PEOPLE'S REPUBLIC OF CHINA GUANGDONG PROVINCIAL GOVERNMENT THE WORLD BANK E829 Volume 4 '.~~~~~A _ ~ ~~~_ - ir: i GUANGDONG PEARL RIVER DELTA URBAN ENVIRONMENT PROJECT DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT VOLUME 4: ENVIRONMENTAL MANAGEMENT PLAN NOVEMBER 2003 No. 035 5073 - R3-Volume 4 /7. g IN COLLABORATION i h SOGREAH .7 / 0,WITH FILECOP PEOPLE'S REPUBLIC OF CHINA GUANGDONG PROVINCIAL ~J!SOGREAH GOVERNMENT __.0 N IStJ 1 TrA N rs THE WORLD BANK GUANGDONG PEARL RIVER DELTA URBAN ENVIRONMENT PROJECT ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL MANAGEMENT PLAN IDENTIFICATION No : 355073.R3.V4 DATE: NOVEMBER 2003 This document has been produced by SOGREAH Consultants as part of the FASEP Grant (French Government Grant) to Guangdong Provincial Government (Job Number 355073). This document has been prepared by the project team under the supervision of the Project Director following the Quality Assurance Procedures of SOGREAH in compliance with IS09001. APPROVED BY INDEX PURPOSE OF MODIFICATION DATE AuTHOR CHECKED BY (PROJECT MANAGER) B Second Issue 9/02/04 BYN/GDM GDM GDM A First Issue 26/11/03 BYN/GDM GDM GDM INDEX DISTRIBUTION LIST CONTACTADDRESS I GPG PMO (Mr ZENG Yu Chang) 2 GMG PMO (Mr ZHAN Yishan) 3 The World Bank (Mr Tom Zearley, tzearlevaworldbank.org, Hao Zhang) hzhanq2(&worldbank.ora 4 DREE (DREE Paris, PEE Canton) Josselin.kalifaoi)dree.oru Alain.gueguena-soareah.fr, SOGREAH (Head Office, Beijing edAard.vametten sogreah.fr, bioffice(&sopreah.com.cn GUANGDONG PROVINCIAL GOVERNMENT- THE WORLD BANK GUANGDONG PEARL RIVER DELTA URBAN ENVIRONMENT PROJECT - DESIGN REVIEW AND ADVISORY SERVICES VOLUME 4: ENVIRONMENTAL MANAGEMENT PLAN FOR WB FINANCED COMPONENTS TABLE OF CONTENTS 1. PURPOSE AND OBJECTIVES OF THE EMP . ...................I......1 1.1. PROJECT BACKGROUND .1 1.2. OBJECTIVES OF THE ENVIRONMENTAL MANAGEMENT PLAN . 3 1.3. STRUCTURE OF THE EMP REPORT .3 2. IMPACTS & MITIGATION MEASURES FOR WB FINANCED COMPONENTS . . 4 2.1. CONCERNED PROJECT COMPONENTS IN BRIEF .4 2.2. SUMMARY OF IMPACTS AND MITIGATION MEASURES . 4 3. MITIGATION PROGRAM .................. _ 15 3.1. STRENGTHENING CONTRACTUAL BACKGROUND FOR ENVIRONMENTAL MANAGEMENT . .15 3.1.1. Contractual Dispositions .15 3.1.2. Preparation of Technical Environmental Specifications .16 3.2. ENVIRONMENTAL MANAGEMENT ORGANIZATION . .20 3.2.1. Project Organization. 20 3.2.2. Roles and Responsibilities .23 3.2.3. Communications and Non-Compliance Resolution .26 3.2.4. Required Strengthening of Capabilities and Means. 29 3.3. COMPENSATION FOR LAND ACQUISITION AND RESETTLEMENT ..30 3.4. DECOMMISSIONING: RECLAMATION OF TEMPORARY USED SITES... 30 3.5. SLUDGE MANAGEMENT STUDY. . 31 3.5.1. Objective .31 3.5.2. Scope of Works .31 3.6. RISK MITIGATION FOR THE HWTC .31 3.6.1. Project Design & Construction Management. 31 3.6.2. Risk that the Facility Will not be used .32 3.6.3. Operation of the Proposed Facilities .32 3.7. DETAIL OF ACTIVITIES . .33 4. MONITORING PROGRAMS ...................... 36 4.1, MONITORING OF CONSTRUCTION ACTIVITIES.........__................ 36 4.1.1. Objective of monitoring construction activities. 36 4.1.2. Content and implementation of the monitoring .36 4.1.3. Detail of Activities. 37 4.2. WATER QUALITY MONITORING (WQM) . .39 4.2.1. Objectives of Monitoring .39 4.2.2. Water Quality Monitoring During the Construction Period .39 4.2.3. Water Quality Monitoring During the Operation Period .42 4.2.4. Detail of Activities .43 4.3. AIR AND NOISE MONITORING . .47 4.3.1. Purpose of Monitoring. 47 SOGREAH - BYN - N
Группа Всемирного банка · Environmental Assessment
China - Guangdong Pearl River Delta Urban Environment Project : environmental assessment (Vol. 4 of 6) : Environmental management plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Environmental Assessment
Страна
Китай
Источник
Всемирный банк