Page 1 Annex 7: Updated Procurement Plan (as of April 22, 2010) Ref. No. Contract No. Contract Description Estimate Cost Procurement Method Review by Bank (Prior / Post) Invitation for Bid Contract Award / (million R MB) (million US$) (1) Shihutang Main Complex Works 1 W1 Preparation of Site 13.58 1.94 NBF/Works N/A 2 2 W2 Buildings Works of Complex ( ) 13.54 1.93 NBF/Works N/A 6 3 W3 Buildings Works in the Jian City 7.03 1.00 NBF/Works N/A 4 W4 Construction of Powerhouse and Right Part Sluices --- 517.93 73.99 ICB/Works Prior 1/16/2009 4 5 W5 Construction of Ship-lock and Rest Sluices ------- 240.24 34.32 ICB/Works Prior 1/16/2009 4 Subtotal 5contracts 5 (2) Flood Protection Works 6 W6 River Bank Protection Works in Wanhe Zhangtang 122.48 17.50 NBF/Works N/A 1 7 W7 River Bank Protection Works in Yanxi 63.65 9.09 NBF/Works N/A 1 8 W8 River Bank Protection Works in Taihe ( ) 68.34 9.76 NBF/Works N/A 1 9 W9 River Bank Protection Works in Jingtan 134.91 19.27 NBF/Works N/A 1 Subtotal 4 contract 4 (3) Complex M&E Equipment Supply 10 G1 Turbine Sets and its automation element 329.15 47.02 ICB/Goods Prior 4/23/2009 8 11 G2 Hydraulic Hoists for Flood Gates and Ship lock 41.84 5.98 ICB/Goods Prior 3/24/2010 6 12 G3 O\03VWUXFWXUH\03RI\03K\GURSRZHU\03 H\0b 03 28.78 4.11 NBF/Goods N/A 4/4/2010 13 G4 O\03VWUXFWXUH\03RI\03IORRG\03 \0b 03 62.97 9.00 NBF/Goods N/A 5/30/2009 14 G5 O\03VWUXFWXUH\03RI\03 ORFN\0b 03 17.56 2.51 ICB/Goods Prior 3/28/2010 15 G6 Speed Goveror and oil pressure unit ( ) 3.60 0.51 NBF/Goods N/A 5/30/2010 16 G7 Automatic excitation regulator 4.80 0.69 NBF/Goods N/A 5/30/2010 61573 Page 2 17 G8 Gantry Crane Crest Lifting Machinery of Powerhouse & trash Rack Equipment( ) 18.85 2.69 NBF/Goods N/A 5/30/2010 18 G9 Main Transformers 216.6 660.2 8.0 4.1 0 : \03 and other dry transformers 13.75 1.96 NBF/Goods N/A 7/10/2010 19 G10 Switchyard Equipment 10.47 1.50 NBF/Goods N/A 7/10/2010 20 G11 Isolated-phase bus 10.22 1.46 NBF/Goods N/A 6 21 G12 High/Low voltage switchgear and switch power panel / 16.23 2.32 NBF/Goods N/A 7/10/2010 22 G13 Cable for power and electric wire 16.23 2.32 NBF/Goods N/A 7/10/2010 23 G14 Relay protection systems 10.32 1.47 NBF/Goods N/A 5/30/2011 24 G15 Control Monitoring System of Complex( ) 10.52 1.50 NBF/Goods N/A 5/30/2011 25 G16 Communication System( ) 2.30 0.33 NBF/Goods N/A Cancelled and merged in G15 26 G17 Automatic Forecast of Water Situation System 304.2 472.4 8.0 4.1 0 : \03 3.65 0.52 NBF/Goods N/A Cancelled 27 G18 Installation of generating units and other M&E equipment in Hydro-plant( ) 23.90 3.41 NBF/Goods N/A 11/6/2009 28 G19 Dam Safety monitoring system 6.20 0.89 NBF/Goods N/A 11/6/2009 29 G24 Powerhouse Auxiliary Systems 4.74 0.68 NBF/Goods N/A 7/10/2010 30 G21 \10H[WLQJXLVKLQJ\03V\VWHP\03\0b 03 0.49 0.07 NBF/Goods N/A 5/20/2011 31 G24 Electrical Equipment for Ship Lock & Flood Gates 2.84 0.41 NBF/Goods N/A Cancelled and merged in G5 32 G25 Electrical Equipment of Protection Areas 6.50 0.93 NBF/Goods N/A 3/1/2009 33 G26 W\03/LIWLQJ\030DFKLQHU\\03RI\03\033URWHFWLRQ\03:RUNV\03 154.7 287.1 8.0 4.1 0 : \0b 03 4.20 0.60 NBF/Goods N/A 34 G27 Pump-set of protection areas 10.90 1.56 NBF/Goods N/A 5/30/2009 Subtotal ( ) 25contracts 25 (4) Consultant Service 35 C1 Study on Reservoir Optimizing Control 2.72 0.39 NBF/Services N/A 6/30/2009 36 C2 Research on Downstream Water Level Connection ( ) 2.49 0.36 NBF/Services N/A 12/20/2007 37 C3 Survey and Design 59.60 8.51 NBF/Services N/A 6/5/2007 38 C4 Supervision Services for Construction of W4 Supervision for major Equipments Manufacturing W4 14.91 2.13 NBF/Services N/A 1/15/2009 39 C5 Construction Supervision Services for W5 290.3 107.9 8.0 4.1 0 : \03 306.3 107.9 8.0 4.1 0 : \03 Flood Protection Works W5 5.30 0.76 NBF/Services N/A 1/15/2009 40 C6 Bidding Agent 5.10 0.73 NBF/Services N/A 12/12/2007 Page 3 41 C7 Overseas Training/Technical Assistance 283.5 705.8 8.0 4.1 0 : \03 3.56 0.51 CQS/Services Prior 11/1/2010 Subtotal 7contracts 7 Total of All 276 Total of ICB/Works 108 Total of NCB/Works 0 Total of NBF/Works 61 Total of ICB/Goods 56 Total of NCB/Goods 0 Total of NBF/Goods 39 Total of CQS Services 1 Total of QBS Services 0 Total of SOE/CQ 0 Total of NBF Services 13 Total of above 277 Total of Prior Review 164 Total of Post Review 0
Groupe de la Banque mondiale · Procurement Plan
China - Jiangxi Shihutang Navigation and Hydropower Complex Project : procurement plan
Voir le document original
Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.
Texte intégral
Informations clés
Organisation
Groupe de la Banque mondiale
Type de document
Procurement Plan
Pays
Chine
Source
Banque mondiale