China - Meishan Coke Dry Quenching Project : environmental impact assessment (Vol. 1 of 2) : Environmental impact report

Chine Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

E1700 v 1 Shanghai Meishan Iron and Steel Co., Ltd. 1# and 2# Coke Ovens Relocated Overhaul System Project Environmental Impact Report (Simplified Version for World Bank) Shanghai Meishan Iron and Steel Co., Ltd. Oct. 2005 Project undertaken by: Nanjing Municipal Environmental Protection Scientific Research Institute Certificate Grade: Grade A Certificate No.: Guo Huan Ping Zheng A No. 1907 Director: Feng Xiaoyi (EA) Post Certificate No. A19070002 Responsible deputy director: Lu Ningchuan (EA) Post Certificate No. A19070004 Chief engineer: Lu Zhangyue (EA) Post Certificate No. A19070001 Project responsible persons: Gao Xiaojie (EA) Senior Post Certificate No. JA1907003 Dai Fengsheng (EA) Senior Post Certificate No. JA1907002 Drafting personnel: Name Certificate No. Chapter Signature Dai Fengsheng (EA) Post Certificate No. JA1907002 2, 5, 9, 12 Jiang Leping (EA) Post Certificate No. A19070013 6, 7, 8 Liu Bihu (EA) Post Certificate No. A19070006 11, 13, 14 Ji Zhengyu (EA) Post Certificate No. A19070019 7, 8, 10 Gao Xiaojie (EA) Post Certificate No. JA1907003 1, 3, 4, 13, 15 Reviewed by: Liu Chunyang (EA) Senior Post Certificate No.HA1907002 Verified by: Lu Ningchuan (EA) Post Certificate No. A19070004 Approved by: Feng Xiaoyi (EA) Post Certificate No. A19070002 Table of Contents 1. General.................................................................................................................................. 1 1.1 Foreword.......................................................................................................................... 1 1.2 Basis of preparation......................................................................................................... 2 1.3 Principles for assessment work........................................................................................4 1.4 Technical line for the assessment .................................................................................... 4 1.5 Emphasis of assessment and classes of assessment work ............................................... 6 1.6 Scope of assessment ........................................................................................................ 6 1.7 Determination of assessment factors............................................................................... 6 2. General environmental conditions of and environmental protection targets in the surrounding areas of the project............................................................................................. 8 2.1 Briefs of natural environment.......................................................................................... 8 2.2 Social environmental conditions ..................................................................................... 9 2.3 Regional social development planning............................................................................ 9 2.4 Environmental function zoning ..................................................................................... 18 2.5 Assessment standards .................................................................................................... 18 2.6 Targets for pollution control and environmental protection.......................................... 21 3 Engineering analysis ........................................................................................................ 23 3.1 Status of current enterprises and discharge from pollution sources .............................. 23 3.2 Overview of the construction project ............................................................................ 28 3.3 Engineering analysis of the construction project........................................................... 31 4. Assessment of pollution prevention and control measures............................................. 59 4.1 Waste gas treatment measures ....................................................................................... 59 4.2 Control and rectification measures for waste water ...................................................... 63 4.3 Noise.............................................................................................................................. 65 4.4 Solid wastes................................................................................................................... 65 4.5 Hygienic protection distance ......................................................................................... 66 4.6 Normalized setup of discharge ports ............................................................................. 66 4.7 Construction schedule arrangement for environmental protection control and rectification setups and estimation of environmental protection investment ...................... 67 5. Clean production and circulating economy analysis....................................................... 68 5.1 Analysis for clean production........................................................................................ 68 5.2 Circulating economy analysis........................................................................................86 6 Investigation and assessment of regional pollution sources ............................................ 87 6.1 Investigation and assessment of atmospheric pollution source situation ...................... 87 6.2 Wastewater pollution source investigation and assessment........................................... 89 7 Investigation and assessment of environment quality present situation........................ 91 7.1 Investigation and assessment of atmospheric environment quality present situation ... 91 7.2 Investigation and assessment of surface water environment quality situation.............. 97 7.3 Investigation and assessment of acoustic environment quality situation .................... 101 8 Prediction and assessment of environmental impact..................................................... 109 8.1 Atmospheric environmental impact assessment.......................................................... 109 8.2 Analysis on environmental impact of surface water.................................................... 111 8.3 Environmental noise impact assessment ..................................................................... 112 8.4 Analysis on environmental impact of solid waste ....................................................... 117 9. Total amount control analysis for pollutant emission................................................... 118 9.1 Purpose of total amount control................................................................................... 118 9.2 Determination of total amount control factors ............................................................ 118 9.3 Pollutant emission from project................................................................................... 118 9.4 Change in total pollutant emission amount after the implementation of the project... 119 9.5 Analysis and balance plan for total amount control on pollutant emission for project119 10 Analysis of environmental impact during construction period................................... 121 10.1 Analysis of atmospheric environmental impact during construction period............. 121 10.2 Analysis of construction acoustic environmental impact .......................................... 122 10.3 Analysis of water environmental impact during construction period........................ 122 10.4 Analysis of environmental impact of construction waste.......................................... 123 10.5 Environment management during construction period .............................................123 10.6 Construction Schedule............................................................................................... 124 11 Public Poll......................................................................................................................... 125 11.1 Purpose and function of public poll........................................................................... 125 11.2 Investigation method, items and the people to be visited....................................... 125 11.3 Result of the public poll............................................................................................. 126 12 Analysis of reasonability of the project site selection................................................... 129 12.1 Analysis of conformability of the project site selection with the planning ............... 129 12.2 Analysis of compatibility of the project with environmental planning.................. 130 12.3 Analysis of conditions of site selection ..................................................................... 130 12.4 Analysis of health protection distance....................................................................... 131 12.5 Influence on the surrounding environment quality after completion of the project131 13. Environmental Risk Evaluation.................................................................................... 132 13.1 Accidental Pollution Analysis.................................................................................... 132 13.2 Accidental Risk Evaluation ....................................................................................... 135 13.3 Relief Solutions and Emergency Preventions for Environment Risk Accidents.......137 13.4 Accidental Discharge and Countermeasures ............................................................. 141 13.5 Integrated Measures against Environmental Risks.................................................... 142 14 Environmental monitoring and EP Management plan................................................ 144 14.1 Environmental monitoring.........................................................................................144 14.2 Environmental management system and monitoring instrument ..............................144 14.3 Suggestions for environmental management system................................................. 146 15. Analysis of economic profit and loss of environment.................................................. 147 15.1 Analysis of economic benefit .................................................................................... 147 15.2 Analysis of social benefit........................................................................................... 148 15.3 Analysis of profit and loss of environmental influence............................................. 148 16 Conclusion and suggestion.............................................................................................. 149 16.1 Conclusion................................................................................................................. 149 16.2 Suggestions................................................................................................................ 152 Appendices 1. General 1.1 Foreword In Shanghai Meishan Iron and Steel Co., Ltd., coke oven No. 1 was put into operation in 1970 and No. 2 coke oven was put into operation in 1971. Both coke ovens are of type 58-II in 65 ducts and have been operating for over 30 years. They are aged with backward technology, featuring high consumptions and unable to meet the modern environmental protection requirements; No. 3 coke oven is of type JNX43-58 in 65 ducts, and was put into operation in 1996. Baosteel Chemical Meishan Branch is subordinated to Shanghai Baosteel Chemical Co., Ltd. under the Baosteel Group. The coal gas purifying system of Baosteel Chemical Meishan Branch is the associated production facilities of the 3 coke ovens of Meishan Iron and Steel Company, built in early 1970s. Due to the long history of the Branch, the gas purifying system equipment has become aged, with serious corrosion, backward in technology and low in automatic control level, resulting in many leaking points in the production area that are difficult to control. The existing facilities and production, equipment and environmental protection level cannot meet the daily increasing requirements in environmental protection. To meet the requirements of modern environmental protection and the admitting conditions set by the state for coking industry, the Company has decided to perform relocated transformation for the three existing 65-duct coke ovens (the site being the newly requisisted land of Meishan Iron and Steel Company), and a new associated gas purifying workshop will also be built. It has been determined that the scale for relocated overhaul of 1# and 2# coke ovens will be 1 million t/a of coke, and the coke ovens will 2

Informations clés
Type de document Environmental Assessment
Date d'adoption
Pays Chine
Source Banque mondiale