E278 Volume 6 FIIO iPY E278 Volume 6 WB Lean Project Anhui Prov-incial Highway Projecd -G318 Huaining Sectio-n of Highway Maintenance Component Environmental Impact- Report Anhui Provincial Communications Department April 2002 Anhui Provincial Highway Project G318 Huaining Section of Highway Maintenance Component Environmental Impact Report Anhui Provincial Communications Department April 2002 W24 ,43'~ ~:4'.':~:~. A'~W~7rL-O Om a IRK - '0 't00 G 0. bg ~ ~ ~ 4 I~~~~~~~ ;90 ~ ~ ~ ~ ~ ~ W-Ar~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~- 'awr f--fi- I 'S - W- - -t--. 1 i~~ ~; > U,,, ;, , ,____, , ' '*, ,* :''_ Assessment Unit: Hefei Design & Research Institute, Ministry of Coal Industry Associated Unit: Hefei Municipal Environmental Monitoring Station Task Manager: Liu Shishui Yan Detian Name list of the Engineers Preparing the Report Name Title Work permission for environmental assessment Cheng Jingru Senior engineer (Environmental assessment) Work pemis ion No A 0 1 16 7 YanDetian Senior engineer (Environmental assessment) Work permission No. A 01169 Liu Shishwl Senior engineer (Environmental assessment) Work _ er is ion N o. A 0 1 1 65- Huang Shuqing Senior engineer (Environmental assessment) Work permission No. A 01173 Zhang Huifen Engineer (Environmental assessment) Work ._ permission No. A 08858 CONTENTS 1. General Description .1 1. I Project Background .''' I1 1.2 Aim of the Environmental Assessment. 2 1.3 Report Preparation Basis. 2 1.4 Assessment Criteria .-----..-.. .................................... 3 2. General Description of the Construction .*--.-------.-.-----.-......... 7 2.1 Geographic Location ........... 7 2.2 Project Name and Construction Nature .-..--------.-.-.-----7 2.3 Teclmical Standard of Project Design .-... .. .. 7 2.4 Project-Affected Areas .... ....... 7 2.5 Basic Process of Surface "Rehabilitation" Construction .10 2.6 Sources of Materials ... 10 2.7 Estimate of Traffic Volume .*-** 10 2.8 Major Technical Indicators of before and after Rehabilitation .*-------------------11 2.9 Project Investment Estimate and Financing Arrangement .11 2.10 Project Implementation Plan .11 3. Environmental Description . 13 3.1 Natural Environment ......................................................... 13 3.2 Ecological Environment .14 3.3 Social Enviromnent .*..---------------------------------------------------14 3.4 Living Quality .........................................15.................... 5 3.5 Natural Resources ........................................................................16 4. Environmental status Investigation and Assessment .17 4.1 Monitoring and Assessment of Environmental Quality. ..............................17 4.2 Investigation into Industrial Pollution Generators .20 4.3 Special Environmental Investigation .20 5. Forecast and Evaluation of Potential Environmental Impact ..................21 5.1 Construction Period .*---......---......----..-----..---..--....-----------.---.----.-.21 5.2 Operation Period. 27 5.3 Other Environnmental Problems. .29 6. Environmental Management and Monitoring Plan. 30 6.1 Environmental Management Organization. 30 6.2 Possible Environmental Impact Compensation Measures .31 6.3 Environmental Monitoring Plan .40 6.4 Staff Training .42 6.5 Cost Estimate of Environmental Protection Action Plan . 44 7. Public Participation and Information Disclosure. 46 7.1 Public Participation .46 7.2 Information Disclosure ..................................................................48 8. Conclusion ...... ................................................... 53 Annex .. . . . . ................................................ 55 Annex 1: "Evidential Document" issued by Huaining Cultural Relics Administration Sector of Anhui Province, dated on Dec. 12, 2001 Annex 2: "Evidential Document" No. [2001] 30 issued by Luan Municipal Forestation Bureau of Anhui Province, dated on Dec. 15, 2001 2 1. General Description 1.1 Project Background 1.1.1 Project Source The proposed G31 8Huaining section (1 ) Beneficial to the economic development in the poverty stricken areas; (2 ) Favorable to transportation centralization and decentralization of the main route (Hefei-Anqing Expressway ) ; (3) Fitted for the provincial 0I five-year plan of highway improvement, and priority given to the sections which have started construction but not completed yet in the 9gh five year plan so as to improve efficiency of the whole route and the road network; (4) The existing road sections cannot meet the increasing demand for transportation and need rehabilitation. (5) The average indicators (PQI) of road surface quality are low and surface is poor. G3 18 Huaining section is located in the south central areas of Anhui Province where the major transportation relies only on road for there is no railway to reach these areas. As the economy develops and the transportation increases, the existing road of narrow surface and poor quality cannot match the demands of economic development and transportation. Thus, Anhui Provincial Communications Department is applying for the World Bank loan (remaining savings) to support the rehabilitation of G318 Huaining highway section. The project is of great significance for improving the condition of transportation to the outside in the poverty stricken areas and stimulating local economic development and bettering the people's life. At the request of Anhui Provincial Communications Department of China, in July, 2001, Anhui Provincial Highway Administration Bureau entrusted the job of environmental assessment and preparation of the environmental impact assessment on G318 Huaining section of highway maintenance, to Hefei Design & Research Institute, Ministry of Coal Industry. 1.1.2 Status of Environmental Assessment The assessment unit, after accepting the entrustment, set up an environmental assessment group in July 2001. The group together with Anhui Provincial Highway Administration Bureau and Anhui Provincial Highway Survey and Design Institute carried out field visits and public participation and consultation along G318 Huaining highway section. The group conducted deep field investigation relating environmental status and environmental protective targets along the section. Based on the site visits, data collection and further study of the project feasibility study report, the group worked out the draft "Environmental Impact Report of G318 Huaining Section of Highway Maintenance Component of the World Bank financed Anhui Provincial Highway Project of China". The group got assistance from the environmental experts of the World Bank in the preparation of the report. Now the draft report is ready for the World Bank review. 1.2 Aim of the Environmental Assessment Qualitative or quantitative anticipation analysis and assessment are made on the possible environmental impact to be brought by the project construction. The work has been done on the base of the investigation into the natural and social environment and environmental quality within the assessment range of G3 18 Huaining section, and on the base of the combination with the understanding of the environmental status and relative environmental issues along the section. The report shall point out the potential problems and propose effective and reasonable alleviating measure correspondingly. The alleviating measure shall be put into practice to reduce the environmental impact during the project construction and operation to the lowest degree. The following targets shall be reached as well. ( I ) Possible environmental impact during the construction as well as the impact range and degree shall be fairly and objectively identified. (2 ) Investigation result shall be presented in the report based on the understanding of the public opinions via the investigation along the section. (3) Various measures of prevention, alleviation and reduction to the lowest degree of the negative impact shall be proposed, established on thc result of environmental impact anticipation and applicable compensation methods shall be proposed as well. The aim is to identify negative impact before the construction, raise attention in finalizing the design document and bid contract, and carry out the alleviation methods during the construction period. (4) The environmental assessment shall work as decision making reference, provided to the highway administration departments and local goverrnent institutions along the section in making environmental administration plan and environmental development programs. 1.3 Report Preparation Basis 1.3.1 The World Bank requirements (1) "Environmental Assessment" (OP4.01 ), the World Bank, January 1999 1.3.2 The national environmental protection laws, regulations and technical standard and guideline of assessment (2) "Environmental Protection Law of the People's Republic of China", Dated on December 26, 1989 (3) "Environmental Noise Prevention Law of the People's Republic of China" Dated on Oct. 29, 1996 (4) "Water Pollution Prevention Law of the People's Republic of China" Dated on May, 15, 1996 (5) "Air Pollution Prevention Law of the People's Republic of China" Dated on Aug. 29, 1995 (6) "Solid Waste Prevention Law of the People's Republic of China" Dated on Oct. 30, 2 1995 (7) "Soil and Water Conservation Law of the People's Republic of China" Dated on June. 29,1991 (8) "Highway Law of the People's Republic of China" Dated on July 3, 1997 (9) "Cultural Relics Protection Law of the People's Republic of China" Dated on Nov. 19, 1982 (10) "Environmental Protection Management Rules of Projects under Construction" 253rd order of the State Council, dated on Nov. 18,1998 (11) "Circular on the Management Work of Environmental Impact Assessment of the Projects Financed by International Financial Organizations" the State Environmental Protection Agency, the State Development and Planning Committee, Ministry of Finance and the People 's Bank of China, 1993 (12) "Environmental Protection Management Methods of Communications Project under Construction"(90), Ith order of the Communications Minister (13) "Technical Guideline of Environmental Impact Assessment" HJ/T2.1-2.3-93, HJ/T2.4-1995, HJITI9-1997, the State Environmental Protection Agency (14) "Environmental Impact Assessment Standard of Highway Project Construction (trial) " JTJ 005-96, the State Ministry of Communications 1.3.3 Project Design Document and Relative Data (15) "Studies on the Highway Maintenance Component a Anhui Province Highway Project Financed by the World Bank" dated on Sep. 2001, prepared by Anhui Provincial Highway Survey and Design Institute (16) "Two Phases Preliminary Designs of G318 Huaining Section Improvement Project" dated on March, 2002, prepared by Anhui Provincial Highway Survey and Design Institute (17) Relative data provided by Anhui Provincial Highway Administration Bureau and Huaining County Highway Administration Branch, statistics and data collected in the field. 1.4 Assessment Criteria 1.4.1 Class of Environmental Assessment In line with the criteria set out in the World Bank "Environmental Assessment" (OP4.0 1), the environmental assessment of G318 Huaining highway section subproject should be classified as class A in accordance with Hefei - Anqing Expressway Project which environmental assessment is Class A. Therefore Environmental Impact Assessment report should be prepared. 1.4.2 Environmental Assessment Range The assessment range is shown in the following Table l-1. 3 Environmental Assessment Range Table I-I No Assessment contents Assessment range I Social environment The area within 200m away from both sides of the highway and the area to be impacted diroctly by the construction 2 Ecological envtronment The area within 200m away from both sides of the central lne of the highway 3 Acoustic environment The area within 200m away from both sides of the central line of the highway 4 Environment air The area within 200m away from both sides of the central line of the highway 5 Suwface water environment Rivers and ditched withtn 200m away from both sides of the central lIne of the highway 6 Cultural relics, historic sites, The area within 200m away from both sides of the central line landscapes of the highway 1.4.3 Selection of Assessment Factors Based on the analysis over the potential environmental impact sources and their impact, the assessment factors are selected as follows: ( 1 ) social environment: social economy, living quality, cultural relics and historic sites; (2) Ecological environment: terrestrial vegetation, soil erosion; (3 ) Environment Noise: equivalent continuous A sound level (Leq); (4) Environment air: TSP, NO2 (5 ) Surface water environment: BOD5, CODcr, SS 1.4.4 Standard of Environmental Assessment It is found through investigation that there are not any environmnental sensitive objects like natural protective areas, tourist landscapes, cultural relics and historic sites that need special protection. The main protective objects are identified as schools, hospitals and farming crops along both sides of the highway. Thus the standard of environmental assessment is finalized as follows concerning the protective objects and the requirements of the World Bank. ( 1 ) Acoustic Environment Assessment of acoustic environment implements "Environmental Noise Standard in Urban Areas" (GB3096--93) , among which Class 1 is suitable for schools and hospitals and Class 4 for the rest. Table 1-2 shows the assessment standard of environment noise (extracts). The industrial enterprises implement "Noise Standard of Industrial Enterprises" (GB12348-90) . Table 1-3 shows the extracts as well. 4 Environmental noise during the construction period implements " Noise Limit of Construction Sites) (GB12523-90) . Table 1-4 shows the extracts. (2) Environment Air Assessment standard of environmental air shall implement Class II of "Environmental Air Quality Standard" (GB3095-1996) . Table 1-5 shows the extracts. Assessment Standard of Urban Environmental Noise (extracts) Table 1-2 Unit :dB (A) Type Daytune Applicable rangc time 55 45 Manm location of urban residential distrcts and govermmental institutions, reference for the environment of rural residential areas 2 70 55 Areas of botb sides of main roads in the cities Assessment Standard of Industrial Noise (extracts) Table 1-3 Umt:dB (A) Type Daytime Night Applicable range {timne 1 55 45 Main location of urban residential districts and govermnental institutions, referenoe for the environment of rural residential areas Noise Limit of Construction Site (extracts) Table 1-4 Unit dB (A) Construction . . Noise hlnit Noise generators penod Daytime Night time earthwork Soil shufter, excavator, shovel loader 75 55 structure Mixer, rapping stick, elcetric saw 70 55 Environmental Air Quality Standard (extracts) Table 1-5 Pollutants (TSP) (NO2) (CO) Concentration Daily 0.30 0.12 4 00 lImit average (mg/rm) Hourly / 0.24 10.00 average (3 ) Surface Water Environment Surface water environment shall implement Class V of "Surface Water Environment Quality Standard" (GHZBI-1999). Table 1-6 shows the quality standard of Class V water body. 5 Surface Water Environment Quality Standard (extracts) Table 1-6 pollutant standard (mg/l) CODcr S40.0 BOD5 A10.0 (4) Ecological Environment Assessment standard of soil erosion on the areas crossed by the highway shall implement "Classification and Grade Standard of Soil Erosion "(SLl90-96). Table 1-7 shows the classification standard and Table 1-8 shows soil unit loss allowance. Classification Standard of Soil Erosion Intensity Table 1-7 Classification of soil erosion Average erosion modulus (t/km2 . a) Average loss thickness (mm/a) Least seriously eroded (no <200, 500, 1000 <0 15, 037, 0.74 apparent erosion) Lesssenouslyeroded (200, 500, 1000) -2500 0 15, 037, 0.74-1 9 Medium senously eroded 2500-5000 1.9-3 7 Senously eroded 5000-8000 3 7-5.9 More seiously eroded 8000-15000 5 9-11 1 Most sefiously eroed > 15000 > 11.1 Note Loss thickness is calculated on the base of soil unt weight 1 35g/cm3 Loss thickness could be calculated based on local soil unit weight. Soil Unit Loss Allowance of Soil Eroded Areas (extracts) Table 1-8 Type of Areas Soil unit loss allowance (t/km2n. a) Southem red soil hilly area 500 1.4.5 Assessment Methods The assessment is conducted via the way of "concentration on points and combination of points and the section". The method of investigation and analysis is applied in the evaluation on society and living quality. The method of modulus calculation is applied in acoustic environmental assessment. The analytic method of comparison and anticipation is applied in environmental air quality assessment. The analytic method is applied in ecological environmental assessment. 6 Drawing2-1 Geographic Location of G318 Huaining Section of Highway Maintenance Component <\ x~ ~ ~~~~~~~~~~~~J i ans Henan ~-7 2' ] -9> ,f R R < hou Z | { -t "5'$ . | g~~~~a, Fengtai'( l |"- --. f_ * bJ g ~~~~Shouxa\ '- -t V - Huoq 1uf ki, i \ / ChzoA Henan e X iangs JW f / fJ Huosha ~ng anhe '}-U>z 8 - ube i >'-> y uonshe;Hangg,- t~~~~~~~. 1. 1; J jilezidun~ Ju u Lujii3gh ayHeMslng uw - -ifK 4 H l ghay t p _( ZheGaioan The~ ~ ~~Qin stt ina RVf an gxi-_ _ _ The projiecta ,/f- Hefei a \ An\ ,;; 8 2. General Description of the Construction 2.1 Geographic Location G3 18 Huaining highway section, part of the state highway 318, lies in the Huaining County, starting from the east at Yueshan Town of the county, and ending at Chezhousi in the west. The total length is 31.83 km. The location of G318 Huaining section is identified in the Drawing 2-1. 2.2 Project Name and Construction Nature 2.2.1 Project name G318 Huaining Section of Highway Maintenance Component of Anhui Provincial Highway Project of China". 2 2.2 Project Nature "Rehabilitation" of road surface. Big repair of the poor road surface is classified as "rehabilitation" set out in "Technical Standard of Highway Maintenance" of China. Accordingly G3 18 Huaining section belongs to the construction of "rehabilitation", meaning the construction shall be carried out on the existing subgrade for improvement. 2.3 Technical Standard of Project Design 2.3.1 Technical Standard of Highway Design ( 1 ) Highway grade: Class II highway in the plain and hilly areas. (2) Calculated traffic speed: 80km/h0 (3) Subgrade and surface: the width of subgrade, 15.0m; the width of road surface, 12.0m; subgrade designed for flood frequency 1/50. (4) Designed load of bridge: vehicle-20, trailer-100, designed flood frequency 1/50 for small bridge and 1/100 for big bridge. 2.3.2 Major Technical and Economic Indicators The major technical and economic indicators are shown in the Table 2-1. 2.3.3 Road Surface Structural Layer 24cm cement concrete + 18cm cement stable brokenstones (basic layer)+ 30cm natural gravel + subgrade. 2.4 Project Affected Areas G3 18 Huaining highway section starts at Yueshan Town and connects G206 (width of subgrade ] 8m and width of surface l 5m, expended Class 11 highway) at Chezhousi and also joints Hurong Expressway, covering the total length of 31. 830m. This section is the major access to Hurong Expressway for Anqing City and most towns of Huaining County and is also a very important route to the tourist landscape Tianzhu Mountain. According to the investigation, the impact towns and villages of Huaining 7 County along G318 Huaining section are identified as follows. Yueshan Town, Shijing Town, Duxiou village, Huangdun Town, Sanqiao Town, Zhonglian village and Xiaoshi Town. Major Technical and Economic Indicators of G318 Huaining Highway Section Table 2-1 No Item Unit Quantity A Basic indicator 1 Highway grade Class 11 2 Calculated traffic speed plain, hill Km/h 80.0 3 Estimated total cost 10,000 yuan 6706 4378 4 Average cost / km 10,000yuan 210.6955 B Route 5 Total length km 31.X30 6 Route extension coefficient % 111.40 7 Average crossover point/im No. 1 41 8 Honzontal curve shortest radium rn/no 250 9 Horizontal curve longest radium m/no 3792.986 10 The length of honzontal curve % 53 60 accounting for the total length It The longest length of straight Ine m 969 022 12 Maximum longitudinal gradient % 5.00 13 Minimwn grade m 200.00 14 The length of vertical curve accounting
Groupe de la Banque mondiale · Environmental Assessment
China - Anhui Provincial Highway Project : environmental assessment (Vol. 6 of 8)
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Environmental Assessment
Pays
Chine
Source
Banque mondiale