Groupe de la Banque mondiale · Staff Appraisal Report

Cameroon - Second Highway Project

Cameroun Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

FILE COPY DOCUMENT OF INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION Not For Public Use Report No. 180-CM APPRAISAL OF A SECOND HIGHWAY PROJECT CAMEROON June 11, 1973 Western Africa Projects Department Transportation Division This report was prepared for official use only by the Bank Group. It may not be published, quoted or cited without Bank Gtoup authorization. The Bank Group does not accept responsibility for the accutacy or completeness of the report. Currency Equivalents: Currency Unit = CFA franc (CFAF) US$1.00 = CFAF 230 CFAF 1 million = US$4,340. Fiscal Year July 1 - June 30 System ofi Weights and Measures: Metric MEtric British/US 1 meter (m) 3.28 feet (ft) 1 kilometer (km) 2 = 0.62 mile (mi) 1 square kilometer (km ) = 0.386 square mile (sq mi) 1 kilogram (kg) 2.2 pounds (lb) 1 metric ton (m ton) 2,204 pounds (lb) Abbreviations and Acronyms DR - Department of Roads FAC - Fonds d'Aide et de Cooperation lED - Fonds Europ

Informations clés
Type de document Staff Appraisal Report
Date d'adoption
Pays Cameroun
Source Banque mondiale