Page 1 Spec Proc Notice Advert Lot Number Estimated Amount in U$'000 Procurement Method Pre-or Post Qualificati on Prior or Post Review Prep & Submission by Ex Agency No-objection Date On-line UNDB Gateway Nat Press Bid Invitation Date Bid Closing- Opening Submission Bid Eval Rpt No-objection Date Contract Amount in US$'000 Date Contract Award Date Contract Signature Opening Let of Credit Arrival of goods If Prequalification Plan 4-7 wks 1-1.5 wks 1-2 wks 6 to 12 wks 1.5-3 wks 1-1.5 wks 1 wk 1.5-3 wks add 7-13 wks Actual List of Contracts A. Sub Program C-1 I. MOFED IT-Software and Hardware COPCU G01/09 Software Licences - Antivirus and Operating Systems 1 5200.00 ICB Post Prior Plan 07/30/10 08/09/10 08/16/10 08/23/10 10/04/10 10/22/10 10/29/10 11/05/10 11/12/10 11/29/10 03/31/11 Actual 1-Windows 2008 Server with Hyper-V 1 2-Microsoft Office 2007 system 1 3-Windows XP Professional License 600 4-Anti virus Software 2 5-Backup Software 1 6-SQL Navigator 13 7-Confio 12 8-Adobe Acrobat 1 9-SmartCode VNC Manager (Enterprise Edition) 1 10-Toad 13 1.2 Oracle Software 2 11-Oracle Data Base11g -standard edition one - Linuxx64, for 2 sockets processor server.Capable to serve 42 servers 12-Oracle Data Base11g standard edition Linux 64, for 1 socket processor server.Capable to serve 200w/Station 13-Oracle Data Base11g personal edition - including required trainings on software -Linux, DBA, Machine Maintenance & Backup administration 2000 pcs 14-Oracle Linux Support License 8 15-Oracle Support 1 Hardware 3 Channel One Program Coordinating Unit(COPCU) If Post-Review, No-objection Dates are not needed Contract Finalization Contract Implementation 1. Goods Ministry of Finance & Economic Development Revised Procurement Plan -Goods (May ,2009--- December 31, 2011) Norm Duration of Proc Steps Bidding Period Bid Evaluation Qty Package Number BASIC DATA Plan vs. Actual Draft Bid Documents, including specs and quantities, draft SPN Page 2 1-Desktop Computers 830 2-Laptop computers 33 3-UPS -- a)15 KVA - including required raised-floor & installation offered for UPS 15 KVA, servers & Data Center 22 b)5KVA 12 c)1.5KVA 1000 4-RAM a) DDR 1 1000 b) DDR 2 1000 5-Ethernet Modules 10 6-Gigi card 2 7-Work station 200 8-Web Application Firewall 25 9-Switch-Cisco Catalyst 3560G-48TS 15 10-Switch-Generic 8 Port Gigabit Access 11 11-Server -With Capacity for 10 Blades for SAN conectivity. 1 12-Server-Recommendable design for Database Management 32 13-Server Rack -42u Type 1 1 14-Server Rack -24u Type 2 10 15-Rack KVM System 12 16-Labeler-PC Connectable labeling System 3 17-Thin Client System 300 18-SAN System 2 II. OFAG (federal +Regional)IT Equipment COPCU G05/09 1 1332.00 ICB Post Prior Plan 07/30/10 08/09/10 08/16/10 08/23/10 10/04/10 10/22/10 10/29/10 11/05/10 11/12/10 11/29/10 03/31/11 Actual 1) Desk Top 191 2)Laptop 837 3)Memory Stick 837 4)Wireless Access Point 15 5)Printer Type 1 29 6)Printer Type 2 43 7)UPS -1 -15 KVA 1 8)UPS-3- 1.5KVA 191 9)Server Rack Type 2 1 2 10)Rack KVM Switch 8 port System 1 11) Server Type -2 a)Web server 1 b)Data server 1 c)ISA server 1 d)Mail server 1 e)exchange server 2 III. Various Vechicle s - OFAG/ORAG/PPA/EMPC/COPCU COPCU G06/09 1 1800.00 ICB Post Prior Plan 07/26/10 08/10/10 08/16/10 08/16/10 09/30/10 10/15/10 10/25/10 11/01/10 11/08/10 11/22/10 03/31/11 1)P/UP Double Cabin 13 Actual 2)Land Cruiser 15 3)Automobile 1300CC 15 4)MiniBus 3000 CC 1 Page 3 5)Service Bus 4200 CC 1 Page 4 IV. Office Equipment- COPCU/PPA/MOARD 1)Computers &Accessories 154 1 2)Laptop 4 3)Photo copiers 9 4)Projector 1 5) Printers 25 08/20/10 6) UPS 154 Actual 03/25/10 07/06/10 07/06/10 07/28/10 V. Office Equipment 1)Binding Machines (2) 2)Desk top (6) 3)UPS (6) 4) Color printer (1) 5)Scanner(1) 2 6 6 1 1 COPCU G03/09 1 49.00 Shopping NA post Plan 10/12/09 NA NA 02/04/10 02/20/10 03/07/10 NA 03/12/10 03/12/10 NA 03/22/10 Actual 10/12/09 NA 03/19/10 03/25/10 04/25/10 NA 04/29/10 04/30/10 NA 05/25/10 VI. Office Supplies -COPCU/PPA Various COPCU G04/09 1 50.00 Shopping NA post Plan 01/30/10 NA NA 02/08/10 02/20/10 02/28/10 NA 03/07/10 03/10/10 NA 03/25/10 Actual VII. Furniture for COPCU COPCU G07/09 2 10.00 Shopping NA post Plan 05/31/10 NA NA 06/02/10 06/09/10 06/17/10 NA 06/21/10 06/21/10 NA 07/30/10 L/Shape Tables 4 Actual Telephone Table 1 Normal Tables meeting room 7 Guest Chairs Meeting Room 18 Medium Swival Chairs (2+4_) 6 Sofa Set 1 set VIII. OFAG's IT Equipment COPCU G08/09 1 30.00 Shopping NA post Plan 07/30/10 NA NA 08/06/10 08/13/10 08/20/10 NA 08/24/10 NA NA 08/31/10 Actual 1)exchange server 1 2)Wireless Access Point 15 3)-KVM Switch- 8 Port 1 4)Anti Virus 1 IX. Procurement of Office equipment for International and Local experts at PPA and BOFED 13 set COPCU G09/09 1 39.00 Shoping NA post plan 07/30/10 NA 08/06/10 08/13/10 08/31/10 NA 09/07/10 NA NA 09/14/10 actual X. Office furniture for PPA COPCU G10/09 1 49.00 Shopping NA plan 07/30/10 NA 08/06/10 08/13/10 08/31/10 NA 09/07/10 NA NA 09/14/10 1.70 set of Tables and Chairs 70 actual 2. 20 filing Cabinet 20 3. Conference Table 1 set 06/25/10 03/25/10 NA Plan 06/25/10 COPCU G02/09 07/23/10 08/06/10 300.00 NCB Post post 10/29/10 08/13/10 NA NA Page 5 Inspection and Final Acceptance 04/29/10 Contract Implementation Page 6 04/29/10 04/29/11 Page 7 Page 8 11/15/10 03/31/10 05/25/10 04/05/10 08/10/10 09/07/10 09/21/10 09/21/10 Page 9 2. Consultancy Prep & Submission by Ex Ag No- objection Date Submission Date No- objection Date Invitation Date Submission/ Opening Date Norm Duration of Proc Steps Plan 3-6 wks 1-2 wks 2 wks 1-2 wks 4 to 12 wks Actual List of Contracts A. Sub Program C-1 1) Consultancy Service for Independent procurement review for PBS II (COPCU) COPCU/C 1/09 QCBS LS 100 Prior Plan 08/31/10 09/07/10 09/14/10 10/07/10 10/08/10 10/15/10 10/22/10 11/19/10 Actual 2)Upgrade FPPA Website - FPPPAA COPCU/C 3/09 QCBS LS 90 prior Plan 09/30/10 10/11/10 10/18/10 11/18/10 11/19/10 11/26/10 12/03/10 12/31/10 Actual 3)Study the feasibility of of e-Procurement & design implementation Strategy-FPPPAA COPCU/C 4/09 QCBS LS 255 prior Plan 03/31/11 04/07/11 04/14/11 05/12/11 05/13/11 05/20/11 05/27/11 06/24/11 Actual 4)Establishment 0f Professional Accountancy body & support for federal & Regional staffs to study accountancy technician qualification COPCU/C 5/09 QCBS LS 39 post Plan 09/27/10 NA 10/08/10 10/22/10 11/05/10 NA 11/12/10 12/10/10 Actual 5)Preparation of Cash Management Manual & Training Module COPCU/C 6/09 QCBS LS 198 post Plan 11/15/10 NA 12/10/10 12/24/10 01/12/11 NA 01/21/11 02/21/11 Actual Description Package Number Prep & Submission by Ex Ag No- objection Date Submissi on Date No- objection Date Invitation Date Submission/ Opening Date Norm Duration of Proc Steps Plan 3-6 wks 1-2 wks 1-1.5 wks 2 wks 1-2 wks 4 to 12 wks List of Contracts Actual 6)Senior Proc. Specialist-2-COPCU COPCU/R 7/09 IC TB 11 prior plan 05/15/09 05/29/09 06/05/09 06/25/10 06/26/09 07/03/09 NA NA Actual 05/28/09 06/09/09 06/23/09 06/23/09 Description* Contract Type (Lumpsu m or Time- Based) Estimated Amount in US$ '000 If Post-Review, No-objection Dates are not needed Selection Method Pckage Number Prior/Post Review Plan vs. Actual Preparation Request for Proposals/TOR Request for EOI (where required) On-line UNDB Gateway Nat Press Consultant Proposals Short List Channel One Program Coordinating Unit(COPCU) Ministry of Finance & Economic Development Procurement Plan -Consultancy (May ,2009--- December 31,2011) Request for EOI (where required ) On - Line UNDP Gate way Nat Press If Post-Review, No-objection Dates are not needed Plan vs. Actual Preparation Request for Short List Consultant Proposals Lead-time before shortlist Selectio n Method Contract Type (Lumps um or Time- Based) Estimate d Amount in US$ '000 Prior/Po st Review Page 10 7)Senior Accountant-1-COPCU COPCU/R 8/09 IC TB 4.3 Post plan 05/15/09 05/30/09 06/05/09 06/25/10 06/26/09 NA NA NA Actual 05/28/09 06/09/09 06/23/09 06/23/09 8)Capacity Building Senior Expert-1-COPCU COPCU/R 9/09 IC TB 4.3 Post plan 09/10/09 09/17/09 09/24/09 10/21/09 10/22/09 NA NA NA Actual 05/28/09 06/09/09 06/23/09 06/23/09 9)FTA T/Leader-1-EMCP COPCU/R 10/09 IC TB 6 Post plan 09/10/09 09/17/09 09/24/09 10/21/09 10/22/09 NA NA NA Actual 07/18/09 09/29/09 10/09/09 NA NA NA 10 -A)FTA Experts-2-EMCP COPCU/R 11/09 IC TB 18.4 Post plan 09/10/09 09/17/09 09/24/09 10/21/09 10/22/09 NA NA NA Actual 07/18/09 07/04/09 11-B)FTA Experts-2-EMCP COPCU/R 12/09 IC TB 18.4 Post plan 09/10/09 09/17/09 09/24/09 10/21/09 10/22/09 NA NA NA Actual 07/18/09 09/29/09 10/09/09 12)National Proc.Training Specialist-1-PPPAA COPCU/R 13/09 IC TB 5.5 Prior plan 06/30/09 07/07/09 07/14/09 08/03/09 08/04/09 08/12/09 NA NA Actual 06/28/09 08/15/09 09/11/09 NA NA 13)FTA Experts-for BOFED-for 11 Regions COPCU/R 14/09 IC TB 50.7 Post plan 10/09/09 10/16/09 10/23/09 11/05/09 11/06/09 NA NA NA Actual 14) Procurement experts for BOFED (11 experts) COPCU/R 15/09 IC TB 60.5 Prior Plan 06/30/09 07/07/09 07/14/09 08/03/09 08/04/09 08/12/09 NA NA Actual 15) International Senior Procurement Specialist COPCU/ R16/09 IC TB/mon thly 163 Prior Plan 10/28/09 11/04/09 11/11/09 12/03/09 12/04/09 12/11/09 NA NA Actual 10/12/09 10/14/09 10/15/09 10/30/09 10/17/09 10/31/09 16) International Environmental and Social Specialist COPCU/ R17/09 IC TB/mon thly 90 Post Plan 07/15/10 NA 07/29/10 08/12/10 08/19/10 NA NA NA Actual 17) Senior Local environmental Expert COPCU/ R18/09 IC TB 5.5 Post Plan 07/15/10 NA 07/29/10 08/12/10 08/19/10 NA NA NA Actual Description Package Number Prep & Submission by Ex Ag No- objection Date Request for EOI (where required) On-line UNDB Gateway Nat Press Submissi on Date No- objection Date Invitation Date Submission/ Opening Date Norm Duration of Proc Steps Plan 3-6 wks 1-2 wks 1-1.5 wks 2 wks 1-2 wks 4 to 12 wks Actual List of Contracts B. Sub Program D 18) Participatory Action Reaserch on accountability - COPCU/MCB COPCU/C 19/09 CQS LS 150 post Plan 06/15/10 NA 07/01/10 07/25/10 07/26/10 NA 08/01/10 08/29/10 Actual Lead-time before shortlist Short List Consultant Proposals Selectio n Method Contract Type (Lumps um or Time- Based) Estimate d Amount in US$ '000 Plan vs. Actual Preparation Request for If Post-Review, No-objection Dates are not needed Prior/Po st Review Page 11 19) Health Commodity Tracking and Stock Management Study COPCU/C 20/09 CQS LS 190 post Plan 07/20/09 NA 08/03/09 08/27/09 08/28/09 NA 09/04/09 10/02/09 Actual 02/07/09 08/07/09 16/7/2009 17/7/2009 NA 21/8/2009 23/8/2009 20) Health Service facility surveys for health center/posts-MOH COPCU/C 21/09 QCBS LS 150 post Plan 10/25/10 NA 11/08/10 12/03/10 12/06/10 NA 12/13/10 01/10/11 Actual 21) Data quality assesement for financial data reporting systems MOFED-GA COPCU/C 22/09 QCBS LS 195 post Plan 10/25/10 NA 11/08/10 12/03/10 12/06/10 NA 12/13/10 01/10/11 Actual 22)Public expenditure and financial accountability assesements-MOFED/COPCU COPCU/C 23/09 QCBS LS 196 post Plan 08/11/10 NA 08/25/10 09/16/10 09/22/10 NA 09/27/10 10/25/10 Actual 23)Development & Establishment of Web based Reporting System-ERA COPCU/C 24/09 QCBS LS 500 prior Plan 01/31/11 02/08/11 02/15/11 03/14/11 03/15/11 03/22/11 03/29/11 05/10/11 Actual 24)Agriculture Sector M&E System Diagonisis COPCU/C 27/09 QCBS LS 195 post Plan 06/25/10 NA 07/26/10 08/27/10 08/27/10 NA 09/01/10 09/30/10 Actual 25)Education Service Provision Assesement : School Facility Survey COPCU/C 29/09 QCBS LS 150 post Plan 09/08/10 NA 09/22/10 10/22/10 10/25/10 NA 11/01/10 11/29/10 Actual 26)Education MIS Peforma nce Module Development COPCU/C 30/09 QCBS LS 198 post Plan 10/11/10 NA 10/26/10 11/22/10 11/23/10 NA 11/30/10 12/28/10 Actual 27) PBS's impact asssessment on Enviroment sustainability COPCU/C 31/09 QCBS LS 190 post Plan 07/30/10 NA 08/09/10 09/09/10 09/09/10 NA 09/16/10 10/15/10 Actual 28) Socio-economic Study on PBS COPCU/C 32/09 QCBS LS 400 Prior Plan 08/16/10 08/23/10 08/30/10 09/27/10 09/28/10 10/06/10 10/13/10 11/10/10 Actual Page 12 Submission Evaluation Report (T) No- objection Evaluation Report (T) Opening Financial Proposals Preparation Eval Report (T) (F) Negotiations (N) Submission Date No- objection Date Contract Amount in US$ '000 Contract Award Contract Signature Mobilization Advance Payment Draft Report Final Report Final Cost 2-3 wks 0.5-2 wks 2 wks 1-2 wks 2 wks 1-2 wks 1-2 wks 1 wk 1-3 wks 11/30/10 12/07/10 12/15/10 12/22/10 12/31/10 01/10/11 01/17/11 01/24/11 02/03/11 02/14/11 05/16/10 06/15/11 01/14/11 01/21/11 01/28/11 02/04/11 02/11/11 02/18/11 02/25/11 03/04/11 03/11/11 03/25/11 05/31/11 06/30/11 07/04/11 07/11/11 07/18/11 07/25/11 08/01/11 08/09/11 08/16/11 08/23/11 08/31/11 09/14/11 11/15/11 12/15/11 12/21/10 NA 12/28/10 01/04/11 01/11/11 01/18/11 NA 01/25/11 02/04/11 02/25/11 05/31/11 06/30/11 03/07/11 NA 03/15/11 03/30/11 04/14/11 04/21/11 NA 04/28/11 05/06/11 05/20/11 08/31/11 09/30/11 Submissio n Evaluation Report (T) No- objection Evaluatio n Report (T) Opening Financial Proposals Preparation Eval Report (T) (F) Negotiations (N) Submissio n Date No- objection Date Contract Amount in US$ '000 Contract Award Contract Signature Mobilizatio n Advance Payment Draft Report Final Report 2-3 wks 0.5-2 wks 2 wks 1-2 wks 2 wks 1-2 wks 1-2 wks 1 wk 1-3 wks NA NA NA NA 07/17/09 07/25/09 08/03/09 08/10/09 08/24/09 NA 08/31/11 09/30/11 07/04/09 07/06/09 08/07/09 07/07/09 07/08/09 Proposal Evaluation and Negotiation for Projects Technical (T) & Financial (F) and Negotions (N) Channel One Program Coordinating Unit(COPCU) Procurement Plan -Consultancy (May ,2009--- December 31,2011) Contract Finalization Draft Contract Proposal Evaluation and Negotiation for Projects Technical (T) & Financial (F) and Negotions (N) Contract Implementation Contract Implementation Contract Finalization Draft Contract Page 13 NA NA NA NA 07/10/09 NA NA 07/17/09 07/24/09 NA 07/29/11 08/31/11 07/04/09 07/16/09 NA 08/07/09 08/07/09 NA NA NA NA 10/29/09 NA NA 11/05/09 11/12/09 NA 11/30/10 12/31/10 07/04/09 07/12/09 NA 07/13/09 07/13/09 NA NA NA NA 10/29/09 NA NA 11/05/09 11/12/09 NA 11/30/10 12/31/10 11/13/09 NA NA NA 11/17/09 11/21/09 NA 11/23/09 11/23/09 NA NA NA NA NA NA NA 10/29/09 NA 11/05/09 11/12/09 NA 11/30/10 12/31/10 08/03/09 NA NA NA 12/10/09 12/12/09 12/15/09 12/15/09 NA NA NA NA NA NA NA 10/29/09 NA NA 11/05/09 11/12/09 NA 11/30/10 12/31/10 12/10/09 NA NA NA 12/12/09 12/15/09 12/15/09 NA NA NA NA NA NA NA 08/19/09 08/26/09 09/02/09 09/09/09 09/16/09 NA 09/30/10 10/29/10 10/05/09 NA NA NA 10/17/09 10/18/09 NA 10/19/09 10/19/09 NA NA NA NA NA NA NA 11/13/09 NA NA 11/20/09 11/27/09 NA 11/30/10 12/31/10 NA NA NA NA 08/19/09 08/26/09 09/02/09 09/09/09 09/16/09 NA 09/30/10 10/29/10 NA NA NA NA 12/25/09 01/01/10 01/08/10 01/15/10 06/29/10 NA 07/01/10 07/01/10 12/28/09 02/09/10 03/05/10 NA 03/29/10 04/06/10 193.00 06/03/10 06/03/10 NA NA NA NA NA NA NA 08/31/10 NA NA 09/07/10 09/21/10 NA 12/31/10 01/31/11 NA NA NA NA 08/31/10 NA NA 09/07/10 09/21/10 NA 08/31/11 09/30/11 Submissio n Evaluation Report (T) No- objection Evaluatio n Report (T) Opening Financial Proposals Preparation Eval Report (T) (F) Negotiations (N) Submissio n Date No- objection Date Contract Amount in US$ '000 Contract Award Contract Signature Mobilizatio n Advance Payment Draft Report Final Report 2-3 wks 0.5-2 wks 2 wks 1-2 wks 2 wks 1-2 wks 1-2 wks 1 wk 1-3 wks 09/14/10 NA 09/30/10 10/11/10 10/18/10 NA NA 10/21/10 10/28/10 11/05/10 02/05/11 03/04/11 Proposal Evaluation and Negotiation for Projects Technical (T) & Financial (F) and Negotions (N) Contract Finalization Draft Contract Contract Implementation Page 14 10/16/09 NA 10/23/09 10/30/09 11/06/09 NA NA 11/13/09 11/20/09 12/04/09 03/04/10 04/02/10 26/8/2009 NA 27/8/2009 31/8/2009 03/09/09 NA NA 163751.78 03/09/09 04/09/09 16/9/2009 14/10/2009 01/24/11 NA 02/04/11 02/11/11 02/25/11 NA NA 03/02/11 03/09/11 03/23/11 07/29/11 08/31/11 01/24/11 NA 02/04/11 02/11/11 02/25/11 NA NA 03/02/11 03/09/11 03/23/11 07/29/11 08/31/11 11/08/10 NA 11/29/10 12/06/10 12/13/10 NA NA 12/20/10 12/27/10 01/10/11 04/29/11 05/31/11 05/24/11 05/31/11 06/10/11 06/17/11 06/30/11 07/07/11 07/14/11 07/21/11 08/01/11 08/15/11 11/15/11 12/15/11 10/15/10 NA 10/22/10 11/01/10 11/10/10 NA NA 11/17/10 11/24/10 12/08/10 03/31/11 04/29/11 12/13/10 NA 12/20/10 12/27/10 12/31/10 NA NA 01/07/11 01/14/11 01/28/11 05/16/11 06/15/11 01/11/11 NA 01/18/11 01/25/11 02/01/11 NA NA 02/07/11 02/14/11 02/28/11 06/30/11 07/29/11 10/29/10 NA 11/05/10 11/12/10 11/19/10 NA NA 11/26/10 12/03/10 12/17/10 04/15/11 05/16/11 11/25/10 12/01/10 12/08/10 12/15/10 12/22/10 12/29/10 01/06/11 01/13/11 01/20/11 02/04/11 05/31/11 06/30/11 Page 15 Description Pckage Number Prep & Submissio n by Ex Ag No- objection Date Submissio n Date No- objection Date Invitation Date Submission/ Opening Date Submissio n Evaluation Report (T) No- objection Evaluation Report (T) Opening Financial Proposals Norm Duration of Proc Steps Plan 3-6 wks 1-2 wks 1-1.5 wks 2 wks 1-2 wks 4 to 12 wks 2-3 wks 0.5-2 wks 2 wks List of Contracts Actual 1)Training on performance audit TOT x 100 Mofed/Internal Audit COPCU /T1/09 QCBS LS 20 post Plan 07/26/10 NA 08/11/10 09/06/10 09/07/10 NA 09/13/10 10/11/10 10/25/10 NA 11/01/10 Actual 2)Capacity building and practical training in demand-side FTA and methodologies for staff in the FTA Mofed & BOFED counterparts . COPCU /T2/09 SSS LS 120 post Plan 02/25/10 03/04/10 NA NA 04/05/10 NA 04/12/10 05/10/10 05/15/10 NA 05/21/10 Actual 02/24/10 03/01/10 NA NA NA NA 03/09/10 03/18/10 03/23/10 NA 03/26/10 3) Training for Internal Audit Staff to do CIA Qualification COPCU /T3/09 SSS LS 75 post Plan 02/18/10 03/04/10 NA NA 04/05/10 NA 04/12/10 05/10/10 05/24/10 NA 05/31/10 Actual 02/18/10 04/29/10 NA NA NA NA 4)Training of MOFED&BOFED IT Staff to support IBEX Rollout throgh the Nation COPCU /T4/09 QCBS LS 172 post Plan 03/18/10 04/20/10 05/27/10 06/21/10 09/07/10 NA 09/13/10 10/11/10 10/25/10 NA 11/01/10 Actual 03/18/10 04/20/10 05/27/10 06/21/10 5)Training on agricultural M&E system at all level(Federal up to woreda) COPCU /T5/09 QCBS LS 197 post Plan 09/27/10 NA 10/11/10 10/25/10 11/05/10 NA 11/12/10 12/10/10 12/21/10 NA 12/28/10 Actual COPCU /T6/09 QCBS LS 150 post Plan 10/15/10 NA 10/22/10 11/26/10 11/29/10 NA 12/06/10 01/03/11 01/17/11 NA 01/24/11 Actual Contrac t Type (Lumps um or Time- Based) Estimate d Amount in US$ '000 Consultant Proposals Request for EOI (where required) On-line UNDB Gateway Nat Press Short List Proposal Evaluation and Negotiation for Projects Technical (T) & Financial (F) and Negotions (N) Selecti on Metho d 6)Provision of training on Equipment/ Tools-ERA Lead-time before shortlist Prior/Po st Review Plan vs. Actual Preparation Request If Post-Review, No-objection Dates are not needed Channel One Program Coordinating Unit(COPCU) Procurement Plan -Goods (May ,2009--- December 31, 2011) 3-Training Ministry of Finance & Economic Development Page 16 Preparation Eval Report (T) (F) Negotiatio ns (N) Submissio n Date No- objection Date Contract Amount in US$ '000 Contract Award Contract Signature Mobilizati on Advance Payment Draft Report Final Report 1-2 wks 2 wks 1-2 wks 1-2 wks 1 wk 1-3 wks 11/09/10 11/16/10 NA NA 11/23/10 12/02/10 12/16/10 03/15/11 04/12/11 06/01/10 06/09/10 NA NA 06/13/10 06/15/10 06/25/10 07/02/10 07/20/10 04/05/10 04/05/10 04/05/10 04/08/10 37084.00 04/08/10 04/08/10 11125.00 04/30/10 04/30/10 06/09/10 06/16/10 NA NA 07/15/10 07/22/10 08/06/10 11/10/10 12/10/10 11/09/10 11/16/10 NA NA 11/23/10 12/02/10 12/16/10 03/15/11 04/12/11 01/04/11 01/11/11 NA NA 01/18/11 01/25/11 02/09/11 04/13/11 05/10/11 01/31/11 02/07/11 NA NA 02/14/11 02/21/11 03/07/11 05/31/11 06/30/11 Contract Finalization Contract Implementation Proposal Evaluation and Negotiation for Projects Technical (T) & Financial (F) and Negotions (N) Draft Contract
Groupe de la Banque mondiale · Procurement Plan
Ethiopia - Second Phase of the Protection of Basic Services Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Éthiopie
Source
Banque mondiale