Document of 'l The World Bank FI I FOR OFFICIAL USE ONLY Report No. 2393a-TUN TUNISIA NATIONWIDE WATER SUPPLY EXPANSION PROJECT (Fifth Water Supply Project) STAFF APPF'AISAL REPORT April 23, 1979 Water Supply and Sewerage Division Europe, Middle East and North Africa Regional Office This document has a restricted distribution and may be used by recipients only in the performance of their officiai duties. Its contents may not otherwise be disclosed without Worid Bank authorization. CURRENCY EQUIVALENTS (As of October 31, 1978) Currency Unit = Tunisian Dinar (D) = 1,000 Millimes D 1 = US$2.53 US$1 D 0.395 D 1 million = US$2,530,000 ABBREVIATIONS ft foot m3/sec cubic meters per second lcpd liters per capita per day Mm3 = million of cubic meters m = meter psig = pound per square inch, gage mm = millimeter sec = second MEASURES AND EOUIVALENTS Metric System US System Kilometer (Km) = 0.62 mile (mi) Hectare (ha) = 2.47 acres (a) Meter (m) = 39.37 inches (in) Cubie meter (m3) = 264 US gallons (g) Million cubic meters/year (Mm3/year) = 0.72 million US gallons per day (mgd) Liter (1) = 0.264 US gallon (g) Liters per second (1/sec) = 22,800 US gallons per day (gd) GLOSSARY OF ACRONYMS ADB = African Development Bank IDA International Development Association IDB Islamic Development Bank RDE = R
Группа Всемирного банка · Staff Appraisal Report
Tunisia - Nationwide Water Supply Expansion Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Staff Appraisal Report
Страна
Тунис
Источник
Всемирный банк