 I) 75687 1 Revised Procurement Plan for next 18 months of the project Rural R oads Project 2 (PMGSY) ' This is an indicative plan prepared by the Project for the second period of 18 months (beginning June 20 12). The Project shall update the Procurement Plan annually or as needed through out the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional capacity. The Project shall implement the Procurement Plan in the manner in which it has been approved by the Bank. I. General I. Bank's approval Date of the procurement Plan November 24, 2010 2. Date of General Procurement Notice issued for Cons ultancies only: September 14, 20 I 0. Updated GPN for the complete project is to he issued. 3. Period covered by this procurement plan: Second 18 months of the project. n. Goods and Works I. Procurement Methods and Prior Review Threshold: Procurement Deci sions shall be subject to Prior Review by the Bank as stated in Appendix I to the Guidelines for Procurement. Expenditure Category Procurement Method Prior Review Threshold comments US$ GOODS, EQU IPMENT & MACHINERY I. Goods and Equ1pment ICB All contracts World Bank SBD will be used and the estimated to cost equivalent procurement will be as per procedures of US$ 300,000 or more per described in World Bank Guidelines contract . i ! 2. Goods and Equ1pment NCB F1rst contract tor goods tor The NCB biddmg document agreed w1th estimated to cost less than each state , irrespective of GOT will be used and the procurement will I US$ 300,000 and greater than value and all contracts be as per procedures described in the US$ 50,000 equivalent per estimated to cost more than Procurement and Contract Management contract US$ 200,000 equivalent per Manual contract . 3. Goods and Equipment Shopping procedure w1th All post review estimated to cost less than at least three quotations US$ 50,000 or more per from qualified bidder in contract accordance with the provisions of paragraph 3.5 of Procurement Guidelines. Procurement through DGS&D rate contracts will be considered equivalent to shopping procedure. 4. Goods and Equ1pment that Direct Contractmg All pnor rev1ew ... meet the requirements of paragraph 3.6 and 3.7 of Procurement Guidelines. CIVIL WORKS 5. Civil works contracts ICB * All contracts World Bank SBD will be used and the estimated to cost more than procurement will be as per procedures US$ 10,000,000 equivalent described in World Bank Guidelines. per contract - 6. Civil works contracts - - NCB - - Firstcontract for works for- The procurement wi ll be done as per estimated to cost up to US$ each state, irrespective of procedures described in the Procurement I 0,000,000 equivalent per value and all contracts cum Contract Management Manual and contract estimated to cost more than using the << Model Bidding Document >> US$ 5,000,000 equivalent cleared by the Bank. per contract will be subject to prior review by the Bank. All other works contracts will be subject to post review. • As per current planning, no ICB contracts are envisaged for civil works. 2. Pre-qualification. Not Applicable 3. Proposed Procedures for C DD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable 4. Reference to (if any) Project Operational/Procurement Manual: A Procurement cum Contract Management Manual has been prepared by NRRDA. The Manual has been reviewed by the Bank and clearance of the Manual given by the Bank. All procurement in the project will be done as per procedures described in it. 5. Any Other Special Procurement Arrangements: The following provisions constitute additional provisions applicable for purposes of National Competitive Bidding (NCB). NCB will be conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines and the following provisions: • Only the Model Bidding Document for procurement of works through NCB agreed with the Bank (and as amended for time to time), shall be used for bidding; • Invitations to bid shall be advertised in at least one widely circulated national daily newspaper, at least 30 days prior to the deadline for the submission of bids; · • No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state: owned enterprises, small scale enterprises or enterprises from any given State; • Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; • Extension of bid validity shall not be allowed for prior review packages, without the prior concurrence of the World Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for prior approved packages, all subsequent requests for extension irrespective of the period (such concurrence will be considered by the Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/ Employer); • Re-bidding shall not be carried out without the prior concurrence of the Bank. The system of rejecting bids outside a pre-determined margin or "bracket" of prices shall not be used in the project; • Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures. Such contracts will be acceptable however for any procurement under the Shopping procedures; • Two or three envelop system will not be used. However, as an exception in this project, two part bidding for NCB works (as described in the model bidding document) has been agreed by the Bank subject to appropriate fiduciary safeguards (e -procurement system and complaint handling mechanism acceptable to the Bank) • All procurement of works through NCB in the seven participating states will be done through a standardized e-procurement system acceptable to the Bank. • As per paragraph 1.14(e) of the World Bank's Procurement Guidelines, the Association's right to inspect the accounts and records of bidders, suppliers and contractors will be included in the bidding documents. I I l. Selection of Consultants I. Selection Methods and Prior R eview Threshold: Selection decisions shall be subject to Prior Review by Bank as stated in Appendix I to the Guidelines Selection and Employment of Consultants: rCategory -- Expenditure -1 x Selection Method Prior Review Threshold Value threshold per contract ~ Consultancy contracts to·be I Each contract estimated to cost -Quality and Cost Based (QCBS) method IAll prior review. awarded to Consultant US$ 200,000 equivalent or -REO: to be published in UNDB on line fmns more per oontract ~ch including selection of __ I training institutes by NRRDA/SRRDAs contract estimated to cost less than US$ 200,000 -Quality and Cost Based (QCBS) method t All single source selection of- - -Quality Based (QBS) method of selection consultants with estimated oost 1 Equivalent per contract in accordance with the provisions of of more than US$ 30,000 paragraph 3.1 to 3.4 ofConsultant's Iequivalent per contract will be Guidelines. subject to prior review. All -Consultant's Qualifications (CQS) method. other contracts will be subject to -Least Cost Method (LCS). post review but with TORs -Fixed Budget Method. subject to prior review by the 1 -Single Source Selection Bank lndividua:t Consultant -Through comparison of qualifications of at IAll cases subject to post review but withl estimated to cost less than least three candidates. TORs subject to prior review by the US$ 30,000 or equivalent per contract Bank. All contracts for single source I d\selection of individual consultant will Sole Source Selection be subject to prior review I 2. S hort list comprising entirely of nationa l consultants: Short list of consultants for services, estimated to cost less than US$ 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. Any Other Special Se lection Arrangements: NIL RURAL ROADS PROJECT II (P124639) Procurement [!3ckages with Methods and Time Schedule Procurement Plan with Packages & Time Schedule for 18 Months period - for CIVlL WORKS (from June 2012 to Dec. 2013) Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)* opening date Total 1 MG/06/06 Rongchadenggre to Wakantagre (upto Jamangggre) 1.807 132.996 NCB Post February - 2013 STACieared 2 MG/06/08 Joyfar to Kasra Sec I (upto Belbari) 1.700 103.266 NCB Post February- 2013 STACieared 3 MG/06/13 Hatisil to MUJI Agalgre 1.711 115.885 NCB Post February- 2013 STA Cleared 4 MG/06114 Jarnanngre to Wakantagre 6.750 418.450 NCB Post February- 2013 STACieared - 5 MG/06/20 Garobadha Rangsakona Road to Jaluagre 2.326 186.289 NCB Post February - 2013 STA Cieared 6 MG/06/11 Waknngtonggre to Gondenggre 2.935 222.134 NCB Post February- 2013 STACieared 7 MG/06/07 7th km of Ampati Boldamgre Road to Kambakpara 3.927 256.921 NCB Post February - 2013 STACleared c. 8 MG/06/09 4th km of KG Road to Dinangpara 4.779 376.205 NCB Post February- 2013 STACieared 9 MG/06/12 Kama Boldakgre to Sotmarenggre 3.714 242.482 NCB Post February- 2013 STACieared - ·---- - 1U r.IG/06/1 b Uamal As1m to Tebronggre upto D1pogre 5.847 518.429 NCB Post February- 2013 STACieared r,:Gi06/1f '~-- Pedaldoba Raksamgre Road to lvleghapara 5.284 411 192 NCB Post February- 2013 STA Cleared 12 .. r!.G/06.70 Road from NH 51 - Sammggre 1.678 187 430 NCB Post February- 2013 STACieared 13 MG/06/72 Road from 8th KM of GR Road to Sangre 3.539 231 .790 NCB Post February - 2013 STACieared 14 f,o!G/02!06 Nongspung laitmaws1ang oad to · Mawkynroh 2.591 252.855 NCB Post February- 2013 STACieared Soh10ng Par10ng Road to - Kharongai Mawlyngthoh and 1b MG/02107 3.590 444.418 NCB Post February- 2013 STACieared Wahnonobah 16 MG/02/08 Sohiong Nongspung Road to · Kyndong Wahlang 2.105 224.274 NCB Post February - 2013 STACieared 17 MG/02104 Mawryngk;Jng to- Nongthymmai Mawshun 2.500 354.594 NCB Post February - 2013 STA Cleared 18 MG/02105 Khrang - Khongthong 3.000 452.213 NCB Post February - 2013 STACieared I 19 MG/01/08 T05 to Darakona 1.650 91.378 NCB Post February- 2013 STACieared 20 MG/01/05 T02 to New Kantolguri 1.537 82.384 NCB Post February - 2013 STACieared 21 ~1G!OM05 Road from Umsiano to Amiono 16.000 1620.830 NCB Post February- 2013 STA Cleared 22 MG/04101 N.U.M.U Rd. to Korstep villaqe 5.23 546.050 NCB Post February- 2013 STACieared 23 MG.104/06 67th Km of UJ Road to Mawker 3.739 353.300 NCB Post February- 2013 STA Cleared 24 MG/04/16 Umsninq Jaqi Road to- Shlllianq Umdoh 1.780 123.360 NCB Posi February· 2013 STA Cieared 25 MG/04/08 Road from Nonolum to Umtangling 3.175 253. 180 NCB Post February - 2013 STACleared 26 MG/04/17 Road from DT Road to Madan Nonqlakhiat 3.373 147.370 NCB Post February - 2013 STACieared 27 MG/04/23 17th KM of Umsnino Jaq1 Road to - Mawkvnrono 2.500 148.650 NCB Post February- 2013 STACieared 28 MG/04/20 MMR Road to - Sohkyrbam Domphlanq 1.550 108.710 NCB Post February- 2013 STACieared Page 1 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid St.No Contract (Description) Comments Package No. KM) Method (Prior/Post)• opening date Total 29 MG/04121 MMR Road to • Gunpati 1.600 83.290 NCB Post February· 2013 STACieared 30 MG/04119 Road from NUMU Road to Umshakait 2.000 191.600 NCB Post February · 2013 STACieared 31 MG/07/01 Nayapara to Koltapara 3.000 397.053 NCB Post February · 2013 STA Cleared · 32 MG/03/05 Cons!. of a Road from Thruk to Moulhoi 13.500 1367.421 NCB Post February • 2013 STACieared 33 MG/06122 10th km of GA Road to Chondonpara 2.861 172.170 NCB Post April and May - 2013 DPR Prepared 34 MG/06/42 Joyfar to Kasra 0.989 83.108 NCB Post April and May- 2013 DPR Prepared 35 47 MG/061 121th Km of AMPT Road to Rongbakgre 2.375 140.243 NCB Post April and May - 2013 DPR Prepared 36 MG/06/43 Dalugaon to Dingkajora 1.712 140.284 NCB Post April and May - 2013 DPR Prepared 37 MG/06/97 128th KM of NH 51 to - Surunanggre 4.868 386.650 NCB Post April and May · 2013 DPR Prepared 38 MG/06/100 Road from NH 51 to - Ganol Songma 2.500 199.510 NCB Post April and May - 2013 DPR Prepared 39 MG/06/119 Road from Sanchonggre to - Galwanggre 3.232 216960 NCB Post Aplil and May- 2013 DPR Prepared 40 MG/06/130 Dollongre to- Dittegre 2.617 206.430 NCB Post April and May - 2013 DPR Prepared 41 MG/06167 Road from 60th W 1 of NH 51 to • Rondenggre 1.637 142.880 NCB Post April and Moy 20i3 DPR Prepared 42 MG/06140 Kalchenggre to Danang Songma 2.730 234.605 NCB Post April and May. 2013 DPR Prepared 43 MG/06/59 Babadam to Buripara 2.270 140 156 NCB Post April and May · 2013 DPR Prepared 44 MG/06/60 Jengjal Bazar to Jen9Jalgre (Megapgre) 2.250 168.693 NCB Post Apnl and May - 2013 DPR Prepared 4:> MG/06/63 NH-51 Road to Mrigre 5.014 437 188 NCB Post Apnl and May. 2013 DPR Prepared 46 MG106/94 Oragitok to Dulakalakgre 4096 371.950 NCB Post April and May 2013 DPR Prepared 47 MGi06,126 GSB Road to· Dipogn, - 3.792 273.400 NCB Post Apnl and May· 2013 DPR Prepared 48 MG/06/33 Jongnapara to Sindapara 2.776 203 735 NCB Post Apnl and May· 2013 DPR Prepared 49 MG/06/69 Kalchengpara to · Buchigre 7 012 759 470 NCB Post April and May 2013 DPR Prepared 50 MG/06/29 17th Km of MM Road to Mekdual Adenggre 1.929 164.675 NCB Post April and May - 2013 DPR Prepared 5th Km of Ampati Purakhasia Road to Anangpara 51 MG/06/36 1.339 93.505 NCB Post April and May - 2013 DPR Prepared Sonosarek 52 MG/06/85 8th KM of PM Road to • Gujangpara 2.431 222.310 NCB Post April and May 2013 DPR Prepared 53 MG/06150 NH-51 (Darengre PHC) to Neng)CI Bolchugre 12.195 776.048 NCB Post Apnl and May- 2013 DPR Prepared 54 MG/06/61 115th Km of NH-51 to Bokakolgre A 1.419 119.778 NCB Post April and May - 2013 DPR Prepared 55 f/~1'>~, 27 Lu...,er Dall'nggrc: to O"'degr~: 2.023 235.350 NCB Post April and May- 2013 DPR Prepared 56 MG/02107 LyngkhatTmar to Nongsohphan 3.029 304 .111 NCB Post April and May· 2013 DPR Prepared 57 MG/02116 Lynshing to Nongpyrd1 6037 767.470 NCB Post April and May 2013 DPR Prepared 58 MGI02115 Road from Rngibah to Thangbanai 3540 388 870 NCB Post April and May- 2013 DPR Prepared 59 MG/01n7 Road from Rongjeng Jambal to • Baringgre 2.000 109.280 NCB Post April and May · 2013 DPR Prepared 60 MG/01n8 Road from Gabil Bisa to - Mejolgre Wancho 6.389 1143.280 NCB Post April and May - 2013 DPR Prepared 61 MG/01/80 Road from Mangsang Makura to · Mangsang Dosikgittim 2.269 363.040 NCB Post April and May- 2013 DPR Prepared ---·· ·-·······--- ·-· - Page 2 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No - Contract (Description) Comments Package No. KM) Method (PriorfPost)• opening date Total 62 MG/01/81 Road from Mangsang Dosikgittim to - Rengkil Apal 1.682 755.620 NCB Post April and May- 2013 DPR Prepared 63 MG/01/82 Road from aringgre Wadro to - Bolkrek 4.719 542.520 NCB Post April and May- 2013 DPR Prepared 64 MG/01/84 Road from T03 to - Gandual 2.581 374.060 NCB Post April and May- 2013 DPR Prepared 65 MG/01/85 Road from L21 to - Dambo Rongjeng 4.402 681.740 NCB Post April and May- 2013 DPR Prepared 66 MG/01/87 Road from T03 to - Gabil Koksi 4.950 791.100 NCB Post April and May- 2013 DPR Prepared 67 MG/01/88 Road from Haslong to - Nagimaram 1.812 163.610 NCB Post April and May - 2013 DPR Prepared 68 MG/01114 Thapa Agitchak to Chisimari 2.219 112286 NCB Post April and May - 2013 DPR Prepared 69 MG/01/17 Bakenang Songma to Chabildam 2.108 115.527 NCB Post April and May- 2013 DPR Prepared 70 MG/01121 T01 to Gongrang 5.005 358.823 NCB Post April and May- 2013 DPR Prepared 71 MGI01/22 T04 to Samin Ch1aning 6.056 391.486 NCB Post April and May 2013 DPR Prepared 72 MG/01/60 ;:.onQsa• cazar to :::,onqsa.. JcHepa 17~ 194.310 NCB Post Aprd ana Mav- 2013 DPR Preoart:a 73 MG/01/58 L028 to Kakwa Bonegre 5.525 627.660 NCB Post Apnl and May· 2013 DPR Prepared "4 r.tG/04.'11 Road fro~1 UJ Ro d to Tihwil:h 7136 438.67<; NCB Post April and r,lay 2013 DPR Prepared l'J MG,u4. ;o 6KD Road to Nongpyroet 2.342 :..;soL r.cs Post Apnl and May .2013 DPR Prepared 76 MGI04/06 UJ Road to Lumphuid 16.123 1587.660 NCB Post April and May- 2013 DPR Prepared 77 MGI04109 Umran Diary to Rilong 5.742 471.530 NCB Post April and May - 2013 DPR Prepared 1P MG'04'14 ' Road from filh KM of BB Road to Mawthei 8.600 1-659170- NCB_ Post April and May 2013 DPR Prepared - 79 MGI04115 Road from DT Road to Sohhya 2.000 216.670 NCB Post April and May - 2013 DPR Prepared 80 MG/04/07 Pahamshru to Ranibari 2.615 214.725 NCB Post April and May- 2013 DPR Prepared 81 MG/04124 MMR Road to - Nongdom Mawpliang 2.320 205.750 NCB Post April and :;1_. 2~~3 DPR Prepar·"d _?2 !k MG/04/09 MG104122 Road from_ T03 to Umie>.!!9__ Ro3d from 3rd K1.1 ol US Road to Nartap Sohla1trim -- 4 12~ 1 - 427217 - - 7 500 552.490 NCB NCB ~- Post ~-~land May· ?013 April and May 2013 DPR Prepared DPR Prepared 84 MG/07125 AradonQa (Athiabari) to Umshiak 6.002 677.620 NCB Post Aoril and May- 2013 DPR Prepared 85 MG/07/03 Lang tor to Ksehkohmoit 2.614 202.471 NCB Post April and May - 2013 DPR Prepared 86 MG/07/05 PWD Road to Mawlumkhri (Road No.1) 4703 357.817 NCB Post April and May . 2013 DPR Prepared 87 MG/07/05 PWD Road Umsar to Lawsiet (Road No.2) 4.607 402.564 NCB Post April and May- 2013 DPR Prepared 88 MG/07/17 Myriew to Auro 5.434 448.787 NCB Post April and May - 2013 DPR Prepared 89 9o MG/07/13 f,IG/07/1.: Mawdoh to Synnia 1'0J f•.o..lvno.:o to UrlwllonQ 5.644 !>.4:>4 499.997 ~:lu.o<:J NCB NGB Post POS\ April and May 2013 Apnl ano r.ia 1 - LOb DPR Prepared OPR Prepareo -- 91 MG/03/01 Construc11on o! road from Mustem to lonQnoh 4.800 294.250 NCB Post Apnl and May- 2013 DPR Prepared 92 MG/03/01 Umlatdoh to Ummat 6.183 561.290 NCB Post April and May - 2013 DPR Prepared ~ MG/03/02 PWD Road to KhfiehmvntrianQ 2.974 213.490 NCB Post Aoril and Mav- 2013 DPR Prepared Total: 367.453 ~3794.096 94 17th km of AP Road to Boldakore 2.00 154 38 NCB Post JunP and July - 2013 DPRs ar~: lJeino prepared by DPR Consultants 95 10th Km. of AM Road to Punchapara 3.00 231 57 NCB Post June and July 2013 DPRs are beinq prepared by DPR Consultants 96 681h Km. of NH-51 IBolbokoreJ Phase-11 to Wariseoore 2.00 15438 NCB Post June and July • 2013 DPRs are being prepared by OPR Consultants 97 Ronoram Phulbari Hill Road to AmpangQre 3.50 ?70 165 NCB Post June and July- 2013 DPRs are bemo prepcued by DPR Consultants 98 GSB Road lo DamaiQre 2.00 154.38 NCB Post June and Julv 2013 DPRs are beinQ prepared bv DPR Consultants 99 Lower Rengsinpara to Tosinpara 14.00 1080.66 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 100 AMPT Road to Daldaqre 3.00 231.57 NCB Post June and July - 2013 DPRs are beino prepared by DPR Consultants . 101 ... - 18th KM. of AP Road to Badupara 5.00 385.95 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants Page 3 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)* opening date Total 102 Bandalkona to Dalbotpara 4.00 30876 NCB Post June and July· 2013 DPRs are beina prepared by DPR Consultants 103 Balachanda to Rabhakona (Kittipara) 3.00 231.57 NCB Post June and Julv- 2013 DPRs are beina oreoared bv DPR Consultants 104 11th Km of GA Road to Samati 5.50 424.545 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 105 3rd Km. of Garabadha Ranasakona Road to Watreare 3.00 231.57 NCB Post June and Julv • 2013 DPRs are beina oreoared bY DPR Consultants 106 Haldibari to Dodoretare 3.00 231.57 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 107 Ronachuare to Meaonaare 6.00 463.14 NCB Post June and Julv - 2013 DPRs are beina oreoared bY DPR Consultants 108 14th km KG Road to Ronoseoore 5.00 385.95 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 109 Damal Asimare to Amonaare 11.70 903.123 NCB Post June and Julv - 2013 DPRs are beino oreoared bY DPR Consultants 110 5th Km. of AMPT road( Belbari) to Upper Rimbiare 6.00 463.14 NCB Post June and Julv- 2013 DPRs are beina prepared by DPR Consuttants 111 Pedaldoba Raksamare Road to Bolchu Katonare 4.00 308.76 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 112 Dilsiare to Sonamaranaare 8.00 617.52 NCB Post June and Julv - 2013 DPRs are beina oreoared bY DPR Consultants 113 Hatuaaon to Borobakra 2.00 15438 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 114 Tikrikilla to Kodamsali 1.50 115.785 NCB Post June and Julv - 2013 DPRs are beino oreoared bv DPR Consultants 115 Selsella Chamaauri Road to Marak 3.50 270.165 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 116 10th km of Dam.,lgre Mellim Boldamgre Road to Daron9gre 4.00 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 308.76 117 13th km of AP Road to Nachilpara 3.00 231.57 NCB Post June and Julv- 2013 DPRs are beina prepared by DPR Consultants 118 Manachim to Bolbokare 3.00 231.57 NCB Post June and Julv - 2013 DPRs are beina prepared by DPR Consultants 119 65th km of NH-51 Road to 'Chiokare 2.00 154.38 NCB Post June and Julv- 2013 DPRs are beina oreoared bv DPR Consultants 120 Betasina Bazar Banduraia Road to Arenaare 400 308.76 NCB Post June and July- 2013 DPRs are beina prepared by DPR Consultants 121 72nd km of AMPT Road to Dipkaiaaon 3.00 231.57 NCB Post June and Julv- 2013 DPRs are beino oreoared bv DPR Consultants 122 Nenakalpara to Okanaare 3.50 270.165 NCB Post June and July- 2013 DPRs are beina prepared by DPR Consultants 123 Bandalkona to JelbonaPara Sonoma A 3.00 231.57 NCB Post June and Julv - 2013 DPRs are beino oreoared bY DPR Consultants 124 3rd km of Garobadha Amoati Road to DuauriPara 3.00 231.57 NCB Post June and July· 2013 DPRs are beina prepared by DPR Consultants 125 Gimbil Aaalare to Renchiare 5.00 385.95 NCB Post June and Julv - 2013 DPRs are beino oreoared bv DPR Consultants 126 16th of AP Road to Kerupara 4 00 308.76 NCB Post June and July- 2013 DPRs are beina prepared by DPR Consultants 127 Debraare to Tepatanaare 11.00 849.09 NCB Post June and Julv- 2013 DPRs are beino oreoared bv DPR Consultants 128 Rohanpara to Naronaare 10.00 771.9 NCB Post June and Julv- 2013 DPRs are beina prepared by DPR Consultants 129 Dadenaare to Satiare 4.00 308.76 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 130 DaiQre to Menaaotchiare 4.00 308.76 NCB Post June and July- 2013 DPRs are beina orepared by DPR Consultants 131 Romiora to Reniare 3.00 231.57 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consuttants 132 Kentaoara to Renabonaare 10.00 771.9 NCB Post June and JulY - 2013 DPRs are beina Prepared bY DPR Consuttants 133 13th km of M.M. road to Kulioiri 3.00 231.57 NCB Post Aua and Sept.- 2013 DPRs are beina prepared by DPR Consultants 134 Ronaram Phulbari hill road to Dokaramare 2.00 154.38 NCB Post Aua and Seot. - 2013 DPRs are beina oreoared bv DPR Consultants 135 3rd km of Anchenaare Sandaare road to Dabelaqre 3.00 231.57 NCB Post Aua and Sept. - 2013 DPRs are beina prepared by DPR Consultants 136 21st km of K.G. road to Durapara 2.00 154.38 NCB Post Aua and Seot.- 2013 DPRs are beino oreoared bv DPR Consultants 137 8th km of A.P. road to Dinapara 2.00 154.38 NCB Post Aua and Sept. - 2013 DPRs are beina prepared by DPR Consultants 138 AMPT road to Bolaanaare 2.00 154.38 NCB Post Aua and Seot. - 2013 DPRs are beinq prepared by DPR Consultants 139 Ronqsai Boriora road to Dalchenqkona 4.50 347.355 NCB Post Aua and Sept. - 2013 DPRs are beina orepared by DPR Consultants 140 Dokaare to Dabakare 8.00 617.52 NCB Post Aua and Sept. - 2013 DPRs are beinq prepared by DPR Consultants 141 121st km of AMPT road to Bollonqqre 5.00 385.95 NCB Post Aua and Sept. - 2013 DPRs are beina prepared by DPR Consultants 142 8th km of P.M. road to Guianqpara 3.50 270.165 NCB Post Aua and Seot.- 2013 DPRs are beino oreoared bY DPR Consultants 143 Pe(ll~~ngaJQ~Qngjalgre 8.00 617.52 NCB Post Auq and Sept.- 2013 DPRs are beinq prepared by DPR Consultants Page 4 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)* opening date Total 144 11th km of K. G. road to Paqlapara 2.00 154.38 NCB Post AuQ and Sept. - 2013 DPRs are beinq prepared by DPR Consultants 145 Upper WatreQre to Didapara Sonqqitcham 4.00 308.76 NCB Post AUQ and Sept.- 2013 DPRs are being prepared by DPR Consultants 146 10th km or Sesengpara Kherapara road to Ranggapara 8.00 NCB Post Aug and Sept- 2013 DPRs are being prepared by DPR Consultants 617.52 147 Gimbil Agal to Dodanggre 6.00 463.14 NCB Post Auq and Sept.- 2013 DPRs are beinQ prepared by DPR Consultants 148 Raksamqre to Laskorpara (Garo) 3.00 231.57 NCB Post Aug_ and Sept. - 2013 DPRs are being prepared by DPR Consultants 149 Dakop to Matcho Sonqram 3.00 231.57 NCB Post AUQ and Sept.- 2013 DPRs are beinq prepared by DPR Consultants 150 Dabakqre Gonda Sonqqitcham to Dabanqqre 3.00 231.57 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants 151 Chidekgre to Wadagre 7.00 540.33 NCB Post AUQ and Sept.- 2013 DPRs are beinq prepared by DPR Consultants 152 Arnpati Civil Sub-Division to Bangkapara 2.00 154.38 NCB Post Auq and Sept.- 2013 DPRs are beinq prepared by DPR Consultants 153 Ronqsakqre to Rabonqqre 2.00 154.38 NCB Post gand Sept- 2013 Au_ DPRs are being prepared by DPR Consultants 154 Jangrapara to Balsatgre 8.00 617.52 NCB Post Auq and Sept.- 2013 DPRs are beinq prepared by DPR Consultants 155 Gimbil AQalto Cheran Sonqmaqre 4.00 308.76 NCB Post Aug and Sept- 2013 DPRs are being prepared by DPR Consultants 156 GSB road (Khalpara) to Oalanqsa 6.00 463.14 NCB Post Auq and Sept· 2013 DPRs are beinq prepared by DPR Consultants 157 4th Km of Kherapara Chenqapara road to Pathanoore 10.00 771.9 NCB Post Aug and Sept. • 2013 DPRs are beinq prepared by DPR Consultants 158 Aduqre Purakhas1a road to Tochapara 3.00 231 57 NCB Post Auq and Sept • 2013 DPRs are beinq prepared by DPR Consultants 159 AMPT road to ManqrUQre 5.00 385.95 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants 160 L-025 (Ba1amara Mangchim road) to Belbari 3.00 231 .57 NCB Post AUQ and Sept.- 2013 DPRs are beinq prepared by DPR Consultants 161 6th Km of PM road to Bakdaqre 3.00 231 .57 NCB Post Aug and Sept.· 2013 DPRs are beinq prepared by OPR Consultants 162 Juriqaon to Balbalqre 2.00 154.38 NCB Post Auq and Sept. • 2013 DPRs are beinq prepared by DPR Consultants 163 Ronqram Phulbari hill road to ChiQitchakgre 3.00 231.57 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 164 Damal Asim Amonqqre road to Balsatqre 3.00 231.57 NCB Post AUQ and Sept • 2013 DPRs are beinq prepared by DPR Consultants 165 1st Km of Aduqiri Purakhasia road to Darak Ak<>nggre 1.50 115.785 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants 166 Asimqre Ia Derinqoaoi'e 300 23157 NCB Post AUQ and Sept.- 2013 DPRs are beinq prepared by DPR Consultants 167 2nd Km of Rom Bazar Gambaregre road to Rom Sangsilgre 3.00 NCB Post Aug and Sept. • 2013 DPRs are being prepared by DPR Consultants 231.57 Holdibari Rochonpara (from Rochonpara Side) road to 168 4.00 NCB Post Aug and Sepl- 2013 DPRs are bemg prepared by DPR Consultants Nisinipara 308.76 169 Mekmakgre to Sampalgre 4.00 308.76 NCB Post Auq and Sept.- 2013 OPRs are beinq prepared by DPR Consultants 170 Masanqpani to Demdema 3.00 231.57 NCB Post Auq and Sept.· 2013 DPRs are beinq prepared by DPR Consultants 171 AMPT road to Gomaijhora Garo 2.00 154.38 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 172 Asirnqre to Deringqaqre 4.00 308.76 NCB Post AUQ and Sept. - 2013 DPRs are being prepared by DPR Consultants 173 Ampati Mellim road to Santapara 4.00 308.76 NCB Post Aug and Sept - 2013 DPRs are beinq prepared by DPR Consultants 174 24th Km of Ampati Purakhasia road to Rimranqpara 2.00 154.38 NCB Post Oct. and Nov. - 2013 DPRs are being prepared by DPR Consultants 175 14th Km of Ampati Purakhasia road to Kimdeqre 3.00 231.57 NCB Post Oct. and Nov.- 2013 DPRs are beino prepared by DPR Consultants 176 WatreQre to Nenqkaklre 6.00 463.14 NCB Post Oct. and Nov.- 2013 DPRs are beinq prepared by DPR Consultants 177 Janqrapara to JengritQiri 10.00 771.9 NCB Post Oct. and Nov.- 2013 DPRs are beinq prepared by DPR Consultants 178 14th Km of KG road to Ro_ ngsepgiri 5.50 424.545 NCB Post Oct. and Nov. - 2013 DPRs are beinq prepared by DPR Consultants 179 Haldibari to Asirnqre 3.00 231.57 NCB Post Oct. and Nov.- 2013 DPRs are beinq prepared by DPR Consultants 180 Kalchenqpara to Marakapara 3.00 231.57 NCB Post Oct. and Nov.- 2013 DPRs are beinq prepared by DPR Consultants 181 Damal Asim to AiQre SonqQitcham 4.00 308.76 NCB Post Oct. and Nov.· 2013 DPRs are beinq prepared by DPR Consultants 182 GSB road to Boldakqre 8.00 617.52 NCB Post Oct. and Nov.- 2013 DPRs are being prepared by DPR Consultants 183 Rooqram Phulbari Hill road to Shekapara 5.00 385.95 NCB Post Oct. and Nov. • 2013 DPRs are beinq prepared by DPR Consultants Page 5 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)* opening date Total 184 15th Km of AP road to Chooapara 6.00 463.14 NCB Post Oct. and Nov. - 2013 DPRs are beina prepared byDPR Consuttants 185 Gimbil Agal to Cheran Songmagre 8.00 617.52 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 186 Cheran SongmaQre to Chisikgre 2.00 154.38 NCB Post Oct. and Nov. • 2013 DPRs are beinQ prepa.red by DPR Consultants 187 L-027 to lapdkoh (Mawjam) 10.00 1225.400 NCB Post Oct. and Nov.- 2013 DPRs are being prepared by DPR Consultants 188 L-042 to Ryngkya 4.90 600.446 NCB Post Oct. and Nov. • 2013 DPRs are being prepared by DPR Consultants 189 L-041 to Lumdiengsai 5.00 612.700 NCB Post Oct. and Nov. - 2013 DPRs are being prepared by DPR Consultants 190 T-01 to Mawiong 1.50 183.810 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 191 T-01 to Nonglyngkien 5.10 624.954 NCB Post Oct. and Nov. · 2013 DPRs are being prepared by DPR Consultants 192 Wahsherkhmut to Korblang 2.00 245.080 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 193 L-023 to Nongthymmai 6.00 735.240 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 194 T - 03 to Kshaid 5.00 612.700 NCB Post Oct. and Nov. - 2013 DPRs are be1ng prepared by DPR Consultants 195 L - 024 to Nongthymmai 2.00 245.080 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 196 T - 02 to Diengkynthong 2.00 245.080 NCB Post Oct and Nov. • 2013 DPRs are being prepared by DPR Consultants 197 Sonatola to Kasudok 8.00 980.320 NCB Post Oct and Nov.· 2013 DPRs are being prepared by DPR Consultants 198 T - 02 to Th1ed d1eng Nongrim 10.00 1225.400 NCB Post Oct and Nov.- 2013 DPRs are being prepared by DPR Consultants 199 T-03 to Mawdon 4.10 502.d14 NCB Post Oct. and Nov • 2013 DPRs are being prepared by DPR Consultants 200 L - 026 to Laitlulong Sec - II 2.00 245.080 NCB Post Oct. and Nov.· 2013 DPRs are be1ng prepared by DPR Consultants 201 T-01 to Jaud 3.00 367.620 NCB Post Oct. and Nov. - 2013 DPRs are being prepared by DPR Consultants 202 L - 029 to Lyngwa 3.00 367.620 NCB Post Oct. and Nov.- 2013 DPRs are being prepared by DPR Consultants 203 T - 03 to Kamohi 2.80 343.112 NCB Post Oct. and Nov.· 2013 DPRs are bemg prepared by DPR Consultants 204 ~1awsmai Sheila to Mawsmai Cave 2.00 245.080 NCB Post Oct. and Nov • 2013 DPRs are being prepared by DPR Consultants 205 Mawkhap to NonQiri 4.00 490.160 NCB Post Oct and Nov • 2013 DPRs are beina prepared by DPR Consultants 206 l-022 to Sohkynduh 2.50 306.350 NCB Post Oct. and Nov • 2013 DPRs are being prepared by DPR Consultants 207 L-038 to Kalatek 5.00 612.700 NCB Post Oct. and Nov.- 2013 DPRs are beino prepared by DPR Consultants 208 T-02 to Mawryngkhong 5.00 612.700 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 209 L-042 to Thliewumtham 100 122.540 NCB Post Oct and Nov. - 2013 DPRs are beina prepared by DPR Consultants 210 T-03 to Sinal Mawshynrut 3.00 367.620 NCB Post Ocl and Nov • 2013 DPRs are being prepa.red by DPR Consultants 211 T-01 to Mawrvnakana . 8.50 1041.590 NCB Post Oct and Nov - 2013 DPRs are belnQ prepared by DPR Consultants 212 T-04 to Telsora 10.00 1225.400 NCB Post Oct. and Nov.- 2013 DPRs are being prepared by DPR Consultants 213 Rongsak Songgitalto Suchilgre 3.00 332.88 NCB Post Oct. and Nov. · 2013 DPRs are be1ng prepared by DPR Consultants 214 Meqhaori Sonooitalto Dilma Debragre 8.00 887.68 NCB Post Dec. and Jan - 2014 DPRs are beino prepared by DPR Consultants 215 Rongrenggre to Akelgre 6.00 665.76 NCB Post Dec. and Jan· 2014 DPRs are being prepared by DPR Consultants 216 T03 to NeOQkrah WatreQre 4.00 443.84 NCB Post Dec. and Jan- 2014 DPRs are beina prepared by DPR Consultants 217 Chekwebibra to Rongbing Boldak 9.00 998.64 NCB Post Dec. and Jan • 2014 DPRs are being prepared by DPR Consultants 218 Chiminminare to Kakwa Duragre 4.00 443.84 NCB Post Dec. and Jan· 2014 DPRs are beino prepared by DPR Consultants 219 Mingkrak to Dochisoram 2.50 277.4 NCB Post Dec. and Jan- 2014 DPRs are being prepared by DPR Consultants 220 Tanoba to Aruak 3.00 332.88 NCB Post Dec. and Jan - 2014 DPRs are beino prepared by DPR Consultants 221 Silkigre to Jalkim 5.00 554.8 NCB Post Dec. and Jan - 2014 DPRs are being prepared by DPR Consultants 222 T04 to TebroOQpara 4.00 443.84 NCB Post Dec. and Jan - 2014 DPRs are beina oreoa.red by DPR Consultants 223 Sakware Songgital to Gorok 3.00 332.88 NCB Post Dec. and Jan- 2014 DPRs are being prepared by DPR Consultants Page 6 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Postj> opening date Total 224 Chilpara to lower Bolmedam 4.50 499.32 NCB Post Dec. and Jan· 2014 DPRs are being prepared by DPR Consultants 225 T04to Tengasot 2.00 221.92 NCB Post Dec. and Jan· 2014 DPRs are being prepared by DPR Consultants 226 Menadoba to Mancheng 2.00 221.92 NCB Post Dec. and Jan · 2014 DPRs are beino prepared by DPR Consultants 227 Rajasimla Songma to Rongdal Atimbo 9.00 998.64 NCB Post Dec. and Jan· 2014 DPRs are beinq prepared by DPR Consultants 228 Dochisoram to Waramia 2.00 221.92 NCB Post Dec. and Jan· 2014 DPRs are beina prepared by DPR Consultants 229 Agropatal to Nengbak Wapil 5.00 554.8 NCB Post Dec. and Jan • 2014 DPRs are be1nQ prepared by DPR Consultants 230 Chima Aoa to Arai Apal 3.00 332.88 NCB Post Dec. and Jan • 2014 DPRs are being prepared byDPR Consultants 231 Upper Bolmedam to Rongmatchu 3.00 332.88 NCB Post Dec. and Jan • 2014 DPRs are beina prepared by DPR Consultants 232 T04 to Chilpara Reserve 3.00 332.88 NCB Post Dec. and Jan· 2014 DPRs are being prepared by DPR Consultants 233 Rongdu HaslonQ to Dabitoittim 9.00 998.64 NCB Post Dec. and Jan · 2014 DPRs are beino prepared by DPR Consultants 234 lmbanggi to Chikal Songma 21.00 2330.16 NCB Post Dec. and Jan · 2014 DPRs are beinQ prepared by DPR Consultants 235 MeioiQre Mancho to Jalwaori Sonoita! 8.50 943.16 NCB Post Dec. and Jan· 2014 DPRs are being prepared by DPR Consultants 236 T03 to Chikama 4.00 443.84 NCB Post Dec. and Jan • 2014 DPRs are being prepared by DPR Consultants 237 T06 to Damit Aaa IMatchakoll 3.00 332.88 NCB Post Dec. and Jan· 2014 DPRs are be1ng prepared by DPR Consultants ?38 L211o Panqsudam 4.40 488.224 NCB Post Dec. and Jan· 2014 DPRs are beinq prepared by DPR Consultants 239 l21 to Nisamoram Babupara 3.00 33288 NCB Post Dec and Jan ~ 2014 DPRs are beinQ prepared by DPR Consultants 240 Raksam Songma to Raksam Sonamaore 3.00 332.88 NCB Post Dec. and Jan· 2014 DPRs are beina prepared by DPR Consultants 241 T04 to Bolsong Kama 2.00 221.92 NCB Post Dec. and Jan • 2014 DPRs are beinq prepared by DPR Consultants ?42 T06 to Danqra Sonqma 7.00 776.72 NCB Post Dec. and Jan • 2014 DPRs are beinq prepared by DPR Consullants 243 l21 to Guresimram 9.00 998 64 NCB Post Dec and Jan· 2014 DPRs are being prepared by DPR Consullants 244 T01 to Gambit Aqa 10.00 1109.6 NCB Post Dec. and Jan • 2014 DPRs are beina prepared by DPR Consullants 245 T05 to Gondonggre 2.50 277 4 NCB Post Dec and Jan • 2014 DPRs are beinq prepared by DPR Consultants 246 RanQaqora to DuionQre 2.00 221.92 NCB Post Dec. and Jan • 2014 DPRs are beinQ prepared by DPR Consultants 247 T04 to Tatolg ri 1.50 166.44 NCB Post Dec and Jan· 2014 DPRs are being prepared by DPR Consultants 248 T04 to DalmangQre 5.50 610 28 NCB Post Dec and Jan • 2014 DPRs are be1na prepared by DPR Consultants 249 l35 to Chipakram 2.00 221 .92 NCB Post Dec. and Jan • 2014 DPRs are being prepared by DPR Consultants 250 T02 to Dilma Reiakqittim 1.50 166.44 NCB Post Dec. and Jan • 2014 DPRs are beinq prepared by DPR Consultants 251 Wagopgre to Rongdolgre 4.00 443.84 NCB Post Dec. and Jan· 2014 DPRs are beinq prepared by DPR Consultants i 252 Ronaap to Ronaap Sonqitcham 3.00 332.88 NCB Post Dec. and Jan • 2014 DPRs are beina prepared by DPR Consultants 253 Boneqre to Asil Songrtal 10.53 1168.409 NCB Post Dec and Jan· 2014 DPRs are being prepared by DPR Consullants ' 254 Gabil Sonqitcham to Gra Sonoitcham 6.00 665.76 NCB Post Feb and Mar· 2014 DPRs are beinq prepared bv DPR Consultants ' 255 DaQal Apal to Bijasik Matwa 8.00 887.68 NCB Post Feb and Mar· 2014 DPRs are beinq prepared by DPR Consultants 256 T03 to Joooori 3.00 332.88 NCB Post Feb and Mar· 2014 DPRs are be1ng prepared by DPR Consultants 257 Bolpuma to Dalbot Ronabok 3.00 332.88 NCB Post Feb and Mar • 2014 DPRs are beina prepared by DPR Consultants 258 l36 to Dalbo! Nokat 4.50 499.32 NCB Post Feb and Mar· 2014 DPRs are being prepared by DPR Consultants 259 Akarok to Akarok SonaQital 6.00 665.76 NCB Post Feb and Mar · 2014 DPRs are beina prepared by DPR Consultants 260 T03 to Rem Matchakolgre 4.00 443.84 NCB Post Feb and Mar· 2014 DPRs are beinq prepared by DPR Consultants 261 T04 to Daoal Samity 3.00 332.88 NCB Post Feb and Mar· 2014 DPRs are beina prepared by DPR Consultants 262 Ronqchek to Rongchek SongQital 3.00 332.88 NCB Post Feb and Mar · 2014 DPRs are beinQ prepared by DPR Consultants 263 Dobu Aoalqri to Dobu Achakoek 4.00 443.84 NCB Post Feb and Mar · 2014 DPRs are beina prepared by DPR Consultants 264 Danqkonq Rabha to lmbanqqi 3.00 332.88 NCB Post Feb and Mar· 2014 DPRs are belnq prepared by DPR Consultants 265 Kharkutta to Kama Gandim 3.00 332.88 NCB Post Feb and Mar· 2014 DPRs are beina prepared by DPR Consultants 266 l24 to Rongpetchi Bolsadam 2.00 221.92 NCB Post Feb and Mar · 2014 DPRs are being prepared by DPR Consultants 267 T04 to Denonangqre 10.00 1109.6 NCB Post Feb and Mar • 2014 DPRs are beina prepared by DPR Consultants Page 7 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)* opening date Total 268 T05 to Son~meqap 4.70 521.512 NCB Post Feb and Mar- 2014 OPRs are beill<l prepared by DPR Consultants 269 BakenallQ SollQma to Chabildam 2.00 221 .92 NCB Post Feb and Mar- 2014 DPRs are being prepared by DPR Consultants 270 T04 to Cheran Chikol 9.00 998.64 NCB Post Feb and Mar - 2014 DPRs are beir1<1 prepared by DPR Consultants 271 Tebil Bonoore to Barikare 7.00 776.72 NCB Post Feb and Mar - 2014 OPRs are being prepared by OPR Consultants 272 Bolmeram Ankekol to Napak Son~ma 7.00 776.72 NCB Post Feb and Mar - 2014 DPRs are beinQ prepared by DPR Consultants 273 Nenamandalare to Mandalare 23.00 2552.08 NCB Post Feb and Mar - 2014 DPRs are bein~ prepared by DPR Consultants 274 Cheran~re to Sisobibra 8.00 887.68 NCB Post Feb and Mar- 2014 DPRs are beina prepared by DPR Consultants 275 JinanarOQre to Dinaminaare 10.00 1109.6 NCB Post Feb and Mar - 2014 DPRs are bein~ prepared by DPR Consultants 276 Ron~sak Bazar to Dinaiekqre 10.00 1109.6 NCB Post Feb and Mar - 2014 DPRs are beina prepared by DPR Consultants 277 Gittinggre to Chibrenggre 7.00 540.33 NCB Post Feb and Mar - 2014 DPRs are beinQ prepared by DPR Consultants 278 T-01 to SudUQre 11.40 879.966 NCB Post Feb and Mar - 2014 DPRs are being prepared by DPR Consultants 279 31st Km of Deku-Dimapara to Mequa AbaQre 1.20 92.628 NCB Post Feb and Mar - 2014 DPRs are beina prepared by DPR Consultants 280 Siiu GarlQ Awe to Siju Rongkugittim 2.70 208.413 NCB Post Feb and Mar- 2014 DPRs are beillQ prepared by DPR Consultants 281 Nen~kona Sonamon~ to Upper Dos~re 960 741.024 NCB Post Feb and Mar- 2014 DPRs are beillQ prepared by DPR Consultants 282 Ronaara to Tardang 8.00 617.52 NCB Post Feb and Mar 201 4 DPRs are beinq prepared by DPR Consultants 283 Mrndikqre to Gar a SonQQrtal 5.00 385.95 NCB Post Feb and Mar 2014 DPRs are beina prepared by DPR Consultants 284 Era aning to Sadri Rongdong Awe 6.40 494.016 NCB Post Feb and Mar - 2014 DPRs are bein~ prepared by DPR Consultants 285 Jarsruql!trm to Daranq Boldak 10.90 841 371 NCB Post Feb and Mar- 201 4 DPRs are bemg J)repared by DPR Consultants 286 T-01 to AlokphaOQ SollQnfOno 6.50 501 735 NCB Post Feb and Mar 2014 OPRs are beillQ prepared by DPR Consultants 287 NH-40 to Nonqbirlum 5.000 437.6 NCB Post Feb and Mar - 201 4 DPRs are beirlg prepared by DPR Consultants 288 UJ road to Pamlathar 7 000 612.64 NCB Post Feb and Mar - 2014 DPRs are beillQ prepared by DPR Consultants 289 UBU road to UmkakrQ h (Pamkroh) 5.000 437.6 . NCB Post Feb and Mar- 201 4 DPRs are being prepared by DPR Consultants I -\00-- 290 291 M M R road to Gunpalr M M road to Nonadbm MawplianQ - 2.000 131 28 17504 NCB NCB Post Post Feb and Mar 2014 Feb and Mar- 2014 DPRs are beinq prepared by DPR Consultants DPRs are beina prepared by DPR Consultants 292 Umsohbar to Belakhowa 6.00 525.12 NCB Post Feb and Mar - 2014 DPRs are bemq prepared by DPR Consultants 293 Mawskerthem Mawskerlum 8.00 70016 NCB Post Feb and Mar- 2014 DPRs are beinQ prepared by DPR Consultants 294 BOD Road to Upper Balian 2.00 17504 NCB Post April and May- 2014 DPRs are beillQ prepared by DPR Consultants 295 Mawnai to Shyiapiarain 3.00 279.18 NCB Post April and Mav- 2014 DPRs are being prepared by DPR Consultants 2C" _') PWD Road to Mawt,khar 4.00 372.24 NCB Post April and May- 2014 DPRs are beillQ prepared by DPR Consultants 297 Wahrrt to Phudbah 2.00 186.12 NCB Post April and May - 2014 DPRs are bemgprepared byDPR Consultants 2<18 !viMRRoad (Maroid)to Kvnruil 2.00 186.12 NCB Post April and May- 2014 DPRs are beinq prepared by DPR Consultants ~ -?'·~ - __ __ _ ~41h '' m of · 13ir'nQ-K'£pshi ~d. to Umthied Bvnther 4.00 372.24 NCB Post April and May- 2014 DPRs are being prepared by DPR Consultants ~"') l)"n=khl<lw to Mawblei-8 4.00 372.24 NCB Post April and May- 2014 DPRs ar& beina prepared by DPR Consultants J01 Umiarain to Lawble• 3.50 325.71 NCB Post April and May 2014 DPRs are beinq prepared by DPR Consultants 302 Phobaud (Mawrap) to Mawkyrwanq 12.00 1116.72 NCB Post April and May- 2014 DPRs are berrlQ prepared bv DPR Consultants 303 Mawphankhrew to Nongmawlein 2.00 186.12 NCB Post Apnl and May - 2014 DPRs are beillQ prepared by DPR Consultants 304 66111 km of MP Rd. Mawkhlaitngap to Mawpat 2.00 186.12 NCB Post April and May- 2014 DPRs are being prepared by DPR Consultants 305 Non~iri to Misei 5.00 465.3 NCB Post April and May - 2014 DPRs are beinq prepared by OPR Consultants 306 T03 to Swanqre 3.00 279.18 NCB Post April and Mav - 2014 DPRs are beinq prepared by DPR Consultants 307 Umdang to Jaiaw 12.00 1116.72 NCB Post April and May - 2014 DPRs are beinq prepared by DPR Consultants 308 Lanqja (Sec- II) to Tynqhor 2.00 186.12 NCB Post April and Mav- 2014 DPRs are beinq prepared by OPR Consultants 309 Pvndenumiarain to Nonarvnniana 4.00 372.24 NCB Post April and May- 2014 DPRs are being prepared by DPR Consultants 310 Rambrai to Mawrok 10.00 930.6 NCB Post April and May- 2014 DPRs are beino prepared bv OPR Consultants Page 8 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid St.No Contract (Description) Comments Package No. KM) Method (Prior/Post)' opening date Total 311 Upper Puksora to East Gulsora 5.00 465.3 NCB Post April and May - 2014 DPRs are beinq prepared by OPR C nsultants 312 MBGM Rd. to Koraibari 5.00 465.3 NCB Post Aoril and May- 2014 DPRs are beinq preoared by DPR C nsultants 313 Umpunq to Pynden-sohsham 2.00 186.12 NCB Post April and May- 201 4 DPRs are beinq prepared by DPR C. nsultants 314 Mawpud to Thiepbamon 2.80 260.568 NCB Post Aoril and May- 2014 DPRs are beinq prepared by OPR C •nsultants 315 Phlanqdiloin to Nonqmluh 6.00 558.36 NCB Post April and May- 2014 DPRs are beinq prepared by DPR C •nsullants 316 Nongum/Nongjlak to Mawkhlie 10.00 9306 NCB Post Aoril and May- 2014 DPRs are beinq prepared by DPR C •nsultants 317 Nonqkasen to Khvllem T.ehsaw 4.00 372.24 NCB Post April and May- 2014 DPRs are beillCI prepared by DPR C •nsultants I 318 Kynshi to Mawlangren 2.00 186.12 NCB Post April and May- 2014 DPRs are being prepared by DPR C •nsultants 319 Shnqimawlein to Sohma 4.268 397.18008 NCB Post April and May · 2014 DPRs are beinq prepared by DPR C •nsultants 320 T-08 (Pamphyrnai) to Ksehkohlonq 2.00 186.12 NCB Post April and May - 2014 DPRs are being prepared by DPR C• 1nsultants 321 L021 INonqstoin Rambrai road) to Mawphansviar 3.00 279.18 NCB Post Aoril and May- 2014 DPRs are beinq prepared by DPR C. 1nsultants 322 UmpoflCidellCI to Patharshipiah 6.00 558.36 NCB Post April and May - 2014 DPRs are beillCI prepared by DPR C. 1nsultants 323 Nongthymmai to Domshken 3.00 279.18 NCB Post Aoril and May - 2014 DPRs are beinq Prepared by DPR C. "'lSUitants 324 SohhyllenQ to Amarsanq 500 465.3 NCB Post April and May • 2014 DPRs are beinq prepared byDPR C. 1nsultants ...11L Umpclem to Umthlu 6.00 55836 NCB Post Apnl and May· 2014 DPRs are being prepared by DPR C nsultants .>2b Borqhat l:ionapur Road to Letn 200 1i/.'J NCB Post Apnl and May. 2014 DPRs are bemq prepared by DPR C. IOSUitants 327 Borqhat Sonapur Road to Lahalein 200 177 5 NCB Post April and May- 2014 DPRs are being prepared by DPR Cc: 1nsultants 32S Jo,·..•1 Khaoduli Road to Rtiilnasanphaw 10.00 887.5 NCB Post to.onl an! 1.1ay 2014 DPRs are beina prepared by DPR C< IOSUitants ~~ Jo:Jai Khanduli Road to t.~ukoiram 5.00 443 75 NCB Post Aonl znd f.1ay - 2014 DPRs are beinq prepared by DPR o- 1nsuttants r-oo Ce>adon1.1 to r.ladanoohksch 8.on 7i0 NCB Post April ;u~~ lh-, 2014 DPRs are beina prepared byDPR C nsultants ~ Lakasein to Kseh 10.00 887.5 NCB Post April and May- 2014 DPRs are being prepared by DPR 0 •nsultants ~2 -· __ T01to S:!libul .-· ~-. - 10.00 - Total= 1161.998 887 <; 109808.050 NCB Post April and May- 2014 DPRs are belnq prepared byDPR 0 >nsultants ' Grand Total= 1529.451 143602.146 ---- Signature : Name : Shri. S B Chyrmang State Secretary : Cn•at t:n~!..1'~ta, P.W.D, (Roads), CUm Eolpowerod Uficer, S..B.B.D.A.. Wsahelar• Page 9

Key facts
Organisation World Bank Group
Document type Procurement Plan
Adoption date
Country India
Source World Bank