Groupe de la Banque mondiale · Environmental Assessment

China - Third National Railway Project : environmental impact assessment (Vol. 4 of 5) : Environmental management program

Chine Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

E-1265 V. 4 Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Funded by the World Bank Loan Environmental Management Program The Second Survey & Design Institute of China Railways October 2005 Chengdu Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Funded by the World Bank Loan Environmental Management Program The Second Survey & Design Institute of China Railways October 2005 Chengdu Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Table of Content 1 Genera..............................................................................1 1.1 Project background............................................................1 1.2 Laws, codes and technical standards.......................................1 1.3 Environmental management institutions.................................3 1.4 Composition of Environmental Management Program..................9 2 Conclusion of environmental impact assessment...........................9 2.1 Rationality of railway location.............................................9 2.2 Conclusion of the present environmental status assessment......10 2.3 Conclusion of environmental impact assessment........................12 3 Mitigation Measures............................................................20 3.1 Environmental protection at early stage of this Project...............20 3.2 Environmental Control Measures in Design Phase.....................21 3.3 Mitigation measures for impact on environment during construction44 3.4 Mitigating measures during operation period...........................61 4 Environmental Supervision Program.......................................62 5 Environmental Monitoring Program.......................................64 5.1 Purpose........................................................................64 5.2 Monitoring parameters for construction period and operation period64 5.3 Report process for supervision and monitoring........................72 6 Personnel Training............................................................73 6.1 Additional trainings for full-time/part-time environmental protection personnel during the construction period.....................73 6.2 Additional trainings for full-time/part-time environmental protection personnel during the operation period...........................74 7 Estimation of Investment for Environmental Protection...............74 Attached Drawings Spotting Map for Monitoring in Environmental Monitoring Plan THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway 1 General 1.1 Project background Liupanshui-Zhanyi Section on Guiyang-Kunming Railway is a main integral part of Shanghai-Kunming Passage, one of the eight vertical and eight transverse trunk railways as an important inter-regional transportation passage connecting Yunnan Province and Guizhou Province with developed areas in the east and middle of our country for linkage of society and economy, shouldering Deleted: on the aspects the mission of transporting materials and passengers of these two provinces and Deleted: personnel also as the most convenient landway passage leading to the Southeast Asia and South Asia. Additional Second Line for the Section is of great significance in enhancing connection between Southeast Asia, South Asia and our country and between the west and developed areas in the east and middle of our country, speeding up the formation of railway fast passenger transportation system, promoting common development of inter-regional society and economy and guaranteeing the sustainable and healthy economic development of areas along the line. Second Survey & Design Institute of China Railways hereinafter referred to as SSDICR has performed several studies on double line plan for Liupanshui-Kunming Section on Guiyang-Kunming Railway Line, completed Preliminary Feasibility Study Report on Liupanshui-Zhanyi Section in December, 2003 and completed Feasibility Study Report in July, 2005. The Project is the Additional Second Line Project of the existing railway. Due to the improved technical standard, reconstruction of existing line and construction of new railway lines will be conducted in some sections, which shall result in problems of noise increase, land occupation, ecosystem disturbance, division of communities, water loss and soil erosion, dweller resettlement etc. belonging to construction project, Category A. 1.2 Laws, codes and technical standards All laws, codes and EIA Guide Rules concerning environmental protection of China as well as the safety policy of the World Bank will be adopted as basis Deleted: in the state of preparation, including the following specifically: Deleted: references 1Environmental Protection Law of the People's Republic of China; 2Law of the People's Republic of China on Appraising of Environment Impacts; 3Law of the People's Republic of China on Water and Soil Conservation; 1 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway 4Law of the People's Republic of China on Prevention and Control of Pollution from Environmental Noise; 5Law of the People's Republic of China on Air Pollution Control; 6Law of the People's Republic of China on Prevention and Control of Water Pollution; 7Law of the People's Republic of China on the Prevention and Control of Environmental Pollution by Solid Waste; 8Forestry Law of the People's Republic of China; 9Law of the People's Republic of China on the Protection of Cultural Relics; 10Regulations of the People's Republic of China on Protection of Basic Farmland; 11 Management Rules on Environmental Protection of Construction Projects, # 253 Decree issued by the State Council; 12Administrative Measures for Electromagnetic Radiation Environmental Protection, No. 18 Decree issued by Environment Protection Administration; 13Urgent Notification of the State Council on Detering the Behavior of Occupying Basic Farmland for Tree Planting, Document No. GFMD [2004]-1 issued by the State Council; 14Notification Regarding Enhanced Control Over Railway Noise Pollution, Document No. GHf [2001]-108 issued by State Environmental Protection Administration; 15 Notification Regarding Strengthening Supervisory Work on Environmental Impact Assessment of Construction Project Funded by International Financial Organizations; 16Regulations of Guizhou Province on Environmental Protection in Construction Project; 17Regulations of Yunnan Province on Environmental Pollution Prevention and Control; 18"Notification on Issuance of Administrative Measures for Environmental Impact Assessment of Railway Construction Project and Administrative Measures for `Three Simultaneities' of Railway Construction Project", Document No. TJZ [1995]-84 issued by Ministry of Railways; 19"Notification on Issuance of Stipulation on Railway Environmental Protection", Document No. TJZ [1997]-46 issued by Ministry of Railways; 20Technical Guide Rule for Environmental Impact Assessment; 2 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway 21Safety Guarantee Policies of the World Bank, including: Environment Assessment OP/BP/GP4.01 and attachments, Action Plan for Environment OP/BP/GP 4.02, Natural Habitat OP/BP/GP 4.04, Involuntary Resettlement OP/BP 4.12, ForestryOP/GP 4.36, Ethnic Minorities OD4.20, etc. 1.3 Environmental management institutions 1Implementation institutions Construction companies of the Project, namely, Headquarters for Deleted: Construction units Construction of Liu-Zhan Railway of Chengdu Railway Administration and Headquarters for Construction of Liu-Zhan Railway of Kunming Railway Administration are in charge of organization and execution of the environment protection management plan within their respective domain. Environmental Protection Office of the Ministry of Railways, Environmental Protection Office of Chengdu Railway Administration and Environmental Protection Office of Kunming Railway Administration are in charge of environmental protection during the period of construction and operation. 2Supervision institutions Guizhou Provincial Environmental Protection Bureau and Yunnan Environmental Protection Bureau, which are directly under the Guizhou Provincial Government and Yunnan Provincial Government are in charge of their respective environmental protection management and supervision. Municipal Environmental Protection Administrations of Liupanshui City, Bijie District and Qujing City are all environmental protection institutions directly under the local government. Guizhou Provincial Environmental Protection Bureau and Yunnan Provincial Environmental Protection Bureau have established provincial environmental monitoring centers. Municipal Environment Protection Agency and Environment Protection Agency of Zhanyi County have also established their own monitoring stations. These county-level, municipal and provincial monitoring stations are in charge of local environment monitoring. Environmental monitoring during construction and operation will be assumed by railway environmental monitoring stations of both Chengdu and Deleted: shouldered Kunming, or by the municipal and county-level environmental monitoring stations along the line. As for the tasks and responsibilities of management and supervision institutions in environmental protection of the Project, please refer to Table 1.3-1. 3 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Environment Protection Foreign Capital Center of Agency of The Ministry of World Bank State Environmental Highest Ministry of Railways Railways of China Environmental Protection Administration Supervision Protection Office of China Institution Environmental Protection Office of Chengdu Liu-Zhan Railway Line Construction Railway Administration Headquarters of Chengdu Railway Environmental Protection Office of Kunming Administration, Railway Administration Liu-Zhan Railway Line Construction Guizhou Provincial Yunnan Provincial Environmental Headquarters of Kunming Railway Environmental Protection Bureau Protection Bureau Administration 4 Contractor Environmenta Design Environme Environmental l Supervision Unit ntal Supervision Liupanshui Engineer assessment Environmental Qujing Municipal and Monitoring department Municipal Protection Environmental Unit Environmental Bureau of Bijie Protection Bureau Protection District Bureau Environmental Management and Implementation Institutions in design and operation period Environmental Protection Offices at stations and sections of base level Environmental Supervision Institutions Environmental Protection Management and Implementation Institutions in operational period Fig. 1.3-1 Framework of Environmental Protection Management and Implementation Institutions THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Table 1.3-1 Environmental Protection Plan-Implementation and Supervision Institutions and Their Functional Responsibilities Period Institutions Supervision Institutions Functional Responsibility State Environmental E Assessment nvironmen Protection Administration, Guizhou Provincial Environmental Protection To determine the environmental Bureau, Yunnan Provincial impact, put forward corresponding protection Fea SSDICR Environmental Protection Bureau, Environmental measures so as to reduce the sibilit Report lIm ta Protection Office of the impact on environment, and pac Ministry of Railways, calculate estimated investment of these measures y t Foreign Capital Center of study the Ministry of Railways, World Bank period En State Environmental Pr Protection Administration, To determine the implementer ot ec vironmen tionPl Ac Environmental Protection and the supervisor of proposed tion an SSDICR Office of the Ministry of environmental protection Railways, Foreign Capital measures, and implementation tal for Center of the Ministry of schedule Railways, the World Bank To design the environmental protection project and make an Deleted: form investment estimation according to proposed measures in Pr elim Environmental Impact Assessment Report and in approvals from Environmental ary Ministry of Railways, State Protection Office of the Ministry SSDICR Environmental Protection de of Railways and State Administration sign Environmental Protection Administration, and to compile a section chapter of Desi environmental protection as part gn of preliminary design. To put the protection measures into effect Pe with sufficient financial support. riod Co ns To organize professionals in tructi environmental protection design to produce construction drawings on Environmental Protection Office of the Ministry of according to measures and Dr Railways, Construction requirements defined in awing SSDICR Deleted: Construction Units companies of Liu-Zhan approved preliminary design Railway Line document and its environmental protection section/chapter. To Des put the protection measures into ign effect with sufficient financial support guaranteed. 5 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Period Institutions Supervision Institutions Functional Responsibility Lan Liu-Zhan Railway Line d Construction Requ Deleted: Construction Units companies commission Ministry of Railways, local isition, Land government of Guizhou Administration Province and Yunnan Bureaus of local Province. Institute of Demoli government to Foreign Capital To appropriately resettle the coordinate land Introduction and impacted public, and to ensure Utilization of Southwest the living standard of public tion requisition and pay for Jiaotong University is impacted by land requisition and entrusted by Construction resettlement would not be Deleted: demolition and compensation. Local land Units, as an external below the level before. Rese management monitoring unit, to departments will supervise land requisition ttlemen be responsible and demolition of Liu-Zhan for Railway Line. implementation t with village committees. Constr uc Liu-Zhan Railway Line tion Environmental Protection Construction companies will rate Deleted: Construction Units Office of the Ministry of the environmental protection per Railways, State measures and ecological iod EcologicalPr Environmental Protection protection measures on key projects and particular sections ot Administration, Guizhou as a major part of tendering ection Construction Units Provincial Environmental Protection Bureau, Yunnan negotiation and bidding, and Deleted: discussion Provincial Environmental urge the Construction companies Pr Deleted: construction units Protection Bureau, to carry out ecological oj protection measures required in ect Construction companies of Deleted: Construction Units Liu-Zhan Railway Line construction drawings in item by item basis with fund Deleted: in sequence allocation guaranteed. Deleted: effective Envir Office of the Ministry of Pr To construct environmental ot Railways, State Environmental Protection protection projects such as noise onm ec Administration, reduction, wastewater treatment and smoke elimination and entalEl tion Guizhou Provincial M Construction Environmental Protection dedusting according to easu Units Bureau, Yunnan Provincial Environmental Impact Assessment Report and emen res Environmental Protection Bureau, Environmental construction drawings so as to ensure the fulfillment of ts for Protection Construction Deleted: Construction Units companies of Liu-Zhan protection measures and "Three Railway Line Simultaneities". 6 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Table 1.3-1 Continued Period Institutions Supervision Institutions Functional Responsibility Envir Environmental onm Protection Office of ent the Ministry of alMonitor Railways, State To carry out environmental protection Environmental measures and ecological protection Protection project, promote local economic pe Administration, development, implement regular riod Guizhou Provincial monitoring, and report to Ministry of ing SSDICR Environmental Railways and competent national Deleted: state during Protection Bureau, administrative department of Yunnan Provincial environmental protection the Environmental implementation of protection measures, Cons Protection Bureau, existing problems and suggestions for Construction improvement. Deleted: Construction Units truction companies of Liu-Zhan Railway Line en involv ironmen v Trai Cons ning To invite experts in environmental Deleted: retain tructio super ed of Organized by protection to train the full-time and in Construction part-time environmental protection Deleted: Construction Units companies of Ministry of personnel involved in construction and n vi const talpr ot Liu-Zhan supervision of this section for period sion ec full-tim ruction Railways tion ean Railway Line, environmental protection laws and d Implemented by regulations, responsibility and tasks so pe part-t SSDICR as to strengthen their awareness of and rson environmental protection. ne im l e Environmental Protection Office of the Ministry of En Railways, vironm Environmental Construction Deleted: Construction Units Monitoring companies of enta Station of Liu-Zhan Railway Chengdu Line State To complete the task of environmental lm Railway Environmental monitoring during construction period of onito Administration, Protection Liu-Zhan railway line and of Kunming Administration, ring Railway Guizhou Provincial Administration Environmental Protection Bureau, Yunnan Provincial Environmental Protection Bureau 7 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway Period Institutions Supervision Institutions Functional Responsibility Preparati Construction Deleted: Construction Units companies of Liu-Zhan State ons Railway Line Environmental Pr for and Protection otection environmental Administration, Ac monitoring Guizhou Provincial To carry out commissioning of cep stations of Environmental environmental protection facilities, Fac tance districts and Protection Bureau, monitor the results for each so as to municipalities Yunnan Provincial guarantee that these facilities will meet ilities of alongside, or Environmental the design requirements and will operate Environm Environmental Protection Bureau, in a good condition. Monitoring Environmental Stations of both Protection Office of Chengdu and the Ministry of en Kunming Railways tal Railway Administrations. Zh National Deleted: State ujiangyu Environmental Protection Administration, Yunnan Construction companies entrust Yunnan Deleted: Construction Units an Construction Environmental Forestry Department and Qujing Forestry Natur companies of Protection Bureau, Bureau with management and protection Deleted: Construction Units Liu-Zhan Yunnan Forestry of the nature reserve so as to prevent it eReser Railway Line Department, Qujing from harm caused by Liu-Zhan Railway Forestry Bureau and Line construction. Environmental ve Protection Office of the Ministry of Railways per lprot envir fu ra T Chengdu To conduct pre-service training to new Railway environmental protection personnel and son Administration, Ministry of facility operators of stations so as to ne ecti nm o ll-time ining Kunming Railways improve their capability and to ensure a l on enta ofRailway normal operation of the environmental Administration protection facilities. Day-t Guizhou Provincial Environmental Operation Protection Bureau, Pr Chengdu Yunnan Provincial To maintain the environmental protection ot o-Day Railway ectio En Administration, Environmental facilities in a good condition, and to vi Kunming Protection Bureau, keep the emission concentration of period n ro environmental pollutant accordant to the local nm Railway Administration monitoring stations environmental requirements. ent of districts and al municipalities alongside Envir Monitor Environmental Monitoring Ministry of onm Stations of both Railways, Chengdu To complete the task of environmental Chengdu and Railway monitoring during the operation period ing ental Kunming Administration, of Liu-Zhan Railway Line. Railway Kunming Railway Administrations Administration 8 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway 1.4 Composition of Environmental Management Program It can be divided into environmental supervision program and environmental monitoring program, details in chapter 4 and chapter 5. 2 Conclusion of environmental impact assessment 2.1 Rationality of railway location 1The geographic location and important functions of the Project Liupanshui-Zhanyi Section on Guiyang-Kunming Railway is an important component of "Shanghai-Kunming Passage", a significant inter-regional transportation passage linking Yunnan and Guizhou Provinces with the eastern and central developed regions in terms of the social and economic relations, as well as the most convenient land passage linking China with the Southeast Asia and the South Asia. 2Rationality of the railway location of the Additional Second Line The Project is the Additional Second Line Project of the existing railway. During the selection of railway location, in accordance with the technical standard of the Project, firstly we concentrate on the minimization of the effect on Zhujiangyuan Nature Reserve and the vegetation, protection for the Deleted: the ecological environment along the line, prevention of water loss and soil erosion, Deleted: the satisfaction with the floodwater discharge requirement of the rivers, harmony Deleted: the with the planning of the cities along the line, avoidance and minimization of the disturbance on and division of the existing towns, and the final proposal is Deleted: recommended made based on the premise of minimum impact on the environment and the Deleted: effect social economy. 1Selection of proposals for railway line in Zhujiangyuan Nature Reserve Zhujiangyuan Nature Reserve is one of the most important protection targets of the Project. The design institute and the assessment department fully study Deleted: unit and assess the sections on both sides of the existing railway that are established as the natural reserve, and finally they put forward the proposal of constructing Deleted: recommend the Additional Second Line along the existing railway. By coordination among various parties and after the consents of the related competent authorities are Deleted: A obtained, the land for Liu-Zhan Railway Line is reserved in the Natural Deleted: planned to be reserved Reserve planning, in principle, the land for Liu-Zhan Railway Line is not incorporated into the buffer zone of the Natural Reserve, the impact of the railway construction on the Natural Reserve can be minimized through 9 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway multi-party coordination. At present, review of the planning draft of the Natural Reserve submitting for approval has passed by experts, and the Deleted: of the Natural Reserve planning will be readjusted in the draft for approval, and the land for the Deleted: the review Additional Second Line for Lipanshui-Zhanyi Section will be reserved. Deleted: and 2Comparison among selection of proposals for railway line at partial sections Deleted: to be constructed plus detouring The lines currently selected are basically along the existing railway, the proposal for the double detouring line is adopted at Meihuashan ~ Qiewu Deleted: due to Section in consideration of complicated geologic conditions; after comparison. Deleted: , The economical and rational speed limit proposal for Xuanwei Station that exerts Deleted: t less impact on the city and enables the full utilization of the equipment of the existing station is selected for the section at urban vicinity of Xuanwei City. Deleted: little influence Because the standard for the existing railway at Qiewu~ Zhanyi Section is Deleted: ; comparatively low, the existing radius of curve is relatively small, and both sides Deleted: b of the existing railway are incorporated into Zhujiangyuan Nature Reserve. The reconstructed section with small-radius of the Additional Second Line will Deleted: , partially cross the buffer zone and the experimental area of the Natural Reserve> Deleted: t With regard to the proposals for the railway lines at Xiaojijie~Zhujiangyuan Deleted: reconstruction section and Yanfang~Heilaowan Section that cross the Natural Reserve, the Deleted: , proposals for long, medium and short Gele tunnels are put forward. The partial cut-off proposal and the cut-off proposal for the railway line along the existing Deleted: w line are compared and selected respectively. Finally Medium Gele Tunnel Deleted: , Proposal for the railway line at Xiaojijie~Zhujiangyuan which exerts little impact Deleted: t on the Natural Reserve and the partial cut-off proposal for the railway line at Yanfang~Heilaowan along the existing line are selected. Deleted: , The railway lines currently selected exerts little adverse impact on the Deleted: f natural ecological environment , impose little disturbance and obstruction on the Deleted: influence existing towns, with obvious function of driving the economic development, Deleted: influence and it complies with the comprehensive planning and the principle of the combination of "the social benefit, economic befit and the environmental Deleted: in terms of the strike benefit", thus the proposals for the railway lines are reasonable. Deleted: have 2.2 Conclusion of the present environmental status assessment Deleted: y 1The assessed area is the human ecological system centered on the human activities and based on the agricultural production. The development history of Deleted: situation the region is long, the land use rate is comparatively high, the grain output is Deleted: gain 10 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway relatively low, the vegetation coverage in Guizhou Province is poor, almost no Deleted: nearly natural vegetation exists, no rare vegetation, old and precious trees and wild rare animals requiring special protection are found, the existing animals and plants are mainly the species preserved and developed for meeting the human needs under the human control, thus the biological species are comparatively single. The ecological system covered by the assessment has relative stability and functional completeness, with certain anti-interference capability. Deleted: as well as 2The acoustic environment of the Project is mainly subject to the influence by the existing railway, the roads along the line, and the social life. The area with a distance less than 60m away from both sides of the existing railway is principally subject to the influence by the engine whistle and the running noise of training, and it exceeds the standards for the acoustic environment at different degrees. The area with a distance more than 60m away from both sides of the Deleted: greater existing railway and the areas with single detouring or double detouring track are principally subject to the influence by the road and the human social activities, and the current quality of the acoustic environment is good. 3 Most rivers crossed by the Project including Shuicheng River, Nanpanjiang River and their tributary rivers which belongs to seasonal and ephemeral streams, and the annual change in the volume of streamflow is comparatively big. The rate of the water quality of Shuicheng River up to standards is 25%, two sections Jingkou and Jiudongqiao at the middle reach belong to Class III water functional zone, the water at the two sections exceeds the standards and belongs to Class IV water and Class V poor quality water; Fangjiazhai Section at the lower reach belongs to Class V water functional zone, and the water belongs to Class V poor quality water. The water from the source region of Nanpanjiang River to the entrance of Huashan Reservoir is up to Class I water, and the water quality is "good", the water at Tianshengba Section belongs to Class V water and medium-polluted water, the water at Sheliqiao Section belongs to Class V poor quality water and heavy-polluted water. The pollutants are mainly ammonia nitrogen, COD, sulfide, SS and so on. 4The quality of the air environment of Liupanshui City reaches Class II Standard of Ambient Air Quality Standard GB3095-1996, among which, the annual average concentration of NO2 reaches Class I Standard, and the primary Deleted: volume pollutant is total suspended particleTSP. The annual average concentration of TSP in ambient air in urban area of Xuanwei City exceeds Class II Standard, the 11 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway annual average concentration of SO2NO2 is up to the standard, the air pollution is mainly caused by TSP and SO2, especially TSP. 2.3 Conclusion of environmental impact assessment 1Major environmental impact in construction period 1In the course of the railway construction, water loss and soil erosion may occur after the damage to and disturbance with the native ground vegetation Deleted: interference and the soil. The areas in which soil erosion may occur include sections with deep-excavation and high-filling , borrow pit, spoil site, temporary construction Deleted: sections site, sections with special geology and other sections interfering with the ground soil layer. The soil erosion may occur due to the failure of the complete recovery of the vegetation in the first 1~2 years' operation. 2The noise occurring in the construction period is mainly caused by the construction machinery, the result of the prediction using the attenuation mode of noise synergistic effect l shows the noise at the area with a distance greater Deleted: superimposed than 60m away from the construction site by day and 120m away from the Deleted: attenuation mode construction site by night can reach the national standard. Therefore, the noise will exerts obvious effect on the residents with a distance less than 60m from the Deleted: to be constructed construction site by day and with a distance less than 120m from the construction Deleted: immersed section site by night. Deleted: of the 3The construction of the canal-crossing bridge may influence the quality of the surface water. The influences mainly include the leakage of oil and Deleted: bridge its entry into water, suspension of the bed mud and the loss of the discarded Deleted: buildings construction waste or building materials caused by the underwater works for Deleted: the lower part bridge construction , and the construction mud at the construction site and the domestic wastewater at the camp . The pollution will influence down stream of Deleted: the lower part the bridge site or of the construction yard near river, and the pollution may Deleted: underwater last in the construction period and after the completion of the construction. Deleted: export 4The major air pollution in the construction period is the construction Deleted: former dust, and the dust mainly comes from the uncompleted subgrade, the stock yard and the transportation road. Many factors may result in dust, including climatic Deleted: the conditions and the type of construction activities, the dust formation are Deleted: area with principally depend on the wind direction, wind speed, and air humidity. The Deleted: a impacted area can reach a distance of 150~200m from the construction site and both sides of the road. Deleted: entry 5The health risk is mainly the risk of transmission and diffusion of Deleted: 12 THE SECOND SURVEY & DESIGN INSTITUTE Environmental Management Program for Additional Second Line Project for Liupanshui-Zhanyi Section on Guiyang-Kunming Railway communicable diseases in the Project area that may be caused by the increase of Deleted: in the large number of the transient population in the construction period. 6The safety problem is principally associated with the injury caused by the linear railway construction to the local residents , in particular, to children Deleted: ts who is short of safety consciousness due to the lack of isolation and control measures for the construction site. The blasting of the section and tunnel to be deeply cut may produce popping rock, and the blasting itself is a kind of potential safety hazard for residents at the vicinity of the construction site. 7Only the project activity of requisition of land and dweller removal in Deleted: engineering the construction period has permanent influence on the environment, and other Deleted: demolition activities will cause temporary influence to it. 2Major environmental impact in the operation period 1Impact on ecological environment After strict comparison, selection and reasoning , the proposal for the Deleted: demonstration Additional Second Line along the existing line is selected, the Additional Second Line will increase little impact of division of the ecological system because Deleted: division of the frequent human development activities along the line and the long-term Deleted: on operation of the existing railway. There is no rare plant and old and precious trees under the State protection in the land for the Project, the areas along the line are principally manmade forest and secondary forest, 176,900 trees will be cut for the implementation of Deleted: growth the Project, most of the trees are sparsely distributed tress, and cutting of them Deleted: the will not influence the woodland resources of the area. 1358.98 hm2 land is requisitioned for the Project, paddy field and dry land account for over 50% of the total area requisitioned for the Project, station and yard and subgrade of the railway and other production establishments will replace the semi-natural ecosystem dominated by the agricultural production, Deleted: s and former function of the land will partially or whole lose, which will cause Deleted: led certain impact on the local agriculture and cultivating fishery. The volume of earth-rock work for the line is comparatively large and reaches 2084.37

Informations clés
Type de document Environmental Assessment
Date d'adoption
Pays Chine
Source Banque mondiale