Document of The World Bank FOR OFmCIAL USE ONLY Report No.75 78 PROJECT COMPLETION REPORT HEXICO BAJO RIO BRAVO/BAJO RIO SAN JUAN IRRIGATION REHABILITATION II (LOAN 2100-ME) DECEMBER 30, 1988 Latin America and the Caribbean Regional Office This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. FOR omCIL USE ONLY THE WORLD BANK Washington. D.C. 20433 U.SA. Opwtns,aEcAm Iaaian December 30, 1988 MEMORANDUM TO THE EXECUTIVE DIRECTORS AND THE PRESIDENT SUBJECTs Pass-Through Audit Report on Mexico: Bajo Rio Bravo/ Bajo Rio San Juan Irrigation Rehabilitation Project II (Loan 2100-ME) Attached, for information, is a copy of a report entitled 'Pass-Through Audit Report on Mexico, Bajo Rio Bravo/Bajo Rio San Juan Irrigation Rehabilitation Project II (Loan 2100-ME)" prepared by the Latin America Regional Office. Full evaluation of this project has not been made by the Operations Evaluation Department. Attacbment This document has a oesUicted distribution and may be used by rocpients only in the prfonarme | |of their official duties. Its contents may not otherwiise be discbsed without World Bank authofintion.| FOR OMCIAL USE ONLY PROJECT COMPLETION REPORT MEXICO BAJO RIO BRAVOIRIO SAN JUAN IRRIGATION REHABILITATION II (LOAN 2100-ME) Table of Contents Page No. Preface.. .................... ............ ..*06....... Basic Data Sheet .............................................. Evaluation Summary . .. ..... t ......... . ........ .......... iii I. INTRODUCTION ........................ ........... 1 II. PROJECT FORMULArION ................... ... ... too ....... *.. 3 Preparation and Appraisal.. ... .... ..... .. ..o .... ........ 3 Negotiations and Board Approval............................ 3 III. IMPLEMENTATIONo ...... ............ 4 General ... ........... ....... 6 civil Works ......... .....t ....0................ 7 Operation and Maintenance ...... .. ...... ........ 7 Technical Assistance .... . ..... ............. 7 Credit ........................ .......o..... . 7 Disbursemento ........ t............ *000-0....... 7 Procuremenit .............00...................... 8 Reports and Auditing. . ..... . . ...... ...... .-. . .. 8 Compliance with Covenants. ....................... 8 IV. AGRICULTURAL AND ECONOMIC IMPACT ........................... 8 Agricultural Impact ...o......o.... .............. ...... ... 8 Economic Imat............................. 11 V. BANK PERFORMANCE...***........................ ............ 11 VI. CONCLUSIONS AND LESSONS LEARNED...o..... o.... ............. 12 Conclusions .............................. .. .... 12 Lessons Learned ... ... ...... ...... 13 ANNEXES 1. Program and Achievements under Phase I and II.............. 15 2. Summary of Basic Data and Achievements..................... 16 3. Summary of Economic Results..0. . ...... .. ....... . ...... . 17 4. Comparative Cost and Financi ng Plan ....................o .... 19 5. Cropping Pattern and Intensity ............................. 20 6. Comments received from Government .......................... 21 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. PROJECT COMPLETION REPORT MEXICO BAJO RIO BRAVOIRIO SAN JUAN IRRIGATION REHABILITATION II (LOAN 2100-ME) PREFACE 1. This is the Projeet Completion Report (PCR) for the Bajo Rio BravolRio San Juan Irrigation Rehabilitation II Project (Loan 2100-ME). The loan was approved in March 1982, in the amount of US$180.0 million, reduced to US$65.0 million in January 1985, and closed in September 1986 after cancellation of US$56.0 milli'n. The project and Bank-financed participation has a long and repetitive history. In 1963, a first Bank Loan (336-ME) was made for the two districts (Bajo Rio Bravo Irrigation District 25 and Bajo Rio San Juan Irrigation District 26). A follow-on project, the Bajo Rio BravolRio San Juan Irrigation Rehabilitation I was approved in 1975 in the amount of US$150.0 million and closed in 1983 after cancellation of US$100.0 million. 2. The PCR was prepared by the Latin America and the Caribbean Regional Office based on a PCR prepared by the Borrower, on the President's Report (No. P-3215-ME, dated February 25, 1982), the Staff Appraisal Report (No. 3663-ME, dated February 19, 1982), internal Bank memoranda and other correspondence as contained in the official Bank files and on discussions with people in the Bank who were involved with the project during its implementation. No further evaluation was undertaken by OED of the project, as the PCR covers adequately the main reasons why the project did not meet its objectives. The draft PCR was sent to the Borrower on October 5, 1988 for their comments. 3. Comments from the Borrower were received on December 2, 1988 and are attached as Annex 6 to this report. BAJ. mo 00WAVOBAA to sIoAM IU A3 It"t IO I41LITATIO P61CT It - (LO S,m.w i1" tiEn 0^1^ til~~FROCT IMPUIO 01 blulo" Ceti Ac. lzgml fe tt 4 otil 1t! all~ ~ ~ ~~~ M_ NOSCI 11 BAI PAIl Sl_Ed ETi_ P.jc go" (11 1111Millelo) 62S.4 It.9 9 16.4 as 21S iLo Amat (UN st 1111.*) Is6.6 11.12 6.6k U 143 0.1. of efetiess 6_/16162 0C1. of e..je cleas.IA. I/IU; 12/11/61 tti O /U Clel dae dot/M/ I1/I/S600 I/I6 _ce.e.b. ste o f ntl. ) *2 1: 1.8 Projest waes .ffe.tei iy 41vtel tot,_i (0 4.n i 9,1"O F.. ftely p he.l.lstle VW. ls 2i. bh) 16,666 16.666 0164.6116 0I*UAmi
World Bank Group · Project Completion Report
Mexico - Second Bajo Rio Bravo - Bajo Rio San Juan Irrigation Rehabilitation Project
View original document
The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.
Full text
Key facts
Organisation
World Bank Group
Document type
Project Completion Report
Country
Mexico
Source
World Bank