World Bank Group · Announcement

Announcement of Road Studies in Peru on November 24, 1964

Peru World Bank
View original document

The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.

Full text

.. l . .•., HOLD FOR RELEASE • .TFRNATiO~-,JAL NS"T'RU 1818 H STREET, N.W., WASHINGTON D. C. 20433 TELEPHONE: EXECUTIVE 3-6360 For Release Subject: Road studies in Peru November 24, 1964 The World Bank has agreed to help finance feasibility studies for three road construction projects in Peru. The Bank has allocated $300,000 to meet foreign ex- change costs of the studies by consultants, while the Government of Peru will bear the local currency costs. The studies will cover the following projects: 1) the Carretera Marginal- Satipo-Via Central road project to connect two penetration roads leading from the Andes into the fertile and potentially rich areas of Ceja. de Montana on the eastern • slopes of the mountain; 2) the Sullana-Paita road section to provide a reliable link between Sechura Valley, Sullana and Paita po.rt; and 3) the 15-kilometer Pasa- mayo section of the· Pan-American Highway which rui1s along the Pacifi~ Ocean serving as the only connection between Lima, the capital city, and the North of Peru. Between 1955 and 1961, the World Bank made three loans totaling $20.5 million to import maintenance equipment and materials to resurface ·sections of Peru's most important high~ays, and to improve road transport between the Ama~on. are~ in east~rn Peru and Lima. In addition, the Bank joined the Peruvian Government in financing a etudy by consultants to provide a basis tor Government decisions with respect to investments in highway development. In their r.eport, submitted to th,e Government and the Bank in 1961, the consultants recommended a 10-yea.r program of improve- ments EI.Ild expansion of highway facilities at a total estimated cost of more than $200 million. The report bas been the Government's principal guide to establish • priorities in planning development of these urgently needed national highways. I • - 2 - At present, feasibility and engineering studies in enough detail exist for only three road sections. In order to have a basis for drawing up a coordinated plan for the recommended further expansion of Peru's highway system, a program of additional studies was evolved as a result of discussions between the Peruvian Government, the U.S. Agency for International Development (AID), the Inter-American Development Bank (IDB) and the World Bank. The program will cost about $2.4 million and will cover 11 road sections totaling about 1,800 kilometers. Studies of two of these road sections are now going forward as part of a high- way maintenance and improvement project toward whii.".i'h the World Bank made a loan of $10 million in 1961. In September 1964, IDB announced a loan of $475,000 to finance the total costs of two other road sections. Negotiations are under way between the Government and AID for financing studies of ?our more road sections. The present • allocation by the World Bank will cover foreign exchange costs of studies of the remaining three sections. The studies a.re expected to take about one year • • ,,,

Key facts
Organisation World Bank Group
Document type Announcement
Adoption date
Country Peru
Source World Bank