Document of The World BankFIEC P FOR OFFICIAL USE ONLY Report No. P-2401a-GUI REPORT AND RECONMENDATION OF THE PRESIDENT OF THE INTERNATIONAL DEVELOPMEN ASSOCIATION TO THE EECUTIVE DIRECTORS ON A PROPOSED DEVELOPMENT CREDIT TO THE REPUBLIC OF GUINEA FOR A POWER ENGINEERING AND REPAIR PROJECT December 5, 1978 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS Currency Unit = Syli US$1.00 = 20 Sylis Syli 1.00 = US$0.05 MEASURES 1 m2 3.28 ft. 1 m 2 10.76 sq. ft. 1 km = 0.38 sq. mile GWh Gigawatt hour KWh Kilowatt hour MW Megawatt ABBREVIATIONS ADB = African Development Bank COMECON = Council for Mutual Economic Assistance EEC = European Economic Community MIE = Ministry of Industry and Energy OCOFI = Office de Coordination Financiere de l'Industrie OECD = Organization for Economic Cooperation and Development OPEC = Organization of Petroleum Exporting Countries SNE Societe Nationale d'Electricite FISCAL YEAR January 1 - December 31 (since 1977) FOR OFFICIAL USE ONLY THE REPUBLIC OF GUINEA POWER ENGINEERING AND REPAIR PROJECT CREDIT AND PROJECT SUMMARY Borrower: Republic of Guinea Amount: US$1.13 million Terms: 10 years, including 2 years grace, with 3/4 of 1 percent service charge. Project The project is intended to complete preparatory work Description: on a large rehabilitation program for the Conakry system part of which would be appraised next year as the Bank Group's First Power Project in Guinea. As the pre- paratory work on the program has progressed, an urgent need for emergency repair work to preclude total system collapse has become manifest; the project thus provides as well for these repairs. The project comprises: (i) a study to determine the feasibility of either repairing or replacing the Grandes Chutes Dam, which is the primary source of potable water for the city of Conakry as well as a storage chamber for the generation of electric power to the cities of Conakry and Kindia; (ii) technical assistance to help the Societe Nationale d'Electricite (SNE) carry out an audit of its 1978 financial statements and implement the recommendations of external auditors; and (iii) emergency repair of four generating units and of the telecommunication system between generating plants. This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Estimated Cost: (excluding tax*) Local Foreign Total _____--(US$)__ (i) Feasibility study of rehabili- tation of Grandes Chutes Dam and related field works 30,000 275,000 305,000 (ii) Technical assistance to improve SNE's accounting systems and procedures and to audit its 1978 financial statements 5,000 50,000 55,000 (iii) Supply of replacement parts, spare parts and repair works 44,000 506,000 550,000 (iv) Supply of distribution tools, service vehicles - 96,000 96,000 (v) Physical contingency on item (iii) above 22,000 203,000 225,000 TOTAL 101,000 1,130,000 1,231,000 Financing Plan: Local Foreign Total
Группа Всемирного банка · President's Report
Guinea - Power Engineering and Repair Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
President's Report
Страна
Гвинея
Источник
Всемирный банк