Texte intégral
Page 1 THE SECOND SURVEY & DESIGN INSTITUTE E-1265 V. 1 Additional Second Line Project for Liupanshui - Zhanyi Section on Guiyang-Kunming Railway Line Funded by the World Bank Loan Environmental Impact Assessment Report Supplementary Data The Second Survey and Design Institute of China Railways Chengdu October 2005 Page 2 THE SECOND SURVEY & DESIGN INSTITUTE On September 26~27, 2005, the World Bank Delegation made an assessment to the feasibility study report. This report is accepted and comments issued accordingly. In view of the experts