Page 1 October 1998 Mr. Shahid Javed Burki Regional Vice President Latin America and the Caribbean Region International Bank for Reconstruction and Development 1818 H Street, N. W. Washington, D.C. 20433 Re: Loan No. 4282-AR (Second Mining Development Technical Assistance Project) Dear Mr. Burki: This letter, with the indicators and implementation program attached hereto, constitutes the "Implementation Letter" referred to in Section 1.02 (d) of the Loan Agreement of even date herewith between the Argentine Republic and International Bank for Reconstruction and Development for the above-captioned Loan. Sincerely yours, ARGENTINE REPUBLIC By: ______________________ Authorized Representative CONFIRMED: INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT By: ______________________ Authorized Representative Date: ______________________
Группа Всемирного банка · Side Letter
Conformed Copy - L4282 - Second Mining Development Technical Assistance Project - Supplemental Letter
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Side Letter
Страна
Аргентина
Источник
Всемирный банк