World Bank Group · Implementation Completion Report Review

Turkey - Oil Pipeline Engineering Project

Türkiye World Bank
View original document

The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.

Full text

 ICRR 10856 Report Number : ICRR10856 ICR Review Operations Evaluation Department 1. Project Data : Date Posted : 07/26/2000 PROJ ID : P045073 OEDID: OEDID : L4089 Appraisal Actual Project Name : Oil Pipeline US$M ) Project Costs (US$M) 5.25 3.19 Engineering Project Country : Turkey Loan/ US$M ) Loan /Credit (US$M) 5.00 2.94 Sector, Major Sect .: Oil & Gas US$M ) Cofinancing (US$M) Transportation , Oil & Gas L/C Number : L4089 FY ) Board Approval (FY) 97 Partners involved : Closing Date 06/30/1998 03/31/1999 Prepared by : Reviewed by : Group Manager : Group : Kevin Warr Fernando Manibog Ridley Nelson OEDST 2. Project Objectives and Components a. Objectives The project had three objectives : 1. Identify and evaluate technically viable and environmentally sustainable pipeline routes for the export of up to 45 million metric tons per year of crude oil from Baku in Azerbaijan to Ceyhan in Turkey 2. Conduct optimization studies of the identified routes and arrive at the most robust pipeline route and configuration 3. Recommend a realistic commercial structure and financing scheme for building and operating the selected pipeline b. Components The project had three components : 1. Conduct a feasibility study including conceptual design, cost estimates, economic analysis and financing scheme 2. Conduct a route survey and an environmental audit 3. Provide training to the Project Implementation Unit c. Comments on Project Cost, Financing and Dates The estimated cost of the project was US$ 5.25 million. The actual cost was US$3.19 million. The Bank provided a loan in the amount of US$5.00 million, of which US$2.94 million was disbursed. The Borrower (Government of Turkey) provided funding in the amount of US$ 0.25 million. There were no other partners involved in the project . The project closed 9 months late. 3. Achievement of Relevant Objectives : The project's objectives were achieved through the successful completion of the TA components . The feasibility study was completed and included a diameter optimization; conceptual design of pipeline, pump stations, terminal and ocean tanker loading facilities in Ceyhan; cost estimates; pipeline tariff calculation and determination of economic feasibility and a financing scheme for the proposed pipeline project . A route survey was also completed for Turkey and included several alternative routes . An environmental audit for the selected route was carried out . Staff from the Project Implementation Unit were trained in pipeline optimization techniques, route selection, environmental audits, tariff calculations and economic analysis . 4. Significant Outcomes /Impacts : None beyond the satisfactory achievements of the project's objectives . 5. Significant Shortcomings (including non -compliance with safeguard policies ): None. 6. Ratings : ICR OED Review Reason for Disagreement /Comments Outcome : Satisfactory Satisfactory Institutional Dev .: Partial Modest These are equivalent ratings . Sustainability : Likely Likely Bank Performance : Satisfactory Satisfactory Borrower Perf .: Satisfactory Satisfactory Quality of ICR : Satisfactory 7. Lessons of Broad Applicability : This project highlights the potential benefits from relatively small TA loans . In this particular case, the feasibility study is for a pipeline that would carry oil from the landlocked countries of Azerbaijan, Kazakhstan and Turkmenistan to the Turkish port of Ceyhan, thus improving these countries' ability to export their crude to international markets . Therefore, the potential benefits from this small initial study could be far -reaching and cross-national. 8. Audit Recommended? Yes No 9. Comments on Quality of ICR : The quality of the ICR is satisfactory .

Key facts
Organisation World Bank Group
Adoption date
Country Türkiye
Source World Bank