Groupe de la Banque mondiale · Memorandum & Recommendation of the President

Afghanistan - Kabul Water Supply and Sewerage Project

Afghanistan Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

Document of The World Bank FILE -COPY FOR OFFICIAL USE ONLY Report No. P-2357-AF REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE EXECUTIVE DIRECTORS ON A PROPOSED DEVELOPMENT CREDIT TO THE DEMOCRATIC REPUBLIC OF AFGHANISTAN FOR A KABUL WATER SUPPLY AND SEWERAGE PROJECT June 20, 1978 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS Calendar 197? December 1977 Currency Unit = Afghani (Af.) US$1 = Afs. 46.1 Afs. 43.0 Af. 1 = US$0.02169 US$0.02326 Note: A depreciated exchange rate (Afs. 45.0 : US$1) compared to the most recent rate i.e. December 1977 has been used in calculating project costs. See paragraph 47 for detailed explanation. FISCAL YEAR March 21 to March 20 GLOSSARY OF ABBREVIATIONS CAWS - The Central Authority for Water and Sewerage (formerly described as AWSSA - Afghan Water Supply and Sewerage Authority; referred to as Da Afghanistan Da Obo Rasawalo Aow Canalization Moassasa in the legal documents) CIDA - Canadian International Development Agency EHD - Environmental Health Department KfW - Kreditanstalt fur Weideraufbau (Federal Republic of Germany) PRIL - Proctor and Redfern International Limited (Canada) FOR OFFICIAL USE ONLY AFGHANISTAN KABUL WATER SUPPLY AND SEWERAGE PROJECT CREDIT AND PROJECT SUMMARY Borrower: Democratic Republic of Afghanistan. Beneficiaries: The Central Authority for Water and Sewerage (CAWS), and the Municipality of Kabul. Amount: US$16.5 million equivalent. Terms: Standard. Onlending Terms: The Government would onlend the equivalent of US$13.0 million to CAWS for 25 years including 5 years of grace, at an interest rate of 8 percent per annum. The Government would carry the foreign exchange risk. Project Description: The project, which places emphasis on services to the urban poor is a continuation of the ongoing Water Supply and Sanita- tion Project (IDA I). It aims to provide the Greater Kabul area with an increased supply of clean drinking water, the beginning of a sewerage system, and improved sanitation ser- vices in selected areas of Kabul, to complement the sewerage system. It would include the equipping of 10 wells being drilled under IDA I; the provision of a 15,000 m3 reservoir together with a booster pumping station; the installation of about 84 km of water mains; the installation of standpipes and hydrants; and about 14,400 meters. In conjunction with ongoing projects, of which this is an integral part, the project would serve 630,000 people, representing about 70 percent of Kabul's urban population. The sewerage component would provide three areas of Kabul with a collector system and disposal arrangements by installation of about 35 km of sewers, a 15,000 m3/day pumping station, a wastewater treatment plant, and house connections. Sanitation improvements would include storage, collection and disposal of human waste from house latrines. The project faces no more than the technical and managerial risks usually associated with water supply projects. CAWS' experience in project implementation under IDA I and the assistance to be provided by capable consultant services would limit project implementation risks. Th1 document has a restricted distributon and my be we by recipients only in the pwfonnfce of their olfcial duti. Its contents may not otherwise be discansd without World Bak authorisan. - ii - Project Costs: Local Foreign Total

Informations clés
Date d'adoption
Source Banque mondiale