Page 1 Environmental Impact Assessment Report On Additional Second Line Project For Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Line 1 THE SECOND SURVEY & DESIGN INSTITUTE E-1265 V. 2 Additional Second Line Project For Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Line (Funded by the World Bank Loan) Environmental Impact Assessment Report The Second Survey and Design Institute of China Railways Chengdu August 2005 Page 2 Environmental Impact Assessment Report On Additional Second Line Project For Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Line 2 THE SECOND SURVEY & DESIGN INSTITUTE Additional Second Line Project For Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Line (Funded by the World Bank Loan) Environmental Impact Assessment Report The Second Survey and Design Institute of China Railways Chengdu August 2005 Page 3 Environmental Impact Assessment Report On Additional Second Line Project For Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Line 3 THE SECOND SURVEY & DESIGN INSTITUTE Table of Content 1 General..............................................................................................................7 1.1 Project background.................................................................................7 1.2 Basis of compilation ................................................................................7 1.3 Assessment grade ....................................................................................9 1.4 Assessment factors.................................................................................10 1.5 Range of assessment.............................................................................. 11 1.6 Period for assessment............................................................................12 1.7 Assessment standard.............................................................................12 2 Project overview ..............................................................................................16 2.1 Conditions of the existing railway ........................................................16 2.2 Overview of the Additional Second Line Project.................................17 3 Assessment of existing environment................................................................26 3.1 General introduction of natural environment......................................26 3.2 Natural Reserves, scenic areas and cultural relics...............................27 3.3 Current conditions of ecological environment .....................................28 3.4 Current conditions of acoustical environment.....................................38 3.5 Monitoring and assessment of the present state of vibration environment........................................................................................................75 3.6 The present quality state of water environment...................................82 3.7 Ambient air quality standard ...............................................................95 3.8 Electromagnetic environment...............................................................99 Page 4 Environmental Impact Assessment Report On Additional Second Line Project For Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Line 4 THE SECOND SURVEY & DESIGN INSTITUTE 3.9 Groundwater resources....................................................................... 104 3.10 Engineering geology............................................................................ 106 3.11 Unfavorable geology and special Karst.............................................. 108 3.12 Present situation about water loss and soil erosion.............................112 3.13 Present situation about social environment........................................ 120 4. Environmental impact assessment and environmental protection measures. 123 4.1 Ecological environment impact assessment and environmental protection measures.......................................................................................... 123 4.1.2 Impact of construction on land-use type along the line...................... 179 4.1.3 Analysis of impact on wildlife resources........................................... 185 4.1.4 Environmental impact analysis of key works .................................... 191 4.2 Predication, prevention and cure measures for water loss and soil erosion 241 4.3 Sound environmental impact prediction and measures..................... 267 4.4 Prediction and control measures of vibration environmental impact305 4.5 Water environmental impact assessment and protection measures..... 315 4.6 Atmosphere environment impact assessment and proposed measures 328 4.7 Evaluation of electromagnetic environment and proposal of measures 331 4.8 Environment impact analysis and measures for solid waste.............. 341 4.9 Analysis of social impact..................................................................... 343 5 Alternative Proposal...................................................................................... 354 5.1 Alternative proposal of the highway................................................... 354 Page 5 Environmental Impact Assessment Report On Additional Second Line Project For Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Line 5 THE SECOND SURVEY & DESIGN INSTITUTE 5.2 Local plan selection............................................................................. 357 6 Environmental Management and Plan of Environmental Supervision and Monitoring ............................................................................................................. 371 6.1 Environmental management institutions ........................................... 371 6.2 Plan of environmental supervision ..................................................... 379 6.3 Plan of environmental monitoring...................................................... 381 6.4 Personnel training............................................................................... 391 7 Public Participation....................................................................................... 394 7.1 General ................................................................................................ 394 7.2 Investigated object composition of public participation.................... 396 7.3 Public opinions.................................................................................... 397 7.4 Suggestions based on the public opinions........................................... 403 7.5 Effects achieved by the public participation ...................................... 404 7.6 Feedback and implementation of the public opinions ....................... 404 7.7 Information disclosure........................................................................ 405 8. Conclusion .................................................................................................... 405 8.1 Rationality of the railway location...................................................... 405 8.2 Conclusion of the environmental situation assessment...................... 407 8.3 Conclusion of environmental impact assessment............................... 408 8.4 Investment estimate for environmental protection............................ 416 Annex 1: Document Annex 2: Questionnaire for Public Participation Page 6 Environmental Impact Assessment Report On Additional Second Line Project For Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Line 6 THE SECOND SURVEY & DESIGN INSTITUTE Attached Drawing: Attached Drawing1: Geographic Location Map Attached Drawing2: Schematic Plan of the Railway Line Attached Drawing3: Schematic Diagram for Distribution of Main Environmental Protection Sensitive Spots Attached Drawing4: Schematic Diagram for Distribution of Main Borrow Pits, Dumping Grounds and Water System Attached Drawing5: Schematic Diagram of Major Environmental Protection Measures Attached Drawing6: Spotting Map for Monitoring in Environmental Monitoring Plan Attached Drawing7: Plan & Profile of Typical Borrow Pits and Dumping Grounds Attached Drawing8: Spotting Map of Noise and Electromagnetic Environmental Monitoring Points Page 7 Environmental Impact Assessment Report On Additional Second Line Project For Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Line 7 THE SECOND SURVEY & DESIGN INSTITUTE 1 General 1.1 Project background Liupanshui-- Zhanyi Section on Guiyang-Kunming Railway is an important inter- regional transportation passage for Yunnan and Guizhou to keep social and economic communications with developed regions in the east and middle parts of our country, and is also the most convenient overland passage leading to Southeast Asia and South Asia. The construction of the Additional Second Line is of great significance in strengthening relations between Southeast Asia, South Asia and our country, and between the west region of our country and developed regions in the east and middle part, as well as in promoting common social and economic development among regions, and ensuring sustainable and healthy development of economy in the catchment area of the Line. Second Survey & Design Institute of China Railways (hereinafter referred to as
Groupe de la Banque mondiale · Environmental Assessment
China - Third National Railway Project : environmental impact assessment (Vol. 2 of 5) : Environmental impact assessment report
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Environmental Assessment
Pays
Chine
Source
Banque mondiale