88716700 96 Table 7-4 Resettlement compensation cost estimation for attachments Unit cost Compensation cost Item Unit Quantity (CNY) (CNY) WC/pig sty m2 7171.2 60 430272 Enclosure wall m 4844 30 145320 Thresh ground M2 5237.5 30 157125 Well Num. 18 350 6300 Methane pit Num. 0 300 0 Pool M3 15 40 600 Kiln M2 2320 80 185600 Total (CNY) 925217 Table 7-5 Resettlement compensation cost estimation for tombs Structure Type Quantity Cost per tomb (CNY) Total (CNY) Single 4866 200 973200 Earth Double 3949 300 1184700 Single 2256 400 902400 Brick Double 1622 500 811000 Single 733 600 439800 Stone Double 677 700 473900 Total 14103 4785000 7.1.4 Compensation cost for relocation of affected household The estimated compensation cost for relocation of affected 1514 households will amount to CNY25.4348 million, with the details shown in Table 7-6. Construction cost for concentrated resettlement site is not included in Table 7-6. The resettlement office will provide sufficient fund to build the concentrated resettlement site in due course. 97 Table 7-6 Cost estimation for relocation of affected households Quantity Unit cost Item Qaty Unit Compensation cost (CNY) ( M2 ) ( CNy/M2 ) Relocation 272092.8 3 (double) 1632557 Transition 272092.8 2 (6 months) 3265113 Average for water, 540.45 mu power, (house site area communication and for CNY38000/mu 20537100 road access recounstruction) Total (CNY) 25434770 7.1.5 Compensation cost for relocation of affected public facilities The estimated compensation cost for relocation of affected public facilities will amount to CNY23.7895 million, with the details shown in Table 7-7. 7.1.6 Compensation cost for the affected enterprises The compensation cost estimation for the affected enterprises includes the affected building relocation cost and the affected production loss cost. The project affected Jitong Plate Manufacturer Company and the Pingan Incense Plant will have to stop production for 6 months, which will have impact on the enterprises and the employees. The total production loss is estimated based on 9-month downtime. The total cost for the affected enterprises is estimated at CNY5866.3 thousand, with the details shown in Table 7-8. 98 Table 7-7 Cost estimation for relocation of affected public facilities Item . Unit cost . Total cost Unit (CNY) Quantity (CNY) 380V Km 25000 12.776 319400 1 OKV Km 50000 135.745 6787250 Power supply lines 35KV Km 120000 7.985 958200 110KV Km 300000 3.194 958200 Telecommunication line Km 80000 73.18 5854400 Broadcast and TV line Km 50000 8.26 413000 Underground cable Km 200000 32.24 6448000 Underground optical cable Km 200000 9.43 1886000 Transformer Num. 15000 1 15000 Small microwave station Num. 30000 5 150000 Total (CNY) 23789450 Table 7-8 Compensation cost estimation for affected enterprises Item Production loss Building Total Enterprise Employee Enterprise relocation Jitong Plate Manufacturing Co. 1782000 262500 478080 2522580 Shangshanji Village Enterprise 2664000 2664000 Spirochaete Algae Manufacturer 203970 203970 Pingan Incense Plant 67500 105000 288060 460560 Runxiang Metallurgical Co. 6060 6060 Wenheng Building Co. 7200 7200 Wuping Yanqian Water Plant 1920 1920 Total 1849500 367500 3649290 5866290 99 7.2 Estimation of Other Costs The estimated of other costs include those used to support the affected vulnerable groups, the administration cost, the cost for development of the RAP and the cost for independent monitoring activities and the contingent cost. 7.2.1 Compensation cost for the affected vulnerable groups The estimated total compensation cost for the affected vulnerable groups amounts to CNY4737.3 thousand, which is about 1% of the total compensation cost as mentioned above from paragraph 7.1.1 to 7.2.6. The purpose of the compensation for affected vulnerable groups in addition to the criteria is to make sure the affected vulnerable group's living standards be enhanced. 7.2.2 Administration cost The administration cost for each of the administration agencies is estimated at 3% of the total land acquisition and resettlement cost for each of the affected areas under the jurisdiction of the administration agency. The administration cost is mainly used for the procurement of the office, equipment, local transport, and personnel training for the implementation of resettlement action plan and shall not be used for any of the local government offices. The total administration cost is estimated at CNY14.2118 million. 7.2.3 Cost for the development of the RAP and monitoring activities The cost for the development of the RAP and monitoring activities is estimated at about CNY9.4745 million, accounting for 2% of the total compensation cost as mentioned above from paragraph 7.1.1 to 7.1.6. It is mainly used for the development of the RAP and the independent monitoring organization and the internal monitoring for the implementation of the RAP. 7.2.4 Contingent cost Since the estimation of the compensation cost is based the preliminary design only, the real cost may be updated during the implementation of the YWE project, according to the actual situation. In addition, the cost estimation is made based on the price in the year of 2005, it is necessary to take into account of the impact of inflation. 15% of the total compensation cost as mentioned above from paragraph 7.1.1 to 7.1.6 is taken as contingent cost, of which 5% is for inflation. Therefore total contingent cost is CNY71.0591 million. 7.3 Total Land Acquisition and Resettlement Compensation Cost The total land acquisition and resettlement compensation cost estimated for the YWE project is about CNY571.9348 million, with the details shown in Table 7-9. 100 Table 7-9 Cost estimation for YWE land acquisition and resettlement Item Cost (CNY) % share Remarks 1.Permanent land acquisition 315086724 66.51% 2.Temporary land acquisition 9122797 1.93% 3. Houses and attachments 94426917 19.93% 4. Household relocation 25434770 5.37% 5. Public facilities relocation 23789450 5.02% 6. Enterprises compensation 5866290 1.24% Basic cost (1-6) 473726948 100.00% 7. Other costs 99482658 7.1 Support vulnerable groups 4737269 1% of (1-6) 7.2 Administration cost 14211808 3% of (1-6) 7.3 RAP and Monitoring 9474539 2% of (1-6) 7.4 Contingent cost 71059042 15% of (1-6) Total (CNY) 571934834 7.4 Compensation Payment The General Resettlement Office of YWE Project will conclude agreement with each of the local resettlement offices, entitled land users, and the public facility owners, in accordance with the compensation policies and criteria under the resettlement action plan. And the compensation payment will be carried out according to the time schedule under the said agreement. The General Resettlement Office of YWE Project Owner will give the compensation payment to the following agencies and individuals. 7.4.1 Project affected persons For project affected persons (PAPs), affected by permanent land acquisition, temporary land acquisition, including economic loss arising from the crops, house and attachment relocation, compensation fees shall be paid as the following. (1) Land compensation fee If the project affected village can reallocate land to the PAPs, the land compensation fee will be paid to the village to be used for economic rehabilitation. If the project affected village has not enough land to be allocated to the PAPs, no less than 70% of the land compensation fee shall be paid to the PAPs. (2) Resettlement compensation fee Resettlement compensation fee shall be paid in accordance with the arrangement of the resettlement. For PAPs arranged by concentrated resettlement, the compensation fee shall be paid to the resettlement agency who is responsible for organization of the concentrated resettlement. For PAPs arranged by scattered resettlement at local village, the compensation fee shall be fully paid to the PAPs. 101 (3) Compensation fee for crops Compensation fee for crops attached to the land requisitioned shall be paid directly to the PAPs. Compensation fee for temporary land acquisition The temporary land compensation fee shall be paid directly to the PAPs, and the economic loss shall be calculated based on the time period of the temporary use. (4) Compensation fee for relocation of houses and attachments If the relocation of the houses of PAPs is going to be arranged by village/township in concentrated resettlement site, the compensation fee shall be paid to the resettlement agency who is responsible for the organization of the concentrated resettlement. If the PAPs are to be resettled on their won, the compensation fee shall be paid directly to the PAPs. Relocation compensation fee for temporary living houses and house site work Relocation fee for temporary living house and the house site work (including water supply, power supply, communication, CCTV, ground leveling, road access, etc.) shall be paid directly to the PAPs. For those arranged by concentrated resettlement, the compensation fee shall be paid to the resettlement agency who is responsible for organization of the concentrated resettlement. For PAPs arranged by concentrated resettlement, there are additional compensations used for green plantation, irrigation system, threshing ground, education and medical service facilities, which shall be paid top the resettlement agency who is responsible for all the work. (5) Way of payment The compensation fee paid directly to the PAPs shall go to the bank account in actual name of each of the PAPs/households, to avoid any intermediate step. 7.4.2 Compensation for affected enterprises Compensations for the affected enterprises include those for relocation of buildings, loss arising from production interruption for the enterprise and the employees, and the payment of the compensations shall be as the following. (1) Compensation for building relocation Compensation for building relocation shall be paid to the enterprise. (2) Compensation for production interruption Compensation for production interruption shall be paid to the affected enterprise and the affected employees. (3) Way of payment The compensation fee paid directly to the affected enterprise and the employees 102 shall go to the bank account in actual name of each of the said enterprises and the employees, to avoid any intermediate step. 7.4.3 Compensation for the affected public facilities (1) Compensation for public facilities owned by departments at county level Compensation for public facilities owned by departments at county level shall be paid directly to each of the said departments. (2) Compensation for public facilities owned by village Compensation for public facilities owned by village shall be directly paid to each villager committee of the said village. 103 8. Public Participation and Consultation 8.1 Public Consultation in the Preparation Period Two public consultation meetings were held during the socioeconomic survey in January and October 2005 in the YWE project area in Fujian province, one is at the regional level and one is at the village level. The issues discussed in the meeting include (1) fair compensation; (2) enough land reallocation; (3) assistance measures to the subsistence of the PAPs. 8.2 Public Participation in the Implementation Period of the RAP In order to successfully carry out the land acquisition and resettlement, the Resettlement Office of YWE Project (ROYWEP) has taken proactive measures to obtain the participation by the affected. By means of television, broadcasting, newspaper and magazine and special column, the information relevant to the YWE project e.g. alignment, location, law, policies, regulations and compensation criteria concerning resettlement, complain/appealing channel, World Bank's OP 4.12 BP 4.12 and the resettlement plan, etc. is introduced to the PAPs, so that the affected can at the stages of the project planning and implementation forward their suggestions and opinions on the basis of their full knowledge of the project. Meanwhile, the Resettlement Information Booklets (RIB) will be available at each of the township resettlement offices for the public to examine. As the YWE Project and the resettlement activities going on, such public meetings as news briefings will be held from time to time, so as to inform the PAPs of the latest development of the project and solicit further opinions and suggestions. The public participation activities of the resettlement action plan include (1) compilation and distribution of Resettlement Information Booklets; (2) formal discussions about arable land reallocation, and compensation payment; (3) detailed survey of the project impact on the PAPs and units to determine actual needs of the land acquisition and the affected properties and their classification. Table 8-1 shows the public participation activities and the time schedule. 8.3 Regular public consultation meeting The successful implementation of the resettlement action plan will be closely relevant to continuous public participation by the PAPs. As mentioned above, during the preparation period, public consultation meetings were held to reach consensus on some of the issues concerning the land acquisition and resettlement compensation, assistance, rights and entitlements of the PAPs. During the implementation period, further consultation meetings will be held regularly, to discuss such issues as reallocation of the farmland, detailed measures for the resettlement, compensation payment and the resettlement management, and etc. 104 8.4 Incorporation of the PAPs' Recommendation in the RAP The PAPs may have freedom to participate the public consultation meetings, whether they are young or old, men or women. They will be able to fully express their opinions, comments and recommendations. The PAPs will be informed of the latest development of the implementation of the RAP to solicit further opinions and suggestions. Minutes of the meetings will be on file and recommendations of the PAPs will be reflected in the RAP, which will be revised whenever it is necessary. Table 8-1 Public Participation and Consultation Plan Excutive Purpose Activity Time Participant Remarks agency - 1 Publish RIB July or August ROYWEP All PAPs To PAPs RAP 2006 CROs, TROs vcs 2 Finalize Distribution July or August ROYWEP All PAPs To CROs, TROs RAP of RAP 2006 CROs, VCs 3 Detailed Meetings March - July ROYWEP All PAPs Lists of land survey With PAPs 2006 CROs, TROs entitlement vcs Asset; List of PAPs; Preparation of compensation contract. 4. Carry out VCs July 2006 CROs, TROs All PAPs Detrmine relocation village RAP meeting VCs site; and Arable land Policy reallocation issues and compensation payment scheme; Discussion of use of compensation fee in the case of the PAPs would like to integrate uniform arrangement. 5. Feedback Public July - Sept. ROYWEP All PAPs Complain and appeal; communication awareness 2006 CROs, TROs Procedure & channel; procedures activities vcs Public awareness. 105 9. Organizations for the Implementation of the RAP 9.1 Organization Frame The following organizations shall plan, coordinate, implement, supervise and monitor the activities concerning land acquisition and resettlement for the Yong-Wu YWE project. (1) Provincial Resettlement Office (PRO) (2) Municipal Resettlement Office MRO) (3) Project Owner Resettlement Office (PORO) (4) County Resettlement Office (CRO) (5) Township Resettlement Office TRO) (6) Village Resettlement Group (VRG) (7) Independent Monitoring Organization (IMO) Table 9-1 shows the organizations responsible for each of the resettlement offices at different levels. Table 9-1 Organizations Responsible for Resettlement Offices No. RO at different levels Organization 1 Provincial RO FPECD 2 Municipal RO Sanming ECD Longyan ECD 3 Project Owner Sanming YWE Ltd.Co. Longyan YWE Ltd.Co. 4 Yongan, Liancheng, Shanghang, County RO YWECD 5 TRO, VRG Affected counties, towns and villages 6 Land Administration Bureau In each of the affected counties and towns 7 RAP survey and design RIOH 8 IMO To be decided 106 9.2 Organization Chart of Leading Group FPECD Sanming ECD Longyan ECD Sanming YWE Ltd.Co. Longyan YWE Ltd.Co. Yongan Liancheng Shanghang Wuping YWE CD YWE CD YWE CD YWE CD 9. Yongan Di Liancheng n Shanghang Wuping YWE RO YWE RO YWE RO YWE RO RO of FPECD RO of SMECD RO of LMECD m RO of SYWE Ltd.Co. RO of LYWE Ltd.Co. 0 (0 Yongan Liancheng Shanghang Wuping YWEPCH YWEPCH YWEPCH YWEPCH EPRO EPRO EPRO EPRO TROs VRGs 107 9.3 Duties for each of the organizations (1) Fujian Provincial Expressway Construction Directorate (FPECD) The FPECD is responsible for: * Policy issues for the RAP for the YWE Project; * Overall coordination and administration of the land acquisition and resettlement for the YWE project; * Internal monitoring work and administration of the ROs at each lower levels. (2) Sanming Municipal Expressway Construction Directorate (SMECD) The SMECH is responsible for: * Coordination and administration of the land acquisition and resettlement for the YWE project; * Internal monitoring work and administration of the ROs at each lower levels. (3) Sanming YWE Ltd.Co. and Longyan YWE Ltd.Co. Sanming YWE Ltd.Co. and Longyan YWE Ltd.Co. are project owners responsible for the following work. * To entrust the design organization to identify the impact of the land acquisition and resettlement, conduct the social survey and the survey of the quantities of land acquisition and resettlement, keep the data on file; * To be responsible for training the members of the ROs; * To coordinate the preparation and implementation of the RAP; * Funding management for the RAP, supervise the payment and use of the compensation fee and sign agreement with county resettlement offices; * To provide guidance, coordination and supervision service for the resettlement activities; * To preside over internal monitoring and prepare monitoring report, the annual audit of the compensation fund payment and use; * To go through the procedures for the land-use with the competent authority; * To coordinate the Project and RAP implementation progress and prepare the work progress report. (4) County resettlement offices The county level resettlement office shall be staffed with people from relevant departments of the county people's government, such as transport, land administration, finance, agriculture, forestry, and urban construction. The CROs shall be responsible for the following: * To assist define the affected areas of the YWE project and the socioeconomic survey; * To assist preparation of the RAP and participate the implementation of the RAP; 108 * To organize the public consultation and the public awareness of the government and World Bank resettlement policies; * To help go through the formalities of the land acquisition and resettlement procedures; * To sign the resettlement contracts with the TROs; * To monitor the payment of the land compensation and resettlement subsidies carried out by TROs; * To organize training of the members of the TRO and VRGs; * To monitor the resettlement activities of the TRO and VRGs; * To address issues arising from the implementation of the RAP; * To assist the internal and external monitoring activities; * To report to the higher level RO the progress of the land acquisition and resettlement. (5) Township resettlement offices (TROs) The TROs shall be staffed with people from relevant local government departments including land administration and village construction departments and shall be responsible for the following: * Participate the field survey and assist the preparation of the RAP; * To organize public consultation, participation and public awareness activities; * To sign resettlement agreements with the affected households, to implement, check, monitor and record all activities concerning the land acquisition and resettlement within the township area; * To arrange the relocation site selection and go through the formalities of the land acquisition and resettlement procedures for the affected houses and public facilities; * To monitor the compensation fund payment and management; * To report to the CRO the progress of the land acquisition and resettlement; * To address issues arising from the implementation of the RAP. (6) Village resettlement groups (VRGs) The VRGs shall be staffed with major cadres of the village and shall be responsible for the following: * To participate the socioeconomic and project impact surveys; * To organize public consultation, participation and public awareness activities; * To select the relocation site and preparation of the house site; * To carry out necessary farmland reallocation and to assist the vulnerable groups and the PAPs; * To manage the compensation payment and use; 109 * To report to the higher level ROs the PAPs' comments and recommendations; * To report to the progress of the land acquisition and resettlement. 9.4 Staffing for Each of the Resettlement Offices Staffing for each of the resettlement offices is shown in Table 9-2 Table 9-2 Number of Staff for Each of the Resettlement Offices Title of professional post More ROs Cardinal Total Time Senior Interm. Junior needed FPECD 1 1 1 Jan.05 - Dec.09 MRO 1 2 1 Jan.05 - Dec.09 Project Owner 2 - 3 4 - 6 2 Nov.05 - Dec.09 CRO 3 - 5 12 - 20 4 Mar. 06 - Dec.09 TRO 3 - 5 45 - 75 Familiar with LA&R work Mar. 06 - Dec.09 4 VRG 3 207 Familiar with LA&R work Mar. 06 - Dec.09 6 S&DO 6 6 3 2 3 Jan. 05-Feb.06 IMO 4 4 2 2 Nov. 06 - Dec.09 9.5 Professional Training Plan and Institutional Strengthening In January 2005, Fujian Provincial Communications Department and the FPECD organized a meeting to make an overall arrangement of the YWE project with the World Bank loan. The participants attended the meeting are project owners and the people to be involved in the land acquisition and resettlement for the road projects. At the meeting the participants studied the WB operational policies and the Bank procedures concerning Involuntary Resettlement; and the professional training work as required by the World Bank operational policies was planned. As the work is going on, a series training courses will be arranged in May and June 2006, concerning the land acquisition and resettlement procedures, the compensation fund appropriation and payment procedures, administration and monitoring, production and living condition recovery, manner to deal with complain, information processing for the land acquisition and resettlement, and etc.. Meanwhile to better implement the RAP and to make the resettlement work more effective and efficient, high quality staff is required for each of the ROs to recruit those with experience in the land acquisition and resettlement work; and training courses will be held to make the officers to learn and grasp the relevant laws and regulations concerning with the land acquisition and resettlement, as well as the 110 World Bank operational policies and the Bank procedures for involuntary resettlement OP 4.12 BP 4.12. 9.6 Complain and Appeal The land acquisition will have impact on the people and units along the road project area in different extents for different people and units, there are more impacts on those whose land and buildings are in the road area need to be resettled. To minimize the impact, especial efforts have been made in the RAP to reduce the resettlement work amount as much as possible and to benefit the affected people from the project. Since the preparation and implementation of the RAP was carried out with the participation of the PAPs, the opinions and suggestions concerning the issues in each of the links of the resettlement work have been taken into account in the RAP. To ensure prompt, transparent and farey treatment of the issues arising from the implementation of the RAP, an appealing channel has been established so that the PAPs may find the way to address his/her complaints. The appealing channel is simple, accessible and impartial. The appealing procedure goes as follows. 9.6.1 Complain Complain shall be made according to the procedures as the following. (1) Stage one Any objection against the RAP may be put forward orally or in writing to the villager committee or township level resettlement office. (For oral appeals, the person in charge of the office or committee has to make written records of the appeal.) The latter should response in writing or have it settled within 2 weeks. (2) Stage two If not satisfied with the response at the stage one, the affected may bring it to the County Resettlement Office within one month from the date he/she got the response. The latter should make a decision on the appeal within 2 weeks. (3) Stage three If not satisfied with the reply in Stage two, the affected may bring it to Municipal RO in one month from the date he/she received the reply. The latter should give an answer in writing within 3 weeks. (4) Stage four If not satisfied with the reply in the stage three, the affected may bring to the FPECD RO in one month from the date he/she received the reply. The latter should give an answer in writing within 4 weeks. 9.6.2 Appeal If not satisfied with the reply in the stage four, the affected may bring the case to the local people court in accordance with the Civil Procedure Law of the PRC in 15 days from the date he/she received the reply. The affected has the right to appeal on 111 any issue of the land acquisition and resettlement including the criteria for the compensation. Details about the appeal procedure have been disclosed to the public during the public consultation. The resettlement offices at various levels and villager committees will also post the procedure at village administration offices at the time of implementation of the RAP. The appeal procedure is also explained in the RIB. The above mentioned contents have been included in the RAP for the YWE project, which will be edited into a RIBs to be distributed to the TROs before the execution of the land acquisition and resettlement, available for the public to examine. 112 10. Monitoring and Appraisal During the implementation of the land acquisition and resettlement, regular monitoring will be carried out on the activities concerning the land acquisition and resettlement and rehabilitation, so as to ensure the RAP be followed. The monitoring activities include internal monitoring and external monitoring. Internal monitoring on the ROs will be exercised by the FPECD RO so as to ensure the schedule and the provisions of the RAP be followed by all the executive agencies concerned. The internal monitoring aims to keep the ROs functioning well in the whole process. An independent monitoring organization (IMO), independent of the government and the Project Owner, shall be selected to monitor the land and resettlement activities for the YWE project. The Project Owner will recommend an eligible candidate agency to undertake the independent monitoring work, which will be determined after it is acknowledged by the World Bank. The IMO is responsible for independent monitoring of all the ROs on two aspects: the operation of the resettlement network; and the adaptability of the PAPs to their new life, for the purpose to give objective evaluation of the implementation effects of the RAP to ensure long term objectives of the resettlement instrument to be achieved. 10.1 Internal Monitoring The FPECD RO has established an internal monitoring frame focusing on the investigation of the PAPs and their properties, also for preparation of the RAP. The FPCD WBPO keeps the relevant database used for the monitoring and management of the resettlement with assistance from the local resettlement offices. The overall object of internal monitoring is to make sure the resettlement activities in compliance with the approved RAP. 10.1.1 Purpose and task The purpose of the internal monitoring is to make sure ROs at various levels function well in the implementation of the RAP, in compliance with the relevant laws, regulations and policies, as well as the time schedule set forth in the RAP. Competent department of the provincial government will exercise audit and supervision authority over the land compensation and resettlement under its jurisdiction area. 10.1.2 Implementation procedures During the implementation of the RAP, each of the county resettlement offices (CROs) will input the information concerning the PAPs and the affected households/units from each of the township resettlement offices (TROs) into the formatted documents already prepared for the internal monitoring. The current working information will be passed on to the FPECD RO, which is the way continuous monitoring will be carried out. The FPECD RO will regularly conduct 113 random inspections on the resettlement work done by the CROs, TROs and the village resettlement groups (VRGs), which will cover all townships and villages concerned, and check the work progress and compliance. Forms in uniform format will be used to continuously display the information flow from villages up to the FPECD RO combined with regular monitoring and review by the FPECD RO, so as to make the resettlement offices at all levels under the supervision of internal monitoring regime. 10.1.3 Contents covered by the internal monitoring (1) If the compensation fund for the project affected persons or units is available and fully paid; (2) If the selection and allocation of the resettlement site for buildings meeting with the requirements; (3) If the relocation of household houses proceeding well in accordance with the time schedule; (4) If the land for the land adjustment is ready to be allocated to the PAPs; (5) If the vulnerable group has got assistance in the resettlement; (6) If the affected public facilities have been rehabilitated; (7) The progress of the resettlement work mentioned above; (8) Consistency of the resettlement work mentioned with the RAP; (9) Public participation and consultation with the PAPs; (10) Staffing, training, work time schedule and efficiency of resettlement office. 10.1.4 Monitoring method The method adopted in the monitoring activities mainly include: to hold meetings with PAPs and representatives from all walks of life; and to drop in the affected families to investigate, interview and listen to their opinions and problems, inviting the PAPs to fill the Monitoring Registration Form. The time schedule of the internal monitoring activities is shown in Table 10.1. 10.1.5 Report After implementation of the RAP commences, each local resettlement office will regularly once every three months at least submit a completed progress form and prepare a working report to its higher office. The FPECD RO will sum up the information and send a RAP Implementation Progress Report to the WB by the end of June and December respectively every year from 2006 to 2009. Upon completion of the YWE project, an Implementation Completion Report will be sent to the WB. 114 Table 10-1 Schedule of Internal Monitoring Time Theme Monitoring activities Prepare RAP, To check if the RAP and criteria in compliance with June 2006 work out compensation criteria, the laws and regulations and the WB's policies and and resettlement measures make the said known to the PAPs If the resettlement agreements concluded between July 2006 Start to implement the RAPthCRsT santePA? the CROs/TROs and the PAPs? Implementation of the RAP, Ols the compensation fund available? Aug. 2006 Write internal monitoring report, Olf the vulnerable groups treated properly?

Informations clés
Type de document Resettlement Plan
Date d'adoption
Pays Chine
Source Banque mondiale