Union européenne · cjeu_case
Case C-189/19: Judgment of the Court (Sixth Chamber) of 14 May 2020 (request for a preliminary ruling from the Bundesverwaltungsgericht — Germany) — Spenner GmbH & Co. KG v Bundesrepublik Deutschland (Reference for a preliminary ruling — Environment — Scheme for greenhouse gas emission allowance trading within the European Union — Directive 2003/87/EC — Article 10a — Transitional system of free allocation of allowances — Decision 2011/278/EU — Article 9 — Determining the historical activity level — Significant change in the capacity of an installation that took place before the baseline period — Determining the relevant baseline period)
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Informations clés
Organisation
Union européenne
Type de document
cjeu_case
Source
Droit de l'UE (EUR-Lex)