India - Haryana State Highway Upgrading Project : sectoral environmental assessment (Vol. 2 of 2)

Inde Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

PUBLIC WORKS DEPARTMENT (B&R) GOVERNMENT OF HARYANA, INDIA Haryana Highway Upgrading Project Project Coordination Consultancy SECTORAL ENVIRONMENTAL ASSESSMENT FINAL REPORT CMA,,ISA \ VOLUMEI11 APPENDICES SEPTEMBER 1997 Carl Bro International als - (2, in association with BCEOM, Louis Berger International Inc. and J adBroGrot Consulting Engineering Services (India) Ltd. PUBLIC WORKS DEPARTMENT (B&R) GOVERNMENT OF HARYANA, INDIA Haryana Highway Upgrading Project Project Coordination Consultancy SECTORAL ENVIRONMENTAL ASSESSMENT FINAL REPORT VOLUME II APPENDICES SEPTEMBER 1997 ~ Carl Bro International als in association with BCEOM, Louis Berger International Inc. and J CarlBroGroup Consulting Engineering Services (India) Ltd. VOLUME It - APPENDICES TO MAIN REPORT Number Appendix Page (s) Appendix I Environmental Attributes of ROW corridors Al-I Appendix 2 Environmental Standards A2-1 Appendix 3 Contract Related Documentation A3-1 Appendix 4 Environmental Management Checklist A4-1 Appendix 5 Environmental Clauses to Bidding Documents A5-1 Appendix 6 List of Consultations A6-l tiaryana tiignway upgraing rrojecr A% lirivirunmentnai AFnnDUTCS 01 KU W APPENDIX 1 Environmental Attributes of ROW Corridors Haryana Highwey Uprading Project Appendix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-2: SHAHZADPUR-SAHA (15.6 KM) ATrRIBUTES LOCATION & DESCRIPTION S.O.L Map Reference 53F/3 53B115 Topography Road pase through more or less plain are Erosional Features None shown in SOI mnap Water odies - AmnrChoaRiver at6km;Markanda ri sat0-10kmoff4km; Dhanaurrierat km 0-16off7 :Badali iver at km 0-16 off5 krn; Dangri river at km 016 off 10km; Begna rive at ht 0-1 off4 km Natural Vegetation None shown in SOI mnap Agriculture Road pas thruh cultivated land on both sides Industry None shown ti SOI maps Urban Settlement Shahz dpur Township: At km 15; Saa township: at km 15 Communication None shown in SOI maps Power Une Not shown in SOl maps Social Institution/Defence/Alrport None shown in SOI maps A. 2 Haryana Highway Upgrading Projet adbt I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-3: SAHA - JAGADHRI (35.4 KM) ATrRIBUTES LOCATION & DESCRIRTION S.O.L Map Reference 53 B/IS:. 53Ft4; 53F/4 nd 53 F/Sl Topography Road is passing throuh plain amia Ersional Features None shown in SOI maps Water Bodks Marktanda liver: at km 17; Suaswati Nallah -at km 24: Chautang Nallah sat 27 km. Unda Nalish t km. 30: Westetn Yamuna canal at km 35 off 4 kms. Natural Vegetation None shown in SOI maps Agriculture Road is passing rough cultivated land on both sides Industry Brick kiln at kmn. I off I km and at km 23 off 0.5 km .No others shown in SOI maps Urban Settlement Sahs: at km 0 off 2km; Dhin township: at km 20: Khan Adampur: at km. 19; Chappar Mansurpur at km. 24; Japdhri town: at km. 35 :Yamuna Napr :at km 35 off 4- km. Communication Postal and Telegraph line runs off 0-0.5 km along the road. No others shown in SOI maps Power Une H.T. linealongthe road:atkn521 :Powerline :atkm.21 Powerlineacmsthefoat km. 6 & 23. No others shown in SOI Maps Social lusetiltlon/DefenceiAirpon Gunrdwwa at km IS and at km 21 close to the road. No others shown in SOI mps. AI-3 Haryana Highway Upgrading Project Appendix I ENVIRONMENTAL ATTRIBUTES ON 20KM CORRIODOR SEGMENT-4: YAMUNANAGAR BYPASS (63 KM) ATIRIBUTES LOCATION & DESCRIPTION S.O.I. Map Reference 53F/8 Topography Road is Passing through more or less plain area Erosional Features Yamunananagar river sand dcposits at 0-2 kmns. off 10 kms. Water Bodies Westem Yamuna Canal Parallel to the road off 3 kms;Yamuna river- 10 km off the toad Natural Vegetation None shown in SOI maps Agriculture Cultivated land on both sides of the road Industry Brick kiln: at km 0, 1. 2, 3,6 off 1-6 km: Sugar mill :at km 6 off 2km Urban Settlement Major Township at Jagadhri and Yamunanagar Communication One Telephone line parallel and another acoss the road at 2 km Power UndRtilway tine One power line: at 3 km acrss the road: Northernrailway line: crosses at km. 6 Social InstitutionlDereneelAirport None shown in SOl Maps A14 Hwayana Highway Upgrading Project Appendix I ENVIRONMENTAL ATT}RIBUTES ON 20 KM CORRDOR SEGMENT 4: YAMUNANAGAR BYPASS - U.P. BORDER (10.8 KM) ATTRIBUTES LOCATION & DESCRIPTION S.O.I. Map Reference 53Fn8 Topography Road passes through more or less plain ae Erosional Festures Between km 2-10 eroded land. Water Bodies Western Yamuna Cal : crosses the road at 3 ku Yamuna river 'at 10 km Naural Vegetation Kalanaur Protected Forest: at km 10 off km off0.5 km Agriculture Rood is passess through cultivated land on both sides. Industry Suga mill and brick kiln: at km 0. No others shown in SOI maps Urban Settlement Yamunanagar township: at km 0; Dasani settlement: at km 6; Mandoli: at 8 km. Kalanaur at 8.5 km Communication Postal line: parallel to the road at km 8. No others shown in SOI map Power Lne/Railway line One power line: across the road at km I; Northem rilway line parellel to the road. No others shown in SOI maps Social InstitutionlDe tnce/Airport None shown in SOI map Al-5 Hofvmna Highway Upgading Project pesulI ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT -6: SAHA - SHAHBAD (37.4 KCM) ATTRIBUTES LOCATION & DESCRIPTION S.O.L Map Refereee 53B/16 Topography Panjhal to Shahbad: average height of road embankment 2 mtrs. Erosional Features None shown in SOI map Water Bodies Markanda river running pawaliel to the road Natural Vegetation None shown in SOI map Agrikulture Road passes through cultivated land on both sidcs Industry None shown in SOI map Urban Settlement None shown in SOI map Communication None shown in SOI map Power Une H. T. line running along the road. No othes shown in SOI map Social Institution/Defence/Airport None shown in SOI map Al-6 H-yna Highway Uppding Pmjecc Appcndix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-7: SAHA - AMBALA (15.1 KM) ATrRIBUTES LOCATION & DESCRIPTION. S.O.I. Map Reference 53B/15 53B/16 Topography Road passes through more or less plain are Panjhal to Shahbad embankment average height 2 mtrs. Erosional Features None shown in SOI maps Water Bodies Tangri riverat kin 5 Choa NIlah :at km .52; Amai Choa river across: at 11.52 km Chorti Choa across: at km 13: Markanda river running parit to the road. Natural Vegetation None shown in SOI maps Agriculture Road passes through cultivated land on both sides Industry None shown in SOI maps Urban Settlement Ambala township :at 0 kIn Communication Postal and telegraph line at 0-Il Ikms. No others shown in S01 maps Power Line I power line and one H. T. line :at 0-Il I kms H. T. line running along the road Social Institution/Defence/Alrport None shown in SOI maps Al-7 Haryan Highway Upgrading Projct Appenxl ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-8: AMBALA - PEHOWA (50 KM) ATTRIBUTES LOCATION & DESCRIPlTON SWO.L Map Reference 53B112: B53C/9 Topography Road Jsses through more or less plain au Ersional Festurs None shown in SOI maps Water Bdies Gadri nalla:at km 20: Bhakm main line(Narwana bmnch): at km 21. Jansui distributory at km 21 Thaskh distinbutory zt km 34 Makanda river at km 36: Markanda distrbutory and Pehowa minor at km 39: Lukhi minor at km 35 - 43 off 5 km. Kh minor at km 4447: Bhakli minor at km 42-47: Saraswati drain: at km .4 Natural Vegeation Open scrubs: t km 37 - 4S off 5 kmsand k o 45 off I km .:Bir Baasun reservedforest km 45.50 off5 kin Agriculture Road passes through cultivated lano on both aides. Industry Floor mills: at km 35. 39. 42: Brick kiln: at km 17, IS. 33; Rice mill at km 47 : Major indutrial ar at Pehowa: t Km 50 Urban Setlekment HasnpurScttlement ktkm9;NaysaSci atkm21;Modeltown Ismnailabd :atkm32: J&Ib at km 36: Malakpur at km 42; Thigri at km 44; Saumshuikhear at km 47: Major township a Pehown km 50. Communication One postal nd telegmh line parllel to the road at km 16-47. No others shown in SOI map Power Li-a Power line: at km 16.47 along the rod. No others show on SOI maps Social Institution/DefeneciAirport None shown in SOI maps A14 Hatyn Highwy Upadaig Pet pedix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-9: PEHOIVA- KATHAL (31.6 KM) ATrRIBUTES LOCATION & DESCRIPTlON S.O.L Map Reference 53C/9 : 53C5 Topography Road pases though more or kss plain arm Erosional Feature None shown in SOI map Water Bodies Kaithal dain: at kbn 21. Keomak minor at km 16; Kultramn minorat km 21: Kaithal sub minor: km 17-23 Nteural Vegetstion None shown on SOI map Agrkniture Road pes through cultivated land on both aides ladstry One brick kiln and totton mill: at km 23. No others shown in SOI mlps Urban Settlement Major township at Kaithal at km 31; Keoakh Seilemen at km 16. Ujsin and Jagdishpua as khm 24. Commanieatie None shown on SOI map Power Line None shown on SOI map Social lastitatiAlMDeleacelAirport None shown on SOI map Al.9 Harsn Highway Upgrading Pijicet Apedix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-IO: KAITHAL - KANAURI (21.7KNM) ATTRIBUTES LOCATION & DESCRIPTION S.O.L Map Reference 53CUt5 ; 53C16 :533/2; 53C/1 Topography Road passes through mome or lss plain ama Erosinal Featurer None shown in SOl maps Water BodIs Kdithl sub minoret km 2.25; Kaauri minorat km 0.12 off 1-9 kIn; Manihia sub minorat km 9.12 off6-10 krn Tail Siwan minor at kIn 0.5 offtO-10 km; Bhanpua sub mino: at km 5; Guhnu miwr atkm8.5.WJC(Sirsabmnch) ;Atkm3-lOoff5-lOkm. Natural Vegetation Open scrubit km 4 off 25 km. rass land: atkmi5 offi kmi; Clustcr of tre: at km 3 off 0.5 km. Siwan Reserve forest at km 6 off7.5 km; Bir Roherian Reserve Forestat kin 5 ofTS kin Agrkicuture Road pasesa through cultivate laud on both sides. Industry Brickkiln atkm0.5; Twobrickkilns:atkn2off9-10km .NoothrshownonSOImaps Urbsn Settlemeut Kaithal township at km 0 Communicatim Northern railway line ( Kaith l Nawana S. G. Section): at km 0-6 off 1.5-5.5 km. No others shown in SOI naps Power Line Power line alng the road: Off 34 kn. No others show in mSO maps Social Institutioa/Defence/Airport Non- descript monument at km 5 off2.75 km; Non -descript monument at km 10: non -descript monument at km 6 off 4.5 km. Templek at km g off8 kmin Gurdwuan :t km. off 7.5 km Al-10 Harrina Highway Uprding P"ent App lI ENVIRONMENTAL AITRIBUTES ON 20 KM CORRIDOR SEGMENT-I1: KCAITHAL - TITRAMOUR (4A KM) ATrIUBUTES LOCATION & DESCRIPTION SOL Map Reference 53C/S S3CU - Topography Road passes through more or less phin are Erosional Festures None Shown n SOI maps aVoter Bodies None Shown in SOI naps Natural Vegetation One reserve forst at km 4 offS kms. Agrkoilture Cultiv ted and on both ades ofthe road lndustry None Shown in SOI maps Urban Settlement None Shown in SOI maps Communiestau None Shown in SOI maps Power Lie None Shown in S01 maps Soial InslitutioniDefence/Airport None Shown in 501 maps Al-II Hamna Highway Upgrading Project Appendix I ENVIRONMENTAL ATrRIBUTES ON 20 KM CORRIDOR SEGMENT-12: KAITHAL - KARNAL (662 KM) ATTRIBUTES LOCATION & DESCRIPTION S.0QI. Map Reference 53C15 653C6; 53C/9; 53C10; 53C/13; 53C/14 Topography Road passes through more or kss plain area. Erosional Features None shown on SOI maps Water Bodies Keormk minor at km 51-52 off 0-9; Shudh Kain major distributory- at km 50 off 1.5 krn Concentrmtion of lrge water bodies: at km 50; Water bodies at km 54 concentrtion of wate bodies at Pundri; Mohana minor at km 30 ;Lrrge water bodies: at km 32; Chotang Nallah at km IS; Habri maj distributory and Nissang minor cuts the road: at km 26; Nwrdak major distributory a km 20; Seori brnch: at km 19; lndri drin :at km 14; Undla minor :tkm I0 J; Narw nabmnch at km 0 Karnl link at km 19 pond. Natural Vegetation Cluster of trees: at km 59 off 0.5 km ; Large chunk of open scrus at km 5-10. Agriculture Road passes though cultivated land on both sides. Industry Brick kilns: at km 57-62; Three brick kilns: at km 62 off 5 km Cotton mill: at km 0 off 1.5 km Brickkiln: atkm54;Twobrickkilns atkm6off3 km;Onebrickkiln: at.km3offO.Skm; atkm 5 10 three brick kiln. Urban Settlement Kaithal township: at km 62; Pundri townshilp: at km 54; Kamal township: at km 0 Communication Norther railway (Narwana -Kurukshetra) at km 37-61; Northern Railway main line :cuts the mad at km 0. No others shown in SOI maps Power LUne Power line: all along the road Social InstitutionfDefence/Airport None shown on SOI naps AI-12 Hary Highway Upgrading Ptect Andix I ENVIRONMENTAL A'TRIBUTES ON 20 KM CORRIDOR SEGMENT-13: KARNAL - UP BORDER (10.8 KM) ATTRIBUTES LOCATION & DESCRIPTION S.O.L Mrp Reference 53 0G2 Topography Road passes though more or less plain aea Ersional Fetmres None shown in SOl map Waner Bedim Indri escpe and Pumni Yamuna river: at km 2 Natural Vegion Open scrubs: at km 5. Bampon potected foret and Sheikbhpra Resere foet :at km t olf O. km Agriculture Road pes thwough csltivated lad on both aides. Veguable garden at Kaml, Nsaal Kunj__pua_ at kmn 0-5 of I km lnduatry Brick kiln: at km 5 three units. No othes Shon in SOI map Urban Settkment Kanal township: at km 0 Communicathn Aerodrome 2tkm 3 Power Lie Power house: at km 1: Power netwtk;. at km 04 Sejal InstitutionlDelemedAirport None shown in SCt mnap AI-13 Haryan, Highwy Upgrading Project App ix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-14: KARNAL -ASSANDH (36.7 KM) ATTRIBUTES LOCATION & DESCRIPTION S.O.L Map Reference 53U14; 53C/10 Topogaphy Road passes through more or less plain aea Erosional Features None shown in SOI maps Water Bodies WJC: at km 4 Om km; Jundba minos td Bnm subminor at km 15 Gagsila subminor at ka 13; Kathila subminorat km 19; Bhudha khern distyt km 0 off5 km: Nadak major disty;at kmn I; Seori bmneh at km 9-11 off2 km Tail minor and kaul minor; at km 5-1 I off T.5 km ;Moana major disty.; at kIn 5 od S kint Bajida disty.; at kin 21 1ndi drin; at km 27-33 off 5 kms. Chotang Nallah at km 17 Pond at km 29 Nardak Mbjo Distributuy: at km 29-31 Uktana bunch: et km 34 oeT3 kms. Padhau Minor: at km 31 Salwan minor: Natural Vegeation Bir Khanda Kheri Reserve Forest at km 34 off2 km. Agriculture Road posses through cultivated land on both sides. Industry None shown in SOI maps Urban Settlement Assndh township: at km 37: Kamal township nt km 0. Communication At km 0 N. Rly.; At km 0-25 telephone line Power Unn Power line: at km 0.25 and at km 30 Social Institution/DefeneeiAirport None shown in SOI maps AI-14 Hatyana Highwsy Upgading Project Appcx I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-14: KARNAL -ASSANDH (36.7 KM) ATrRIBUTES LOCATION & DESCRIPIMON S.O.L Map Reference 53C14; 53Ctl0 Topography Road pauses through more or kss plain ar Eresional Features None shown n SOI maps Water Bodies WJC: at km 4 Om km; Jundla mimn and Basa subminor. at kmn 15; Gpila subminor at km 13; Kaithi asubmninorat km 19; Bhudha khera dityat ki n0offS kmi Nardk major disty ;at km I; Sedi banclt at kn 9411 off2 km .Tail minor and kaul minor; at km 5-11 off 8.5 km Moana major disty.; atin 5 off 5 kmn Bajida disty.; at km 21 Indri drin ; at km 27-38 off 5 kmn Chotang Nallah : at km 17 Pond at km 29 Nardak Maj Ditributoly at kn 29-33 Ukana branch: at km 34 off3 kms Padhan Minor: at km 31 Salwan minor: Notura Vegetation Sir Khanda Khei Resee Famst at km 34 off2 km. Agriculture Road passes through cultivated law on both aies Industry None shown in SOI maps Urban Settlement Assadh township: at km 37; Kamal township at km 0. Communkation At km 0 N. Rly.; At km 0.25 telephone line Power ULe Power line: at km 0-25 and at km 30 Social InstitutioniDelence/Arlport None shew in SOI maps AI-14 Haryana Highway Upgrading Project Appendix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-15: ASSANDH - JIND (39.7 KM) ATTRIBUTES LOCATION & DESCRIPTION S.0QI. Map Reference 53C1I0 :53 Cu l: 53C/7 Topogaphy Road passes through more or less plain ar Erosional Features None shown in SOI maps Water Bodies Chotang Nailah:at km 0-5 off 2 kbm Uklana branch: at km 0-5 off 3 km; Nardak major distributary :at km 0-1 off 2 km; Nardak major distributory at km 6-l l off 2 kin: Tai minorat km 9-11 off2.s km: Kaul minor at km 8- I off 2.5 km; Moama major distributoryat km. 6- r of S.5 kin W. J. C. ( Hansi branch):at km 6-l l or 1 km: Alewah minor.at km IS off 0.5 kin: Shanidu mninora * km 25 - 2S off 2 kin; WJC Hans branch: at km 12-11 of r2.5 km. Natural Vegetation Birbansi Reserve Forest at km 0 off 5 km. Agriculture Road passes through cultivated land on both sides. Industry None shown in SOI maps Urban Settlement Assandh township; at km 0: Jind Township :at km 41 Communication Northem Railway line ( Jind- Panipat Section): at km 4 Power Une At km 20-41 off 10 km. power line; At km 20-41 telephone line Social Institution/DefenceiAlrport None shown in SOI maps Al-IS Haqum Highway Upgmding Ptoject Appedix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-16: JIND-HANSI (40.6 1hl) ATRIhBUTES LOCATION & DESCRIMTION S.O.L Map Reference 53U7.53U3,53U4,44016 Topography * Road psses thwough more or less plin ar Eroiondal Fealeres Sanddunes:atkm6.off4km ofelaveht.6m;alkm7-l0off3kmSanddune Water Bodies WJCHnsi bkochat kn 0-13 off Ik;Jind disuibutqy2t kn 0-11 off 3km; Namund distribu at kml2-14; Sina khni minor.at km 16-36 off 9km, Hisar distnauey: at km 16-40 Pew disuibouay. at km 26 off lOkmLohari minor, at km22 Moth minor, Sisai minorat km 27; KIem minorat km 17.28. Pdi minor at km 28-31; Durjanpur minor. at k 31-35; Jamaori minor, at km 36. Sheikhpua minor at km 38 off 6 km Bhakala minor; At km 3W40. Natural Vegetatlo None shown in SOI map Agriculture Road pxses through cultivated and on both sides of the t Industry Brick kilns: at km 23.29 and 32 Urban Settlement Hanitownhipitkm40;Jindz atkm0; Nuaund; atkm32 Communication Nonhemn Railway line; at km 0-4 Power LUae Power line: at km 0-4.16-36.32,33. and 36-40. No othes show in SOI map. Socsi lnstitutionlDefencelAirp.rt Non -descuipt monumens: atkm 18 off5kkm, atkm It off8km nd at kml4 off5km; AI-16 Haryana Highway Upgnding Projet Adix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-17: JIND-NARWANA (35.5KM) ATTRIBUTES LOCATION & DESCRIPTION S.O.L Mop Reference 53C12.53MU353C/7 Topegraphy Road passes thwugh merc or less plain ar. Eresional Features Sand dunes of relative hL 6m at km 04 off 3km. Water Bodies Shudh hin minor. at km 27; WJC: at km 29; Barwala canal: at km 25 off 5km; Kheri sfa miw and Ghaso minorat km 27 off Q.Skm;Tarkha minort at km 25-30 off 4km; Barsola minor at km I 32 off 5km: KhIci saa minorat km 25; Badan minor at km 7; WJC Hansi banch; at km 36 off 0.5km, Jind distributary No.6; at km 3. Dariyawala minor. t ka 5. Natural Vegetatbon None shown in SOI map. Agriculture Road passes through more or less cultivated and on both sides.Vegetable gprden: at km 35 and a km 1.3 Industrv Brick kilns; at km 12.22.23 and 24. No others shown in SOI map Urban Settlemeat Narwana township: at km 35; Jind: at km 0 Communication Railway line:at km25-36 off 2km; Railway line: at km 11-28 off Ikm; Nortem Railway lineat km 0-5 off 2km. No others shown in SOI map. Power Line Power linesaot km 25-36. 11-2 and 04, No others shown in SOI map. Social Institution/DefeneeiAirport None shown in SOI map. AI-17 Haryna Highway Upgrading PTjUcC Apendix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRDOR SEGMENT-18: TITRAMOUR - NARWANA (32 KM) ATTRIBUTES LOCATION & DESCRIMTION S.O.L Map Reference 53C/6 53CG2 Topogrspby Road pusses through mote or lrss plain arm Erosional Features None shown in SOI map Witer Bodies Westem Yamuna cl Sis Branch at km 0-15 off km 3: Bats minorat knkm 6 Shudh Kan maj distributory at km 0.16 offkm *; Dhamtan Sahib distributory a:t km 0-16 offS kms Mughl khm bnch *t km 0-16;Dharoti branch t km 12-16 of 10 kms; Shudh Kain disributor ;at km 0-16 off I kms;TakhA Barsola t 0-16 km off r kms. Natural Vegetation None shown in SOI mnap Agriculture Road ptas through cultivated land on both sides Industry None shown in SOI map Urban Settlement Shimia settemet at km IS; Dhak ;' km 27 and Narwan township: at km 32. Communication None shown in SOI map Power Line Nonhem railway line; at km 0-16 of 3 kms Social InslitutionADefence/Airport None show in SOI map Al-l1 Haryana Highway Upgrading Project Appeix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT -19: NARWANA - UKLANA (23.3 KM) ATTRIBUTES LOCATION & DESCRIPTION S.O.I. Map Reference 53C/2 :440/14: 440/15 Topogrphy Road passes through more or less plain aea. Erosional Features None shown in SOI maps Water Bodies Narwana minor at km 0 off .5 km ;Sancha khea minor, at km 5 running across the oad Yamuna Canal Sirsa branch:at km 04 off 3 kms. Santhali minor :at km 14 ;Gorakhpur distributory at 0 km;Uklana minor ;at km 0 Watn Yamuna Canal at km 4; Pabrm iistributory at km 14: Budha Kthera minor at km 21 ; Uklana minor :at km I3 Naturl Vegetatlon None shown in SOI maps Agriculture Road passes through cultivated land on both sides. Industry Uklna: Nondescript industry, Bnck kiln: at km 21. No others shown in SOI map. Urban Settlement Narwvana township at km. 0 ;Dharam garh at km 3;Sati ; at km 3 , Dhanaunda Kalan al km 10 Naronda khurd at km 10, Township Jagon wala at km 16, Township Uklana mandi a km 27.Township at Prabhuwala and Budhakhera Communication one telegraph line: at km 10-21;one power line at km 10-21; Northern railway line Hisau Ihakal passing across the road at km 0. No others shown in SOI map. Power _ne Northern railway line at Narwana at km 0 Social Institution/Defence/Alrport None shown in SOI maps AI-19 Haywy Highway UpVding Proejct Appendbil ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-20: UKLANA-TOHANA (29.4 KM) ATTRIBUTES LoCATION & DESCRIPTION S.0.1. Map Reference 440/14 Topegraphy Road paem through moe or less plain ae Ersional Features Nonc shown on SOI map Vater Bodies Pond (embankment 3mk *t km 0-1 offO.5 kmn Pond (emebnkment height 5 mi):ot km S off 0.3km Ponds (embenikent 3m)kt km 14 off I km; Saman distibutraat km 10; New san kh minor at km 5; Nangli minor.at lm 12 Bhak, canal (Fatehabod I 'anc)et km 215; Pirthala disnribty at km 68; uajtwab miner Ukana minort ikm 19. Natural Vegetation Dne jungle t km 4.5 offO 5 knm Agriculture Rood po theugh cltivated lad on both sides ofthe road. Industry Brick kilsa:t km 0 off3 kn, At km 12 and 16 offO.Ikm. at km 17. 19 and 20 off03 kn N othes shown in SOl maps Urban Settlement Ukian townshipat km O;Tohana at km 30 Communication Telephone line crossinF at 4km Power ULe I Power lineit km 0-20. Social InstitutionlDefene-JAirport None shown in SOI map A1.20 Haryna Highway Upgrading Projtc AppeWix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-21: UKLANA-FATEHABAD (47.1 KM) ATrRIBUTES LOCATION & DESCRIPTION S.O.L Map Reference 440/14 440/IO, 440111; 440/6; 440r7 Topography Rocky ae: at km 0-13. Rest oftheruod pses thiugh more or lcss plain ares Erosional Features Sand dunes:at km It-27and 39-47 off0-5 km Water Bodies Sahu minorat km 5; Golakpur disttibutyat km 6; Pinhaa distfibutaay at ktm 10-13 off Ikm 2 ponds: at km 24 (ht. 5m & 7m). Weirat km It off2km; Khajoli distributary, at km 13-16 off4km Dhman disnbutwy. at km 14 off4km Bhkra canl (Fatehabed branch); at km 13-16 off4km. Bhunadistributary, at km 14-1S. Fatchb. d disti buwly it km34. Nadhaiu sub minor at km 16-23; at km 13-2S off2km Chandawal minor at km 13-9, Bhimna distributarry at km 39 off 4tm Dhir minor at km 32-35 off3km. Mohammadpur distributa; at km 16-39. Bhan cal (Fatehabad brandh); at km 2U-32. Natural Vegetation None shown in SOI map. Agriculture Road passes through cultivated land on both sides ofthc rad Industry Brickkilns:atkm0,4.6offO-lkm. NoothersshownSOlmap. Urban Settlement Uklana township-at km 0; Fatehabad: at km 45-47 Communication Telephone and Telegrph lines: at km 0-47;. Power Line Power line at 0-39 km2 Power lincs:at km 39-47; Electric Substation: at km 17.1t off 0.5 km. N otherm shown in SOI maps. Social Insitution/DerenceiAirport None shown in SOI map. A 1-21 Huna Highay Upgrading Poject AppndxI ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-22: UKLANA - BARWALA (16.9KM) A1TRIBUTES LOCATION & DESCRIMFTON S0.L Map Reference 4401l5 Topography Road passes thwough mome or less plain am Erosional Features None shown in SOl mnap Water Bodies Pmbhualia minor at kmn 3; Pabm sub branch . hkm 7; Ponds at km 17; Uklana minor, at km O of 6 k:m.; Subs sdinsriutoty tbkn 7-17 offS.s his. Batak minor;at km 7.17: Faridpur minwor aat 6-9 ,Sairo distibutay t km 7.17 off L.5 km Natural Vegetatlo None shown in SO0 map Agriculture Road passes through cultivated land on both aides Industry Uklane h arwah induwies at kmO 17.No oths shown in SOI map Urban Setlement Ukna :at kmn O : Bawaa 2t km 17 Kalar Bahini att km 17: Ghaibipurc at kn 10 Dlz Pemnnapr'it km 12. Communication None s_ow in SO0 map Power Une Powerline: at km 0-17, Railway line; at km 0.17 off4 bns No others shown in SOI map Social InstitutlionDeencedAlrport. None shown in SOI map Al-22 Haryana Highway Upgrading Project Appendix I ENVIRONMENTAL ATTRIUTES ON 20 KM CORRDOR SEGMENT-23: BARWALA - HISAR (26.91CM) ATTRIBUTES LOCATION & DESCRIPTION S.O.I. Map Reference 440/15 ; 440/16 ; 440/12 Topography Road passes through mom or less plain are Erosional Features None shown in SOI maps. Water Bodies Cluster of ponds with relative height 3 - 4 mtr- at krm 30, 22, 16 and 15 off 2 kmn; Dhansu minor at km 25 off 3 km; Rana distributory at km 25; Balsaman major distributory with relative ht 4 m: at km 6; -WJ. C. running parallel to the alignment. Rana distributory crosses the road :at km 6: Dhabra minor atkm30; ; Devsa3 Feeder at km 30 ;Rana distributory crosses the road: at km IO Natural Vegetation Fairly dense scrub.:at km, 16-17 off km 4. Bill Hisar protected forest: at km 7-8 off km I open scrubs on both sides of the road: at km 24-29 off 0-3km. Agriculture Road passes through cultivated land on both sides. Industry Brick kilns:at km 30, 22, 16,19 and 15 off 0-2 kmTextile mill: at km 7 off 4 kmnGovL Live Stock farm and Indo-Australian Sheep breeding farm: at km 24. Salli farm: at km 22-23 off 0-I km. Urban Settlement Barwala township: at km 30 ; Sarsaundh, Badon :at krn 16: Bahabalpur at km 18; Hisar township :at kmn 30. Communication Electric sub station: at km 0 off lkm; Jalandhar road extenstion :at km 27 ;Northern Railway line (Jhakat - Hisar): at km 0-18 off 4 km; Railway lin Icrosses Hisar city :at kmn 30. Power Line 3 Power lines between km 0-18 off O-2km; Two power lines crosses the road a km I; one power line and one telephone line running paralle to the road:at km 24 30off 0 km. Social Institution/Defence/Airport Hisar Agricultural North University, Helipadc, Hospital, Eductional Institution (lindal School):at kn 26-30. off O-5km. A I-23 Ha-ysa Highway Upgrading Project * Apcu I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-24: BARWALA - HANSI (ZS.8IM) ATTRIBUTES LOCATION & DESCRIMTION S.O.L Map Reference 440/15.440/16 Topography Rocky dope: at km 0-4 nd at t412 Erosional Features Snd dunes at km 13-11 Water Bodies Balamnd subbfsnch:t km 14; Bhakta canal: at km 13; Khar KWai distributoy :at km IS Kolw minor .t kmn 17.21; Sisai minor it km 23; Sir Hansi minor at km 26;WIC (Hiarr distributary at km 29. Nrunral Vegeation None shwn in SOI map Agrickltere Vegetable garden at km 29; Govt Agriculture Farm it km 24-26. Road is pasing dwugh cultivated band on both sides. Industry None sown in 501 map Urban Settlement lansi township. at km 29; Barwalh township at km 0 Comnmuniation None shown in SOI map Power Une Power line: at km 0-11 13-39; Ekcctric substation: at km 0. No othes shown in SOI maps Social :nstitutienlefeneeAirport Noae shown in SOl nap A1-24 Haryans Highway Upgrading Project Appcndix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-25: HANSI - BHIWANI (37 KM) ATTRIBUTES LOCATION & DESCRIMON SO.L Misp Refcrence 440/16 . 53 C/4. 53 D/I Topogaphy Road passes throush mots or ltss plain mare. Eresional Features None Shown in SOI mnps. Water Oodies Pairwar disty: at km 0.5; Prothi distr at km 2; Duijanpur distr. at km 7;Siwaia minorAt km Oio off 5 kin; Sunder serki link chnnel; at ktn 6; Rajpurm subeminorat kin 3;Sunder disty. at km 14: Bhawani khera disty-at km 22; Dang minor & Gujaniminorat km 26.33 ; Tai minor at km 12-24 offO-2km; Bhiwani disty. & Bapwua subaminor at km 0; Natural Vegetation Open sub: at km 3,12,19 offoffO-5km; Open sub; at km 36 off 10 kmn and at km 13 off 4km. Agriculture Road passes through cultivated land on both sides of the road. Vegetbles garden; at km 19 & 36. Industry Industrialarea:atkmn37offO2km2; Bnckkilns:atkmn34,35 h36off14kmiandatkm7&Skm off 1-5 km.' Urban Settlement Htwi township mt km 0; Bawani & Bhiweni township: st km 37 Communicatie. Telegmph line: at km 0-9 offO km. N.Rly( Rewari-Fazilka section):at km 12-36. Power Line Power line: at km 0.9 12-36 off O.5 km Social l.tstitution/Defence/Airport Non decrnpt Monument at km 6 ff 4 km. at km 12 off Ikm. A1-25 Haryan Highway Upgading Pn$ect Appndix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT- 26: BHIWANI -DADRI (29.1 KM) ATTRIBUTES LOCATION & DESCRIPTION S.O.L Map Reeremee 53 Dl. 533D12, 53016 Topography Road is pasing thmoh more or less plain area. Eroiasal Features Sand dunes: at km 2.4 off0-I km. Water Bodis At km 0 Halww minor,Sagna minor. At km 10-20 Maneiau mino, At km 27-29 off 5 km Dar *; . ~~~~~~~~~~~~disty Natural Vegetation Open srib: at km 0,4 offt km; Dense sfubatb km 6-14 of g km. Agriculture Road pases thmuh cultivated land on both sides. Industry Brick kiln: et km 30 off I km Urban Settlemet Shiwani township:at km 0: Chrkhi tu'wbhip: at km 23 Commuiar tion N.RIy( Rcwari-Fazilka section): at km 6-23 km offO km. Power LUie Power line at km 0, 6-29.29-30 adjucent to oad. Social lnstitationADerence/Alrport Nondcrienpt momunEat km 30 Off I km. Al-26 Harya Highway Upgrding Proj et Appndix I ENVIRONMENTAL ATTRBUTES ON 20 NM CORRUDOR SEGMENT -27: DADR - MAHENDRAGARH (30.9 FuM) ATTRIBUTES LOCATION & DESCRIPTION S.O.L Map Referace 53 t6: 53D2: 53 1)/3 Topogmphy Road pLsses through mome or less paiin am; Erosional Features Sand dwues with reiative height of 2-6 mtrs:at km 30 off 0|-5 km. Water Bodies Dohan riveat km 30 off 2 km: Natural Vegetation Scrub area: at km 0-5 off0-10 km: Open scrub at 5.10 km off5km. Agrkulture Road pase through eultivated land on both sides of the road Industry Briek kilns at km 0, 1, 2 off 1-3km. Urban Settlement Charkhi iadri :at km 0; Mahendgarh township: at km 30 Communieation N.Rl,v( Rewari-Fazilka section):at km 0 Power Line Power lineat km 0-5 nd t km 5-13 km off0 km, And t km 26 one lin crosses the road. Social Institution/Defenee/Airport Non descript monu_mt at km 30. A.-27 Haryana Highway Upgrading Project App x I ENVIRONMENTAL ATFRIBUBES ON 20 KM CORRIDOR SEGMENT-28: MAHENDRAGARH - NARNAUL (33 KM) ATTRBUTES LOCATION & DESCRIPTION S.O.L Map Reference 53 D/4 Topography Road pses throh more or kss pin ae. Rocky slopes: at kn 20-25 and at 5kin off 5 km Erosional Features Sand dunes with height of 6-10 mu. at km 4-9 off0-10 km high oncentration of hifting dunes. Water Bodie Dodan river: at km 13 crosses the rod Kaaunt bkh:at km 19-2Soff 4kmL Nturail Vegetin Open scnabs and protected forests: at km 2-S and 21-25 off0-10 kmr.on either side Agriculture Road paes through cultivated land on both sdeL Industry None Shown in SOI snap Urban Settlement MoaxitagarlsTownship: at km 0. Namul township:t km 33 Communiation Telecom line at km 2-25. No othem shown in SOI map Power Use Power linc along the road alignment Social lnstitutionADefence/Airport None Shown in SOI map AI-2g Hatyana Highway Upsnding Pnojet Apendix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT -29:NARNAUL - ATELI (18.3 KM) ATTRIBUTES LOCATION & DESCRIPTION SO.L Map Reference 53 DA4 Topography Road pase through more or less plain ae. Erosional Features Eroded ground At km 14-15 offg kms. Low sand dumes with 4U mtrs. heighL at km 2-12 off 0-10 km.' Water Bodis Kusunu Nxilsi at km 3 cross Natural Vegetation Poted fost at km II off2 km. Agriculture Road passes through cultivated bnd on both sides. Ind_stry Brick kiln: at km 1-2 off I km. No others shown in SOI mp. Urban Settlement Nanul township at km 0 Communication Wcstern Railway (Rewari-Phullah) scction: at km 0off2 km Power UAne Power line: at km 35-54 off2 km. Social Institution/DefenceiAirport Vetennary hospital: at km 13 off O.2 km. No othes shown in SOI map. A 1-29 Hupna Highway Upgrding Projeet AppendixI ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-30: ATELI - REWARI (37.1 KM) ATTRIBUTES LOCATION & DESCRIPTION S.O.1. Map Reterence 53D/S: 53D112 Topography Rocky slopes with averag height 10 mts: at km 0-5 Off 5bn: Rocky slopes: at km 9-17 offO-11 km. R oad pLase through mome or les plain area. Erosional Festnes Eoded grunds: atkm 2-7 off3-7km; Erded ground:at km 1415 offS kms; Eoded pound:a km 19.17 off3-10 km :Lowaandunes:atkm 15-26 off 1-10km. Witer Bodies None shown in SO0 maps. Natural Vegetation Protected frei at km 3 off5km;Serubs: at km 0-5 off3- 10 km-. Open scrub: at km 9-17 off4 km ;Open serub : At km 6-11 ajucent to the mad. Dense jungle: at km 6 off2 km. Agriculture Road pases ttough cultivated Iand on both sides. Industry St tcquany:atkm lIoffI kmano25km off2-3kmL Noothersshown inSOlmaps Urban Settlement Ateli: At km4; Reai township: t km 27. Communiation Wesm Railway F.ewui. Phullams Section )at km 0-1 off 3.2 km and 15_37 off_ km.Tw rmilway crossings at km 22 and km 36. Power Une Power line: psrlkl to the railway line fomm 0-37 km off O-2km. Social lnstitution/DerenelAirport Non-dsenipt monumnts: at km 25 km Off4km at km34 off2 km, at km 37 off2-3km. Al.30 Haryana Highway Upgrading Projcct Appendix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-31: NARINAUL - KOTPFLI (30.7 KM) ATrRIBUTES LOCATION & DESCRIPTION S.O.5 Map Reference 53D/4 :54A/l. Topography Road passes through more or kss plain ama. Erosional Features Eroded ground: at kn 9-17.19-24 and aso at 0-3 km Off2-5 km. Water Bodies Nanaul Canal: at km 6; So6 Nadi: at km 3: Kasaunti/ nalla: at kin 9. -21 off 1-3 kms Natural Vegetation Open scrub: at km 11-32: off 1-10 km . Reserve Forest; at km 7-10 off 5 km; Khatjo Proteeted forest and Balupura Protected fomst : At km 19-23 off 5410 km: Baneti protected forestat km 26 offS-10 km. Agwiculture Road passes through cultivated land on both sides of the road. Industry Stone quarris: at km 9-25 off2.10 kms; Line kiln quany: a km I I off I kin: Limc stone qutany ;at km 21 off0.5 km 4 km: Besides isolated rocky hills at km 9 25 km off I-l0 km. Urban Settlement Nataul. at km 0: Bathota ki Dhani: at km II: Nangpl Choudary:at km 21 Communication Telephone and telegrphic line rninng parellel to the road up to 21 kms. Westem railway (Rcwari - Phulbamh section): at km 4. Power Line Power line: at km 0.32 Electric substation: at km 22 Socil InstitutiontDefencejAirp.rt None shown in SOI topo maps AI-31 Haryan Highwy Upgprding Project Appeudix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-32: NARNAUL - RAJASTHAN BORDER (14.4 KM) ATIRIBUTES LOCATION & DESCRIPTION S.O1. Map Reference 53 D1/4. Topography Road passe Isg h moeor ks plain am ; Steep rcky hillocks at km 2 Erouional Festure Erodable groud: at km 0.5 off0-5 km Water Bodi Dohn nver. at km 10; Dohan expeTimnAl channal: at km 0-10 off Skm. Natural Vegetation Open scrubs: at km 046 off`04 km. Agrkulture Road poses through cultiited land on both sids of the rood. Industry None shown n SOI map Urban Settlement Namul townshiat km 0. Communication None shown n nSOI map Power Une None shown in SOI map Social lnstitutionlDefeneeAlrport None shown in SOI map AI-32 Haryana Highway Upgrading Project Appedix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-33:SIRSA-ELLANABAD (49.6 KM) ATrRIBUTES LOCATION & DESCRIPTION S.O.I. Map Reference 53B/15; 53B/Il I Topography Road is passing through mor or less plain are Erosional Features Sand deposits orGhagpr river at km 5-1S off6 kms. Water Bodies Ghaggar river at km 5-15 off km 6: Bhakra main line :at kim 0-16 off 5 kms. Baknaur minor: at km 14-1S off 4.5 kms.: Malaur minor at km 13-15 off km 5.: Naneola minor t kat 12-14 off .5 kms : Sheikhpua minor at km 10-IS. Natural Vegetation None shown in SOI maps Agriculture Road passes through cultivated land on both sides. Industry None shown in SOI maps Urban Settlement Balana settlement: at km 7; Dhor Kara km 5 : and Ngl : at km 9. Communication One postal and telegrmm line :at km 5-IS No others shown in SOI maps Power Line One power linc along the road at km 5-15. No others shown in SOI maps. Social lnstitutionlDefenee/Alrport. None shown in SOl maps A1-33 Haryana Highway Upgading Proect Appdix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT.34:ROHTAK - JHAJJAR (33.5 KM) ATRIBUTES LOCATION & DESCRIPTION S&O.L Map Reference and Dlstrkts 53 D19, 53 D110 Rohtak Topognphy Level Plin 210-220m ASL Eresinael Features Ersion negligible due tonesrly kvel topography Water edkes Settered ta throught a anssociateo with villages ligption sluices crossed; Jha subbranch. Barham minor. Rampura minor, Natuiral Veetatio no poected or tesm foes, all ra in a crops except for overgiaed dunes 2.6 n SW of xlignment Agrikulture Extensively ingpted; wheat oilsee nd W gramre leading crops in disuzict Industry briek kilns along aligmnent, industrial deveiopments at Rohtak and Jhajiar Urban Settkment Only Rohtak has over 210.000 inhabitans, Jhajr has 27,000 Communkatban Tekgagh and Telephone lines pralel to alipment nd cross it at several poims Power Une Loeal distribuion lines parallel the alignmen and cross it at seveI points Social Institutlon/Defence/lArport No airports Or defence installations were noted; hospitals and health care centes are in JhaDb nd Rohtak Railroad crssingp At gpde crossing at Rohtak A1-34 Harysa Highway Upgnading Prqeet .AppeixI ENVIRONMENTAL A[TRIBUTES ON 20 KM CORRIDOR SEGMENT-35:JHAJJAR - REWARI (66 KM) ATMRIDUTES LOCATION & DESCRIPTION S.O.L Map Reference and Districts 53 D/10.53 Dtl I, 53 Dt/2 Rohtak, Rewari Topography Level Plain 215-235m ASL Erosional Features Emsion negligible due to neady level topognphy Water Bodls numaeros sl uanks throughout, lrge (I km in radius) along 2 km east of alignment igiption canls incluek Drain No. g Zalidpur minor 4. Salahawas UR Channel Rathantha Distributory, Sunmrheu and Bunhal Distribuutaies and Jawaharl Nehru Canl Natural Vegetation Scrub thorn wasteland/grassland on dune remnants from I to 10 km from alignment Agrikulture Extensively iripted; what, oilseedsand grm ae leading crops Industry brick kilns along alignment, otherwise restncted to Jhajjar and Rewari Urban Settlement Rewan is a metropolitan centre with 75,000 person Communication Telegrgh and Telephone lnes paralel to alignment and eross it at severi points Power Une Numerous Lines paallel and cross the alignment Sociel Institution/Defence/Alrport No airports or defence installations were noted; hospitals and health care cents are in Jhaji and Rewar AW-3S Haryan Highway Upgading Prjct Appendix I ENVIRONMENTAL ATIRIBUTES ON 20 KM CORRDOR SEGMENT-36:PANIPAT - GOHANA (33 KM) ATTRIBUTES LOCATION & DESCRIPTION S.O.L Map Reference and Districts 53 C112 53 Cil6. 53 CI15 Rohtak and Paript Districts Topopgphy Neardy lenel plain, 220-230m ASL Ermsloal Fetures Neariy leel btut subject to flooding, erosion of berm fill a potential conceim Water Bdeds NumeroUS small tanks throught, aliginent crosses Western Yunun Ca. Notm Drin Chirnal Minor Nai Nala Din and nwneous minr irripton tribunries Natural Vegetation Vinually none rmaining due to agridultuml deveiopment and grazing pressure. some p thorn scrub is present Agrikulture Nearly all is imriteid with fice, wheat suprcane. bajra Industry Concentrted at Panipat and Gona exet for occasional b.ck kilns Urban Settlement Panipat has 191.000 inhabitants Communictbon Distributied hrughout Power Une Parllel and crnss alignmntt at sveral points Social lnstitutionADefencelAlrport Hospitals at Goluna and Psnipat A I.36 Huyans Highway Upgrading Projc Appedix I ENVIRONMENTAL ATIRBUTES ON 20 KM CORRIDOR SEGMENT-37:GOHANA - ROHTAK (36.5 KM) ATMRIBUTES LOCATION & DESCRIPTION S.O.L Map Reference and DIstricts 53 D19. 53 C112, Robtak. Panipnt Topogrphy Nearly level plin 220-225m ASL Erosional Features Nearly kvel but subject to flooding, erosion orbenm fill a potential concer Water Bodles Numerous tanks and caals including Westem Yamuna Caal, Main Dtain No. B. and N Nala Drain Natural Vegetation Virtually none except Lalpur Protected forest 3 km West of Rohlak. and Sone pastu ed sob waslnd ner a few villages Agriculture Nearv all land abutting alignient is iaipted cropland, wheat, oilseeds and gramn ae kadinl crops Industry brick kilns along alignment, other industry concentrated in Rohtak Urban Settlement Rohtak has over 210.000 inhabitants. Communication praliel nd ros the alignment Power Une panilel and cross th alignment at severl points Social Institution/Defence/Airport Hospitals at Rohtak and Gohana Railroads One railroad grade crossing between Ghilun Kalan and Rukhi A -37 Hafryn Highwy Upgading oject Apendix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT-38:ROHTAK - EHIWANI (43.6 KM) ATrRIBUTES LOCATION & DESCRIPTION S.O.L Map Reference and Distrkis 53 Df9, 53 D/5, 53 D/I Rohtak, Rewai Topography Nealy level plain 210-220mn ASL with secttemed dune mnam Erosional Features due to level terain vitualy none Water Bodies small seaso tanks thoughout adK iigation wodr; crosses Main Dmin No. Natural Vegetation Open Scrub thorn waste land heavily opastured on scattered rmnnts ofdunes. Agriculture Wheat and grarndorninant crops extenively inigated Industry brick kilns along alipment, other industry oncentrated at Rohtak and Bhiwani Urban Settlement Rohtak has 210,000 and Bhiwani has 121,000 inhabitants Communkc__on Telephone and telegrph lines parilel to alignment and cross it often Power Une Numerous throughout Social InstitutlonADefencelAlrport Hospitals at Rohtak and Bhiwani Al-38 Haren Highway Upgrading Project Appeix I ENVIRONMENTAL ATnRIBUTES ON 20 KM CORRIDOR SEGMENT-39:BHIWANI - LOHARU (60.5 KM) ATTRIBUTES LOCATION & DESCRIMTION S.O.L Map Refermnce 53Dtl. 53 D/2 44 P/I I Topography Fairly level 215-250 mASL with scattered dunes Eruaonal Features Wind ad Water erosion potent l exists Water Bodies Few seasonal tanks Natarl Vegetation Umited to scrub waelnds on due remnants Agriculture Extensive. occasionuly irrigated principally what bja and gm Industry Concentrated at Biwani Urban Seltlement Bhiwani has 121.000 inhatants Communication Numerous lines Power Une Numerous throughoutand pamilel to alignment Social Institutbon/DefenceiAlrport Hospitals at ioharu and Biwani Railroad Grade crossing at Lohau A1-39 tIaryana Highway Upgding Project ix I ENVIRONMENTAL ATTRIBUTES ON 20 KM CORRIDOR SEGMENT40:HISAR - BHADRA (33 KM) ATTRIBUTES LOCATION & DESCRIPTION S.O.I. Map Reference 44 0/12,44 0/1 Topography Road pas through more or less plain a Erosional Features Sand dunes of rlative height 5-20 off 0-10 mn at kn 25 to 33 Water Bodies Nunaous irigption ntwork at 0-26 kn off 0-12 kn Natural Vegetation None shown on SOI maps Agriculture Ifragted agicture of 0-26 km off 0.10 kn on either side Industry Numerous indutries in wound Hisar at km 16 Cotton mill off 500 m. Many brick klins of 0.25 km off 0-10 km Urban Sttlfement His (O km) and Balsnand at 26 km Communication Telephone line fim 0-26 km along the rad Power Une Powerline from 0-26 km along the road Social Institution/Defence/Airport None showm on SOI maps Al-tO Haryana Highway Upgrading Project A2/Environmental Standards APPENDIX 2 Environmental Standards Haryana Highway Upgrading Project Appendix 2 APPENDIX 2: ENVIRONMENTAL STANDARDS The following standards have been promulgated under the Environment Protection Act and will have to be met by the project. Noise Standards 1. Noise Limits for automobiles (at one metre in dB(A) at manufacturing) a) Motorcycle, scooters and three wheelers 80 b) Passenger car 82 c) Passenger or commercial vehicle to 4MT 85 d) Passenger or commercial vehicle 4-12 MT 89 e) Passenger or commercial vehicle over 12 MT 91 2. Recommended Extemal Ambient levels a) Residential 65 b) Commercial 70 c) Places of national importance 55 d) Places of workshop, schools, hospitals, etc. 65 General Standards for Water Discharge Parameter General Irrigated area Colour and Odour Suspended solids (mg/I) Suspended Particle size (micron) 100 200 Dissolved inorganic solids (mg/I) <850 pH 5.5-9.0 5.6-9.0 Temperature (above receiving) < 5C+ Oil and grease (mg/I) 10 10 Residual Chlorine (mg/I) I BOD (5 days at 20C) 30 100 3. CP CB Ambient air quality standards A2-1 Haryana Highway Upgrading Project Appendix 2 (In pg/m3) SPM 500 S02 120 NOx 120 CO 500 A2-2 Haryana Highway Upgrading Project A3lContract Related Documentations APPENDIX 3 Contract Related Documentations Haryana Highway Upgrading Project Appendix 3 CONTRACT RELATED RECOMENDATIONS Road side tree planting: Necessary provision will be made in the contract documents for incorporation of the road side tree planting scheme proposed here Table 1 below, present the planting regimes for the of HHUP. The quantity and species composition of each mix is presented in the following tables These regimes are based on rainfall patterns, soil types and the list of plant species of each districts as per the 1991 census records. Table 1: Planting Regimes for Phase I roads ROAD GRASS NATIVE NATIVE AVENUE MIX* GRASS MIX SEED MIX SEEDLING Jagadhri Ambala 1 E A V (Four Laning) Kaithal Narwana 1 F A V Narwana Jind 1 E B W Jind Hansi 1 F C X Mahendragarh Dadri 1 G C Y Dadri Bhiwani I G D Z ____ __ GS _ Bhiwani Hansi I G D Z - Would attract harvesters of such food crops; hence their planting should be encouraged within the ROW. Table 2: Grass mix -I Species Season Quantity(Kg/ha) Sorghum or Millet Summer 30 Rice and Wheat Winter and summer 30 The grass species used will grow quickly to reduce the level of soil erosion. Following the rains it is anticipated that native grass species will grow also. Table 3: Native Grass and shrub seed mix Composition and quality (identified to resist grazing). SPECIES QUANTITY (Kgtha) Mix E Mix F Mix G Euphorbia (Unpalatable) 15 15 10 Oleander(Unpalatable) 15 10 Anwal 15 10 Native grass species should be seeded at the same time as the crop to allow them to gerninate as soon as the rain comes. A3-1 Haryana Highway Upgrading Project Appendix 3 Table 4: Native seed mix Composition and quantities Quantity (Kg/ha) Species Common name Mix A Mix B Mix C Mix D De1bergia sisso Shisham 0.5 0 0.5 1.0 Acacia nilotica Kikar 0.5 0 1.0 1.0 Cassia fistula Amaltas 0.5 0.2 0.5 0.2 Prosophis chilensis Mesquite 1.0 0.2 0.2 0.2 Acacia catechu Khair 0.5 0.5 0.2 1.0 Eucalypyus hybrid Safeda 0.5 0.5 0.5 0.5 Acacia torfils Henna 1.0 0.5 0.5 0.2 Cordia dichotoma Lasura 0.5 0.2 0.5 0.2 Ficus bengalensis Badh 0.5 0.2 0.5 0.2 Tamarix cyphilla Farash 0.5 0.2 0.5 0.2 Ziziphus Mauratiana Baer 0.5 0.5 0.5 0.2 Anogeissus latifolius Dhok 0.5 0.2 0.5 0.5 Bauhima racemoasa Kachmar 0.5 0.5 0.2 0.2 Albizzia lebbek Siris 0.5 0.2 0.2 0.5 Accacia Jaquimonti Babool 0.5 0.5 0.5 0.2 Moringa Alcifera Drumstic 1.0 0..2 0.2 0 Where ever necessary seed requirements pre-treatment of 24 hours soaked in water Table 5: Species for avenue planting Species Common Mix V Mix W Mix X Mix Y Mix Z Name Azadiracht indica Neem . Ficus bengalensis Badh * Ficus religosa Pipal *_ _ Syngium cumini Jamun _ Tamarindus Indica Tamarind Terminalia Indica Terminala A3-2 Haryana Highway Upgrading Project Appendix 3 Species have been selected to complement the endemic vegetation of each area. The variety of species used ensures that species not suited to the local conditions and micro climate will be replaced by those suitable for that area. Only. the fittest species will survive in each locality thereby maintaining the genetic variation that is essential for bio-diversity. Figure I Shows a typical cross section for the planting regime with the larger avenue trees located no closer than 6 metre from the centre line of the road and the seeded species growing in between. The native seed mix will be applied following the application of water to the recently turned and topsoiled natural surface. Seeding will not take place in unfavourable weather such as winds exceeding 15 kmn/hr or during rain periods. Fast growing ground covering species mentioned in the grass table will be seeded immediately after the area has been landscaped to reduce erosion, with the seeding and avenue planting occurring closer to the rainy season. Figure 2 illustrates a longitudinal section of road with the associated planting regime. Avenue seedlings will be placed at 25 m intervals with the listed species being placed in turn. Approximately 2000 seedlings per hectare are intended to be planted. The native trees will be seeded indiscriminately within the ROW and at bends etc. Where larger areas of the ROW occur the seeding will fill these areas to create small groves of native bush land. Where ROW is available , an additional row of seedlings will be placed. This will be to ensure a thick ROW vegetation along the road. This will act as wind block and will in turn act to increase crop production through the reduction of evapo-transpiration. The seedlings may be grown in nurseries near or along the project road by the contractor. These nurseries may be situated within the road ROW or in nearby land under contractual arrangement with local social forestry programs. The seedlings will be placed in holes (lCu.m) the base of which will be filled with 0.2 m of top soil and organic fertiliser (eg. manure). An area around the base of the seedlings will be dug out in the most recent method of seedling protection used in India (see Figure 3) . This method provides a moat like barrier around the plant which makes the leaves of the tree out of reach from browsing herbivorous. Furthermore the moat retains water to aid the plants survival. The seedlings will be between 12 -18 irmnths old when they are planted to increase their chances of survival. Another method of protecting the seedlings will be tried also. The thom bush Prosopisjuliforia is cut into 1.2 -1.4 m lengths and the stock is buried in the \hole dug around the seedling and bound with a length of the vegetation. The thom bush is between 15- 30mm. in diameter and speared in to the ground at 20 cm spacings. Three months after the seedlings are planted, those not surviving will be replaced with others still growing at a nearby nursery and of a similar age. About 10 % of the total seedlings used should be stored for this replacement. Areas where the seeding has not been sufficient will also be re-seeded following the application of an organic fertiliser. A similar process will occur one year after the initial planting. During the first year after .planting, watering will occur every month except in the wet season. In the hottest season(February to mid June) this will occur more frequently. From I" February to 15'h April watering will occur every three weeks and from then until 15'h June every 10 days. Watering will be done as early in the morning and as late in the evening as possible to reduce evaporation and increase the amount of water reaching the roots. The contractor will be paid half his fee following the initial planting and the rest one year later contingent on previously established survival criteria. All revegetation shall take place within 14 days of each work completion. Top soil shall be stockpiled on site in low mounds no greater than 3 metres high and where it is to be stored for in excess of 14 days it shall be seeded with the above mentioned grasses immediately. Where Al__ Haryana Highway Upgrading Project Appendix 3 imported topsoil is required it will be friable and porous and free of weeds, toxic material, lumps, stumps or roots. Fertiliser where required will be organic in nature such as cow manure. On steeper slopes a binding agent will be used to reduce erosion and keep seeds in place at the onset of the rains. Bitumen emulsions has been used before in India and will be used here. Straw will be mixed with the bitumen emulsion to further aid the binding process. Other measures to mitigate against environmental impacts that are standard in contract docunents will naturally be included. These include provisions covenng soil erosion and selection and restoration of quarry sites. A3-4 Haryana Highway Upgrading Project - Appendix 3 6 m Paved Road Way Figure 1 lYPICAL ROAD CROSS SECTION WITH PLANTING REGIME A3-S Haryana Highway Upgrading Project Appendix 3 Figure 2 25 m TYPICAL L-SECTION OF ROADS WITH PLANTING REGIME A3-6 Haryana Highway Upgrading Project Appendix 3 Ground level j 1 0.6 m L =56 ml J K Shrub ' * -.~~~ree Figure 3 INDIVIDUAL SEEDLING PLANTING REGIME FOR TREES AND SHRUBS A3-7 Haryana Highway Upgrading Project A4/Environmental Management Checklist APPENDIX 4 Environmental Management Checklist Haryana Highway Upgrading Project Appendix 4 COMMENTARY ON FIELD QUESTIONNAIRE CHECKLIST FOR ENVIRONMENTAL MONITORING Enviromnental monitoring refers to the continuing environmental assessment of project, starting at the project preparation stage and continuing through out the construction and post construction stage of the project. In most cases a monitoring program consists of the identification and selection of key environmental indicators or parameters which may be qualitatively measured and compared over time. These can be any environmental indicators viz. physical, chemical or social indicators. A general monitoring tool is useful and there is advantage in adopting a uniform monitoring proforma. It is frequently based on recorded project details combined with recording of expected project actions or outcomes. For these reasons the following Checklist/ Questionnaire purposely has been kept simple and generalised. It should, however, be reviewed and improved in the light of experience. Objectives of Monitoring and Evaluation 1. To demonstrate that unfavourable effects have been addressed and adverse consequences minimised. 2. To monitor and promote favourable impacts which enhance environmental quality. 3. To record conditions, actions and project impact, enabling adoption of better mitigation methods and documenting legal or community obligations 4. To evaluate the adequacy of Environmental Impact Assessment already carried out, and to suggest improvement. Methodology The methodology adopted is basically a subjective rapid appraisal based on visual observation with quantification of some key parameters. This requires a basic knowledge and some understanding of environmental impacts. Only a limited number of key impact areas have been adopted in order to frame a simple and general questionnaire and to encourage its completion by site supervisors. Sources of information are largely visual observations and basic project details and it allows the collection of base line data. The collation of this information fed into an Environmental unit provides the basic data on which further selective analysis and investigation may be undertaken. Strict specification of sampling numbers and numerous tests should be avoided. Supplementary tests can always be arranged by the Environmental Unit if so required. This avoids the cost of unnecessary tests, the results of which are often seen as an end in themselves, and it simplifies the process. This approach of selective investigation and questioning should provide a practical and achievable development of environmental awareness. There are already numerous returns and reports required from construction activity and protection of the environment should not be seen as an unnecessary additional burden on limited time resources. It should, however, become a regular procedure and part of routine contract management. A4- 1 Haryana Highway Upgrading Project Appendix 4 FIELD OUESTIONNAIRE CHECKLIST FOR ENVIRONMENTAL MONITORING 1. Name of Person completing report: Signature Date Part -1 (A). General Infonnation 1. Location: District: Mandal: Gram Panchayat: Road No.: 2. Project Name/Identification: 3. The road work connects: width Length: km 4. Type of Road: National/State/District/Feeder/Local Surface type: Asphalt/gravel Existing Final 5. Physical dimensions: Embankment Base width (m): Pavement (m): Average Height/depth (m): ROWwidth (m): 6. Attach a map of road, if available (B). Ecological Impact 1. Does the road pass through? Landuse Forest Reserve Wetland Dryland Wildlife Sanctuaries Total Length (km): 2. Are any natural water resources interrupted or reduced in Yes/No waterway area? If yes, attach list of bridges/culverts (location, length, size) and stream width. 3. Numbers of trees (over 3 inch diameter) to be removed:- Species: Number to be planned Species: Instructions SECTION I of thc questionnairm should be completcd at the commencement of a construction or maintenance contract by the Supervising Engineer in consultation with the Contractor and forwarded to the Environmental Unit SECTION 2 should be compicted at thc hand ovcr of accepted construction work and forwarded to the Environmental Unit. Reference should be madc to any Environmental Asscssment of the project or Managemcnt Plan prepared as part of the approval process. A4-2 Haryana Highway Upgrading Project Appendix 4 4. Is the road embankment likely to interfere with fisheries Yes/No production or mitigation? 5. Are there any animals or vegetation unique to this area or known Yes/No to be endangered? 6. Is it necessary to open borrow pits outside the road alignment? Yes/No (C) Impact up on Physio-Chemical environment 1. Is the construction and soil to be used likely to lead to siltation Yes/No downstream? If yes, is batter protection around waterways included? Yes/No 2. Is the embankment likely to obstruct natural drainage? Yes/No 3. Does the area regularly flood? Yes/No Both sides? Yes/No If yes, to what depth above ground level (m)? Frequency (times per year)? 4. Are there urbar or industrial area along the road alignment? Yes/No If yes, attach details of sites, distance off centreline and type of activity. 5. Are the proposed construction camp sites away from water Yes/No resources and settlement? If no, has provision been made for safe disposal of wastes and Yes/No septic? (D) Socio- Economic impacts 1. Have the local people been informed when construction is to Yes/No commence? 2. Is land acquisition and compensation finalised? Yes/No 3. Number of Residences to be removed or shifted? 4. Are there any mosques, temples, graveyards or historical sites on Yes/No the road reserve? Part II (Complete at hand over of works from Contractor) (E) Record of Compliance I. Were there any -complaints from the local people during Yes/No construction? 2. Has there been any erosion or damage to the embankment? Yes/No 3. Were there any spillage of chemicals or bitumen? Yes/No A4-3 Haryana Highway Upgrading Project Appendix 4 4. Have all borrow pits, camps sites and roadsides been restored? Yes/No 5. Pavement Structure used? Macadanm/Gravel/FCR 6. Have all replacement trees been planted? Yes/No Signed: Senior Engineer Date Please now forward to:Head of Environmental Unit A4-4 Haryana Highway Upgrading Project AS/Environmental Clauses APPENDIX 5 Environmental Clauses to Bidding Documents 0~~~~~~~~~~~~~~ Haryana Highway Upgrading Project Bidding Documents Volume II Section 5: Conditions of Particular Application (Part In) Page 5.6 Sub-Clause 15.2 Add the following Sub-Clause 15.2: Language Ability of Contractor's "If the Contractor's authorised representative is not, in the Representative opinion of the Engineer, fluent in the language specified in the Appendix to Bid, the Contractor shall have available on site at all times a competent interpreter to ensure the proper transmission of instructions and information." Sub-Clause 16.3 Add the following Sub-Clause 163: Language Ability of Superintending Staff "A reasonable proportion of the Contractor's superintending staff shall have a working knowledge of the language specified in the Appendix to Bid, or the Contractor shall have available on site at all times a sufficient number of competent interpreters to ensure the proper transmission of instructions and information." Sub-Clause 16.4 Add the following Sub-clause 16.4 employment of Local Personnel "The Contractor is encouraged, to the extent practicable and reasonable, to employ staff and labour with appropriate qualifications and experience from sources within the country of the Employer stipulated in the Appendix to Bid." Sub-Clause 17.2 Add the following Sub-clause 17.2: Notice to Engineer "The Contractor shall give to the Engineer not less than 48 (forty eight) hours notice of his intention to set out or give levels for any part of the Works so that timely arrangement may be made for checking or issuing instructions. He shall indicate therein by which date the information, if any is required by him." Sub-Clause 18.1 Replace the text of Sub-Clause 18.1 by the following: Boreholes and Exploratory "If at any time during the execution of the works the Engineer Excavations requires the contractor to make bore-holes or to carryout exploratory excavations in excess of the provisions specified elsewhere in the contract and such requirement shall be the subject of an instructions in accordance with Clause 51, unless an item or a provisional sum in respect of such work is included in the bill of quantities." Sub-Clause 19.1 Add the following below para (c) in Sub-clause 19.1. Safety, Security and Protection of the "(d) The Contractor will take all due precaution to avoid soil and environment water contamination by spillage of oil, grease, fuel and paint in the equipment yard, workshop or site of work. Lubricants should be recycled. (e)The Contractor will install pollution control device in his asphalt plant. (f) The Contractor shall implement replantation and grading of steep slopes in quarries and borrow pits to prevent disfiguration of landscape. Haryana Higlhway Upgrading Project Bidding Documents Volume II Section 5: Conditions of Particular Application (Part EI) Page 5.7 (g)The Contractor shall implement compensatory afforestation plan to counteract destruction of vegetation when required to do so by the Engineer. The Contractor will pay proper attention to the aspect of borrow pit drainage to prevent formation of stagnant pools of water and incidence of mosquito vectors. All borrow pits will be provided with efficient drains which shall be connected to the natural outfalls. (h)Notwithstanding implementation of any other provision contained in the Conditions of the Contract, the failure on the part of the Contractor or his staff in the cases listed below will be considered default on the part of the contractor and will attract provisions of sub clause 63.1 for remedies: - poor sanitation and solid waste in workers camps. - possible transmission of communicable diseases between local people and Contractor's workers. - poaching by Contractor's workers - illegal invasion of indigenous people by Contractor's labour. (i) All lights provided by the Contractor shall be screened so as not to interfere with any signal light on the railways or with any traffic or signal lights of any local or other authority." Sub-Clause 20.4 Amend Sub-Clause 20.4 to read as follows: Employer's Risks "The Employer's risks are a) insofar as they directly affect the execution of the Works in the country where the Permanent Works are to be executed: (i) war and hostilities (whether war be declared or not), invasion, act of foreign enemies; (ii) rebellion, revolution, insurrection, or military or usurped power, or civil war, (iii) ionising, radiation, or contamination by radioactivity from any nuclear fuel, or from any nuclear waste from the combustion of nuclear fuel, radioactive toxic explosive or other hazardous properties of any explosive nuclear assembly or nuclear component thereof; (iv) pressure waves caused by aircraft or other aerial devices travelling at sonic or supersonic speeds: (v) riot, commotion or disorder, unless solely restricted to the employees of the Contractor or of his SccSParO.doc 0 l07i97. 16:08 Haryana Highway Upgrading Project A6/List of Consultations APPENDIX 6 List of Consultations Haryana Highway Upgrading Project Appendix 6 APPENDIX 6 PUBLIC CONSULTATION ON ENVIRONMENT BHIWANI - WEDNESDAY 24.09.1997 The first consultation was held in Bhiwani as per the guidelines of World Bank on Environmental Impact expected to be caused due to proposed upgrading of highways in the State of Haryana. Two more are to be held in Ambala and Jind. These three places are chosen as they are ideally located at three road segments included in the Phase I of the project. The meeting at Bhiwani was well attended by all the concemed Govt. Department Representatives and the affected villagers. No NGO could be located as there is hardly any in existence in and around Bhiwani. Mr. 0. P. Leather, Superintending Engineer, PWD, presided over the meeting. Copies of an PWD Executive Summary of the SEA draft report were distributed to the participants. In his inaugural remarks the SE, PWD outlined the objective of the proposed project along with its utility and benefits to the people of the area in general. The discussions generally centred around flood control and compensatory tree planting. The representative of Forest Dept. Haryana apprised the participants that a large number of trees are likely to be axed. However, the Forest Dept. has already counted the number of trees and as per current rules ten times the number of trees to be felled, should be replanted. The land and funds for the replanting should be provided by PWD, Govt. of Haryana. The villagers suggested that fruit trees may be planted so that village children can make the best use of the same. However, there was some reservation on the part of the Forest Department who felt that as a matter of policy fruit trees are avoided by the roadside due to increased accident factor. Instead they reiterated the state Govt. policy of stressing the need of planting fuel, fodder and timber producing trees. The Forest Dept. representative claimed that this-policy is socially relevant and required in order to safeguard the depleted forest resources. The next point came up on flooding along both sides of the road. This is a flood prone area and naturally the villagers expressed their concern. The PWD officers explained that they are aware of the occurrence of flood during monsoon months and therefore suitable drainage measures have been provided in the project. Moreover adequate crust thickness would also be provided in the specification for tenders. Participating in the discussion Shri. Prabhu Dayal, Sarpanch (Headman) of Leghan village mentioned about 100 (hundred) acres of land now being occupied by Kikar trees. He faVoured that the same land may be used for planting some other variety of species which can be of some use to the villagers. The Forest Dept. has assured that they will consider the proposal. A list of participants along with photographs of the meeting is enclosed. Af I Haryana Highway Upgrading Project Appendix 6 AMBALA - MONDAY 29.09.1997 The public consultation on environment in Ambala was held on Monday 29.09.1997 at the PWD Rest House in Ambala. The Number of participants were more than 40 comprising Govt. Officials of Forest, Revenue and Irrigation Departments plus Project Affected Persons (PAPs). No NGO's participated as none could be located. Ambala was selected as it is located in the northern part of the State and as it is an important urban road junction point. Mr. K. K. Singhal, Superintending Engineer, Ambala presided over the meeting. The PWD's Executive Summary of the SEA draft report was distributed to the participants. Mr. Singhal broadly outlined the salient features of the project including the likely benefits which will accrue to the people in general and villages on both sides of the road in particular. Villagers complained about the problem of water-logging at Kalpi - Joli junction on the Ambala - Jagadhri Road. Similarly Khudda - Kala village gets flooded during rainy season. Responding to the complaints Mr. Singhal assured the villagers that the proposed upgrading project has taken into considerations the drainage pmblems of the flood prone areas. Mr. Nityaprakash, village Sarpanch (Head Man) of Mithapur stressed the need for widening of some of the culverts. The present culverts being rather small would be inadequate in the event of upgrading the road. Mr. Singhal assured that this issue has been adequately dealt with in the project design. During the meeting it was pointed out by the villagers ihat the PWD Officials are marking 100 feet of land on both sides of road over and above the ROW, as buffer land where no construction of permanent nature would be allowed. The villagers were taken by surprise. However, the chairman calmed them down by pointing out that this is the building line and as per the requirement of law and has been made keeping in view the safety requirement of road users. At the very end of the meeting a large number of people claiming to be PAPs barged in. Participating in the discussion they strongly resented the move of demolition of shops and other establishments being unauthorisedly occupied by them. Shri. Singhal tried to pacify them by saying that no fresh land is going to be acquired and the upgrading work would remain confined within the land under the ownership of PWD. X list of participants along with photograph is enclosed. A6-2 Haryana Highway Upgrading Project Appendix 6 JIND - TUESDAY 30.09.1997 The last of the series of public consultation meetings on the enviromnent of the Haryana Highway Upgrading Project Phase I was held at Jind on Tuesday the 30'h September 1997 at the PWD Rest House. The meeting was well attended with the presence of concerned Govt. Officials from the Dept. of Forest, Revenue, Police and Irrigation along with a large number of villagers. NGO's did not participate as there was hardly any in existence. Mr. T. C. Rewaria, Executive Engineer, Jind presided over the meeting. In his introductory comments Mr. Rewaria apprised the participants about the broad outline of the proposed project and likely benefits to accrue-to the people of the area. He explained that the present conditions of the roads are unable to carry the existing load of traffic and would create even more trouble with the future growth. Hence it has become absolutely essential to upgrade the existing highways. Villagers complained generally about water-logging along link roads and that seemed to be their primary concern. Shri. Gyan Chand, President, Municipal Council Jind complained about flooding of Kaithal - Narwana road which is a part of the proposed upgrading project. Responding to this complaint Shri. Rewaria mentioned that the project report has already considered this point and necessary steps have been incorporated in detailed engineering report. On the point of tree felling due to widening and strengthening, district forest officer mentioned that approximately 15000 (fifteen thousand) trees are going to be affected. As per the guidelines the Forest Department would provide for replanting to the tune of ten times of trees axed due to project implementation. The Forest Department would do the replanting as per the social relevance of the forest policy i. e. fuel, fodder and timber. Copies of the PWD Executive Summary on the project was distributed among the participants. The list of participants and photographs of the meeting is enclosed. .~~~~~~~~~~~~~~~~ _ Harvana HighAvay Upgrading Projcct Appcndix 6 BHIWANI E 1 A64 . I S.k~ ..tL,c.(Divy ~4~4t2...~c(j A b.kH' c l: 1 .~ c=iL ED,- 5 - /&. % 4L . ,8A,.$s,. , o3- :AW.&. I 4.~~~~~~~~~~~~~~~~~~2 kAY 9. a ,4,d)- s~A . /1)4,,I4V,. Ci A.,, -, 4>1h- 3. L- * b1TQ~ir-- .~ (;c E3' i , i c /46 Is. / z42I~ f

Informations clés
Type de document Environmental Assessment
Date d'adoption
Pays Inde
Source Banque mondiale