75933 1 Revised Procurement Plan for next 18 months of the project Rural Roads Project 2 (PMGSY) ' This is an indicative plan prepared by the Project for the second period of 18 months (beginning June 2012). The Project shall update the Procurement Plan annually or as needed through out the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional capacity. The Project shall implement the Procurement Plan in the manner in which it has been approved by the Bank. J. General I. Bank's approval Date of the procurement Plan November 24, 2010 2. Date of Genera l Procurement Notice issued for Consultancies only: September 14, 20 I 0. Updated GPN for the complete project is to be issued. 3. Period covered by this procurement plan: Second 18 months of the project. 11. Goods and Works I. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior Review by the Bank as stated in Appendix I to the Guidelines for Procurement. Expenditure Category Procurement Method Prior Review Threshold <...:omments US$ GOODS, EQUIPMENT & MACHINERY I. Goods and Equipment ICB All contracts World Bank SBD will be used and the estimated to cost equivalent procurement will be as per procedures of US$ 300,000 or more per described in World Bank Guidelines contract 2. Goods and Equipment NCB F1rst contract tor goods tor The NCB bidding document agreed With estimated to cost less than each state, irrespective of GOT will be used and the procurement will US$ 300,000 and greater than value and all contracts be as per procedures described in the US$ 50,000 equivalent per estimated to cost more than Procurement and Contract Management contract US$ 200,000 equivalent per Manual contract ,.. -,....,..- 3. - - - - - . -, Goods and Equipment - - - - - - - - .--..-. - - - - Shopping procedure with All post review estimated to cost less than at least three quotations US$ 50,000 or more per from qualified bidder in contract accordance with the provisions of paragraph 3.5 of Procurement Guidelines. Procurement through DGS&D rate contracts will be considered equivalent to shopping procedure. 4. Goods and EqUipment that DLrect Contracting All pnor revLew meet the requirements of paragraph 3.6 and 3.7 of Procurement Guidelines. CIVIL WORKS 5. Civil works contracts ICB * All contracts World Bank SBD w11l be used and the estimated to cost more than procurement will be as per procedures US$ 10,000,000 equivalent described in World Bank Guidelines. per contract ~ - 6. Civil works contracts NCB 'F1rst contract for works for - 1-- - - - - -- -- --·- - The procurement will be done as per estimated to cost up to US$ each state, irrespective of procedures described in the Procurement I 0,000,000 equivalent per value and all contracts cum Contract Management Manual and contract estimated to cost more than using the << Model Bidding Document >> US$ 5,000,000 equivalent cleared by the Bank. per contract will be subject to prior review by the Bank. All other works contracts will be subject to post review. * As per current planning, no !CB contracts are envisaged for civil works. 2. Pre-qualification. Not Applicable 3. Proposed Procedures for C OD Components (as pe r paragraph. 3.17 of the Guidelines: Not Applicable 4. Reference to (if any) Project Operational/Procurement Manual: A Procurement cum Contract Management Manual has been prepared by NRRDA. The Manual has been reviewed by the Bank and clearance of the Manual given by the Bank. All procurement in the project will be done as per procedures described in it. 5. Any Other Special Procurement Arrangements: The following provisions constitute additional provisions applicable for purposes ofNational Competitive Bidding (NCB). NCB will be conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines and the following provisions: • Only the Model Bidding Document for procurement of works through NCB agreed with the Bank (and as amended for time to time), shall be used for bidding; • Invitations to bid shall be advertised in at least one widely circulated national daily newspaper, at least 30 days prior to the deadline for the submission of bids; · • No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state7 owned enterprises, small scale e nterprises or e nterprises from any given State; • Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; • Extension of bid validity shall not be allowed for prior review packages, without the prior concurrence of the World Bank (i) for the first request for extension if it is longer than four weeks; and (ii) for prior approved packages, all subsequent requests for extens ion irrespective of the period (such concurrence will be considered by the Bank only in cases of Force Majeure and circumstances beyond the control of the Purchaser/Employer); • Re-bidding shall not be carried out without the prior concurrence of the Bank. The system of rejecting bids outside a pre-detennined margin or "bracket" of prices shall not be used in the project; • Rate contracts entered into by Directorate General of Supplies and Disposals will not be acceptable as a substitute for NCB procedures. Such contracts will be acceptable however for any procurement under the Shopping procedures; • Two or three enve lop system w ill not be used. However, as an exception in th is project, two part bidding for NCB works (as described in the model bidding document) has been agreed by the Bank subject to appropriate fiduciary safeguards (e -procurement system and complaint handling mechanism acceptable to the Bank) • All procurement of works through NCB in the seven participating states will be done through a standardized e-procurement system acceptable to the Bank. • As per paragraph 1.14(e) of the World Bank's Procurement Guidelines, the Association's r ight to inspect the accounts and records of bidders, suppliers and contractors will be included in the bidding documents. Ill. Selection of Consultants I. Selection Methods a nd Prio r Review T hreshold: Selection decisions shall be subject to Prior Review by Bank as stated in Appendix I to the G uidelines Selection and Employment of Consultants: [ Expenditure Selection Method Prio r Review Threshold Ca tegor y !Consultancy contracts to·be I Each contract estimatedto cost ~uality and Cost Based (QCBS) method I All prior review.- 1 awarded to Consultant US$ 200,000 equivalent or -REO: to be published in UN DB on line firms including selection of training institutes by ~ more per contract __ __ __ Each contract estimated to cost _ _ ___ __ -Quality and Cost Based (QCBS) method __ :.1 __ ___ _ All single source selection of NRRDA/SRRDAs less than US$ 200,000 -Quality Based (QBS) method of selection consultants with estimated cost Equivalent per contract in accordance with the provisions of of more than US$ 30,000 paragraph 3.1 to 3.4 ofConsultant's I equivalent per contract wi II be Guidelines. subject to prior review. All -Consultant's Qualifications (CQS) method. other contracts will be subject to -Least Cost Method (LCS). post review but with TORs -Fixed Budget Method. Isubject to prior review by the -Single Source Selection Bank -L--- IndividuaJ Consultant -Through comparison of qualifications of at IAll cases subject to post review but withl estimated to cost less than least three candidates. TORs subject to prior review by the US$ 30,000 or equivaJent per Bank. All contracts for single source 1 contract d\selection of individual consultant will Sole Source Selection I I 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2. 7 of the Consultant Guidelines. Any Other Special Selection Arrangements: NIL RURAL ROADS PROJECT II (P124639) Procurement 12ackages with Methods and Time Schedule Procurement Plan with Packages & Time Schedule for 18 Months period- for CIVIL WORKS (from June 2012 to Dec. 2013) Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)• opening date Total 1 MG/06106 Rongchadenggre to Wakantagre (upto Jamangggre) 1.807 132.996 NCB Post February • 2013 STACieared 2 MG/06/08 Joyfar to Kasra Sec I (upto Belbari) 1.700 103.266 NCB Post February· 2013 STACieared 3 MG/06/13 HaUsil to Muji Agalgre 1.711 115.885 NCB Post February· 2013 STACieared 4 MG/06/14 Jamanngre to Wakantagre 6.750 418.450 NCB Post February • 2013 STACieared 5 MG/06/20 Garobadha Rangsakona Road to Jaluagre 2.326 186.289 NCB Post February· 2013 STACieared 6 MG/06111 Waknngtonggre to uondenggre 2.935 222.134 NCB Post February· 2013 STACieared 7 MG/06/07 7th km of Ampali Boldamgre Road to Kambakpara 3.927 256.921 NCB Post February· 2013 STACieared 8 MG/06/09 4th km of KG Road to Dinangpara 4.n9 376.205 NCB Post February· 2013 STACieared 9 MG/06112 Kama Boldakgre to Sotmarenggre 3.714 242.482 NCB Post February· 2013 STACieared -- 1U f;\(,/06/1!> llamal As1m to Tebronggre upto U1pogre 5.847 518.429 NCB Post February· 2013 STACieared I_ '1 MGJ06/16 Pedaldooa Raksamgre Road to Meghapara 5.284 411 192 NCB Post February· 2013 STA Cleared 12 ~.IG/06.70 Road Iron" liH 51 Saminggre 1.678 187.430 NCB Post February· 2013 STACieared '- 13 MG/06.'72 Road from 8th KM of GR Road to Sangre 3.539 231.790 NCB Post February · 2013 STACieared 14 -AG/02'06 1 Nongspung Laitmawsiang oad to · Mawkynroh 2.591 252.855 NCB Post February· 2013 STACieared Sohiong Pariong Road to • Kharongai Mawlyngthoh and 15 MG/02/07 3.590 444 418 NCB Post February· 2013 STACieared Wahnonqbah 16 MGI02t08 Sohiong Nongspung Road to • Kyndong Wahlang 2.105 224.274 NCB Post February · 2013 STACieared 17 MG/02/04 Mawryngkang to · Nonglhymmal Mawshun 2.500 354.594 NCB Post February· 2013 STA Cleared 18 MG/02105 Khrang • Khongthong 3.000 452 213 NCB Post February • 2013 STACieared 19 MG/01108 T05 to Darakona 1.650 91.378 NCB Post February. 2013 STACieared 20 MG/01/05 T02 to New Kantol~uri 1.537 82.384 NCB Post February · 2013 STACieared :11 MG/0-'-105 Road from Umsianq to Amjonq 16.000 1620.830 NCB Post February· 2013 STA Cleared 22 MG/04101 N.U.M U Rd. to Korsteo villaQe 5.23 546.050 NCB Post February· 2013 STACieared 23 MG'04/06 67th Km of UJ Road to M<l\vker 3.739 353.300 NCB Post February· 2013 STA Cleared 24 MG/04/16 UmsmnQ JaQi Road to • ShllhanQ Umdoh 1.780 123 360 NCB Posi February • 2013 STACieared 25 MG/04/08 Road from Nonqlum to Umtanqlinq 3.175 253. 180 NCB Post February • 2013 STACieared 26 MG/04/17 Road from DT Road to Madan NonQiakhiat 3.373 147.370 NCB Post February · 2013 STA Cleared 27 MG/04/23 17th KM of Umsninq Jaqi Road to· Mawkynronq 2.500 148.650 NCB Post February • 2013 STACieared 28 MG/04/20 MMR Road to • Sohkvrbam Domohla11<1 1.550 108.710 NCB Post February • 2013 STACieared Page 1 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)• opening date Total 29 MG/04/21 MMR Road to - Gunoati 1.600 83.290 NCB Post February- 2013 STACieared 30 MG/04/19 Road from NUMU Road to Umshakait 2.000 191.600 NCB Post February- 2013 STACieared 31 MG/07/01 Navaoara to Ko~aoara 3.000 397.053 NCB Post February - 2013 STACieared 32 MG/03/05 Const. of a Road from Thruk to Moulhoi 13.500 1367.421 NCB Post February- 2013 STACieared 33 MG/06/22 10th km of GA Road to Chondonpara 2.861 172.170 NCB Post April and May- 2013 DPR Prepared 34 MG/06/42 Joyfar to Kasra 0.989 83.108 NCB Post April and May- 2013 DPR Prepared 35 MG/06/47 121th Km of AMPT Road to Rongbakgre 2.375 140.243 NCB Post April and May- 2013 DPR Prepared 36 MG/06/43 Dalugaon to Dingkajora 1.712 140.284 NCB Post April and May - 2013 DPR Prepared 37 MG/06/97 128th KM of NH 51 to - Surunanggre 4.868 386.650 NCB Post April and May· 2013 DPR Prepared 38 MG/06/100 Road from NH 51 to- Ganol Songma 2.500 199.510 NCB Post April and May- 2013 DPR Prepared 39 MG/06/119 Road from Sanchonggre to- Galwanggre 3.232 216 960 NCB Post April and May- 2013 DPR Prepared 40 MG/061130 Dollongre to - D1ttegre 2.617 206.430 NCB Post April and May- 2013 DPR Prepared 41 MG/06i67 Road from 60th Ki 4 of NH 51 to- Rondenggre 1.637 142880 NCB Post April and Moy- 2013 DPR Prepared 42 f•IG/06/40 Kalchenggre to Danang Songma 2.730 234 605 NCB Post April and May- 2013 DPR Prepared 43 MG/06/59 Babadam to Bunpara 2.270 140 156 NCB Post April and May- 2013 DPR Prepared 44 MG/06/60 Jengjal Bazar to Jen9Jalgre (Megapgre) 2.250 168.693 NCB Post April and May- 2013 DPR Prepared 4o '.IG.06 o, t-.H-51 Road to Mrigre 5.014 437 188 NCB Post Apnl and May- 2013 DPR Prepared 46 MG/06/94 Oragitok to - Dulakalakgre 4.096 371 950 NCB Post April and May- 2013 DPR Prepared 47 MG/061126 GSB Road to- Dipogn. - 3.792 273.400 NCB Post April and May- 2013 DPR Prepared 48 MG/06/33 Jongnapara to Sindapara 2.776 203.735 NCB Post Apnl and May - 2013 DPR Prepared 49 MG/06/69 Kalchengpara to • Buchigre 7012 759 470 NCB Post April and May. 2013 DPR Prepared 50 MG/06129 17th Km of MM Road to Mekdual Adenggre 1.929 164.675 NCB Post April and May- 2013 DPR Prepared 5th Km of Ampati Purakhasia Road to Anangpara 51 MG/06136 1.339 93.505 NCB Post April and May- 2013 DPR Prepared SonQsarek 52 MG/06/85 8th KM of PM Road to - Gujangpara 2.431 222.310 NCB Post April and May· 2013 DPR Prepared -- 53 MG/06/50 NH-51 (Darengre PHC) to NengJa Bolchugre 12.195 776.048 NCB Post Apnl and May- 2013 DPR Prepared 54 MG/06/61 115th Km of NH-51 to Bokakolgre A 1.419 119.778 NCB Post April and May - 2013 DPR Prepared 55 MG/06/87 Lower Darenggrt· to Ooldegre 2.023 235 350 NCB Post Apnl and May- 2013 DPR Prepared 56 MG/OZ·.;7 lyr><:khatTmar to Nongsohphan 3029 304 111 NCB Post April and May- 2013 DPR Prepared 57 MG/02116 Lynsh1ng to Nongpyrdi 6.037 767 470 NCB Post April and May· 2013 DPR Prepared 58 MG/02/15 Road from Rngibah to Thangbanai 3.540 388.870 NCB Post April and May- 2013 DPR Prepared 59 MG/01177 Road from RongJeng Jambalto • Bannggre 2.000 109.280 NCB Post April and May· 2013 DPR Prepared 60 MG/01/78 Road from Gabil Bisa to - Mejolgre Wancho 6.389 1143.280 NCB Post April and May- 2013 DPR Prepared 61 MG/01/80 Road from Mangsang Makura to - Mangsang Dosikgittim 2.269 363.040 NCB Post April and May- 2013 DPR Prepared Page 2 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (PriorfPost)' opening date Total 62 MG/01181 Road from Mangsang Dosikgittim to - Rengkil Apal 1.682 755.620 NCB Post April and May- 2013 DPR Prepared 63 MG/01/82 Road from aringgre Wadro to - Bolkrek 4.719 542.520 NCB Post April and May- 2013 DPR Prepared 64 MG/01/84 Road from T03 to - Gandual 2.581 374.060 NCB Post April and May· 2013 DPR Prepared 65 MG/01/85 Road from L21 to - Dambo Rongjeng 4.402 681.740 NCB Post April and May- 2013 DPR Prepared 66 MG/01/87 Road from T03 to - Gabil Koksi 4.950 791.100 NCB Post April and May- 2013 DPR Prepared 67 MG/01/88 Road from Haslong to- Nagirnaram 1.812 163.610 NCB Post April and May - 2013 DPR Prepared 68 MG/01/14 Thapa Agitchak to Chisirnari 2.219 112.286 NCB Post April and May - 2013 DPR Prepared 69 MG/01/17 Bakenan9 Songma to Chabildam 2.108 115.527 NCB Post April and May - 2013 DPR Prepared 70 MG/01121 T01 to Go'l(jriln'l 5.005 358 823 NCB Post April and May· 2013 DPR Prepared 71 MG/01/22 T04 to Samin Ch1anmg 6.056 391.486 NCB Post April and May - 2013 DPR Prepared 72 MG/01/60 Sonqsa" Bazar to SonQsak Jarepa 17~ 194 310 NCB Post 1\pnl ano May -l01J DPR Prepareo 73 MG/01158 L028 to Kakwa Boneqre 5 525 627 660 NCB Post April and May- 2013 DPR Prepared 74 lvlG/04111 Road from UJ Rw1to T1hwieh 7136 438675 NCB Post April and May - 2013 DPR Prepared 75 MG/04'10 BKO Road to Nonqpvrdet 2 342 i45 010 fllCB Po~t Aon and Mav ~ 2\J i 3 DPR Prepared 76 MG/04/06 UJ Road to Lumphuid 16.123 1587.660 NCB Post April and May- 2013 OPR Prepared 77 MG/04/09 Umran Diary to Rilong . 5 742 471.530 NCB Post April and May • 2013 DPR Prepared 1e MG/04114 Road from 6th KM of B§ Road to Mawthei 8.600 659170 NCB Post April and Mav • 2013 DPRPre~red 79 MG/04/15 Road from DT Road to Sohhya 2.000 216.670 NCB Post April and May - 2013 OPR Prepared 80 MG/04/07 Pahamshru to Ranibari 2.615 214.725 NCB Post April and May - 2013 DPR Prepared 81 MG/04/24 MMR Road to - Nongdom Mawpliang 2.320 205.750 NCB Post April and •.~av 2~~~ DPR Prt;' ~red 8~ MGK\4109 ~from T03 to Umiono __ 1- 4 123 427 ?17 NCB Post April and May- 7013 DPR Prepared - - !l3 MG,04!L2 Ro3d from 3rd Ki.1 ol US Road to Nartap Sohla1trim 7 500 552 490 NCB Post April and May- 2013 DPR Prepared 84 MG/07/25 AradonQa (Athiabari) to Umshiak 6.002 677.620 NCB Post Aoril and May- 2013 DPR Prepared 85 MG/07/03 Langtor to Ksehkohmoit 2.614 202 471 NCB Post April and May - 2013 DPR Prepared 86 MG/07/05 PWD Road to Mawlumkhri (Road No.1) 4.703 357.817 NCB Post April and May - 2013 DPR Prepared 87 MG/07/05 PWO Road Umsar to Lawsiei (Road No.2) 4.607 402.564 NCB Post April and May - 2013 DPR Prepared 88 MG/07/17 Mvriew to Auro 5.434 448.787 NCB Post April and May· 2013 OPR Prepared 89 MG/07113 Mawdoh to S~nnia 5.644 499.997 NCB Post April and May · 2013 DPR Prepared 90 MG/07/14 TOJ ll!;,wlyndepto Urkyllong 54J4 .:::~u.o<!J Nc;B Post Apnl ano 1.1ay- L01J uPR f'repareo t 91 MG/03101 Construcbon of road from Mustem to lonQnoh 4.800 294.250 NCB Post Aonl and Mav- 2013 DPR Prepared 92 MG/03101 Umlatdoh to Ummat 6.183 561.290 NCB Post April and May - 2013 DPR Prepared gL_ MG/03/02 _ PWD Road to Khliehmyntriano 2.974 213 490 NCB Post Aoril and May- 2013 DPR Prepared Total :1 367.453 33794.096 94 km ol AP Ro"d to Boldakqre i 7th 2.00 154 38 NCB Post June and July - 2013 DPRs are bemg prepared by DPR Consultants 95 10th Km. of AM Road to Punchapara 300 231 57 NCB Post June and July · 2013 DPRs are beinq prepared bv DPR Consultants 96 68th Km of NH-511Bolbo@el Phase-If to Warisepqre 2.00 154 38 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 97 Ronqram Phulban Hill Road to AmpanQQre 3.50 270 165 NCB Post June and July- 2013 DPRs are be1nQ prepa1ed llv OPR Consultants 98 GSB Road to Damalgre 200 154 38 NCB Post June and July- 2013 DPRs are being prepared by OPR Consultants 99 Lower Rengsinpara to Tosinpara 14.00 108066 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 100 AMPT Road to Oaldoore 3.00 231.57 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 101 18th KM. of AP Road to Badupara 5.00 385.95 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants Page 3 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)* opening date Total 102 Bandalkona to Dalbot(lara 4.00 30876 NCB Post June and July· 2013 DPRs are being prepared by DPR Consultants 103 Balachanda to Rabhakona (Kittipara) 3.00 231.57 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 104 11th Km of GA Road to Samati 5.50 424.545 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 105 3rd Km. of Garabadha Rangsakona Road to Watreqre 3.00 231.57 NCB Post June and July • 2013 DPRs are being prepared by DPR Consultants 106 Haldibari to Dodoretgre 3.00 231.57 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 107 Rongchugre to Meqonggre 6.00 463.14 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 108 14th km KG Road to Ronaseoore 5.00 385.95 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 109 Damal Asimgre to Amonggre 11.70 903.123 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 110 5th Km. of AMPT road( Belbari) to Upper Rimbigre 6.00 463.14 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 111 Pedaldoba Raksamare Road to Bolchu Katonare 4.00 308.76 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 112 Dilsigre to Songmaranggre 8.00 617.52 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 113 Hatuaaon to Borobakra 2.00 15438 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 114 Tikrikilla to Kodamsali 1.50 115.785 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 115 Selsella Chamaguri Road to Marak 3.50 270.165 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 116 10th km or Dam.,lgre Mellim Boldamgre Road to Daron9gre 4.00 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 308.76 117 13th km of AP Road to Nachilpara 3.00 231.57 NCB Post June and July- 2013 DPRs are being (lrepared by DPR Consultants 118 Mangchim to Bolbokgre 3.00 231.57 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 119 65th km of NH-51 Road to 'Chiokgre 2.00 154.38 NCB Post June and July- 2013 DPRs are beina prepared by DPR Consultants 120 Betasing Bazar Banduraja Road to Arenggre 400 308.76 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 121 72nd km of AMPT Road to Dipkai<Jaon 3.00 231.57 NCB Post June and July- 2013 DPRs are beina prepared by DPR Consultants 122 Nengkalpara to Okanggre 3.50 270.165 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 123 Bandalkona to Jelbo[lgpara Songma A 3.00 231.57 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 124 3rd km of Garobadha Ampati Road to DuauriPara 3.00 231.57 NCB Post June and July· 2013 DPRs are being prepared by DPR Consultants 125 Gimbil AQalgre to Renchigre 5.00 385.95 NCB Post June and July - 2013 DPRs are beina prepared by DPR Consultants 126 16th of AP Road to Kerupara 4 00 308.76 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 127 Debragre to Tepatanggre 11.00 849.09 NCB Post June and July- 2013 DPRs are beina prepared by DPR Consultants 128 Rohanpara to Naronggre 10.00 771.9 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 129 Dadengqre to Satiare 4.00 308.76 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 130 Daigre to Menggotchigre 4.00 308.76 NCB Post June and July- 2013 DPRs are being prepared by DPR Consultants 131 Romiora to ReniQre 3.00 231.57 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 132 Kentapara to Rengbonggre 10.00 771.9 NCB Post June and July - 2013 DPRs are being prepared by DPR Consultants 133 13th km of M.M. road to Kuliairi 3.00 231.57 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants 134 Rongram Phulbari hill road to Dokaramgre 2.00 154.38 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 135 3rd km of Anchenggre Sandagre road to Dabelagre 3.00 231.57 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 136 21st km or K.G. road to Durapara 2.00 154.38 NCB Post Aug and Sept.- 2013 DPRs are beina prepared by DPR Consultants 137 8th km of A.P. road to Dinapara 2.00 154.38 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 138 AMPT road to BoiQangqre 2.00 154.38 NCB Post Auo and Sept. - 2013 DPRs are being Qrepared by DPR Consultants 139 Rongsai Borjora road to Dalchengkona 4.50 347.355 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 140 Dokaore to Dabakare 8.00 617.52 NCB Post Aoo and S~t.- 2013 DPRs are being prepared by DPR Consultants 141 121st km of AMPT road to Bollonggre 5.00 385.95 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 142 8th km of P.M. road to Guiangpara 3.50 270.165 NCB Post Aoo and Sept.- 2013 DPRs are being prepared by DPR Consultants 143 Peradanga to Sonaialare 8.00 617.52 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants Page 4 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)' opening date Total 144 11th km of K. G. road to Paolaoara 2.00 154.38 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 145 Upper Watregre to Didapara Songgitcham 4.00 308.76 NCB Post Aug and Sept.- 2013 DPRs are beinq prepared by DPR Consultants 146 10th km of Sesengpara Kherapara road to Ranggapara 8.00 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants 617.52 147 Gimbil Agal to DodanqQre 6.00 463.14 NCB Post Auq and Sept. - 2013 DPRs are beingpreQared by DPR Consultants 148 Raksamgre to Laskorpara {Garo) 3.00 231.57 NCB Post Aug and Sept. - 2013 DPRs are beinq prepared by DPR Consultants 149 Dakop to Matcho Sonqram 3.00 231.57 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 150 Dabakgre Gonda Songgitcham to Dabanggre 3.00 231.57 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 151 Chidekqre to Wadagre 7.00 540.33 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants 152 Ampati Civil Sub-Division to Banqkapara 2.00 154.38 NCB Post Auo and Sept.- 2013 DPRs are beino prepared bv DPR Consultants 153 Rongsakgre to Rabonggre 2.00 154.38 NCB Post Aug and Sept. - 2013 DPRs are beinq prepared by DPR Consultants 154 Jangrapara to Balsatgre 8.00 617.52 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants 155 Gimbil Agal to Cheran Songmagre 400 308.76 NCB Post Aug and Sept - 2013 DPRs are beinq prepared by DPR Consultants 156 GSB road (Khalparal to Dalanqsa 6.00 463.14 NCB Post Aug and Sept.· 2013 DPRs are being prepared by DPR Consultants 157 4th Km of Kherapara Chenqapara road to Palhanggre 10.00 771.9 NCB Post AuQ and Sept. • 2013 DPRs are being prepared bv DPR Consultants 158 Aduore Purakhas1a road to Tochapara 3.00 231 57 NCB Post Aug and Sept • 2013 DPRs are being prepared by DPR Consultants 159 AMPT road to Mangrugre 5.00 385.95 NCB Post Aug and Sept.- 2013 DPRs are beinq prepared by DPR Consultants 160 L-025 (Baiamara Manqchim road) to Belbari 3.00 23157 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants 161 6th Km of PM road to Bakdagre 3.00 231.57 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants 162 JuriQaon to Balbalqre 2.00 154.38 NCB Post Aug and Sept. - 2013 DPRs are being prepared by DPR Consultants 163 Rongram Phulbari hill road to Chiqitchakqre 3.00 231.57 NCB Post Aug and Sept.- 2013 DPRs are beinq prepared bv DPR Consultants 164 Damal Asim Amonqqre road to Balsatore 300 231.57 NCB Post Aug and Sept- 2013 DPRs are being prepared by DPR Consultants 165 1st Km of Adugiri Purakhasia road to Darak Akonggre 1.50 115.785 NCB Post Aug and Sept.- 2013 DPRs are beinq prepared by DPR Consultants 166 Asirnqre to Derinqqaore 300 23157 NCB Post Aug and Sepl. - 2013 DPRs are being prepared by DPR Consultants 167 2nd Km of Rom Bazar Gambaregre road to Rom Sangsilgre 3.00 NCB Post Aug and Sept. • 2013 DPRs are being prepared by DPR Consultants 231 .57 Holdibari Rochonpara (from Rochonpara Side) road to 168 4.00 NCB Post Aug and Sepl- 2013 DPRs are being prepared by DPR Consultants Nis1mpara 308.76 169 Mekmakgre to SampaiQre 4.00 308.76 NCB Post Auq and Sept.- 2013 DPRs are beinq prepared bv DPR Consultants 170 Masanqpani to Demdema 3.00 231.57 NCB Post Aug and Sept.- 2013 DPRs are being prepared by DPR Consultants 171 AMPT road to Gomaiihora Garo 2.00 154.38 NCB Post Auo and Sept.- 2013 DPRs are beinq prepared bv DPR Consultants 172 Asirngre to Deringgagre 4.00 308.76 NCB Post Aug and Sept.- 2013 DPRs are beinq prepared by DPR Consultants 173 Ampati Mellim road to Santapara 4.00 308.76 NCB Post Auo and Sept - 2013 DPRs are being prepared by DPR Consultants 174 24th Km of Ampati Purakhasia road to Rimrangpara 2.00 154.38 NCB Post Oct. and Nov.- 2013 DPRs are being prepared by DPR Consultants 175 14th Km of Ampati Purakhasia road to Kimdeore 3.00 231.57 NCB Post Oct. and Nov.- 2013 DPRs are being prepared by DPR Consultants 176 Watregre to NengkaiQre 6.00 463.14 NCB Post Oct. and Nov.- 2013 DPRs are beinq prepared bv DPR Consultants 1n Janqrapara to Jenqritoiri 10.00 771.9 NCB Post Oct. and Nov.- 2013 DPRs are being prepared by DPR Consultants 178 14th Km of KG road to Rongsepgiri 5.50 424.545 NCB Post Oct. and Nov. - 2013 DPRs are beinq prepared by DPR Consultants 179 Haldibari to Asirnqre 3.00 231.57 NCB Post Oct. and Nov.- 2013 DPRs are being prepared by DPR Consultants 180 Kalchengpara to Marakapara 3.00 231.57 NCB Post Oct. and Nov.- 2013 DPRs are beinq prepared bv DPR Consultants 181 Damal Asim to AiQre Sonqoitcham 4.00 308.76 NCB Post Oct. and Nov.- 2013 DPRs are being prepared by DPR Consultants 182 GSB road to Boldakgre 8.00 617.52 NCB Post Oct. and Nov. - 2013 DPRs are beinq prepared by DPR Consultants 183 Ronqram Phulbari Hill road to Shekapara 5.00 385.95 NCB Post Oct. and Nov.- 2013 DPRs are being prepared by DPR Consultants PageS Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior!Post)* opening date Total 184 15th Km of AP road to Chooapara 6.00 463.14 NCB Post Oct and Nov. • 2013 DPRs are being prepared by DPR Consultants 185 Gimbil Agal to Cheran Songmagre 8.00 617.52 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 186 Cheran SonQm3Qre to Chisikqre 2.00 154.38 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 187 L-027 to lapdkoh (Mawjam) 10.00 1225.400 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 188 L-042 to Ryngkya 4.90 600.446 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 189 L-041 to Lurndiengsai 5.00 612.700 NCB Post Oct. and Nov. · 2013 DPRs are be1ng prepared by DPR Consultants 190 T-01 to Mawiong 1.50 183.810 NCB Post Oct. and Nov. - 2013 DPRs are being prepared by DPR Consultants 191 T-01 to Nonglyngkien 5.10 624.954 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 192 Wahsherkhmut to Korblang 2.00 245.080 NCB Post Oct. and Nov. · 2013 DPRs are being prepared by DPR Consultants 193 L-023 to Nongthymmai 6.00 735.240 NCB Post Oct. and Nov. · 2013 DPRs are being prepared by DPR Consultants 194 T • 03 to Kshaid 5.00 612.700 NCB Post Oct. and Nov. • 2013 DPRs are being prepared by DPR Consultants 195 L · 024 to Nongthymmai 2.00 245.080 NCB Post Oct and Nov. • 2013 DPRs are being prepared by DPR Consultants 196 T • 02 to Diengkynthong 2.00 245080 NCB Post Oct and Nov.· 2013 DPRs are being prepared by DPR Consultants 197 Sonatola to Kasudok 8.00 980.320 NCB Post Oct and Nov.· 2013 DPRs are being prepared by DPR Consultants 198 T • 02 to Thied dieng Nongrim 10.00 1225.400 NCB Post Oct and Nov. • 2013 DPRs are being prepared by DPR Consultants 199 T-03 to Mawdon 410 502.414 NCB Post Oct and Nov · 2013 DPRs are being prepared by DPR Consultants 200 L • 026 to Laitlulong Sec · II 2.00 245.080 NCB Post Oct and Nov.· 2013 DPRs are be1ng prepared by DPR Consultants 201 T-01 to Jaud 3.00 367.620 NCB Post Oct and Nov. • 2013 DPRs are being prepared by DPR Consultants 202 L • 029 to Lyngwa 3.00 367.620 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 203 T · 03 to Kamohi 2.80 343.112 NCB Post Oct and Nov. · 2013 DPRs are bemg prepared by DPR Consultants 204 Mawsmai Sheila to Mawsmai Cave 2.00 245.080 NCB Post Oct and Nov. · 2013 DPRs are be1ng prepared by DPR Consultants 205 Mawkhap to Nongiri 4.00 490.160 NCB Post Oct and Nov · 2013 DPRs are being prepared by DPR Consultants 206 L-022 to Sohkynduh 2.50 306.350 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by OPR Consultants 207 L-038 to Kalatek 5.00 612.700 NCB Post Oct. and Nov.· 2013 DPRs are beino prepared bv OPR Consultants 208 T-02 to Mawryngkhong 5.00 612.700 NCB Post Oct. and Nov.· 2013 DPRs are beinQ prepared by DPR Consultants 209 L-042 to Thliewumtham 1.00 122.540 NCB Post Oct and Nov.· 2013 DPRs are being prepared by DPR Consultants 210 T-03 to S1nai Mawshynrut 3.00 367.620 NCB Post Oct. and Nov.· 2013 DPRs are being prepared by DPR Consultants 211 T-01 to MawrvOQkang . 8.50 1041.590 NCB Post Oct and Nov • 2013 DPRs are be1ng prepared by DPR Consultants 212 T-04 to Telsora 10.00 1225.400 NCB Post Oct. and Nov. • 2013 DPRs are beino prepared by DPR Consultants 213 Rongsak Songgital to Suchilgre 3.00 332.88 NCB Post Oct. and Nov.· 2013 DPRs are be1ng prepared by DPR Consultants 214 Meqhaori Sonqqilal to Dilma Debraore 8.00 887.68 NCB Post Dec. and Jan· 2014 DPRs are beino prepared by DPR Consultants 215 Rongrenggre to Akelgre 6.00 665.76 NCB Post Dec. and Jan · 2014 DPRs are being prepared by DPR Consultants 216 T03 to Nenokrah Watreore 4.00 443.84 NCB Post Dec. and Jan · 2014 DPRs are being prepared by DPR Consultants 217 Chekwebibra to Rongbing Boldak 9.00 998.64 NCB Post Dec. and Jan • 2014 DPRs are being prepared by DPR Consultants 218 Chiminmingre to Kakwa Duraore 4.00 443.84 NCB Post Dec. and Jan· 2014 DPRs are beino prepared by DPR Consultants 219 Mingkrak to Dochisoram 2.50 277.4 NCB Post Dec. and Jan· 2014 DPRs are beinQ prepared by DPR Consultants 220 Tanoba to Aruak 3.00 332.88 NCB Post Dec. and Jan • 2014 DPRs are being prepared by DPR Consultants 221 Silkigre to Jalkim 5.00 554.8 NCB Post Dec. and Jan· 2014 DPRs are being prepared by DPR Consultants 222 T04 to TebroOQpara 4.00 443.84 NCB Post Dec. and Jan · 2014 DPRs are being prepared by DPR Consultants 223 Sakware Songgijalto Gorok 3.00 332.88 NCB Post Dec. and Jan · 2014 DPRs are being prepared by OPR Consultants Page 6 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)' opening date Total 224 Chilpara to Lower Bolmedam 4.50 499.32 NCB Post Dec. and Jan - 2014 DPRs are being prepared by DPR Consultants 225 T04 to Tengasot 2.00 221.92 NCB Post Dec. and Jan - 2014 DPRs are being prepared by DPR Consultants 226 Menadoba to Mancheng 2.00 221.92 NCB Post Dec. and Jan- 2014 DPRs are being prepared by DPR Consultants 227 Rajasimla Songma to Ronqdal Atlmbo 9.00 998.64 NCB Post Dec. and Jan - 2014 DPRs are beinq prepared by DPR Consultants 228 Dochisoram to Waramia 2.00 221.92 NCB Post Dec. and Jan- 2014 DPRs are being prepared by DPR Consultants 229 Aqropatal to Nengbak Wapll 5.00 554.8 NCB Post Dec. and Jan - 2014 DPRs are be1ng prepared by DPR Consultants 230 Chima Aga to Arai Apal 3.00 332.88 NCB Post Dec. and Jan - 2014 DPRs are being prepared by DPR Consultants 231 Upper Bolmedam to RonQmatchu 3.00 332.88 NCB Post Dec. and Jan - 2014 DPRs are being prepared by DPR Consultants 232 T04 to Chilpara Reserve 3.00 332.88 NCB Post Dec. and Jan- 2014 DPRs are being prepared by DPR Consultants 233 Ronqdu Haslonq to Dabitqittim 9.00 998.64 NCB Post Dec. and Jan- 2014 DPRs are being prepared by DPR Consultants 234 lmbangQi to Chikal Songma 21.00 2330.16 NCB Post Dec. and Jan- 2014 DPRs are beinq prepared by DPR Consultants 235 Mejolgre Mancha to Jalwagri Songital 8.50 943.16 NCB Post Dec. and Jan - 2014 DPRs are being prepared by DPR Consultants 236 T03 to Chikama 4.00 443.84 NCB Post Dec. and Jan - 2014 ng prepared by DPR Consultants DPRs are bei. 237 T06 to Damit Aga (Matchakol) 3.00 332.88 NCB Post Dec. and Jan- 2014 DPRs are beinq prepared by DPR Consultants ?38 L21 to PanQsudam 4.40 488.224 NCB Post Dec. and Jan- 2014 DPRs are beina preoared by DPR Consultants 239 L21 to Nisamoram Babupara 3.00 332.88 NCB Post Dec. and Jan- 2014 DPRs are beinq prepared by DPR Consultants 240 Raksam Sonoma to Raksam Sonqmaqre 3.00 332.88 NCB Post Dec. and Jan - 2014 DPRs are being prepared by DPR Consultants 241 T04 to Bolsono Kama 2.00 221.92 NCB Post Dec. and Jan - 2014 DPRs are being prepared by DPR Consultants ?42 T06 to Danqra Sonqma 7.00 776.72 NCB Post Dec. and Jan- 2014 DPRs are beina prepared by DPR Consultants 243 L21 to Guresimram 9.00 998.64 NCB Post Dec. and Jan- 2014 DPRs are beinQ prepared by DPR Consultants 244 T01 to Gambit Aaa 10.00 1109.6 NCB Post Dec. and Jan - 2014 DPRs are beinq prepared by DPR Consultants 245 T05 to Gondonoare 2.50 277 4 NCB Post Dec and Jan- 2014 DPRs are being prepared by DPR Consultants 246 247 Ranqaqora to DuiorlQre T04 to Tatolqri - 2.00 1.50 221.92 166.44 NCB NCB Post Post Dec. and Jan - 2014 Dec. and Jan- 2014 DPRs are beina oreoared by DPR Consultants DPRs are being prepared by DPR Consultants 248 T04 to Dalmanqqre 5.50 610.28 NCB Post Dec. and Jan - 2014 DPRs are be1nq prepared by DPR Consultants 249 L35 to Chipakram 2.00 221.92 NCB Post Dec and Jan- 2014 DPRs are being prepared by DPR Consultants 250 T02 to Dilma Rejakoittim 1.50 166.44 NCB Post Dec. and Jan- 2014 DPRs are beinq prepared bv DPR Consultants 251 Wagopqre to Rongdolgre 4.00 443.84 NCB Post Dec. and Jan - 2014 DPRs are being prepared by DPR Consultants 252 Ronqap to Ronqap Sonoitcham 3.00 332.88 NCB Post Dec. and Jan - 2014 DPRs are being prepared by DPR Consultants 253 Boneqre to Asil Sonqrtal 10.53 1168.409 NCB Post Dec and Jan- 2014 DPRs are being prepared by DPR Consultants 254 Gabil Sonqitcham to Gra Songitcham 6.00 665.76 NCB Post Feb and Mar- 2014 DPRs are being prepared by DPR Consultants 255 DaQal Apal to Biiasik Matwa 8.00 887.68 NCB Post Feb and Mar- 2014 DPRs are beinq prepared by DPR Consultants 256 T03 to Jogogri 3.00 332.88 NCB Post Feb and Mar- 2014 DPRs are be1ng prepared by DPR Consultants 257 Bolpuma to Dalbot Ronqbok 3.00 332.88 NCB Post Feb and Mar- 2014 DPRs are beinq prepared by DPR Consultants 258 L36 to Dalbo! Nokat 4.50 499.32 NCB Post Feb and Mar- 2014 DPRs are being prepared by DPR Consultants 259 Akarok to Akarok Sonooital 6.00 665.76 NCB Post Feb and Mar- 2014 DPRs are beinq prepared by DPR Consultants 260 T03 to Rem Matchakolqre 4.00 443.84 NCB Post Feb and Mar- 2014 DPRs are beinq prepared by DPR Consultants 261 T04 to Daoal Samitv 300 332.88 NCB Post Feb and Mar- 2014 DPRs are being prepared by DPR Consultants 262 Rongchek to RonQchek SongQital 300 332.88 NCB Post Feb and Mar- 2014 DPRs are beinq prepared by DPR Consultants 263 Dobu Aoalori to Dobu Achakoek 4.00 443.84 NCB Post Feb and Mar- 2014 DPRs are being prepared by DPR Consultants 264 DanQkong Rabha to lmbanqQi 3.00 332.88 NCB Post Feb and Mar- 2014 DPRs are being prepared by DPR Consultants 265 Khar\(Ulta to Kama Gandim 3.00 332.88 NCB Post Feb and Mar- 2014 DPRs are being prepared by DPR Consultants 266 l24 to Rongpetchi Bolsadam 2.00 221.92 NCB Post Feb and Mar- 2014 DPRs are beinq prepared by DPR Consultants 267 T04 to Denqnanoore 10.00 1109.6 NCB Post Feb and Mar - 2014 DPRs are beinq prepared bv DPR Consultants Page 7 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)* opening date Total 268 T05 to Songmeqap 4.70 521.512 NCB Post Feb and Mar - 2014 OPRs are beirJQ prepared by DPR Consultants 269 Bakenang Songma to Chabiidam 2.00 221 .92 NCB Post Feb and Mar - 2014 DPRs are being prepared by DPR Consultants 270 T04 to Cheran Chikol 9.00 998.64 NCB Post Feb and Mar - 2014 DPRs are being prepared by DPR Consultants 271 Tebil Bo_ negre to Barikgre 7.00 776.72 NCB Post Feb and Mar - 2014 DPRs are being prepared by DPR Consultants 272 Bolmeram Ankekol to Napak Songma 7.00 776.72 NCB Post Feb and Mar - 2014 DPRs are beingpreQared by DPR Consultants 273 Nengmandalgre to Mandalqre 23.00 2552.08 NCB Post Feb and Mar - 2014 DPRs are beinq prepared by DPR Consultants 274 CheranQre to Sisobibra 8.00 887.68 NCB Post Feb and Mar· 2014 DPRs are being prepared by DPR Consultants 275 Jingnamqre to Dinaminggre 10.00 1109.6 NCB Post Feb and Mar - 2014 DPRs are beinq prepared by DPR Consultants 276 Rongsak Bazar to Dinaiekgre 10.00 1109.6 NCB Post Feb and Mar - 2014 DPRs are being prepared by DPR Consultants 277 Gittinggre to Chibreng(Jre 7.00 540.33 NCB Post Feb and Mar - 2014 DPRs are beinQ prepared by DPR Consultants 278 T-01 to Sudugre 11.40 879.966 NCB Post Feb and Mar - 2014 DPRs are being prepared by DPR Consultants 279 31st Km of Deku-Oimapara to Meaua AbaQre 1.20 92.628 NCB Post Feb and Mar - 2014 DPRs are being prepared by DPR Consultants 280 Siju Gang Awe to Siju Rongku(Jitlim 2.70 208.413 NCB Post Feb and Mar . 2014 DPRs are being prepared by DPR Consultants 281 NenQkonQ SongmonQ to Upper Dosoore 9.60 741.024 NCB Post Feb and Mar · 2014 DPRs are being prepared by DPR Consultants 282 Rongara to Ta1 dang 8.00 617.52 NCB Post Feb and Mar 201 4 DPRs are beinQ prepared by DPR Consultants 283 M1ndikqre to Gcua Sonoo1tal 5.00 385.95 NCB Post Feb and Mar- 2014 DPRs are beinQprepared by DPR Consultants 284 Era aning to Sadri Rongdonq Awe 6.40 494,016 NCB Post Feb and Mar · 2014 DPRs are beino prepared by DPR Consultants 285 Jaisruo•tllm to DaranQ Boldak 10.90 8413/1 NCB Post Feb and Mar· 201 4 DPRs are bemq prepared by DPR Consultants 286 T-01 to Alokphang SonQmono 650 501.735 NCB Post Feb and Mar · 2014 DPRs are being prepared by DPR Consultants 287 NH-40 to Nongbirlum 5 000 4376 NCB Post Feb and Mar· 201 4 DPRs are being prepared by DPR Consultants 288 UJ road to Pamlathar 1 oon 612.64 NCB Post Feb and Mar · 2014 DPRs are being prepared by DPR Consultants 289 UBU road to Umkakroh (Pamkrohl 5.000 437.6 NCB Post Feb and Mar· 201 4 DPRs are being prepared by DPR Consultants 290 M M R road to Gunpah . I ~llO 131 28 NCB Post Feb and Mar 2014 DPRs are beinq prepared by DPR Consultants 291 M M road to Nonodbm Mawpliano 2.000 175.04 NCB Post Feb and Mar· 201 4 DPRs are bein(l prepared by DPR Consultants 292 Umsohbar to Belakhowa 600 525.12 NCB Post Feb and Mar • 201 4 DPRs are belnQ prepared by DPR Consultants 293 Mawske1them Mawske•lum 800 700 16 NCB Post Feb and Mar· 201 4 DPRs are bein(l prepared by OPR Consultants 294 BOD Road to Upper Balian 2.00 175.04 NCB Post April and May- 201 4 OPRs are being prepared by DPR Consultants 295 Mawna1 to ShviaPiarain 300 279.18 NCB Post April and May. 2014 DPRs are betng prepared by DPR Consultants 295 PWD Road to Mawt1khar 400 37224 NCB Post April and May- 2014 DPRs are being prepared by DPR Consultants '2!17 .Vahrit to Phudbah 200 18612 NCB Post April and May· 2014 DPRs are be10q prepared by DPR Consultants r.s lr 'I 1R Roa<!_i_Maroidl to Kvnruil 2.00 186.12 NCB Post April and May • 2014 DPRs are beinq prepared bv DPR Consultants ~ ~"1 .1 14th Km of l.lairang·Kvnshi Rd. lo Um1111f~d Bvnther _I' lOn<'khlaw to Mi!wblei-8 4.00 4.00 372.24 372 24 NCB NCB Post Post April and May - 2014 April and May- 2014 DPRs are beinQ prepared by DPR Consultants DPRs are being prepared by DPR Consultants 301 Umjara1n to Lawble1 3.50 325.71 NCB Post April and May 2014 DPRs are beinq prepared bv DPR Consultants 302 Phohaud (Mawrap) to Mawkyrwang 12.00 1116.72 NCB Post Apnl and May - 2014 DPRs are be1 ng prepared by DPR Consultants 303 Mawphankhrew to Nongmawlein 2.00 186.12 NCB Post Apnl and Mav • 2014 DPRs are being prepared by DPR Consultants 111 304 66 km of MP Rd Mawkhlaitngap to Mawpat 2.00 186.12 NCB Post April and May - 2014 DPRs are being prepared by DPR Consultants 305 Nonq jri to M1sei 5.00 465.3 NCB Post April and Mav - 2014 DPRs are beinq prepared by DPR Consultants 306 T03 to Swanore 3.00 279.18 NCB Post April and May - 2014 DPRs are bein(l prepared by DPR Consultants 307 Umdanq to Jaiaw 12.00 1116.72 NCB Post April and May · 2014 DPRs are being prepared by OPR Consultants 308 Lanoia (Sec- Ill to Tvnghor 2.00 186.12 NCB Post April and May - 2014 DPRs are being prepared by DPR Consultants 309 Pyndenumjarain to Nongrynnianq 4.00 372.24 NCB Post April and May - 2014 DPRs are being prepared bv DPR Consultants 310 Rambrai to Mawrok 10.00 930.6 NCB Post Aoril and May - 2014 DPRs are being prepared by DPR Consultants Page 8 Reference Length (in Amount(Rs. In Lakh) Procurement Review by Bank Expected bid SI.No Contract (Description) Comments Package No. KM) Method (Prior/Post)' opening date Total 311 Upper Puksora to East Gulsora 5.00 465.3 NCB Post April and May · 2014 DPRs are bein<1 prepared by DPR C nsultants 312 MBGM Rd. to Koraibari 5.00 465.3 NCB Post April and May · 2014 DPRs are being prepared by OPR C nsultants 313 UmpunQ to Pynden-sohsham 2.00 186.12 NCB Post April and May · 201 4 DPRs are belnQ prepared bY DPR C nsultants 314 Mawpud to Thiepbamon 2.80 260.568 NCB Post April and May - 201 4 DPRs are being prepared by DPR C •nsultants 315 PhlanQdilom to Nonqmluh 6.00 558.36 NCB Post April and May · 201 4 DPRs are beinQ prepared byDPR C •nsultants 316 NoogunVNongjlak to Mawkhlie 10.00 9306 NCB Post April and May . 2014 DPRs are being prepared by DPR C •nsultants 317 Non<~kasen to Khvflem Ttehsaw 4.00 372.24 NCB Post April and May· 2014 DPRs are beinq prepared by DPR C •nsultants 318 Kynsh1 to Mawlangren 2.00 186.12 NCB Post April and May · 2014 DPRs are being prepared by DPR C •nsultants 319 Shnaimawlein to Sohma 4.268 397.18008 NCB Post April and May· 2014 DPRs are beinq prepared by DPR C •nsultants 320 T-08 (Pamphyrnai) to KsehkohlonQ 2.00 186.12 NCB Post April and May • 2014 DPRs are beinq prepared by DPR C• •nsultants 321 L021 (Nongstoin Rambrai road) to Mawphansyiar 3.00 279.18 NCB Post ADril and May- 201 4 DPRs are being prepared by DPR c- •nsultants 322 UmoonQdenq to Patharshipiah 6.00 558.36 NCB Post April and May • 2014 DPRs are beinq prepared by DPR c- •nsultants 323 Nonqthymmai to Domshken 3.00 279.18 NCB Post April and May - 2014 DPRs are being prepared by DPR C. u1SUitants 324 Sohhyllenq to Amarsana 5.00 465.3 NCB Post April and May - 2014 DPRs are beina prepared by DPR c- •nsultants 325 Umpdem to Umthlu 6.00 558.36 NCB Post April and May - 2014 OPRs are be1ng prepared by DPR C nsultants .>2o Borahat Sonapur Road to Le1n 200 117.5 NCB Post April and May 2014 OPRs are bemo prepared by OPR C« u1SUilanls 327 Borohat Sonapur Road to Lahalein 200 177 5 NCB Post April and May - 2014 OPRs are being prepared by OPR Cc u1sullants 328 Jowdl Khanduh Road to Rlianasanohaw 10.00 887 5 NCB Post tlonl ar~d May 2014 OPRs are be1na prepared by DPR Cc lilSultants 1?9 Jo·:;al Khanduli Road to riukoiram 5.00 <143 75 NCB Post Aonl ;;nd I My 201 4 OPRs are be1na prepared by OPR Cc IOSUitants 0 La: adona to r,ladanoohkseh 800 7~0 NCB Post Aprl1r:' lh·, ')014 DPRs are beino prepared by OPR C nsultants 331 Lakase1n lo Kseh 10.00 887.5 NCB Post April and May • 2014 DPRs are be1ng prepared by DPR C nsultants 332 T01 to Saibul - ,__1000 887 5 NCB Post April and May 201 4 DPRs are beinq prepared by DPR C nsultants ' Total= 1161.998 109808.050 Grand Total= 1529.451 143602.146 Signature : Name : Shri. S B Chyrmang State Secretary : ChUtf tng1 f'~['S"llmd:frilil. P.W.D. (Roads), c;um Empowered Uf icer, s.&.B.D.A. U58b~lar• Page 9
World Bank Group · Procurement Plan
India - Pradhan Mantri Gram Sadak Yojana (PMGSY) Second Rural Roads Project : procurement plan
View original document
The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.
Full text
Key facts
Organisation
World Bank Group
Document type
Procurement Plan
Country
India
Source
World Bank