FOR IMMEDIATE RELEASE World Bank 1818 H Street, N.W., Washington, D.C. 20433, U.S.A. * Telephone: (202) 477-1234 BANK NEWS RELEASE NO. 91/90 Contact: Pastor B. Sison Tel: (202) 458-0344 INDIA: PRIVATE POWER UTILITIES (BSES) PROJECT The following is information on a project approved by the World Bank's Board. DATE: June 17, 1991 WORLD BANK GROUP SUPPORT: World Bank loan: $200 million. The loan is for 20 years, including five years of grace, with a variable interest rate, currently 7.73 percent, linked to the cost of the Bank's borrowings. It also carries an annual commitment charge of 0.25 percent on the undisbursed balance. TOTAL COST: $653.3 million OTHER FINANCING: Indian financial institutions, $155.1 million; International Finance Corporation (IFC) investment, $50 million; IFC syndication, $18.0 million; Internal accruals, $65.6 million; Special reserves, $47.5 million; Fully convertible debentures (first and second issue), $117.1 million IMPLEMENTING AGENCY: Bombay Suburban Electricity Supply Limited (BSES) ESTIMATED COMPLETION DATE: 1997 PROJECT DESCRIPTION: The objectives of the Private Power Utilities (BSES) Project are to: (a) provide additional generation, trans- mission, and distribution capacity to meet the increasing demand for electricity in the Bombay area and maintain high-quality service to BSES consumers; (b) increase private sector participation in the supply of power; and (c) transform BSES from a distribution company into an integrated power utility with responsibilities for genera- tion, transmission, and distribution. The project includes: (a) a thermal power plant comprising two 250 megawatt coal-fired units located at Dahanu with steam generators, turbo-generator sets complete with auxiliaries, a once-through circulating water system, coal, ash, and oil handling plants, a water treatment plant, a power station switchyard, miscellaneous electrical and mechanical equipment, environmental safeguard and monitoring equipment, and associated civil works and consulting services; (b) two double- circuit 220 kilovolt transmission lines (about 105 kilometers) to transmit power from Dahanu to BSES's license area and three 220/33 kilovolt receiving substations; and (c) strengthening and extending BSES's 33 kilovolt and 11 kilovolt subtransmission and distribution system.
Groupe de la Banque mondiale · Announcement
Announcement of India Private Power Utilities (BSES) Project on June 17, 1991
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Announcement
Pays
Inde
Source
Banque mondiale