BOZAT INC. PARTNERSHIP OF ÖZALTIN İNŞAAT TİCARET VE SANAYİ A.Ş. (ÖZALTIN CONSTRUCTION TRADE AND INDUSTRY INC. CO.) AND NUROL İNŞAAT VE TİCARET A.Ş. (NUROL CONSTRUCTION AND TRADE INC. CO.) Arjantin Cad. No:9 G.O.P./ANKARA Buğday Sokak No:9 Kavaklıdere/ANKARA Tel: (312) 466 40 20/ (312) 455 18 80 Fax: (312) 427 06 04/(312) 455 18 85 E2065 v39 PROJECT SITE Province of Osmaniye, Duzici District, Karagedik Village OSKAN HYDROELECTRIC POWER PLANT FINAL ENVIRONMENTAL IMPACT ASSESSMENT (EIA) PRELIMINARY SURVEY REPORT – PROJECT INFORMATION FILE PREPARER OF THE REPORT Bozat İnş. ve Tic. A.Ş. (Bozat Construction and Trade Inc. Co.) Mahatma Gandi Cad. No:92/3 G.O.P. /ANKARA Tel : (312) 447 26 22 Fax : (312) 446 38 10 August-2003 OSKAN Hydroelectric Power Plant EIA Preliminary Survey Report 1 BOZAT INC. * The Project Owner: Name : PARTNERSHIP OF ÖZALTIN İNŞAAT TİCARET VE SANAYİ A.Ş - NUROL İNŞAAT VE TİCARET A.Ş. Address : Arjantin Cad. No:9 G.O.P. /ANKARA Buğday Sokak No: 9 Kavaklıdere/ANKARA Telephone : (312) 4664020 : (312) 4551880 Fax No : (312) 4270604 (312) 4551885 * Project Name : BERKMAN Hydroelectric Power Plant * Name of the Place Selected for the Project : Province : Osmaniye District : Duzici Town/Village : Karagedik Village Location : --- Sheet No : --- Block No : --- Parcel No : --- Precipitation Area: 14.842 km2 * The Organization Drafting the Report; Name : Bozat İnş. ve Tic. A.Ş. Address : Mahatma Gandi Cad. No:92/3 06680 G.O.P. /ANKARA Telephone : (312) 4472622 Fax no : (312) 4463810 * Draft Date of the Report : August 2003 OSKAN Hydroelectric Power Plant EIA Preliminary Survey Report 2 BOZAT INC. CONTENTS* PAGE NO DEFINITION AND OBJECTIVE OF THE PROJECT 1 1. NON-TECHNICAL REPORT SUMMARY 2 2. PROJECT SPECIFICATIONS 3 a) Capacity of and the Project and the Area Covered by the Project etc. 3 b) Interaction with the Other Facilities around it 5 c) Use of Natural Resources 6 d) Waste Generation 6 e) Its impacts on Pollution and Environment 22 f) Accident Risks due to the Technology and Materials to be Utilized 23 3. LOCATION OF THE PROJECT 28 a) Current Use of Lands 32 b) Geological and Hydrogeological Characteristics and Natural Disaster Status 33 c) Status, Quality and Renewability of the Natural Resources in the Region 41 d) Considering the List of Sensitive Regions in Appendix-V the assessment of the natural environment (wetland areas, coastal areas, mountainsides and forest lands, agricultural areas, national parks, specially protected areas, densely populated areas, areas of historical, cultural, archaeological etc. importance) 48 4. PROPERTIES OF THE POSSIBLE IMPACTS ON THE CURRENT ENVIRONMENT 49 a) Scope of the Impact Area (geographical area and population affected) 49 b) Quality and Property, Duration, Frequency and Renewability of the Impact 50 5. ALTERNATIVES TO THE PROJECT AND SITE 52 6. CONCLUSIONS 53 *: The original Report (in Turkish) was approved by Turkish authorities. Only sections relevant to environmental impacts and monitoring has been translated to English for Infoshop disclosure OSKAN Hydroelectric Power Plant EIA Preliminary Survey Report 3 BOZAT INC. DEFINITION AND OBJECTIVE OF THE PROJECT Oskan Regulator and Hydroelectric Power Plant is located 14 km to the northwest of Osmaniye Province, within the borders of Duzici District and on the Ceyhan River. The approximate head is 21 m between the upstream Aslantaş Dam and HEPP and downstream Cevdetiye Irrigation Regulator. This head is planned to be utilized through upstream Oşkan HEPP and Berkman HEPP. With an installed power of 3x10 MW, Oskan HEPP will generate 109,93 Gwh/year in total, 49,09 Gwh/year of which is reliable. Turkey is a rich country in terms of hydroelectric energy sources. However, only 11% of annual capacity estimated to be 108,5×109 can be used. This is nearly the half of our total annual energy consumption while the rest of it is provided from thermal sources and abroad. Berkman HEPP and upstream Oşkan HEPP planned together are two plants which will be established in order to make use of the 21-meter head between Cevdetiye Regulator and Aslantaş Dam on Ceyhan River. Total annual energy generation of the two regulators, each of which have 10,5 m heads, is 219,86 Gwh. This generation occupies an important place within Ceyhan Basin. Inasmuch as the state sector has to undertake investments of large dams, the authority to establish and operate the facilities bearing the quality of this type of “River type Power Plants
Группа Всемирного банка · Environmental Assessment
Turkey - Private Sector Renewable Energy and Energy Efficiency Project : environmental assessment (Vol. 39 of 80) : Oskan hydroelectric power plant final environmental impact assessment (EIA) : preliminary survey report - project information file
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Environmental Assessment
Страна
Турция
Источник
Всемирный банк