Groupe de la Banque mondiale · Announcement

Announcement of Twenty-Four Million US Dollars Loan to Nicaragua for Power Project on June 29, 1972

Nicaragua Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

INTERNATIONAL BANK FOR • RECONSTRUCTION AND DEVELOPMENT 1818 H STREET. N.W.·, WASHINGTON o. c. 20433. '!'ELEPHONE: EXE<iUTIVE 3-6380 Bank Press Release No. 72/47 . ~bJ~c~: . $24~0 million loan to Nicaragua June 29, 1972 · fqr .power project The World Bank has approved a $24.0 million ·equival~t ·1~an to Ernpresa Nacional de Luz y Fuerza (ENALUF) of Nicaragua to finance jointly with the Central A11M:9rican Bank for Economic Integration (CABEI) a power project which will be the first step in a coordinated development program of ~ne Nicaragu~ and Honduran power sectors based on interconnection and -- in the longer run -- in the integrated power development or the whole Central American region. This will be the eighth loan to ENALUF. The· Bank, since ·~95.3, bas assisted in financing practical~ all or PNALUF's expansion in generation and .transmission through seven loans, totaling $42.3 million.. · · An adequate and reliable supply of ~er has piayed a key ·rc:,1e·· i:n the .industrial growth or the 196os in Nicaragua •. '!he annual increase in power gener~tion averaged an impressive 23% from 1958 to 1966 and r~ained at a substantial 14% from 1966 to 1971. Per capit$ generation., 245.;,kilowatt hours in 1970., is second only to Costa Rica (500- kilowatt hours) among the Central American ·countri~s. . . • Power demand in Nicaragua is projected· to increase by 13% in 1972-76 and 10% in 1977-85 as a result or growii,g industrial requirements ·and village electrification. Prelimina:ry explorations of geothermal resources have, given favorable results. These resources: . however, are insufficient to meet the expected demand. Identification or major hydro resources is ··in.its early stages, and for the ·next. decade ENALUF 1 s require- ments will have to be met· mainly by thermal plants, unless power is .imported f'rom neighboring countries. ·· . . The project will help to meet the rapidly growing demand for energy and to build the Nicaraguan portion. or the interconnectioq between the power·· systems of Nicaragua and Honduras. , ·· The. project includes. a 100.,000-kilowatt steam-el~ctric station at Puerto Somoza; a 110-mile, 230-kilovolt transmis1;1ion system to connect the Puerto Somoza station to ENALUF•s syst~m and to the system or Empresa·Nacional de Energia Electrica of ~onduras; a 138-kilovolt ·r1ng around Managua, the capital ·or Nic.aragua; •· 55.:.m11e, 138..;ldlovo~t line to . extend ENALUF' s service area ·in the· n9rthern. part ·of the ·country.; 'alld. manage- ment consultants' services to as.sist ENAIDF i.n impfoving it~ organization an.d administration. . · · . .. . ·. ·: ·.· · .) The est:l.inated total financing r$q~irement·. for the proje~t .is $4).9 million equiv- alent, including $30.9 lll;illion in .foreign currency •..In addition to. the Bank's $24.0 million loan·, CABEI will lend ENALUF .$6 .l million·. The· rest. will come from ·ENALUF •s own resources .and a $700,000 loan CABEI made ~·arli~r in ~he.year~ _'!he German Govem-· m.ent is qona±dering ~. cont.ribution to 'ijle .#rianqing or ;the· proj..:rct by: providing a loan to CABE!. . . ·· . . .. . · · ·· .. ' · · · ~ · . · · • The Bank loari, vith··the gua~ant·ee .or ·the Gqv~mment. of the ~public or Nicaragua, ,is for a peri~- or 24 years;,. 1nciu~ng a four -and orie-half year. grace period, at an annual interest rate of 7-;%. · · · ~ 0 ~ • June 29, 1972 TECHNICAL DATA PBOJEcr: Power COUNTRY: Nicaragua TOTAL COST: $43.9 million BANK FINAHCii-lG: $24.0 million, 24 years,, ~ years of grace, M interest per annum. OTHER FINANCING: Internal cash generation and loans from the Central American Bank for Economic Integration (CABEI). • IMPLEMENTING ORGANIZATION: F.mpresa Nacional de Luz y Fuerza (ENALUF)!, Apartaclo 55, Managua, Nicaragua. cable Address: ENALUF. PROJECT DESCRIPTION: Construction and installation of the.\ Nicaraguan portion of the interconnection line between the powe~sys~em of ENALUF and the system of Empresa Nacional de Energia E~c~rica (ENEE) of Honduras; a new 100-megawatt stea--electric st&tion at Puerto Somoza, on the Pacific Coast, and associated 230-kilovolt transmission lines; exte1!18iODS to EN.ALUF's 138-kilovolt transmission I) system; and consultant studies for management improvement. PBOCUREMElfr: Goods financed by ·the Bank and CABEI will be procured through ·international competitive bidding. Manufacturers wf thin the Central American Comm~ Market will ~eceive a preference of 15% of the c.i.f. price or SO% of the customs duties, whichever is lower. CONSULTANTS: Kuljian Engineers/C~tr'actors of the U.S.A.; Electroconsult of Italy. ESTIMATED COMPLETION DATE: 1976. - 0 - ()

Informations clés
Type de document Announcement
Date d'adoption
Pays Nicaragua
Source Banque mondiale