62743 Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project (Project ID No P124351) Abbreviated Procurement Plan I. GENERAL 1. The project will have three components: Component 1: Upgrading of the existing 220kV transmission line to 330kV. Estimated cost US$16.2 million. This component consists of replacing the existing 341 kilometers of 220kV transmission cable from Kafue-town through Muzuma to Victoria falls with a new 330 kV transmission cable on the same towers. Component 2: Reinforcement and Construction of Substations Estimated cost US$87.8 million. Under this component, the existing 220 kV transformers and associated switchgear equipment will be decommissioned and replaced with 330 kV transformers and associated equipment at the Kafue Town and Muzuma substations, and new 330/220 kV substation will be constructed at Livingstone. The use of available bays within the Kafue Town and Muzuma substations for installation of the new transformers and other equipment, and the deliberate selection of the site for the new Livingstone substation in an unpopulated area will minimize the environmental and social impacts of the project and will increase the implementation speed. Component 3: Project Management, Environmental and Social Mitigation, and TA to ZESCO. Estimated Cost US$6 million. 1. Project information: Zambia - Kafue Town -Muzuma- Livingstone 220kV transmission line upgrade Project 2. Project ID No.: P124351 3. Project Implementing Agency: ZESCO 4. Bank’s approval Date of the Procurement Plan: March 2011 5. Date of General Procurement Notice: (TBA) 6. Period covered by this procurement plan: 12 months from February 2011 to February 2012 2010 7. Applicable Procurement and Consultants Guidelines. All goods and services required for the Project and to be financed out of the proceeds of the Grant shall be procured in accordance with the requirements set forth or referred to in: (a) Section I of the “Guidelines: Procurement under IBRD Loans and IDA Credits” published by the World Bank in May 2004 and revised in October 2006 and May 2010 (“Procurement Guidelines”) in the case of goods, and Sections I and IV of the “Guidelines: Selection and Employment of Consultants by World Bank Borrowers” published by the World Bank in May 2004 and revised in October 2006 and May 2010 (“Consultant Guidelines”) in the case of consultants’ services; and the provisions of this Section III, as the same shall be elaborated in the procurement plan prepared and updated from time to time by the Recipient for the Project in accordance with paragraph 1.16 of the Procurement Guidelines and paragraph 1.24 of the Consultant Guidelines (“Procurement Plan”). II. Goods and Works and Non-Consulting Services. Prior Review Threshold: Procurement Decisions subject to Prior Review by IDA as stated in Appendix 1 to the Guidelines for Procurement: Table 1: Thresholds for Procurement Methods and Prior Review - Goods and Works Expenditure Contract Value Threshold Contracts Subject to Prior Procurement Method Category For use of Method (US$) Review (US$) 1. Works ICB (Works/Supply & Installation) >=3,000,000 All contracts NCB >=100,000 - <3,000,000 As in procurement plan Shopping <100,000 None Direct Contracting All values All contracts 2. Goods ICB >=500,000 All contracts NCB >=50,00 <500,000 As in procurement plan Shopping <50,000 None Direct Contracting All values All contracts 2.Prequalification. In accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. Contracts for the 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: N/A 4. Reference to (if any) Project Operational/Procurement Manual: N/A 5. Any Other Special Procurement Arrangements: None 6. Procurement Packages with Methods and Time Schedule a. Procurement of Works (N/A) Expect Expected Prior Estimated Preq Bid Contract Package Ref Proc Domestic or Description Amount in (yes / Openin Comment Number Number Method Pref Post US $ no) g Signature Review Date Date ZESCO/K TMV/ G/01 b. Procurement of Goods Expecte d Prior Expect Contrac Package Estimated Preq Ref Proc Domesti or Bid t Description Amount in (yes / Comment Number Method c Pref Post Opening Number US $ no) Review Date Signatu re Date Supply, Install and ZESCO/KT Commission works at MV/ G/01 1 50,000,000 ICB Yes No Prior 10/2011 02/2012 Kafue Town, and Muzuma Substations ZESCO/KT May be Supply, Install and MV/ G/01 funded by Commission works at 1 26,000,000 ICB Yes No Prior 10/2011 02/2012 EIB using Livingstone substation their own procedures Supply, Install and ZESCO/KT Commission the MV/ G/02 1 29,000,000 ICB Yes No Prior 10/2011 02/2012 upgraded 330kV transmission line If vehicles are of different Vehicles (for ZESCO/KT capacity and Substations and 2 200,000 NCB No No Prior 09/2011 11/2011 MV/ G/03 type may have Transmission Lines) more than 1 package or lot ZESCO/KT Office Furniture 3 20,000 S No No Post 09/2011 11/2011 MV/ G/04 ZESCO/KT Office IT equipment 4 20,000 S No No Post 09/2011 MV/ G/05 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Table A8.2: Thresholds for Consultants Selection Methods and Prior Review Contract Value Threshold for Contracts Subject to Prior Expenditure Category Procurement Method use of selection method (US$) Review (US$ millions) QCBS, QBS >=200,000 All contracts Consulting Firms CQS, LCS, QBS, FBS <200,000 As in procurement plan SSS All values All Contracts Individual Consultants Competitive selection >=100,000 All contracts (IC) IC Single Source Selection All values All contracts NOTE: Contracts selected on basis of CQS may not exceed US$200,000 equivalent. Those under LCS and FBS should not be estimated to cost below US$100,000 or equivalent. 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Terms of Reference (TOR) for all consultancy contracts as well as all single source selections, irrespective of the contract value, will be subject to prior review. 4. Any Other Special Selection Arrangements: N/A 5. Consultancy Assignments with Selection Methods and Time 1 2 3 4 5 6 7 Expected Prior / proposal Ref. Selection Estimated Description Post submission Comments No. Method Cost in US$ Review /opening Date Consultant for the Engineering Design and Supervision of the upgraded transmission lines September C01 QCBS 500,000 Prior and substations (Phase1. Designs and pre- 2011 contract) Consultant for the Engineering Design and September C02 Supervision of the upgraded transmission lines QCBS 2,100,000 prior 2011 and substations (Phase2. supervision) c. Non Consultant Services (N/A) Expected Prior / proposal Ref. Selection Estimated Description Post submission Comments No. Method Cost in US$ Review /opening Date NCS 1 d. Training and Workshops Ref. Description of Training, workshop and Estimated Estimated Cost (US$) Expected Training Date No. study tours Duration TW1 TW2 Note: All training will be based on agreed training plan that will be prepared by ZESCO and approved by the Bank and will include at the least the justification of the training identified and the capacity gap, the intended trainees, the name of the training provider, the date and the eventual cost of training. After the training, the beneficiaries will be requested to submit a brief report indicating what skill have been acquired and how these skills will contribute to enhance his performance and contribute to the attainment of the project objective. The training plan will be prepared and submitted once a year and updated as required.
Groupe de la Banque mondiale · Procurement Plan
Africa - Zambia Kafue Town - Muzuma - Victoria Falls Regional Transmission Line Reinforcement Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Source
Banque mondiale